CN210133937U - Portable floating bed for ecological restoration of urban river - Google Patents

Portable floating bed for ecological restoration of urban river Download PDF

Info

Publication number
CN210133937U
CN210133937U CN201920850999.7U CN201920850999U CN210133937U CN 210133937 U CN210133937 U CN 210133937U CN 201920850999 U CN201920850999 U CN 201920850999U CN 210133937 U CN210133937 U CN 210133937U
Authority
CN
China
Prior art keywords
frame
floating bed
bed main
sleeve
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920850999.7U
Other languages
Chinese (zh)
Inventor
万明
刘彦龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Laitai Garden Ltd By Share Ltd
Original Assignee
Henan Laitai Garden Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Laitai Garden Ltd By Share Ltd filed Critical Henan Laitai Garden Ltd By Share Ltd
Priority to CN201920850999.7U priority Critical patent/CN210133937U/en
Application granted granted Critical
Publication of CN210133937U publication Critical patent/CN210133937U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use
    • Y02A20/40Protecting water resources
    • Y02A20/402River restoration

Landscapes

  • Hydroponics (AREA)

Abstract

The utility model discloses a city river course ecological remediation is with portable bed that floats, including the air cushion, first frame, second frame and bed main part that floats, the sleeve post is all installed in the left side of first frame and second frame, the sleeve is installed on the right side of first frame and second frame, the sleeve is passed through on the right side of first frame and is fixed with the left sleeve post joint of second frame, the bed main part that floats is all installed through the plastics screw rod to the inboard of first frame and second frame, the lug is all installed to the both sides of first frame and second frame, the fixed surface of lug has fixed rope, the other end of fixed rope is fixed on the river bank through the ground nail, the air cushion is all installed to the front and back side of first frame and second frame. The utility model discloses a set up first frame, second frame, float bed main part, sleeve, cover post, plastics screw rod, lug, fixed rope, ground nail, air cushion structure, solved the ecological bed of floating and be not convenient for carry the equipment and float the bed and carry out the not easily fixed showy problem when river course is restoreed.

Description

Portable floating bed for ecological restoration of urban river
Technical Field
The utility model relates to a river course ecological remediation technical field specifically is a city river course ecological remediation is with portable bed that floats.
Background
The ecological restoration means stopping artificial interference on an ecological system to reduce load pressure, and evolving in an orderly direction depending on self-regulation capacity and self-organization capacity of the ecological system, or gradually restoring a damaged ecological system or developing the ecological system in a virtuous circle direction by using the self-restoration capacity of the ecological system and assisting artificial measures; mainly aims at the work of restoring and rebuilding a natural ecosystem destroyed under the influence of natural mutation and human activities, restores the original appearance of the ecosystem, such as planting felled forests, returning to farmlands and returning animals to the original living environment. In this way, the ecosystem is better restored, known as "ecological remediation". One of the ecological restoration is river ecological restoration, which generally needs to use an ecological floating bed for restoration, and the ecological restoration of the river mainly aims at solving the problem of water eutrophication, and the ecological floating island is also called an artificial floating bed, an ecological floating bed and the like. The artificial floating island is one of artificial floating islands, and aims at eutrophicated water quality, and degrades the content of COD, nitrogen and phosphorus in water by utilizing the principle of ecological engineering. The method takes aquatic plants as a main body, applies the technical principle of soilless culture, takes high polymer materials and the like as carriers and substrates, applies the symbiotic relationship among species, and fully utilizes the space ecological niche and the nutrition ecological niche of the water body, thereby establishing a high-efficiency artificial ecosystem for reducing the pollution load in the water body. It can greatly raise water transparency, and can effectively improve water quality index, specially has good inhibiting effect for algae. The ecological floating island has the main effect of purifying water quality by absorbing eutrophic substances, such as total phosphorus, ammonia nitrogen, organic matters and the like, in water by using the root system of plants, so that the nutrition of the water body is transferred, and the phenomena of fishy smell and eutrophication of the water body caused by the insufficient sealing or self-circulation of the water body are reduced. The ecological floating island is generally used for ecological restoration of water body pollution in cities and rural areas, and is also used for building urban wetland scenic spots and the like.
However, the prior art has the following defects:
1. in ecological restoration of a river channel, an ecological floating bed is needed, but the floating beds need to be assembled according to the distribution area of a river channel water body, so that a plurality of floating beds are needed, but a plurality of groups of floating beds are inconvenient to carry and assemble;
2. because the ecological floating bed floats on the river water body and lacks stability, once the river flows, the floating bed is easy to drift along with the river water body and lose the due ecological restoration effect, and therefore the structure capable of fixing the floating bed is needed.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a city river course ecological restoration is with portable bed that floats has solved the ecological bed that floats and is not convenient for carry the equipment and float the bed difficult fixed showy problem when carrying out the river course restoration.
(II) technical scheme
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a city river course ecological remediation is with portable bed that floats, including the air cushion, first frame, second frame and the bed main part that floats, the cover post is all installed in the left side of first frame and second frame, the sleeve is installed on the right side of first frame and second frame, the right side of first frame is passed through the sleeve and is fixed with the left cover post joint of second frame, the inboard of first frame and second frame is all installed through the plastics screw rod and is floated the bed main part, it has seted up the planting groove to float the inboard of bed main part, the lug is all installed to the both sides of first frame and second frame, the fixed surface of lug has fixed rope, the other end of fixed rope is fixed on the river bank through the ground nail, the air cushion is all installed to the front and back side of first frame and second frame.
Preferably, the first frame and the second frame are identical in structure, and the floating bed body, the first frame and the second frame all float on the surface of the river water body.
Preferably, the front side and the rear side of the interior of the first frame are both provided with a first thread groove, the center of the interior of the floating bed main body is longitudinally provided with a second thread groove, and the plastic screw penetrates through the first thread groove in the first frame and is fixedly connected with the second thread groove in the floating bed main body.
Preferably, the square block is installed to the left sleeve column end of first frame and second frame, and the square block is located the mounting groove inboard of first frame and second frame, and the gag lever post is installed to the top of mounting groove, and the through-hole has been seted up to the inboard of square block.
Preferably, the surface of the sleeve column is provided with a limiting pin, the surface of the sleeve is provided with an L-shaped groove, the limiting pin is clamped and fixed with the L-shaped groove on the surface of the sleeve, and the bottom end of the limiting rod is inserted into the through hole on the inner side of the square block.
Preferably, the floating bed body comprises a concrete coating, a synthetic resin, a polystyrene foam and a stainless steel outer frame, the polystyrene foam is mounted on the inner side of the stainless steel outer frame, the synthetic resin is mounted on the inner side of the stainless steel outer frame above the polystyrene foam, and the concrete coating is coated on the inner side of the stainless steel outer frame above the synthetic resin.
Preferably, four groups of planting grooves are arranged on the inner side of the floating bed main body, and return water grooves penetrate through the two groups of planting grooves and the inner side of the floating bed main body and are communicated with the planting grooves.
Preferably, the inner side of the first frame is provided with nine floating bed main bodies and three plastic screws, and one plastic screw penetrates through the three floating bed main bodies and is connected with the first frame.
(III) advantageous effects
The utility model provides a portable bed that floats for ecological restoration of city river course possesses following beneficial effect:
(1) the utility model is convenient to disassemble and assemble by arranging the first frame, the second frame, the floating bed main body, the sleeve column and the plastic screw rod, can be spliced according to needs, has smaller occupied space during transportation, thereby effectively solving the problem that the ecological floating bed is not convenient to carry and assemble, when carrying, the floating bed main body is assembled in advance on the inner sides of the first frame and the second frame, the floating bed main body is placed on the inner sides of the first frame and the second frame, a group of plastic screw rods pass through the first thread grooves in the first frame and the second frame, then pass through the second thread grooves in the floating bed main body until three groups of plastic screw rods pass through nine floating bed main bodies, make its inboard fixed with first frame and second frame, place first frame and second frame in the river course water again, cup joint the sleeve on first frame right side and the left cover post of second frame, insert the L type inslot on sleeve surface with the spacer pin on cover post surface, rotatory cover post again, insert the gag lever post this moment in inserting the mounting groove of second frame inboard, it is fixed rather than the through-hole joint in the inboard square, thereby make the spacer pin joint not take place to rock at the inboard terminal of L type inslot, realize assembling, plant the water planting plant at last in planting the inslot can, and along with the drift of rocking of river course water, the inboard floating bed main part of first frame and second frame can fluctuate from top to bottom thereupon, the water that gets into to plant the inslot can return to the river course water through the return water tank in, avoid staying for a long time and lead to the water planting plant root system to rot in planting the groove.
(2) The utility model discloses a set up the lug, fixed rope, the ground nail, the air cushion, make the utility model discloses a stability obtains improving, can not drift to other places along with the flow of water, carry out the ecological remediation in river course in appointed region, regionality is obvious, thereby effectual solved float bed difficult fixed showy problem when carrying out the river course restoration, assemble the completion back to first frame and second frame, fixed rope is all sheathe in to the lug on lug and the second frame right side of first frame left end, install the other end of fixed rope on the river bank through the ground nail, avoid rocking of first frame and second frame and float bed main part, and the air cushion has all been add to the front and back side of first frame and second frame, further increased buoyancy, make it can be stable float in the river course water.
Drawings
Fig. 1 is a schematic top view of the present invention;
fig. 2 is a side view of the present invention;
FIG. 3 is a connection structure diagram of the first frame and the second frame of the present invention;
fig. 4 is a side view of the first frame of the present invention;
FIG. 5 is a structural diagram of the present invention;
FIG. 6 is a structural diagram of the floating bed body of the present invention;
FIG. 7 is a side view of the floating bed of the present invention;
fig. 8 is a top view of the floating bed body of the present invention.
The reference numbers in the figures are: 1. a ground nail; 2. river banks; 3. river water body; 4. an air cushion; 5. a first frame; 6. a sleeve; 7. sleeving a column; 8. a second frame; 9. an L-shaped groove; 10. fixing a rope; 11. a spacing pin; 12. a limiting rod; 13. a plastic screw; 14. a floating bed main body; 15. planting grooves; 16. lifting lugs; 17. mounting grooves; 18. a square block; 19. a first thread groove; 20. a through hole; 21. coating the concrete; 22. a synthetic resin; 23. foaming polystyrene; 24. a stainless steel outer frame; 25. a second thread groove; 26. and (5) returning the water to the water tank.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
As shown in fig. 1-8, the utility model provides a technical solution: a portable floating bed for urban river ecological restoration comprises an air cushion 4, a first frame 5, a second frame 8 and a floating bed main body 14, wherein the structures of the first frame 5 and the second frame 8 are completely consistent, the floating bed main body 14, the first frame 5 and the second frame 8 all float on the surface of a river water body 3, the floating bed main body 14 comprises a concrete coating 21, a synthetic resin 22, a polystyrene foam 23 and a stainless steel outer frame 24, the polystyrene foam 23 is installed on the inner side of the stainless steel outer frame 24, the synthetic resin 22 is installed on the inner side of the stainless steel outer frame 24 above the polystyrene foam 23, the concrete coating 21 is coated on the inner side of the stainless steel outer frame 24 above the synthetic resin 22, sleeves 7 are installed on the left sides of the first frame 5 and the second frame 8, sleeves 6 are installed on the right sides of the first frame 5 and the second frame 8, the right side of the first frame 5 is fixedly connected with the sleeves 7 on the left side of the second frame 8 through the sleeves 6 in a, a square block 18 is arranged at one end of a sleeve column 7 at the left sides of a first frame 5 and a second frame 8, the square block 18 is positioned at the inner side of a mounting groove 17 in the first frame 5 and the second frame 8, a limiting rod 12 is arranged above the mounting groove 17, a through hole 20 is arranged at the inner side of the square block 18, a limiting pin 11 is arranged on the surface of the sleeve column 7, an L-shaped groove 9 is arranged on the surface of a sleeve 6, the limiting pin 11 is clamped and fixed with the L-shaped groove 9 on the surface of the sleeve 6, the bottom end of the limiting rod 12 is inserted into the through hole 20 at the inner side of the square block 18, when the portable, a second thread groove 25 is longitudinally arranged at the center of the inner part of the floating bed main body 14, plastic screws 13 pass through a first thread groove 19 in the first frame 5 and are fixedly connected with a second thread groove 25 in the floating bed main body 14, planting grooves 15 are arranged at the inner side of the floating bed main body 14, four groups of planting grooves 15 are arranged at the inner side of the floating bed main body 14, a water return groove 26 penetrates through the two groups of planting grooves 15 and the inner side of the floating bed main body 14, the water return groove 26 is communicated with the planting grooves 15, nine floating bed main bodies 14 and three plastic screws 13 are arranged at the inner side of the first frame 5, one plastic screw 13 passes through the three floating bed main bodies 14 and is connected with the first frame 5, when the assembly is needed, the floating bed main body 14 is assembled at the inner sides of the first frame 5 and the second frame 8 in advance, the floating bed main body 14 is placed at the inner sides of the first frame 5 and the second frame 8, and then one group of plastic screws 13 passes through the first thread groove 19 in the first frame 5 and the second, then the water planting device penetrates through a second thread groove 25 in the floating bed main body 14 until three groups of plastic screws 13 penetrate through nine floating bed main bodies 14 to be fixed with the inner sides of the first frame 5 and the second frame 8, the first frame 5 and the second frame 8 are placed in the riverway water body 3, a sleeve 6 on the right side of the first frame 5 and a sleeve column 7 on the left side of the second frame 8 are sleeved, a limiting pin 11 on the surface of the sleeve column 7 is inserted into an L-shaped groove 9 on the surface of the sleeve 6, then the sleeve column 7 is rotated, a limiting rod 12 is inserted into a mounting groove 17 on the inner side of the second frame 8 at the moment and is clamped and fixed with a through hole 20 in a square block 18 on the inner side, so that the limiting pin 11 is clamped and connected with a terminal on the inner side of the L-shaped groove 9 without shaking, assembly is realized, finally, the water planting plants can be planted in the planting groove 15, and the floating along with the shaking of the riverway water body 3, the floating bed main, the water entering the planting groove 15 returns to the river water body 3 through the water return groove 26 to avoid staying in the planting groove 15 for a long time, the lifting lugs 16 are arranged on the two sides of the first frame 5 and the second frame 8, the fixed ropes 10 are fixed on the surfaces of the lifting lugs 16, the other ends of the fixed ropes 10 are fixed on the river bank 2 through the ground nails 1, the air cushions 4 are arranged on the front side and the rear side of the first frame 5 and the second frame 8, after the first frame 5 and the second frame 8 are assembled, the lifting lugs 16 at the left end of the first frame 5 and the lifting lugs 16 at the right side of the second frame 8 are sleeved with the fixing ropes 10, the other ends of the fixing ropes 10 are installed on the river bank 2 through the ground nails 1, so that the first frame 5, the second frame 8 and the floating bed main body 14 are prevented from shaking, and the air cushions 4 are additionally arranged at the front side and the rear side of the first frame 5 and the second frame 8, so that the buoyancy is further increased, and the floating frame can stably float in the river channel water body 3.
The working principle is as follows: when in use, the utility model is carried, the first frame 5 and the second frame 8 can be disassembled and assembled, the first frame 5 and the second frame 8 can be independently stacked and transported, when in need of assembly, the inner sides of the first frame 5 and the second frame 8 are assembled with the floating bed main body 14 in advance, the floating bed main body 14 is placed at the inner sides of the first frame 5 and the second frame 8, then a group of plastic screws 13 is used to pass through the first thread grooves 19 in the first frame 5 and the second frame 8, and then pass through the second thread grooves 25 in the floating bed main body 14 until the three groups of plastic screws 13 pass through the nine floating bed main bodies 14, so that the floating bed main bodies are fixed with the inner sides of the first frame 5 and the second frame 8, then the first frame 5 and the second frame 8 are placed in the river channel water body 3, the sleeve 6 at the right side of the first frame 5 and the sleeve 7 at the left side of the second frame 8 are sleeved, the limit pin 11 at the surface of the sleeve 7 is inserted into the L9 at the surface of the sleeve 6, then the sleeve column 7 is rotated, the limiting rod 12 is inserted into the mounting groove 17 on the inner side of the second frame 8 and is clamped and fixed with the through hole 20 in the square block 18 on the inner side of the second frame, so that the limiting pin 11 is clamped and fixed at the inner side of the L-shaped groove 9, the assembly is realized, finally, the water culture plants are planted in the planting groove 15, along with the drift of the riverway water body 3, the floating bed main body 14 on the inner side of the first frame 5 and the second frame 8 can fluctuate up and down along with the water, the water entering the planting groove 15 can return to the riverway water body 3 through the water return groove 26, the long-time temporary stay in the planting groove 15 is avoided, after the first frame 5 and the second frame 8 are assembled, the lifting lugs 16 on the left end of the first frame 5 and the lifting lugs 16 on the right side of the second frame 8 are both sleeved with the fixing ropes 10, the other ends of the fixing ropes 10 are mounted on the river bank 2 through the ground nails 1, the shaking of the first frame 5, and the air cushions 4 are additionally arranged at the front side and the rear side of the first frame 5 and the second frame 8, so that the buoyancy is increased, and the floating frame can stably float in the river channel water body 3.
To sum up, the utility model discloses a set up first frame 5, second frame 8, float bed main part 14, sleeve 6, sleeve post 7, plastics screw rod 13, lug 16, fixed rope 10, ground nail 1, air cushion 4 structure, solved the ecological bed of floating and be not convenient for carry the equipment and float the bed and carry out the not easy fixed showy problem when river course is restoreed.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (8)

1. The utility model provides a portable bed that floats for ecological restoration of city river course, includes air cushion (4), first frame (5), second frame (8) and floats bed main part (14), its characterized in that: the left side of first frame (5) and second frame (8) all installs cover post (7), sleeve (6) are installed on the right side of first frame (5) and second frame (8), sleeve (6) and the left cover post (7) joint of second frame (8) are passed through to the right side of first frame (5) fixed, the inboard of first frame (5) and second frame (8) is all installed through plastics screw rod (13) and is floated bed main part (14), planting groove (15) have been seted up to the inboard of floating bed main part (14), lug (16) are all installed to the both sides of first frame (5) and second frame (8), the fixed surface of lug (16) has fixed rope (10), the other end of fixed rope (10) is fixed on river bank (2) through ground nail (1), air cushion (4) are all installed to the front and back side of first frame (5) and second frame (8).
2. The portable floating bed for ecological restoration of urban river channels according to claim 1, wherein: the structures of the first frame (5) and the second frame (8) are completely consistent, and the floating bed main body (14), the first frame (5) and the second frame (8) float on the surface of the river channel water body (3).
3. The portable floating bed for ecological restoration of urban river channels according to claim 1, wherein: the front side and the rear side of the interior of the first frame (5) are both provided with a first thread groove (19), the center of the interior of the floating bed main body (14) is longitudinally provided with a second thread groove (25), and the plastic screw (13) passes through the first thread groove (19) in the first frame (5) and is fixedly connected with the second thread groove (25) in the floating bed main body (14).
4. The portable floating bed for ecological restoration of urban river channels according to claim 1, wherein: square blocks (18) are installed to the left side of the first frame (5) and the left side of the second frame (8) of the sleeve column (7), the square blocks (18) are located on the inner sides of installation grooves (17) in the first frame (5) and the second frame (8), limiting rods (12) are installed above the installation grooves (17), and through holes (20) are formed in the inner sides of the square blocks (18).
5. The portable floating bed for ecological restoration of urban river channels according to claim 4, wherein: the surface mounting of cover post (7) has spacer pin (11), and L type groove (9) are seted up on the surface of sleeve (6), and spacer pin (11) are fixed with L type groove (9) joint on sleeve (6) surface, and the bottom of gag lever post (12) is pegged graft in through-hole (20) of square (18) inboard.
6. The portable floating bed for ecological restoration of urban river channels according to claim 1, wherein: the floating bed main body (14) comprises a concrete coating (21), synthetic resin (22), polystyrene foam (23) and a stainless steel outer frame (24), the polystyrene foam (23) is installed on the inner side of the stainless steel outer frame (24), the synthetic resin (22) is installed on the inner side of the stainless steel outer frame (24) above the polystyrene foam (23), and the concrete coating (21) is coated on the inner side of the stainless steel outer frame (24) above the synthetic resin (22).
7. The portable floating bed for ecological restoration of urban river channels according to claim 1, wherein: four groups of planting grooves (15) are arranged on the inner side of the floating bed main body (14), return water grooves (26) penetrate through the two groups of planting grooves (15) and the inner side of the floating bed main body (14), and the return water grooves (26) are communicated with the planting grooves (15).
8. The portable floating bed for ecological restoration of urban river channels according to claim 1, wherein: the inner side of the first frame (5) is provided with nine floating bed main bodies (14) and three plastic screws (13), and one plastic screw (13) penetrates through the three floating bed main bodies (14) to be connected with the first frame (5).
CN201920850999.7U 2019-06-06 2019-06-06 Portable floating bed for ecological restoration of urban river Expired - Fee Related CN210133937U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920850999.7U CN210133937U (en) 2019-06-06 2019-06-06 Portable floating bed for ecological restoration of urban river

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920850999.7U CN210133937U (en) 2019-06-06 2019-06-06 Portable floating bed for ecological restoration of urban river

Publications (1)

Publication Number Publication Date
CN210133937U true CN210133937U (en) 2020-03-10

Family

ID=69705996

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920850999.7U Expired - Fee Related CN210133937U (en) 2019-06-06 2019-06-06 Portable floating bed for ecological restoration of urban river

Country Status (1)

Country Link
CN (1) CN210133937U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111533269A (en) * 2020-04-22 2020-08-14 长沙理工大学 Floating bed for ecological restoration of rural surface water pollution
CN113003732A (en) * 2021-04-01 2021-06-22 郑州轻工业大学 Environment-friendly urban river combined ecological floating bed

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111533269A (en) * 2020-04-22 2020-08-14 长沙理工大学 Floating bed for ecological restoration of rural surface water pollution
CN113003732A (en) * 2021-04-01 2021-06-22 郑州轻工业大学 Environment-friendly urban river combined ecological floating bed

Similar Documents

Publication Publication Date Title
KR101130237B1 (en) An ecological system for restoration of the water-ecology and improvement of the quality of water
CN205088008U (en) Can plant ecological bed that floats of enduring water and benthophyte
CN210133937U (en) Portable floating bed for ecological restoration of urban river
CN209685411U (en) A kind of river corridor restoration system
CN102079582A (en) Lightweight detachable composite ecological floating island and constructing method thereof
KR20130132015A (en) Floating structure for photovoltaic power generation and water purification
CN2773062Y (en) Biological float island frame
CN104803557A (en) Compound type ditch pond wetland system with functions of farmland drainage purification and ecological restoration
CN206814489U (en) The combined ecological floating island of multi-layer compound structure
KR100825917B1 (en) A park on the water for leisure and ecology experience
CN206051662U (en) Water ecology repair system
CN210140480U (en) Water pollution control system for coal mining subsidence area
CN209778451U (en) Combined solar aeration biological floating bed
CN112794560A (en) In-situ ecological purification module and system for polluted water treatment
CN205241362U (en) Pollute river water body ecological remediation device a little
CN209940603U (en) Ecological chinampa device of high-efficient water purification combined type
CN204529619U (en) The ditch pool wet land system of composite type purifying farmland drainage and restoration of the ecosystem
CN109231473B (en) Polyurethane artificial floating island
CN208829374U (en) A kind of floating frame system of the ecology of stable breeding submerged plant
CN103508563B (en) Wooden trestle and biofilm grid integrated water body purification device
CN105776560A (en) Mobile solar floating island for water ecological restoration and water ecological restoration method
CN215529855U (en) Ecological structure is resumeed fast to degradation mangrove
CN214141769U (en) Combined ecological floating bed
CN103214094A (en) Fixed type composite layer net supporting floating island
CN112174333A (en) Constructed wetland module and application thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200310

CF01 Termination of patent right due to non-payment of annual fee