CN210150566U - Portable material hoist for construction - Google Patents
Portable material hoist for construction Download PDFInfo
- Publication number
- CN210150566U CN210150566U CN201921072127.9U CN201921072127U CN210150566U CN 210150566 U CN210150566 U CN 210150566U CN 201921072127 U CN201921072127 U CN 201921072127U CN 210150566 U CN210150566 U CN 210150566U
- Authority
- CN
- China
- Prior art keywords
- hanging
- bucket
- lifting
- steel
- bottom plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
The utility model provides a portable construction material hoist, including the hanging fill, hanging fill upper and lower open-ended, be equipped with the lug on the hanging fill, the hanging fill is articulated with the one end of bottom plate, the bottom plate cooperates with the under shed of hanging fill, the other end and the hanging piece I of bottom plate are connected, on the hanging fill with articulated relative one end with hang a II and be connected. The utility model has the advantages that: simple structure, convenient to use, the material can be directly packed into the hanging bucket from the upper shed, and when hoist and mount, wire rope pulls and hangs a I and hang a II, realizes the fixed of bottom plate, and the material can not drop from the lower open-end, and the hoist and mount back that targets in place gets rid of wire rope from hanging a I, remains pulling to hanging a II, avoids wire rope to contract and leads to the focus skew, hangs the hanging bucket again, and the bottom plate opens, and the material falls from the bottom is automatic.
Description
Technical Field
The utility model relates to a construction equipment especially indicates a portable construction material hoist.
Background
Because the quantity of materials needed by a construction site is large and the weight is heavy, the materials are often lifted to the construction site by a crane, and a bucket is a common device for placing the materials. The existing bucket is mostly an upper opening, a hoisting framework or a lifting lug is welded on the upper portion of the bucket, the bucket is simple in structure and convenient to manufacture, when the bucket is unloaded, the bucket needs to be manually turned, the whole weight is large, the turning of the bucket is extremely difficult, the turning effect is not good, the bottom material needs to be taken off, and time and labor are wasted.
SUMMERY OF THE UTILITY MODEL
The utility model provides a portable construction material hoist has solved the problem that wastes time and energy when current hanging fill falls the material.
The technical scheme of the utility model is realized like this: the utility model provides a portable construction material hoist, includes the hanging fill, the hanging fill under shed, be equipped with the lug on the hanging fill, the hanging fill is articulated with the one end of bottom plate, the bottom plate cooperates with the under shed of hanging fill, the other end and the hanging piece I of bottom plate are connected, on the hanging fill with articulated relative one end with hang a II and be connected.
The bucket be the cuboid basket that horizontal angle steel, vertical angle steel and vertical angle steel formed, the four corners on cuboid upper portion are established to the lug, four sides of cuboid are equipped with the protection reinforcing bar, the laminating has the guard plate on the protection reinforcing bar.
The protection plate is bound on the protection reinforcing steel bars through iron wires.
The lifting lugs are welded on the bucket.
The lifting lugs are bolt lifting lugs, the bolt lifting lugs penetrate through the transverse angle steel and the longitudinal angle steel on the upper layer to be connected with nuts, and the nuts clamp the protection plates.
The bottom of hanging fill be equipped with the sleeve, be equipped with the pivot of activity in the sleeve, the pivot is connected with steel framework's one end, is equipped with the guard plate on the steel framework, steel framework's the other end and hang a I and be connected.
The protection plate is bound on the steel bar framework through an iron wire.
The steel bar framework is connected with the hanging piece I through a connecting steel bar, and the hanging bucket is connected with the hanging piece II through a connecting steel bar.
The utility model has the advantages that: simple structure, convenient to use, the material can be directly packed into the hanging bucket from the upper shed, and when hoist and mount, wire rope pulls and hangs a I and hang a II, realizes the fixed of bottom plate, and the material can not drop from the lower open-end, and the hoist and mount back that targets in place gets rid of wire rope from hanging a I, remains pulling to hanging a II, avoids wire rope to contract and leads to the focus skew, hangs the hanging bucket again, and the bottom plate opens, and the material falls from the bottom is automatic.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a front view of the present invention.
Fig. 2 is a side view of the present invention.
In the figure: 1-a bucket, 11-transverse angle steel, 12-longitudinal angle steel, 13-vertical angle steel, 14-protective steel bars, 15-a sleeve, 2-a protective plate, 3-lifting lugs, 4-a bottom plate, 41-a rotating shaft, 42-a steel bar frame, 43-connecting steel bars, 5-a hanging piece I and 6-a hanging piece II.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without any creative effort belong to the protection scope of the present invention.
As shown in fig. 1 and 2, the portable material lifting appliance for construction comprises a lifting bucket 1, wherein the lifting bucket 1 is provided with an upper opening and a lower opening, the lifting lug 3 is arranged on the lifting bucket 1, the lifting bucket 1 is hinged with one end of a bottom plate 4, the bottom plate 4 is matched with the lower opening of the lifting bucket 1, the other end of the bottom plate 4 is connected with a lifting piece I5, and one end, opposite to the hinge, of the lifting bucket 1 is connected with a lifting piece II 6.
The bucket 1 is the cuboid basket that the welding of horizontal angle steel 11, vertical angle steel 12 and vertical angle steel 13 formed, and the four corners on cuboid upper portion is established to lug 3, and four sides of cuboid are equipped with protective reinforcement 14, and the vertical welding of protective reinforcement 14 has wooden guard plate 2 in the laminating on protective reinforcement 14 between the horizontal angle steel 11 of upper and lower floor or vertical angle steel 12. The welded bucket is a main body frame and is used for placing and containing materials.
The guard plate 2 passes through the iron wire ligature on protection reinforcing bar 14, and 3 welding of lug are on the bucket 1. Or the lifting lug 3 is a bolt lifting lug, the bolt lifting lug penetrates through the transverse angle steel 11 and the longitudinal angle steel 12 on the upper layer to be connected with the nut, and the nut clamps the upper part of the protection plate 2, and the protection plate 2 has thickness, and the lower part of the protection plate 2 is positioned on the angle steel, so that the protection plate can be limited, and the protection plate is ensured not to fall off. Both the two modes can realize the fixation of the protection plate on the protection steel bar.
The welding of the bottom of bucket 1 has sleeve 15, is equipped with movable pivot 41 in the sleeve 15, and pivot 41 welds with steel framework 42's one end, is equipped with guard plate 2 on the steel framework 42, and guard plate 2 passes through the iron wire ligature on steel framework 42, and steel framework 42's the other end welded connection reinforcing bar 43, connecting bar 43 and the welding of hanging a I5, bucket 1 equally with connecting bar 43 welding, connecting bar 43 and the welding of hanging a II 6. The bottom plate articulates in the bottom of hanging fill, and when the handling, it receives pulling of wire rope to hang a I, can guarantee the fixed of bottom plate, and when unloading, it receives pulling of wire rope to hang a II, guarantees the stability of whole hanging fill.
The utility model discloses an instruction for use: the material is packed into from the upper shed of hanging fill, during the hoist and mount, pass the lug with wire rope, the card is gone into in the draw-in groove of hanging piece I, II simultaneously, adjust wire rope's position, guarantee that the focus of hanging fill is stable, when the hanging fill leaves the ground, wire rope pulls hanging piece I and hanging piece II simultaneously, the bottom plate does not overturn, can carry out the outrigger to the material, then put the hanging fill in place, place subaerial, get rid of wire rope from hanging piece I's draw-in groove this moment, only let wire rope card in hanging piece II, hang the hanging fill again, the bottom plate is overturned by the gravity of material emergence, the material is from the under shed automatic landing, wire rope pulls hanging piece II simultaneously, guarantee that the hoist and mount is.
The above description is only a preferred embodiment of the present invention, and should not be taken as limiting the invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims (8)
1. The utility model provides a portable construction material hoist, includes hanging fill (1), its characterized in that: the lifting bucket is characterized in that the upper opening and the lower opening of the lifting bucket (1) are formed, a lifting lug (3) is arranged on the lifting bucket (1), the lifting bucket (1) is hinged to one end of the bottom plate (4), the bottom plate (4) is matched with the lower opening of the lifting bucket (1), the other end of the bottom plate (4) is connected with a lifting piece I (5), and one end, opposite to the hinge, of the lifting bucket (1) is connected with a lifting piece II (6).
2. The portable construction material hanger according to claim 1, wherein: the hanging bucket (1) is a cuboid basket formed by transverse angle steel (11), longitudinal angle steel (12) and vertical angle steel (13), lifting lugs (3) are arranged at four corners of the upper portion of the cuboid, four side faces of the cuboid are provided with protective steel bars (14), and protective plates (2) are attached to the protective steel bars (14).
3. The portable construction material spreader of claim 2, wherein: the protection plate (2) is bound on the protection reinforcing steel bars (14) through iron wires.
4. The portable construction material hanger according to claim 2 or 3, wherein: the lifting lugs (3) are welded on the bucket (1).
5. The portable construction material spreader of claim 2, wherein: the lifting lugs (3) are bolt lifting lugs, the bolt lifting lugs penetrate through the transverse angle steel (11) and the longitudinal angle steel (12) on the upper layer to be connected with nuts, and the nuts clamp the protection plate (2).
6. The portable construction material hanger according to claim 1, wherein: the bottom of bucket (1) be equipped with sleeve (15), be equipped with movable pivot (41) in sleeve (15), pivot (41) are connected with the one end of steel reinforcement frame (42), be equipped with guard plate (2) on steel reinforcement frame (42), the other end and the piece of hanging I (5) of steel reinforcement frame (42) are connected.
7. The portable construction material hanger of claim 6, wherein: the protection plate (2) is bound on the steel bar framework (42) through iron wires.
8. The portable construction material hanger of claim 6, wherein: the steel bar framework (42) is connected with the hanging piece I (5) through a connecting steel bar (43), and the bucket (1) is connected with the hanging piece II (6) through the connecting steel bar (43).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921072127.9U CN210150566U (en) | 2019-07-10 | 2019-07-10 | Portable material hoist for construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921072127.9U CN210150566U (en) | 2019-07-10 | 2019-07-10 | Portable material hoist for construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210150566U true CN210150566U (en) | 2020-03-17 |
Family
ID=69765701
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921072127.9U Expired - Fee Related CN210150566U (en) | 2019-07-10 | 2019-07-10 | Portable material hoist for construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210150566U (en) |
-
2019
- 2019-07-10 CN CN201921072127.9U patent/CN210150566U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210150566U (en) | Portable material hoist for construction | |
CN106809722B (en) | A kind of frame-type suspender and the combination pile suspender using the frame-type suspender | |
CN109573418B (en) | Garbage collection and transportation device with crane | |
CN212953879U (en) | Concrete column hangs gets device for building engineering | |
CN106829725B (en) | A kind of construction site cage free of demolition | |
CN217417475U (en) | Automatic discharging device is used in shaft construction | |
CN206751166U (en) | Half self-unloading steel scrap case | |
CN208585950U (en) | Hopper handling turnover device | |
CN210884874U (en) | Installation hoist for high-speed tunnel fan | |
CN212151313U (en) | Multilateral protection type hoisting device for electric power engineering | |
CN209259473U (en) | Lifting device and hanging component | |
CN206615921U (en) | A kind of construction site with exempt from dismantle cage | |
CN209872132U (en) | Tower crane hanging basket with sliding chassis | |
CN207932992U (en) | A kind of transport vehicle with prefabricated components switching mechanism | |
CN207774598U (en) | Implement special hanger in cabin under harbour handling | |
CN208485480U (en) | One kind rotating lifting beam device for gantry crane | |
CN214269942U (en) | Auxiliary lifting appliance capable of being assembled and disassembled | |
CN206447469U (en) | T beams lift anti-drop device | |
CN214935252U (en) | Lifting appliance for welded steel bar mesh | |
CN216945842U (en) | Air compressor machine cage with protection isolation function | |
CN211412214U (en) | Steel ball adding device of ball mill | |
CN217461505U (en) | Concrete hopper | |
CN208532002U (en) | A kind of combined hanging basket | |
CN210619994U (en) | Hoisting member for hoisting large-capacity box transformer substation | |
CN207684709U (en) | Hanger under a kind of electric block that can automatically adjust balance |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200317 Termination date: 20210710 |
|
CF01 | Termination of patent right due to non-payment of annual fee |