CN210141010U - Building construction material lifting device - Google Patents

Building construction material lifting device Download PDF

Info

Publication number
CN210141010U
CN210141010U CN201920807132.3U CN201920807132U CN210141010U CN 210141010 U CN210141010 U CN 210141010U CN 201920807132 U CN201920807132 U CN 201920807132U CN 210141010 U CN210141010 U CN 210141010U
Authority
CN
China
Prior art keywords
bottom plate
building construction
fixedly connected
lifting device
construction material
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920807132.3U
Other languages
Chinese (zh)
Inventor
伍少凤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201920807132.3U priority Critical patent/CN210141010U/en
Application granted granted Critical
Publication of CN210141010U publication Critical patent/CN210141010U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Types And Forms Of Lifts (AREA)

Abstract

The utility model relates to the technical field of building construction, in particular to a building construction material lifting device, which solves the defects that the application is difficult in the high-rise building construction existing in the prior art, and comprises a bottom plate, a movable pulley and a placement basket, wherein the upper part of the bottom plate is fixedly provided with a winch, a winding drum of the winch is fixedly connected with a transmission cable rope, the other end of the transmission cable rope is fixedly connected with the lower side of the bottom plate, the movable pulley is sleeved on the upper part of the transmission cable rope, the upper part of the movable pulley is bolted with a connecting cable rope, the upper end of the placement basket is bolted with a plurality of lock chains, the lower end of the connecting cable rope is bolted with the lock chains, the rear end of the bottom plate is fixedly connected with a backing ring, the upper side of the rear part of the bottom plate is provided with a counterweight table, the lifting device has simple structure, can be free from the restriction of the length of a, the stress of the steel bar is reduced.

Description

Building construction material lifting device
Technical Field
The utility model relates to a construction technical field especially relates to a building construction material hoisting device.
Background
In the building construction, some building materials are generally required to be lifted between floors so as to meet the construction requirement, the lifting of a large number of building materials is realized through a special crane, the crane is complex in structure and high in cost, the crane is small in size and wastes resources when being applied to lifting of small-scale materials, and moreover, the chassis of the conventional lifting device, such as the building material lifting machine disclosed in Chinese patent CN105621304A, generally runs on the ground, the lifting height is limited by the length of a guide rail, and the application of the lifting device in the construction of high-rise buildings is limited.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the shortcoming that the hoisting device who exists is difficult to use in the high-rise building construction among the prior art, and the building construction material hoisting device who provides.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a building construction material hoisting device, includes bottom plate, movable pulley and puts the thing basket, the upper portion fixed mounting of bottom plate has the hoist engine, and fixedly connected with transmission hawser on the reel of hoist engine, the other end fixed connection of transmission hawser is at the downside of bottom plate, the movable pulley cover is on transmission hawser upper portion, and the upper portion bolt joint of movable pulley has a connecting cable rope, the upper end bolt joint of putting the thing basket has a plurality of chain, connecting cable rope's lower extreme and chain bolt joint, the rear end fixedly connected with grommet of bottom plate, the rear portion upside of bottom plate is provided with the counter weight platform.
Preferably, the front end of the bottom plate is fixedly connected with a pulley support, the upper part of the sliding support is rotatably connected with a fixed pulley, and the transmission cable is matched with the fixed pulley.
Preferably, the corners of the counterweight table are fixedly connected with vertical limiting columns.
Preferably, the movable pulley comprises a rotating part and a connecting bracket, and the connecting cable is bolted to the upper part of the connecting bracket.
Preferably, the lining ring comprises two mutually symmetrical linings, one end of each lining is fixedly connected with the bottom plate, and the other end of each lining is provided with a threaded hole.
The utility model has the advantages that:
1. the lifting device is simple in structure, free of the limitation of the length of the guide rail, installed on a high-rise construction platform and suitable for high-rise building construction.
2. This hoisting device rear end is equipped with the grommet, can with the steel bar connection, and the balancing weight can be placed as required on the counter weight bench, alleviates the atress of reinforcing bar.
Drawings
Fig. 1 is a schematic structural view of a building construction material lifting device provided by the utility model from the front;
fig. 2 is the utility model provides a building construction material hoisting device overlook the schematic structure.
In the figure: the device comprises a base plate 1, a winch 2, a transmission cable 3, a movable pulley 4, a storage basket 5, a chain 6, a fixed pulley 7, a counterweight table 8, a limiting column 9, a lining ring 10 and a connecting cable 11.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and to simplify the description, but do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore should not be construed as limiting the present invention.
Furthermore, the terms "first", "second" and "first" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of the present invention, "a plurality" means two or more unless specifically limited otherwise.
Referring to fig. 1-2, a building construction material lifting device comprises a bottom plate 1, a movable pulley 4 and a material placing basket 5, wherein a winch 2 is installed on the upper portion of the bottom plate 1 through screws, a transmission cable 3 is bolted on a winding drum of the winch 2, the other end of the transmission cable 3 is bolted on the lower side of the bottom plate 1, the movable pulley 4 is sleeved on the upper portion of the transmission cable 3, a connection cable 11 is bolted on the upper portion of the movable pulley 4, a plurality of lock chains 6 are bolted on the upper end of the material placing basket 5, the lower end of the connection cable 11 is bolted with the lock chains 6, a lining ring 10 is connected to the rear end of the bottom plate 1 through screws, and a counterweight table 8 is arranged on the upper side of the rear portion.
Specifically, the front end welding of bottom plate 1 has the pulley support, and sliding support upper portion rotates and is connected with fixed pulley 7, and transmission hawser 3 cooperates with fixed pulley 7, and movable pulley 4 includes rotation portion and linking bridge, and connecting hawser 11 bolt is on linking bridge upper portion, and grommet 10 includes the facing of two mutual symmetries, and the one end of facing passes through screwed connection with bottom plate 1, and the other end of facing sets up threaded hole.
Wherein, in order to prevent the balancing weight aversion, the welding of the corner of balancing weight platform 8 has vertical spacing post 9.
Example (b): when the device is applied to high-rise building construction, the device is firstly flatly placed on a high-rise building construction platform, the front end of the bottom plate 1 protrudes out of the platform, the backing ring 10 is sleeved on a steel bar, a bolt matched with the threaded hole is screwed into the threaded hole, a nut is screwed on, so that the two linings clamp the steel bar, then the balancing weight blocks penetrate through the limiting columns 9 one by one and are placed on the balancing weight table 8, pressure is applied to the bottom plate 1, the friction force between the bottom plate 1 and the construction platform can be improved, and the tensile force borne by the steel bar is reduced;
when promoting the material, press the control button of hoist engine 2, hoist engine 2 releases transmission hawser 3, because gravity puts thing basket 5 and descends, descend to ground after, pause hoist engine 2, put the material on putting thing basket 5 upper portion, press the control button of hoist engine 2, hoist engine 2 tightens up transmission hawser 3, will put thing basket 5 and promote, at the in-process that promotes thing basket 5, movable pulley 4 also rises thereupon, compare in direct promotion, hoist engine 2 only needs about half pulling force can accomplish the promotion, the load that has alleviateed hoist engine 2.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (5)

1. The utility model provides a building construction material hoisting device, includes bottom plate (1), movable pulley (4) and puts thing basket (5), its characterized in that, the upper portion fixed mounting of bottom plate (1) has hoist engine (2), and fixedly connected with transmission hawser (3) on the reel of hoist engine (2), the other end fixed connection of transmission hawser (3) is at the downside of bottom plate (1), movable pulley (4) cover is on transmission hawser (3) upper portion, and the upper portion bolt joint of movable pulley (4) has connecting cable rope (11), the upper end bolt joint of putting thing basket (5) has a plurality of chain (6), the lower extreme and the chain (6) bolt joint of connecting cable rope (11), the rear end fixedly connected with grommet (10) of bottom plate (1), the rear portion upside of bottom plate (1) is provided with counter weight platform (8).
2. The building construction material lifting device according to claim 1, wherein a pulley bracket is fixedly connected to the front end of the bottom plate (1), a fixed pulley (7) is rotatably connected to the upper portion of the pulley bracket, and the transmission cable (3) is engaged with the fixed pulley (7).
3. The building construction material lifting device according to claim 1, characterized in that a vertical limit post (9) is fixedly connected to a corner of the counterweight table (8).
4. A building construction material lifting device according to claim 1, characterised in that the movable pulley (4) comprises a turning part and a connecting bracket, the connecting cable (11) being bolted to the upper part of the connecting bracket.
5. The building construction material lifting device according to claim 1, wherein the lining ring (10) comprises two linings symmetrical to each other, one end of the lining is fixedly connected with the bottom plate (1), and the other end of the lining is provided with a threaded hole.
CN201920807132.3U 2019-05-31 2019-05-31 Building construction material lifting device Expired - Fee Related CN210141010U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920807132.3U CN210141010U (en) 2019-05-31 2019-05-31 Building construction material lifting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920807132.3U CN210141010U (en) 2019-05-31 2019-05-31 Building construction material lifting device

Publications (1)

Publication Number Publication Date
CN210141010U true CN210141010U (en) 2020-03-13

Family

ID=69734019

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920807132.3U Expired - Fee Related CN210141010U (en) 2019-05-31 2019-05-31 Building construction material lifting device

Country Status (1)

Country Link
CN (1) CN210141010U (en)

Similar Documents

Publication Publication Date Title
CN210084801U (en) Building engineering lifting device
CN210141010U (en) Building construction material lifting device
CN211946187U (en) Device is laid with well lid of being convenient for remove to road facilities construction
CN109516409A (en) Flooring construction tower crane turns device for hoisting
CN202558444U (en) Steel penstock hoisting balance beam device
CN205802741U (en) The anti-skidding clamping device of mine hoist
CN211037773U (en) Hanging basket suspension device
CN213738318U (en) Rotatable crane used on engineering ship
CN111232820B (en) House building lifting equipment with anti-falling function and implementation method thereof
CN112723135A (en) Multi-functional hoisting accessory that construction was used
CN211499833U (en) Novel hydraulic climbing type unloading platform matched with attached scaffold for use
CN210558996U (en) Assembled building model platform double-limb column lifting appliance
CN209758819U (en) Annular horizontal hoisting accessory of iron bucket
CN218708598U (en) Steel bar vertical hanging auxiliary structure for house building
CN210480582U (en) Prefabricated superimposed sheet lifting device of assembled structure
CN215402564U (en) Gallows structure for engineering construction
CN212269314U (en) Manhole cover hoisting and transporting device
CN210236917U (en) Ship unloaders grab bucket hoist and mount maintenance device who is lifted by fork truck
CN100460308C (en) Rubber membrane sealed type air storage cabinet thin shell top multiple-point digital control integrated raising method
CN220300255U (en) Hoisting device
CN218113642U (en) Solar panel transportation tool
CN213707577U (en) Building material lifting device
CN212133951U (en) Crane tension testing device
CN212101608U (en) Steel construction hoist and mount protector
CN219314370U (en) Steel construction hoist device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200313

Termination date: 20210531

CF01 Termination of patent right due to non-payment of annual fee