CN210105306U - One-step structural molding profile of water and electricity pressure tank for building - Google Patents

One-step structural molding profile of water and electricity pressure tank for building Download PDF

Info

Publication number
CN210105306U
CN210105306U CN201920815887.8U CN201920815887U CN210105306U CN 210105306 U CN210105306 U CN 210105306U CN 201920815887 U CN201920815887 U CN 201920815887U CN 210105306 U CN210105306 U CN 210105306U
Authority
CN
China
Prior art keywords
template
water
pressure tank
section bar
electricity pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920815887.8U
Other languages
Chinese (zh)
Inventor
姜淦清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhaoqing Chuangfu New Material Technology Co ltd
Zhaoqing Chuangfu New Materials Technology Co ltd
Original Assignee
Zhaoqing Chuangfu Aluminum Mold Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhaoqing Chuangfu Aluminum Mold Technology Co Ltd filed Critical Zhaoqing Chuangfu Aluminum Mold Technology Co Ltd
Priority to CN201920815887.8U priority Critical patent/CN210105306U/en
Application granted granted Critical
Publication of CN210105306U publication Critical patent/CN210105306U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to the technical field of building, in particular to a water and electricity pressure tank one-step structure molding section bar for building, which comprises a first template, a second template and a third template, wherein the middle part of the front surface of the first template is provided with a first lug, the two sides of the front surface of the first template are both provided with second lugs, the middle part of the back surface of the first template is provided with a first clamping groove, and the two sides of the back surface of the first template are both provided with second clamping grooves; the utility model discloses a first template, the second template, the third template, first lug, the second lug, first draw-in groove, the second draw-in groove, the mounting hole, splice plate and fixing bolt's setting for this water and electricity pressure tank one shot construction shaping section bar for building possesses structural safety factor height, avoid artifical secondary fluting, very convenient advantage is dismantled in the installation, it is inconvenient to have solved current secondary water and electricity construction fitment water pipe simultaneously, destroy overall structure, and the problem that factor of safety is low, construction operation for construction worker brings the facility.

Description

One-step structural molding profile of water and electricity pressure tank for building
Technical Field
The utility model relates to a building technical field specifically is a water and electricity indent once structure shaping section bar for building.
Background
Formwork, for the erection template, be different from "support template", the template engineering should the template braced system design before the construction to calculate, draw the support node, common formwork has: the method comprises the following steps of constructing a cushion layer formwork, a tall formwork, a hard frame formwork and the like, wherein concrete is poured on a traditional building shear wall (column), a beam and a floor, a wooden template formwork is usually erected during concrete pouring to form a beam column or wall concrete pouring space, concrete is poured into the space, the templates are detached one by one after the concrete pouring is finished, then secondary water and electricity slotting decoration is carried out, and water pipes are buried in the wall.
However, the existing secondary hydroelectric slotting decoration brings inconvenience to site construction, for example, the secondary slotting can damage a primary structure and the overall stability, the safety coefficient is low, cracking and water leakage are avoided, and therefore, the section bar which can effectively solve the technical problems that the existing secondary hydroelectric construction decoration water pipe is inconvenient, the overall structure is damaged, and the safety coefficient is low is provided to deal with the problem.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a water and electricity indent once structure shaping section bar for building possesses structural safety factor height, avoids artifical secondary fluting, and very convenient advantage is dismantled in the installation, has solved the current secondary water and electricity construction fitment water pipe inconvenient, destroy overall structure and the problem that factor of safety is low.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a water and electricity indent one shot structure shaping section bar for building, includes first template, second template and third template, the positive middle part of first template is provided with first lug, the positive both sides of first template all are provided with the second lug, first draw-in groove has been seted up at the middle part at the first template back, the second draw-in groove has all been seted up to the both sides at the first template back, the mounting hole has been seted up on the surface of third template, the surface of third template is provided with the splice plate, the surface of splice plate runs through and is provided with fixing bolt.
Preferably, the first template, the second template, the third template, the first bump and the second bump are all made of T6061-T6 aluminum, and the first template, the second template and the third template are manufactured through integrated processing.
Preferably, the length of the first template and the second templates on two sides in the horizontal direction is 54mm, the length of the third template in the horizontal direction is 22mm, and the lengths of the first template, the second template and the third template in the horizontal direction are 98mm in total.
Preferably, one side of the third template, which is far away from the second template, is provided with a bevel edge, and an included angle between the bevel edge and the horizontal direction close to the third template is 45 degrees.
Preferably, the volume of the first bump is the same as that of the first clamping groove, the volume of the second bump is the same as that of the second clamping groove, and the first bump, the second bump and the first template are integrally machined.
Preferably, the number of mounting holes is a plurality of, and the mounting holes that are located both sides use the perpendicular bisector of first template to be the symmetry setting as the axle.
Preferably, the number of the fixing bolts on the surface of the splicing plate is two, and the fixing bolts are matched with the mounting holes for use.
Compared with the prior art, the beneficial effects of the utility model are as follows:
the utility model discloses a first template, the second template, the third template, first lug, the second lug, first draw-in groove, the second draw-in groove, the mounting hole, splice plate and fixing bolt's setting for this water and electricity pressure tank one shot construction shaping section bar for building possesses structural safety factor height, avoid artifical secondary fluting, very convenient advantage is dismantled in the installation, it is inconvenient to have solved current secondary water and electricity construction fitment water pipe simultaneously, destroy overall structure, and the problem that factor of safety is low, construction operation for construction worker brings the facility.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a top view of the partial structure of the present invention;
fig. 3 is a side view of the present invention.
In the figure: the template comprises a first template 1, a second template 2, a third template 3, a first bump 4, a second bump 5, a first clamping groove 6, a second clamping groove 7, a mounting hole 8, a splicing plate 9 and a fixing bolt 10.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, a one-step structural molding profile for water and electricity pressure tank for building, comprising a semi-circular arc and a flat surface bent at a certain angle with the semi-circular arc, and respectively composed of a first template 1, a second template 2 and a third template 3, wherein the middle part of the front surface of the first template 1 is provided with a first bump 4, the two sides of the front surface of the first template 1 are respectively provided with a second bump 5, the middle part of the back surface of the first template 1 is provided with a first clamping groove 6, the two sides of the back surface of the first template 1 are respectively provided with a second clamping groove 7, the surface of the third template 3 is provided with a mounting hole 8, the surface of the third template 3 is provided with a splice plate 9, the surface of the splice plate 9 is provided with a fixing bolt 10 in a penetrating manner, and the first template 1, the second template 2, the third template 3, the first bump 4, the second bump 5, the first clamping groove 6, the second clamping groove 7, the mounting hole 8, the, make this water and electricity indent primary structure shaping section bar for building possess structural safety factor height, avoid artifical secondary fluting, the very convenient advantage is dismantled in the installation, has solved current secondary water and electricity construction fitment water pipe simultaneously inconvenient, destroy overall structure and the problem that factor of safety is low, offers convenience for construction worker's construction operation.
In this embodiment, first template 1, second template 2, third template 3, first lug 4 and second lug 5 all adopt T6061-T6 aluminium system material, make through the integration processing between first template 1, second template 2 and the third template 3, integrative template formula stable in structure, the installation is dismantled very conveniently, adopts T6061-T6 aluminium system material, and is very light, long service life.
In this embodiment, the length of the first template 1 and the second templates 2 on both sides in the horizontal direction is 54mm, the length of the third template 3 in the horizontal direction is 22mm, the lengths of the first template 1, the second templates 2 and the third templates 3 in the horizontal direction are 98mm in total, and the standard general-purpose indent modulus is any modulus, only one of which is shown here, and can be customized according to actual requirements.
In this embodiment, one side that second template 2 was kept away from to third template 3 is provided with the hypotenuse, and this hypotenuse is 45 with the horizontal direction contained angle that is close to third template 3, has the setting of hypotenuse, makes things convenient for the dismouting, prevents structural deformation and fracture simultaneously.
In this embodiment, the volume of the first bump 4 is the same as that of the first clamping groove 6, the volume of the second bump 5 is the same as that of the second clamping groove 7, and the first bump 4, the second bump 5 and the first template 1 are integrally machined.
In this embodiment, the quantity of mounting hole 8 is a plurality of, and the mounting hole 8 that is located both sides uses the perpendicular bisector of first template 1 to be the symmetry setting as the axle, and mounting hole 8 can play the effect of connecting and fixed die plate.
In this embodiment, the number of the fixing bolts 10 on the surface of the splice plate 9 is two, the fixing bolts 10 and the mounting holes 8 are used in a matching manner, and the splice plate 9 and the fixing bolts 10 are used for mounting and fixing the assembly between the two pressure grooves.
The two wings of the template are provided with connecting holes, so that the connection between the template and the template is firmer; the length of template is according to the on-the-spot needs, arbitrary length, and weight is suitable, makes things convenient for the workman to transport and dismouting, and its used number of times that reuses is many, and factor of safety is high, adopts this kind of novel aluminium template for building, and one shot forming makes things convenient for the dismouting, effectively prevents fracture and leak, and the wide application is in high-rise civilian house, and its economic benefits and practicality have obtained the wide acceptance of domestic many famous builders.
The working principle is as follows: according to the required length specification, the indent of corresponding quantity is selected, and the joint is carried out on the indent, so that the first bump 4 and the second bump 5 are respectively filled into the first clamping groove 6 and the second clamping groove 7, then the splice plate 9 is selected, the splice plate 9 is covered above the joint of the two third templates 3, the hole on the surface of the splice plate is overlapped with the mounting hole 8 on the surface of the third template 3, and finally the fixing bolt 10 is selected for mounting, so that the two indent can be spliced together.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a water indent one shot structure shaping section bar for building, includes first template (1), second template (2) and third template (3), its characterized in that: the novel die is characterized in that a first lug (4) is arranged in the front middle of the first die plate (1), second lugs (5) are arranged on the two sides of the front of the first die plate (1), a first clamping groove (6) is formed in the middle of the back of the first die plate (1), a second clamping groove (7) is formed in the two sides of the back of the first die plate (1), mounting holes (8) are formed in the surface of the third die plate (3), splicing plates (9) are arranged on the surface of the third die plate (3), and fixing bolts (10) are arranged on the surface of the splicing plates (9) in a penetrating mode.
2. A water-electricity pressure tank one-time structure molding section bar for building according to claim 1, which is characterized in that: first template (1), second template (2), third template (3), first lug (4) and second lug (5) all adopt T6061-T6 aluminium system material, make through the integration processing between first template (1), second template (2) and third template (3).
3. A water-electricity pressure tank one-time structure molding section bar for building according to claim 1, which is characterized in that: the length of the first template (1) and the second templates (2) on two sides in the horizontal direction is 54mm, the length of the third template (3) in the horizontal direction is 22mm, and the lengths of the first template (1), the second templates (2) and the third templates (3) in the horizontal direction are 98mm in total.
4. A water-electricity pressure tank one-time structure molding section bar for building according to claim 1, which is characterized in that: one side of the third template (3) far away from the second template (2) is provided with a bevel edge, and the included angle between the bevel edge and the horizontal direction close to the third template (3) is 45 degrees.
5. A water-electricity pressure tank one-time structure molding section bar for building according to claim 1, which is characterized in that: the volume of the first bump (4) is the same as that of the first clamping groove (6), the volume of the second bump (5) is the same as that of the second clamping groove (7), and the first bump (4), the second bump (5) and the first template (1) are integrally machined.
6. A water-electricity pressure tank one-time structure molding section bar for building according to claim 1, which is characterized in that: the quantity of mounting hole (8) is a plurality of, and the mounting hole (8) that are located both sides use the perpendicular bisector of first template (1) to be the symmetry setting as the axle.
7. A water-electricity pressure tank one-time structure molding section bar for building according to claim 1, which is characterized in that: the number of the fixing bolts (10) on the surface of the splicing plate (9) is two, and the fixing bolts (10) are matched with the mounting holes (8) for use.
CN201920815887.8U 2019-06-01 2019-06-01 One-step structural molding profile of water and electricity pressure tank for building Active CN210105306U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920815887.8U CN210105306U (en) 2019-06-01 2019-06-01 One-step structural molding profile of water and electricity pressure tank for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920815887.8U CN210105306U (en) 2019-06-01 2019-06-01 One-step structural molding profile of water and electricity pressure tank for building

Publications (1)

Publication Number Publication Date
CN210105306U true CN210105306U (en) 2020-02-21

Family

ID=69562715

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920815887.8U Active CN210105306U (en) 2019-06-01 2019-06-01 One-step structural molding profile of water and electricity pressure tank for building

Country Status (1)

Country Link
CN (1) CN210105306U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111691669A (en) * 2020-06-29 2020-09-22 中国十九冶集团有限公司 Construction method for pipeline groove pressing

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111691669A (en) * 2020-06-29 2020-09-22 中国十九冶集团有限公司 Construction method for pipeline groove pressing

Similar Documents

Publication Publication Date Title
CN210105306U (en) One-step structural molding profile of water and electricity pressure tank for building
CN102003046B (en) Steel structure staircase for multi-storied industrialized house
CN109441099B (en) Basement unilateral formwork supporting system and method for constructing basement outer wall by utilizing same
CN106088400A (en) A kind of modular assembly formula light gauge cold-formed steel shape combined wall
CN106088399A (en) A kind of installation method of multi-cavity steel column shear wall combined structure building system
CN211817040U (en) Slurry leakage prevention structure at splicing part of assembled laminated slab
CN210086281U (en) Prefabricated assembled constructs support basis
CN210067425U (en) Standard universal olecranon drip aluminum template for building
CN210976598U (en) External corner template for building
CN203034615U (en) Novel outer sleeve tube type connecting node of cold-bending rectangular steel tube column and H-shaped steel girder
CN205742988U (en) The explosion-proof membrane module of template one word piece
CN212896873U (en) Dry-type connected node device of prefabricated wallboard in L type node
CN103498512B (en) A kind of assembled architecture wall beam stablizes syndeton
CN208981559U (en) Three wall T-types are located by connecting fixed structure
CN103147510B (en) Combined assembly type house device
CN210067442U (en) Standard universal chamfering internal corner aluminum template for building
CN113006465A (en) Wall body pouring mold and method
CN206467762U (en) A kind of modular architectural dresser mounting structure
CN106088324A (en) A kind of difunctional node of the light steel of the formula that is linked and packed light wall floor
CN216840495U (en) Convenient dismantlement formula I-steel cantilever frame construction node
CN205712830U (en) A kind of steel structure stairway step plate
CN103195284B (en) Method for constructing combined and assembled type house device
CN214994867U (en) Assembled light wall structure
CN218234334U (en) Arc structure system for toilet
CN214498030U (en) Assembled floor with connection structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 526241 The second floor, No. 10, Industrial Avenue, Fuxi Industrial Park, Dasha Town, Sihui City, Zhaoqing, Guangdong Province

Patentee after: Zhaoqing Chuangfu New Material Technology Co.,Ltd.

Address before: 526241 The second floor, No. 10, Industrial Avenue, Fuxi Industrial Park, Dasha Town, Sihui City, Zhaoqing, Guangdong Province

Patentee before: Zhaoqing Chuangfu aluminum mold technology Co.,Ltd.

CP01 Change in the name or title of a patent holder
CP03 Change of name, title or address

Address after: No. 11, Huiyuan Avenue, Longfu Town, Sihui City, Zhaoqing City, Guangdong Province 526000

Patentee after: Zhaoqing Chuangfu New Materials Technology Co.,Ltd.

Address before: 526241 The second floor, No. 10, Industrial Avenue, Fuxi Industrial Park, Dasha Town, Sihui City, Zhaoqing, Guangdong Province

Patentee before: Zhaoqing Chuangfu New Material Technology Co.,Ltd.

CP03 Change of name, title or address