CN210136575U - Icon presentation device for building engineering management - Google Patents
Icon presentation device for building engineering management Download PDFInfo
- Publication number
- CN210136575U CN210136575U CN201920989545.8U CN201920989545U CN210136575U CN 210136575 U CN210136575 U CN 210136575U CN 201920989545 U CN201920989545 U CN 201920989545U CN 210136575 U CN210136575 U CN 210136575U
- Authority
- CN
- China
- Prior art keywords
- frame body
- auxiliary frame
- icon
- main frame
- engineering management
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Devices For Indicating Variable Information By Combining Individual Elements (AREA)
Abstract
The utility model discloses an icon presentation device for building engineering management, including main frame body, bearing and connecting hole, the inside of main frame body is inlayed and is installed the display screen, the bearing symmetry is fixed in the inside upper and lower both sides of vice framework, the connecting hole is seted up inside the outside of vice framework, the bottom of flexible stand is installed on the transition piece through accepting the connecting axle, the top of flexible stand is equally through accepting connecting axle and mounting panel interconnect, the inside at the center block is seted up to the spread groove, the front surface welded fastening of center block has leading board, and leading board passes through leading connecting axle and supports board interconnect. This icon presentation device for building engineering management, the inside display screen of main frame body can circulate the relevant icon information of show, and then can post corresponding icon on the demonstration board of sub-frame body internally mounted, and the icon on the demonstration board can let workman's a glance see the icon information that needs to pay attention in this piece of region.
Description
Technical Field
The utility model relates to a building engineering management technical field specifically is an icon presentation device for building engineering management.
Background
Building engineering management involves the square face, not only can use various engineering apparatus, and in order to let the relevant information of this building engineering of understanding that workman can be better, often will demonstrate the icon that has certain meaning to relevant, thereby make things convenient for operating personnel to carry out engineering operation under the prerequisite of having understood relevant meaning, but the icon presentation device that present majority building engineering management used is some bulky, it is comparatively inconvenient to install and carry, and some icon presentation device volumes are too little also be convenient for summarize the demonstration to the icon that needs attention in this piece region, be not convenient for put corresponding presentation device in the region of difference, certain limitation has, be unfavorable for the use. Aiming at the problems, the device is innovatively designed on the basis of the original icon demonstration device for building engineering management.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
The utility model provides a not enough to prior art, the utility model provides an icon presentation device for building engineering management has solved that some volumes of icon presentation device that present majority of building engineering management used are too big, and it is comparatively inconvenient that the installation carries, and some icon presentation device volumes also are not convenient for summarize the demonstration to the icon that needs notice in this piece region too little, are not convenient for put corresponding presentation device in the region of difference, have certain limitation, are unfavorable for the problem of use.
(II) technical scheme
In order to achieve the above object, the utility model provides a following technical scheme: an icon demonstration device for building engineering management comprises a main frame body, bearings and connecting holes, wherein a display screen is embedded in the main frame body, the outer side of the main frame body is connected with an auxiliary frame body through side connecting shafts, the bearings are symmetrically fixed on the upper side and the lower side of the inner part of the auxiliary frame body, the bearings are connected with one end of a rotating shaft, the other end of the rotating shaft is fixed on a demonstration board, the connecting holes are formed in the inner side of the outer side of the auxiliary frame body, the inner part of each connecting hole is connected with one end of a telescopic supporting rod, the other end of the telescopic supporting rod is installed on the outer side wall of a telescopic upright post through a bottom connecting shaft, the bottom of the telescopic upright post is installed on a transition block through a bearing connecting shaft, the transition block is welded and fixed on the upper surface of a supporting plate, the top of the telescopic, the connecting groove is formed in the center block, the center block is fixed to the center of the lower surface of the main frame body, a front plate is fixedly welded to the front surface of the center block, and the front plate is connected with the abutting plate through a front connecting shaft.
Preferably, the main frame body and the auxiliary frame body have the same longitudinal cross-sectional area, the main frame body is rotatably connected with the auxiliary frame body through a side connecting shaft, the number of the auxiliary frame bodies is two, and the 2 auxiliary frame bodies are staggered on the front surface and the rear surface of the main frame body.
Preferably, the longitudinal section area of the demonstration board is larger than that of the display screen, the outer diameter of the demonstration board is smaller than the inner diameter of the auxiliary frame body, the auxiliary frame body is of a circular ring structure, and the auxiliary frame body is rotatably connected with the demonstration board through a bearing and a rotating shaft.
Preferably, the connecting holes are arranged below the outer side wall of the auxiliary frame body at equal intervals, the connecting holes are connected with one end slots of the telescopic support rods, and the other ends of the telescopic support rods are rotatably connected with the telescopic stand columns through bottom connecting shafts.
Preferably, the two ends of the telescopic upright post respectively form a rotating structure with the transition block and the mounting plate through the bearing connecting shaft, and the rotating structure is symmetrically provided with two groups about the axis of the central block.
Preferably, the central block and the mounting plate form a bolt dismounting and mounting structure through the connecting groove, the front plate fixed on the front surface of the central block and the abutting plate form a rotating structure through the front connecting shaft, the front surface and the rear surface of the central block are provided with two groups of rotating structures, and the width of the front plate is larger than the thickness of the auxiliary frame body.
(III) advantageous effects
The utility model provides an icon presentation device for building engineering management. The method has the following beneficial effects:
(1) this icon presentation device for building engineering management, through the setting of the sub-frame body that sets up at main frame body front and back surface, the inside display screen of main frame body can circulate the relevant icon information of show, and then can post corresponding icon on the demonstration board of sub-frame body internal installation, the icon on the demonstration board can let workman see the icon information that needs attention in this piece region at a glance, and then can more detailed explanation each icon meaning on the display screen, be convenient for watch and understand.
(2) This icon presentation device for building engineering management, setting through the mounting panel of dismantling mounting structure, when the device is at the in-process that removes the transportation, can be with mounting panel and centre block phase separation, two solitary flexible stands then can be separately deposited, it is comparatively convenient, and also can be at the in-process of transportation, it is closed with main framework and vice framework rotation, area has not only been reduced, and two vice frameworks are sealed the front and back surface of main framework respectively, and the area of demonstration board is greater than the area of display screen, thereby make the effect of fine protection can be played to main framework to vice framework after the closure, thereby be convenient for more transport and carry.
Drawings
FIG. 1 is a front view of the present invention;
FIG. 2 is an enlarged schematic view of the structure at A of FIG. 1 according to the present invention;
FIG. 3 is a schematic view of the side frame body of the present invention;
fig. 4 is a schematic view of the mounting plate of the present invention.
In the figure: 1. a main frame body; 2. a display screen; 3. a side connecting shaft; 4. a sub-frame body; 5. a bearing; 6. a rotating shaft; 7. a demonstration board; 8. connecting holes; 9. a telescopic stay bar; 10. a bottom connecting shaft; 11. a telescopic upright post; 12. a connecting shaft is connected; 13. a transition block; 14. a support plate; 15. mounting a plate; 16. connecting grooves; 17. a center block; 18. a front panel; 19. a front connecting shaft; 20. and a support plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
As shown in fig. 1-4, the utility model provides a technical solution: an icon demonstration device for building engineering management comprises a main frame body 1, a display screen 2, a side connecting shaft 3, an auxiliary frame body 4, a bearing 5, a rotating shaft 6, a demonstration board 7, a connecting hole 8, a telescopic stay bar 9, a bottom connecting shaft 10, a telescopic upright post 11, a bearing connecting shaft 12, a transition block 13, a supporting plate 14, a mounting plate 15, a connecting groove 16, a central block 17, a front plate 18, a front connecting shaft 19 and a resisting plate 20, wherein the display screen 2 is embedded in the main frame body 1, the outer side of the main frame body is connected with the auxiliary frame body 4 through the side connecting shaft 3, the bearing 5 is symmetrically fixed on the upper side and the lower side of the inner part of the auxiliary frame body 4, the bearing 5 is connected with one end of the rotating shaft 6, the other end of the rotating shaft 6 is fixed on the demonstration board 7, the connecting hole 8 is formed in the outer side of the auxiliary frame body 4, the inner part, the other end of the telescopic stay bar 9 is installed on the outer side wall of the telescopic upright post 11 through a bottom connecting shaft 10, the bottom of the telescopic upright post 11 is installed on a transition block 13 through a bearing connecting shaft 12, the transition block 13 is fixedly welded on the upper surface of a supporting plate 14, the top of the telescopic upright post 11 is also mutually connected with an installation plate 15 through the bearing connecting shaft 12, the installation plate 15 is connected inside a connecting groove 16, the connecting groove 16 is arranged inside a central block 17, the central block 17 is fixed at the central position of the lower surface of the main frame body 1, a front plate 18 is fixedly welded on the front surface of the central block 17, and the front plate 18 is mutually connected with a resisting plate 20 through a front connecting shaft 19;
the longitudinal section areas of the main frame body 1 and the auxiliary frame body 4 are the same, the main frame body 1 is rotatably connected with the auxiliary frame body 4 through the side connecting shaft 3, the number of the auxiliary frame bodies 4 is two, meanwhile, 2 auxiliary frame bodies 4 are arranged on the front surface and the rear surface of the main frame body 1 in a staggered mode, the occupied area can be reduced after the auxiliary frame bodies 4 are closed, and the carrying and the transportation are convenient;
the longitudinal section area of the demonstration board 7 is larger than that of the display screen 2, the outer diameter of the demonstration board 7 is smaller than the inner diameter of the auxiliary frame body 4, the auxiliary frame body 4 is of a circular ring structure, meanwhile, the auxiliary frame body 4 is rotatably connected with the demonstration board 7 through a bearing 5 and a rotating shaft 6, and the demonstration board 7 can play a role in protecting the display screen 2 after the auxiliary frame body 4 is closed;
the connecting holes 8 are arranged below the outer side wall of the auxiliary frame body 4 at equal intervals, the connecting holes 8 are connected with one end slots of the telescopic stay bars 9, the other ends of the telescopic stay bars 9 are rotatably connected with the telescopic upright posts 11 through bottom connecting shafts 10, and the telescopic stay bars 9 can be rotatably opened to a proper angle and then are connected with the connecting holes 8 at corresponding positions to support the auxiliary frame body 4;
two ends of the telescopic upright post 11 respectively form a rotating structure with the transition block 13 and the mounting plate 15 through the bearing connecting shaft 12, and the rotating structure is symmetrically provided with two groups about the axis of the central block 17, so that the telescopic upright post 11 can be conveniently adjusted according to the demonstration height of the device, and the split telescopic upright post 11 is also convenient to carry during transportation;
the center block 17 and the mounting plate 15 form a bolt dismounting and mounting structure through the connecting groove 16, a front plate 18 fixed on the front surface of the center block 17 and a resisting plate 20 form a rotating structure through a front connecting shaft 19, the rotating structure is provided with two groups on the front surface and the rear surface of the center block 17, the width of the front plate 18 is larger than the thickness of the auxiliary frame body 4, and the resisting plate 20 can limit the position of the auxiliary frame body 4 after being mutually attached with the closed auxiliary frame body 4.
When the device is used, the device is firstly transported to a proper position in a building engineering field, then the angle of the telescopic upright post 11 is adjusted through the rotation of the bearing connecting shaft 12, the two ends of the telescopic upright post 11 respectively rotate with the mounting plate 15 and the transition block 13 through the bearing connecting shaft 12, the telescopic length of the telescopic upright post 11 can also be adjusted, after the angle and the height of the two telescopic upright posts 11 are adjusted, the mounting plate 15 is inserted into the connecting groove 16 and fixed by using bolts, and the two telescopic upright posts 11 can play a good supporting role for the whole body;
then the front connecting shaft 19 rotates to open the resisting plate 20, so that the resisting plate 20 is not mutually attached to the auxiliary frame body 4, the auxiliary frame body 4 rotates to be opened to an angle convenient for viewing through the side connecting shaft 3, then the telescopic stay bar 9 rotates to be opened through the bottom connecting shaft 10, the telescopic length and the rotation angle of the telescopic stay bar 9 are adjusted, so that one end of the telescopic stay bar 9 can be inserted into the connecting hole 8 at the corresponding position, the telescopic stay bar 9 can play a role of supporting the sub-frame 4, so that the staff can paste the relevant icons needing attention in the area on the front and back surfaces of the demonstration board 7 and then transmit the information of the icons to the display screen 2, the device can conveniently demonstrate the related icon information, and the content which is not described in detail in the specification belongs to the prior art which is well known by the person skilled in the art.
To sum up, the icon demonstration device for building engineering management can show the related icon information circularly by the display screen 2 in the main frame 1 through the arrangement of the sub-frame 4 arranged on the front and back surfaces of the main frame 1, the corresponding icon can be pasted on the demonstration board 7 arranged in the sub-frame 4, the icon on the demonstration board 7 can make the worker see the icon information needing attention in the area at a glance, the meaning of each icon can be explained in more detail on the display screen 2 for convenient viewing and understanding, by the arrangement of the mounting plate 15 of the detachable mounting structure, when the device is in the process of moving transportation, the mounting plate 15 can be separated from the central block 17, the two independent telescopic columns 11 can be stored separately, which is convenient, and the main frame 1 and the sub-frame 4 can also be rotated and closed in the process of transportation, not only reduced area to two sub-frame 4 are respectively with main frame 1 front and back surface closed, and the area of demonstration board 7 is greater than the area of display screen 2, thereby make sub-frame 4 after the closure can play the effect of fine protection to main frame 1, thereby be convenient for more transport and carry.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising an … …" does not exclude the presence of other identical elements in a process, method, article, or apparatus that comprises the element.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. The utility model provides an icon presentation device for building engineering management, includes main frame body (1), bearing (5) and connecting hole (8), its characterized in that: the display screen (2) is embedded in the main frame body (1), the outer side of the main frame body is connected with the auxiliary frame body (4) through a side connecting shaft (3), the bearings (5) are symmetrically fixed on the upper side and the lower side of the inside of the auxiliary frame body (4), the bearings (5) are connected with one end of a rotating shaft (6), the other end of the rotating shaft (6) is fixed on a demonstration board (7), the connecting hole (8) is formed in the inside of the outer side of the auxiliary frame body (4), the inside of the connecting hole (8) is connected with one end of a telescopic supporting rod (9), the other end of the telescopic supporting rod (9) is installed on the outer side wall of a telescopic upright post (11) through a bottom connecting shaft (10), the bottom of the telescopic upright post (11) is installed on a transition block (13) through a bearing connecting shaft (12), and the transition block (13) is welded and fixed on the upper surface of a supporting plate, the top of flexible stand (11) is through accepting connecting axle (12) and mounting panel (15) interconnect equally, and mounting panel (15) are connected inside spread groove (16), spread groove (16) are seted up in the inside of center block (17), and center block (17) are fixed at the lower surface central point of main frame body (1) and are put, the front surface welded fastening of center block (17) has leading board (18), and leading board (18) through leading connecting axle (19) and support board (20) interconnect.
2. The icon demonstrating device for construction engineering management as claimed in claim 1, wherein: the main frame body (1) and the auxiliary frame body (4) are the same in longitudinal section area, the main frame body (1) is rotatably connected with the auxiliary frame body (4) through the side connecting shaft (3), the number of the auxiliary frame bodies (4) is two, and meanwhile, the 2 auxiliary frame bodies (4) are arranged on the front surface and the rear surface of the main frame body (1) in a staggered mode.
3. The icon demonstrating device for construction engineering management as claimed in claim 1, wherein: the longitudinal section area of demonstration board (7) is greater than the longitudinal section area of display screen (2), and the external diameter of demonstration board (7) is less than the internal diameter of auxiliary frame body (4) to auxiliary frame body (4) are the ring form structure, and auxiliary frame body (4) are connected with demonstration board (7) rotation through bearing (5) and pivot (6) simultaneously.
4. The icon demonstrating device for construction engineering management as claimed in claim 1, wherein: the connecting holes (8) are arranged below the outer side wall of the auxiliary frame body (4) at equal intervals, the connecting holes (8) are connected with one end of each telescopic support rod (9) in a slot mode, and the other end of each telescopic support rod (9) is rotatably connected with the telescopic upright column (11) through a bottom connecting shaft (10).
5. The icon demonstrating device for construction engineering management as claimed in claim 1, wherein: two ends of the telescopic upright post (11) respectively form a rotating structure with the transition block (13) and the mounting plate (15) through the bearing connecting shaft (12), and the rotating structure is symmetrically provided with two groups about the axis of the central block (17).
6. The icon demonstrating device for construction engineering management as claimed in claim 1, wherein: the bolt dismounting and mounting structure is formed by the central block (17) and the mounting plate (15) through the connecting groove (16), the front plates (18) fixed on the front surface of the central block (17) and the abutting plates (20) form a rotating structure through the front connecting shaft (19), the front surface and the rear surface of the central block (17) are provided with two groups of rotating structures, and meanwhile the width of the front plates (18) is larger than the thickness of the auxiliary frame body (4).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920989545.8U CN210136575U (en) | 2019-06-27 | 2019-06-27 | Icon presentation device for building engineering management |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920989545.8U CN210136575U (en) | 2019-06-27 | 2019-06-27 | Icon presentation device for building engineering management |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210136575U true CN210136575U (en) | 2020-03-10 |
Family
ID=69705929
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920989545.8U Expired - Fee Related CN210136575U (en) | 2019-06-27 | 2019-06-27 | Icon presentation device for building engineering management |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210136575U (en) |
-
2019
- 2019-06-27 CN CN201920989545.8U patent/CN210136575U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109410799A (en) | A kind of house lease information propagating device | |
CN210136575U (en) | Icon presentation device for building engineering management | |
CN214364984U (en) | Reinforcing apparatus of single-side wall template support | |
CN111573528B (en) | Tower crane wall attaching device and construction method thereof | |
CN214170031U (en) | Steel structure supporting frame for construction | |
CN215976939U (en) | Warning device for construction | |
CN207847031U (en) | A kind of supporting rack of construction site portable scaffold | |
CN212809715U (en) | Building engineering cost budget result display device | |
CN210378279U (en) | Rotary advertisement body | |
CN213333531U (en) | Adjustable supporting device for display screen of architectural design intelligent television | |
CN212000722U (en) | Temporary warning device for municipal construction | |
CN220790706U (en) | Reinforcing device for wall body of civil engineering building | |
CN206907342U (en) | Map displaying device | |
CN208985627U (en) | A kind of estate management bulletin displaying device | |
CN220709912U (en) | Show plate for conference exhibition | |
CN213806501U (en) | Scaffold for building engineering with measurement function just has protective structure | |
CN214068274U (en) | Mobilizable think of political affairs teaching show fence | |
CN216010270U (en) | Aluminum support convenient to dismantle | |
CN210291225U (en) | Adjustable just, portable animation play device | |
CN219775293U (en) | Rotary spliced screen | |
CN215107958U (en) | Prop guardrail convenient to install for fire construction | |
CN211604562U (en) | Electronic information board fixing device capable of being quickly disassembled and assembled | |
CN212406030U (en) | Scaffold stand pipe footing | |
CN206594998U (en) | A kind of careers guidance information displaying support frame | |
JP2014227766A (en) | Column erection device and frame structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200310 Termination date: 20210627 |
|
CF01 | Termination of patent right due to non-payment of annual fee |