CN210106799U CN201920604853.4U CN201920604853U CN210106799U CN 210106799 U CN210106799 U CN 210106799U CN 201920604853 U CN201920604853 U CN 201920604853U CN 210106799 U CN210106799 U CN 210106799U
Authority
CN
China
Prior art keywords
pipeline
platform
carbon steel
frame
plug
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920604853.4U
Other languages
Chinese (zh)
Inventor
王雪文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Zhonggang Construction Engineering Co Ltd
Original Assignee
Shenzhen Zhonggang Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Zhonggang Construction Engineering Co Ltd filed Critical Shenzhen Zhonggang Construction Engineering Co Ltd
Priority to CN201920604853.4U priority Critical patent/CN210106799U/en
Application granted granted Critical
Publication of CN210106799U publication Critical patent/CN210106799U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Duct Arrangements (AREA)

Abstract

The utility model discloses a carbon steel air conduit convenient for installation, which belongs to the technical field of building construction, and the key points of the technical proposal are that the carbon steel air conduit comprises a first conduit and a second conduit, one end of the first conduit is fixedly connected with an inserting platform, the inserting platform is communicated with the inside of the first conduit, one end of the second conduit is fixedly connected with an inserting frame matched with the inserting platform for use, and a fixing component for fixedly connecting the inserting frame and the inserting platform is arranged between the first conduit and the second conduit; and a horizontal supporting plate for supporting the second pipeline is fixedly connected to the bottom of the inserting table. The effect that the pipeline installed firstly limits the pipeline installed later and is convenient to install is achieved.

Description

Carbon steel air pipe convenient to installation
Technical Field
The utility model relates to a construction field, in particular to carbon steel air pipe convenient to installation.
Background
Air pipe is for making the circulation of air, reduces a infrastructure of harmful gas concentration, also is more than indispensable component part among the modern building ventilation system, and current air pipe has according to the material branch: the steel plate air pipe, the galvanized plate air pipe, the stainless steel ventilation pipe, the glass steel ventilation pipe, the plastic ventilation pipe, the composite material ventilation pipe, the color steel sandwich insulation board ventilation pipe, the carbon steel ventilation pipe and the like, and the carbon steel ventilation pipe is high in hardness and small in deformation.
At present, the ventilation duct is usually installed by splicing on the ground and then fixedly installing on a high wall surface through a crane. Because the air pipe size is great, hoist after the concatenation can lead to the operation difficulty again, bring inconvenience for the installation.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a carbon steel air pipe convenient to installation, reach the pipeline that earlier the installation was good and play the restriction to the pipeline of back installation, the effect of the installation of being convenient for.
The above technical purpose of the present invention can be achieved by the following technical solutions:
a carbon steel ventilating duct convenient to install comprises a first pipeline and a second pipeline, wherein one end of the first pipeline is fixedly connected with an inserting table, the inserting table is communicated with the inside of the first pipeline, one end of the second pipeline is fixedly connected with an inserting frame matched with the inserting table, and a fixing assembly used for fixedly connecting the inserting frame and the inserting table is arranged between the first pipeline and the second pipeline; and a horizontal supporting plate for supporting the second pipeline is fixedly connected to the bottom of the inserting table.
Through adopting above-mentioned technical scheme, earlier with first pipeline installation back, install the second pipeline again, when the second pipeline is close to first pipeline for the bottom surface and the backup pad butt of second pipeline insert the grafting bench on the first pipeline with the grafting frame on the second pipeline again, then will insert the frame through fixed subassembly and fix with the grafting bench, thereby realize the fixed to first pipeline and second pipeline. The setting of backup pad plays certain limiting displacement to the second pipeline, is convenient for aim at the second pipeline with first pipeline, saves adjust time, and it is convenient to install first pipeline and second pipeline for the staff, and the cooperation of grafting platform and grafting frame is used, plays certain limiting displacement to the removal of second pipeline for first pipeline and second pipeline aim at fast, and it is convenient to provide for the installation of staff.
The utility model is further arranged in that the cross section of the plug-in platform is in a U shape.
Through adopting above-mentioned technical scheme, when the cross-section of grafting platform is the U shape, after the grafting frame inserted the grafting bench, can make first pipeline and second pipeline aim at fast, prevent to appear the dislocation between first pipeline and the second pipeline, it is convenient to provide for staff's installation is fixed.
The utility model discloses further set up as, the grafting bench has been seted up pre-installation hole, and the pre-installation hole is waist shape, and the length direction of pre-installation hole is mutually perpendicular with the direction of height of grafting platform, has seted up the connecting hole on the grafting frame, and the connecting hole is equipped with the installation round pin at same horizontal plane with pre-installation hole, the interpolation of connecting hole in advance.
Through adopting above-mentioned technical scheme, because the cross-section of grafting platform is the U-shaped form, the grafting frame has probably to break away from with the grafting platform, consequently inserts the grafting frame and inserts the bench back of pegging graft, insert the mounting pin in mounting hole and the connecting hole in advance, realize the pre-fixing of grafting frame and grafting platform, when the mounting hole is waist shape setting in advance for the second pipeline has certain removal surplus, also can make the inseparable butt of grafting frame and grafting platform like this, it is convenient to provide for staff's installation.
The utility model discloses further set up as, the grafting platform is close to the grafting of open-ended position and has vertical baffle, and the bottom and the backup pad of baffle are pegged graft, baffle one side and second pipeline outer wall butt.
Through adopting above-mentioned technical scheme, after grafting frame and grafting platform butt, for preventing that grafting frame breaks away from with the grafting platform, peg graft baffle and grafting platform and backup pad, realize the further restriction to the grafting frame, effectively prevent to break away from between grafting frame and the grafting platform, provide convenient indirectly for staff's operation.
The utility model discloses further set up as, fixed subassembly includes fixing bolt, the fixed orifices that uses with the fixing bolt cooperation, and the fixed orifices is seted up on the platform of pegging graft and the frame of pegging graft.
Through adopting above-mentioned technical scheme, because the size of grafting platform and grafting frame all is greater than the size of first pipeline and second pipeline, consequently when offering the fixed orifices on grafting platform and grafting frame, the staff of being convenient for will insert the platform with fixing bolt and peg graft the frame fixedly, improve the convenience of operation.
The utility model discloses further set up as, be equipped with the seal cover between first pipeline and the second pipeline, the both ends of seal cover insert respectively in first pipeline and the second pipeline.
Through adopting above-mentioned technical scheme, insert the both ends of seal cover back in first pipeline and the second pipeline respectively, play sealed effect to the junction of first pipeline and second pipeline, prevent that the junction of plug frame and plug platform from leaking out and influencing indoor air.
The utility model discloses further set up as, fixedly connected with connects the boss on the seal cover outer wall, connects the size of boss and the size looks adaptation of grafting frame.
Through adopting above-mentioned technical scheme, when connecting boss and seal cover outer wall fixed connection and with the size phase adaptation of grafting frame, grafting platform have the tight effect of clamp to connecting the boss when fixed, prevent that the seal cover from breaking away from and can not reach sealed effect with first pipeline or second pipeline.
The utility model discloses further set up to, it sets up the intermediate position at seal cover length direction to connect the boss.
Through adopting above-mentioned technical scheme, when connecting the boss setting in seal cover length direction's intermediate position for the seal cover inserts the length in first pipeline and the second pipeline and is the same, both is sealed to first pipeline and second pipeline junction, also effectively reduces the probability of gas leakage simultaneously.
To sum up, the utility model discloses following beneficial effect has:
1. the insertion platform, the insertion frame and the fixing assembly are matched for use, so that workers can fix the first pipeline and the second pipeline conveniently, and the convenience of operation is improved;
2. the cooperation of pre-installation hole, connecting hole, installation round pin and baffle is used, prevents effectively that second pipeline and first pipeline from breaking away from, and it is convenient to provide for the fixed first pipeline of staff and second pipeline.
Drawings
Fig. 1 is a schematic structural diagram of the present invention;
figure 2 is a schematic view of a partial explosion intended to show the sealing sleeve.
In the figure, 1, a first pipeline; 11. a plug-in station; 2. a second conduit; 21. a plug-in frame; 3. pre-mounting holes; 31. connecting holes; 32. mounting a pin; 4. a baffle plate; 5. a fixing assembly; 51. fixing the bolt; 52. a fixing hole; 6. a support plate; 7. sealing sleeves; 71. and connecting the lug bosses.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
The utility model provides a carbon steel air pipe convenient to installation, combines fig. 1 and fig. 2, includes first pipeline 1, second pipeline 2 and fixed subassembly 5, and the cross-section of first pipeline 1 and second pipeline 2 is the rectangle, and first pipeline 1 and second pipeline 2 pass through fixed subassembly 5 and connect.
As shown in fig. 1, an insertion platform 11 with a U-shaped cross section is fixedly connected to one end of the first pipeline 1, the cross section of the insertion platform 11 is larger than that of the first pipeline 1, and the insertion platform 11 is communicated with the first pipeline 1. An insertion frame 21 is fixedly connected to one end of the second pipe 2, and the insertion frame 21 is used in cooperation with the insertion platform 11. A horizontal support plate 6 is fixedly connected to the bottom of the plugging table 11, and the length direction of the support plate 6 is consistent with the width direction of the first pipeline 1.
After 1 installation of first pipeline, hang second pipeline 2 and install with first pipeline 1 for during the installation, make plug frame 21 and the 6 butts of backup pad on the second pipeline 2, play certain restriction to second pipeline 2, then will plug frame 21 inserts in the plug platform 11, realize the restriction to second pipeline 2, prevent that second pipeline 2 from rocking when fixed, convenience when improving the installation.
As shown in fig. 2, a sealing sleeve 7 is arranged between the first pipeline 1 and the second pipeline 2, the shape of the sealing sleeve 7 is the same as that of the first pipeline 1 and the second pipeline 2, two ends of the sealing sleeve 7 can be inserted into the first pipeline 1 and the second pipeline 2, a connecting boss 71 is fixedly connected to the outer wall of the sealing sleeve 7, the connecting boss 71 is arranged in the middle of the sealing sleeve 7 in the length direction, and the size of the connecting boss 71 is the same as that of the plug-in frame 21.
During the use, insert first pipeline 1 earlier with seal cover 7 one end in to make connection boss 71 and grafting platform 11 butt, then will insert in the frame 21 inserts the platform 11 of pegging graft, the other end of seal cover 7 just inserts in the second pipeline 2 this moment, and make the frame 21 of pegging graft and the platform 11 of pegging graft will be connected the boss 71 and press from both sides tightly, prevent that the gas in first pipeline 1 and the second pipeline 2 from spilling over and influencing indoor air.
As shown in fig. 2, pre-mounting holes 3 are formed in two side surfaces of the docking station 11, the pre-mounting holes 3 are of a waist-shaped structure, the length direction of the pre-mounting holes 3 is perpendicular to the height direction of the docking station 11, a connection hole 31 which is located on the same horizontal plane with the pre-mounting holes 3 is formed in the docking frame 21, and a mounting pin 32 is inserted into the pre-mounting holes 3 and the connection hole 31. The mounting pin 32 is inserted into the pre-mounting hole 3 and the connecting hole 31 to pre-fix the socket frame 21 and the socket 11.
The vertical baffle plate 4 is inserted at the position, close to the opening, of the insertion platform 11, the bottom of the baffle plate 4 is inserted with the support plate 6, and one side of the baffle plate 4 is abutted to the outer wall of the second pipeline 2.
The cooperation of erection pin 32, pre-installation hole 3 and connecting hole 31 is used, plays the limiting displacement to second pipeline 2, with baffle 4 vertical insert the platform 11 and backup pad 6 back on simultaneously, play further limiting displacement to second pipeline 2, effectively prevent to insert frame 21 and the platform 11 breaks away from, improves the convenience when installing.
As shown in fig. 2, the fixing assembly 5 includes a fixing bolt 51 and a fixing hole 52 used in cooperation with the fixing bolt 51, and the fixing holes 52 are formed at the top and the bottom of the plugging table 11 and the plugging frame 21. After the fixing bolt 51 passes through the fixing holes 52 on the plug-in platform 11 and the plug-in frame 21, the plug-in platform 11 and the plug-in frame 21 are fixed, that is, the first pipeline 1 and the second pipeline 2 are fixed.
The implementation principle of the embodiment is as follows;
fix first pipeline 1 earlier, insert first pipeline 1 with the one end of seal cover 7 in, then fix second pipeline 2 again, transport first pipeline 1 department with second pipeline 2, make plug-in frame 21 and backup pad 6 butt on the second pipeline 2, and make the other end of seal cover 7 insert in the second pipeline 2, then promote second pipeline 2, make plug-in frame 21 and connection boss 71 butt, insert in pre-installation hole 3 and connecting hole 31 with mounting pin 32 again, continue to promote baffle 4 again, and insert plug-in platform 11 with fixing bolt 51 in the fixed orifices 52 on the plug-in frame 21, realize the fixed of plug-in platform 11 and plug-in frame 21, realize the fixed to first pipeline 1 and second pipeline 2 promptly.
The present embodiment is only for explaining the present invention, and it is not limited to the present invention, and those skilled in the art can make modifications to the present embodiment without inventive contribution as required after reading the present specification, but all of them are protected by patent laws within the scope of the claims of the present invention.

Claims (8)

1. The utility model provides a carbon steel air pipe convenient to installation, includes first pipeline (1) and second pipeline (2), its characterized in that: one end of the first pipeline (1) is fixedly connected with an inserting platform (11), the inserting platform (11) is communicated with the interior of the first pipeline (1), one end of the second pipeline (2) is fixedly connected with an inserting frame (21) matched with the inserting platform (11) for use, and a fixing component (5) for fixedly connecting the inserting frame (21) with the inserting platform (11) is arranged between the first pipeline (1) and the second pipeline (2); a horizontal supporting plate (6) which supports the second pipeline (2) is fixedly connected to the bottom of the inserting table (11).
2. A carbon steel ventilation duct easy to install according to claim 1, characterized in that: the section of the plug-in table (11) is U-shaped.
3. A carbon steel ventilation duct easy to install according to claim 1, characterized in that: the inserting table is characterized in that a pre-mounting hole (3) is formed in the inserting table (11), the pre-mounting hole (3) is waist-shaped, the length direction of the pre-mounting hole (3) is perpendicular to the height direction of the inserting table (11), a connecting hole (31) is formed in the inserting frame (21), the connecting hole (31) and the pre-mounting hole (3) are located on the same horizontal plane, and a mounting pin (32) is inserted into the pre-mounting hole (3) and the connecting hole (31).
4. A carbon steel ventilation duct easy to install according to claim 1, characterized in that: the vertical baffle (4) is inserted in a position, close to the opening, of the insertion platform (11), the bottom of the baffle (4) is inserted into the support plate (6), and one side of the baffle (4) is abutted to the outer wall of the second pipeline (2).
5. A carbon steel ventilation duct easy to install according to claim 1, characterized in that: the fixing assembly (5) comprises a fixing bolt (51) and a fixing hole (52) matched with the fixing bolt (51), and the fixing hole (52) is formed in the plug-in platform (11) and the plug-in frame (21).
6. A carbon steel ventilation duct easy to install according to claim 1, characterized in that: be equipped with seal cover (7) between first pipeline (1) and second pipeline (2), the both ends of seal cover (7) insert respectively in first pipeline (1) and second pipeline (2).
7. A carbon steel ventilation duct easy to install according to claim 6, characterized in that: the outer wall of the sealing sleeve (7) is fixedly connected with a connecting boss (71), and the size of the connecting boss (71) is matched with that of the plug-in frame (21).
8. A carbon steel ventilation duct easy to install according to claim 7, characterized in that: the connecting boss (71) is arranged in the middle of the sealing sleeve (7) in the length direction.
CN201920604853.4U 2019-04-27 2019-04-27 Carbon steel air pipe convenient to installation Expired - Fee Related CN210106799U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920604853.4U CN210106799U (en) 2019-04-27 2019-04-27 Carbon steel air pipe convenient to installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920604853.4U CN210106799U (en) 2019-04-27 2019-04-27 Carbon steel air pipe convenient to installation

Publications (1)

Publication Number Publication Date
CN210106799U true CN210106799U (en) 2020-02-21

Family

ID=69537347

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920604853.4U Expired - Fee Related CN210106799U (en) 2019-04-27 2019-04-27 Carbon steel air pipe convenient to installation

Country Status (1)

Country Link
CN (1) CN210106799U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111841264A (en) * 2020-08-26 2020-10-30 叶永清 Absorption tower for desulfurization and denitrification based on connecting pipe positioning function
CN113700956A (en) * 2021-09-15 2021-11-26 河北都创机电工程有限公司 Splicing sealing structure of ventilating duct

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111841264A (en) * 2020-08-26 2020-10-30 叶永清 Absorption tower for desulfurization and denitrification based on connecting pipe positioning function
CN113700956A (en) * 2021-09-15 2021-11-26 河北都创机电工程有限公司 Splicing sealing structure of ventilating duct

Similar Documents

Publication Publication Date Title
CN210106799U (en) Carbon steel air pipe convenient to installation
CN214171605U (en) Sealed energy-conserving air pipe structure
CN214093313U (en) Air pipe mounting structure
CN211378430U (en) Electrical box body convenient to maintain
CN218492621U (en) Outdoor holding water box of high strength combination formula
CN112922658A (en) Socket assembly type flue plate for smoke discharge at top of shield tunnel and construction method thereof
CN211977152U (en) Building ventilation system
CN219866721U (en) Stainless steel ventilating duct for environmental protection and dust removal
CN202769838U (en) Air-conditioning outdoor unit and panel connection structure thereof
CN217178755U (en) Outdoor unit
CN207257551U (en) Water is cut and trim panel bridging arrangement in a kind of car door
CN204786891U (en) Effective fixed pipe box of air conditioner
CN217053928U (en) Energy-concerving and environment-protective type thermal-insulated curtain
CN214789457U (en) Drainage pipeline assembly convenient to mount
CN220302975U (en) Fixing device for fireproof blocking of subway station
CN213929889U (en) Pipeline connecting device for hydraulic engineering construction
CN212960336U (en) River-crossing steel pipe for downwards passing through river channel
CN216693735U (en) Air conditioner
CN215009537U (en) Cable fire-proof plate integral type support
CN218714709U (en) I-shaped bolted curtain wall oversized combined decorative strip structure
CN216278105U (en) Combined type automobile exhaust manifold clam shell structure
CN211289141U (en) Air draft pipeline
CN218976142U (en) Dry air insulation ring main unit
CN220287663U (en) Assembled ventilating duct
CN211977190U (en) Ventilating duct convenient to install

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder
CP02 Change in the address of a patent holder

Address after: 518000 809, Bolong building, No.52, Qingshuihe 1st Road, Qingshuihe community, Qingshuihe street, Luohu District, Shenzhen City, Guangdong Province

Patentee after: Shenzhen Zhonggang Construction Engineering Co.,Ltd.

Address before: 518114 7e, shangshuijing complex building, 333 Jihua Road, Buji street, Longgang District, Shenzhen City, Guangdong Province

Patentee before: Shenzhen Zhonggang Construction Engineering Co.,Ltd.