CN210104952U CN201920450729.7U CN201920450729U CN210104952U CN 210104952 U CN210104952 U CN 210104952U CN 201920450729 U CN201920450729 U CN 201920450729U CN 210104952 U CN210104952 U CN 210104952U
Authority
CN
China
Prior art keywords
fixed
fixedly connected
fixed frame
motor
rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920450729.7U
Other languages
Chinese (zh)
Inventor
来燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201920450729.7U priority Critical patent/CN210104952U/en
Application granted granted Critical
Publication of CN210104952U publication Critical patent/CN210104952U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Pipe Accessories (AREA)

Abstract

The utility model discloses a municipal administration pipeline pull throughs relates to municipal works technical field, this municipal administration pipeline pull throughs, including fixed frame, the top fixedly connected with electric putter of fixed frame inner wall, electric putter keeps away from the one end fixedly connected with fixed plate of fixed frame, the fixed slot has been seted up to the inside of fixed plate, the first sealed bearing of inside fixedly connected with of fixed slot, the last fixed surface of fixed plate is connected with the guard box, the inside of guard box is provided with the motor. This municipal administration pipeline pull throughs sets up the motor and drives dredging rod and dredge to set up the universal wheel in the bottom of fixed frame, not only can improve mediation efficiency, but also can make things convenient for device's removal and reduced intensity of labour, reached the purpose that improves work efficiency and reduce intensity of labour, set up a plurality of barbs at dredging rod's surface, can make things convenient for the staff to clear up the inside rubbish of municipal administration pipeline, reached the purpose of being convenient for clear up rubbish.

Description

Municipal administration pipeline pull throughs
Technical Field
The utility model relates to a municipal works technical field specifically is a municipal administration pipeline pull throughs.
Background
Along with the development in city, road surface debris are more and more, and when the rainfall was great, debris can cause the pipe blockage along with rainwater entering sewer, the clearance of being not convenient for.
Traditional pipeline mediation mode is that the manual work utilizes some simple instruments to comb, and not only work efficiency is low, and intensity of labour is big moreover to at the in-process of mediation, inconvenient to some rubbish clear up, therefore we improve this, provide a municipal pipeline pull throughs.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a municipal administration pipeline pull throughs has solved current municipal administration pipeline pull throughs that is used for, and work efficiency is low, and intensity of labour is big, and is inconvenient to the problem of clearing up some rubbish.
(II) technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes:
a municipal pipeline dredging device comprises a fixed frame, wherein an electric push rod is fixedly connected to the top of the inner wall of the fixed frame, one end, away from the fixed frame, of the electric push rod is fixedly connected with a fixed plate, a fixed groove is formed in the fixed plate, a first sealing bearing is fixedly connected to the inside of the fixed groove, a protection box is fixedly connected to the upper surface of the fixed plate, a motor is arranged in the protection box, and a rotating shaft of the motor is fixedly connected to the inside of the first sealing bearing;
one end, far away from the first sealing bearing, of a rotating shaft of the motor is fixedly connected with a connecting rod, the outer surface of the connecting rod is fixedly connected with a second sealing bearing, the outer surface of the second sealing bearing is fixedly connected with a fixed disc, and the bottom of the fixed disc is fixedly connected with an anti-abrasion pad;
the one end swing joint that motor shaft was kept away from to the connecting rod has the dredging rod, the equal threaded connection in inside of connecting rod and dredging rod has first fixing bolt, first fixing bolt's quantity is four.
Optionally, the outer fixed surface of dredging rod is connected with the barb, the quantity of barb is a plurality of.
Optionally, the anti-abrasion pad is made of rubber, and anti-slip lines are formed on the outer surface of the anti-abrasion pad.
Optionally, the limiting groove has been seted up to the both sides of fixed frame, the quantity of limiting groove is four, four the equal swing joint in inside of limiting groove has the stopper, four one side and fixed plate fixed connection that the limiting groove was kept away from to the stopper.
Optionally, the bottom fixedly connected with supporting leg of fixed frame, the one end fixedly connected with universal wheel of fixed frame is kept away from to the supporting leg.
Optionally, the bottom of the fixed frame is fixedly connected with two fixed sleeves, and the number of the fixed sleeves is two.
Optionally, the upper surface of fixed disk has seted up the fixed orifices, the internal thread connection of fixed orifices has the telescopic link, the one end swing joint in fixed sleeve's inside that the fixed orifices was kept away from to the telescopic link.
Optionally, the inside equal threaded connection of fixed sleeve and telescopic link has second fixing bolt, the surface of fixed frame is provided with the baffle.
(III) advantageous effects
The utility model provides a municipal administration pipeline pull throughs possesses following beneficial effect:
(1) this municipal pipeline pull throughs, on the one hand, set up the motor and drive dredging rod and dredge to set up the universal wheel in the bottom of fixed frame, not only can improve dredging efficiency, but also can make things convenient for device's removal and reduced intensity of labour, reached the purpose that improves work efficiency and reduce intensity of labour, on the other hand sets up a plurality of barbs at dredging rod's surface, can make things convenient for the staff to clear up the inside rubbish of municipal pipeline, reached the purpose of being convenient for clear up rubbish.
(2) This municipal pipeline pull throughs, on the one hand, set up the fixed disk and set up second seal bearing in its inside, can shelter from the pipe mouth when dredging the pipeline, prevent that the inside debris of pipeline from splashing, the purpose that prevents debris from splashing has been reached, on the other hand, bottom at the fixed disk sets up rubber material abrasionproof pad, and set up anti-skidding line at its surface, can advance to carry out fixed protection to the fixed disk, the good mesh of protecting effect has been reached, secondly, set up the stopper in the both sides of fixed plate, can carry on spacingly to the fixed plate, prevent that it from taking place the skew, the purpose of stable in structure has been reached, furthermore, set up the telescopic link, can consolidate the fixed disk, fixed effectual purpose has been reached, the rationality of design has been embodied.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the structure of the working state of the present invention;
FIG. 3 is an enlarged schematic view of the structure at A in FIG. 1 according to the present invention;
fig. 4 is an enlarged schematic view of the structure at B in fig. 1 according to the present invention.
In the figure: 1-fixing frame, 2-electric push rod, 3-fixing plate, 4-fixing groove, 5-first sealing bearing, 6-protection box, 7-motor, 8-connecting rod, 9-second sealing bearing, 10-fixing plate, 11-anti-abrasion pad, 12-dredging rod, 13-first fixing bolt, 14-barb, 15-limiting groove, 16-limiting block, 17-supporting leg, 18-universal wheel, 19-fixing sleeve, 20-telescopic rod, 21-second fixing bolt and 22-baffle.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", "axial", "radial", "circumferential", and the like, indicate the orientation or positional relationship indicated based on the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
In the present invention, unless otherwise expressly stated or limited, the terms "disposed," "mounted," "connected," and "fixed" are to be construed broadly, e.g., as meaning either a fixed connection or a removable connection; may be a mechanical connection; may be directly connected or indirectly connected through an intermediate. The specific meaning of the above terms in the present invention can be understood according to specific situations by those skilled in the art.
Furthermore, the terms "first", "second" and "first" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of the present invention, "a plurality" means two or more unless specifically limited otherwise.
Referring to fig. 1-4, the present invention provides a technical solution:
a municipal pipeline dredging device comprises a fixed frame 1, wherein an electric push rod 2 is fixedly connected to the top of the inner wall of the fixed frame 1, one end, away from the fixed frame 1, of the electric push rod 2 is fixedly connected with a fixed plate 3, a fixed groove 4 is formed in the fixed plate 3, a first sealing bearing 5 is fixedly connected to the inside of the fixed groove 4, the upper surface of the fixed plate 3 is fixedly connected with a protection box 6, a motor 7 is arranged in the protection box 6, and a rotating shaft of the motor 7 is fixedly connected to the inside of the first sealing bearing 5;
one end, far away from the first sealing bearing 5, of a rotating shaft of the motor 7 is fixedly connected with a connecting rod 8, the outer surface of the connecting rod 8 is fixedly connected with a second sealing bearing 9, the outer surface of the second sealing bearing 9 is fixedly connected with a fixed disc 10, the fixed disc 10 is arranged, and the second sealing bearing 9 is arranged in the fixed disc 10, so that a pipe opening can be shielded when a pipeline is dredged, sundries in the pipeline are prevented from splashing, the purpose of preventing the sundries from splashing is achieved, and an anti-abrasion pad 11 is fixedly connected to the bottom of the fixed disc 10;
one end swing joint that motor 7 pivot was kept away from to connecting rod 8 has dredging pole 12, and the equal threaded connection in inside of connecting rod 8 and dredging pole 12 has first fixing bolt 13, and the quantity of first fixing bolt 13 is four.
As an optional technical solution of the utility model:
the outer fixed surface of dredging rod 12 is connected with barb 14, and the quantity of barb 14 is a plurality of, sets up a plurality of barb 14 at the surface of dredging rod 12, can make things convenient for the staff to clear up the inside rubbish of municipal pipeline, has reached the purpose of being convenient for clear up rubbish.
As an optional technical solution of the utility model:
the anti-abrasion pad 11 is made of rubber, anti-slip lines are arranged on the outer surface of the anti-abrasion pad 11, the rubber anti-abrasion pad 11 is arranged at the bottom of the fixed disk 10, the anti-slip lines are arranged on the outer surface of the fixed disk, the fixed disk can be fixedly protected by the anti-abrasion pad 10, and the purpose of good protection effect is achieved.
As an optional technical solution of the utility model:
spacing groove 15 has been seted up to the both sides of fixed frame 1, and the quantity of spacing groove 15 is four, and the equal swing joint in inside of four spacing grooves 15 has stopper 16, and one side and fixed plate 3 fixed connection of spacing groove 15 are kept away from to four stopper 16, sets up stopper 16 in the both sides of fixed plate 3, can carry on spacingly to the fixed plate, prevents that it from taking place to deviate, has reached stable in structure's purpose.
As an optional technical solution of the utility model:
the bottom fixedly connected with supporting leg 17 of fixed frame 1, the one end fixedly connected with universal wheel 18 of fixed frame 1 is kept away from to supporting leg 17, sets up motor 7 and drives dredging rod 12 and dredge to set up universal wheel 18 in the bottom of fixed frame 1, not only can improve dredging efficiency, but also can make things convenient for the removal of device and reduced intensity of labour, reached the purpose that improves work efficiency and reduce intensity of labour.
As an optional technical solution of the utility model:
the bottom of the fixed frame 1 is fixedly connected with two fixed sleeves 19, and the number of the fixed sleeves 19 is two.
As an optional technical solution of the utility model:
the fixed orifices has been seted up to the upper surface of fixed disk 10, and the inside threaded connection of fixed orifices has telescopic link 20, and telescopic link 20 is hand regulation formula telescopic link, and telescopic link 20 keeps away from the one end swing joint of fixed orifices in the inside of fixed sleeve 19, sets up telescopic link 20, can consolidate fixed disk 10, has reached fixed effectual purpose.
As an optional technical solution of the utility model:
the inner parts of the fixed sleeve 19 and the telescopic rod 20 are both connected with a second fixed bolt 21 in a threaded manner, and the outer surface of the fixed frame 1 is provided with a baffle 22.
When the dredging device is used, firstly, the dredging rod 12 and the connecting rod 8 are fixedly connected through the first fixing bolt 13, then the electric push rod 2 is started to enable the dredging rod 12 to enter a municipal pipe pipeline, then one end of the telescopic rod 20 is in threaded connection with the fixed disk 10, finally the length of the telescopic rod 20 is adjusted to enable the telescopic rod 20 to enter the inside of the fixed sleeve 19 and be fixed through the second fixing bolt 21, and the motor 7 is started to start dredging work.
In conclusion, when the municipal pipeline dredging device is used, on one hand, the motor 7 is arranged to drive the dredging rod 12 to dredge, and the universal wheel 18 is arranged at the bottom of the fixing frame 1, so that the dredging efficiency can be improved, the device can be moved conveniently, the labor intensity is reduced, the purposes of improving the working efficiency and reducing the labor intensity are achieved, on the other hand, the barbs 14 are arranged on the outer surface of the dredging rod 12, workers can clean garbage in the municipal pipeline conveniently, and the purpose of facilitating garbage cleaning is achieved; on the one hand, set up fixed disk 10 and set up second seal bearing 9 in its inside, can shelter from the pipe mouth when dredging the pipeline, prevent that the inside debris of pipeline from splashing, the purpose that prevents debris from splashing has been reached, on the other hand, bottom at fixed disk 10 sets up rubber material abrasionproof pad 11, and set up anti-skidding line at its surface, can advance 10 fixed protections to the fixed disk, the good mesh of protecting effect has been reached, secondly, set up stopper 16 in the both sides of fixed plate 3, can carry on spacingly to the fixed plate, prevent that it from taking place the skew, the purpose of stable in structure has been reached, set up telescopic link 20, can consolidate fixed disk 10, fixed effectual purpose has been reached, the rationality of design has been embodied.
It is noted that in the present disclosure, unless otherwise explicitly specified or limited, a first feature "on" or "under" a second feature may be directly contacting the first and second features or indirectly contacting the first and second features through an intermediate. Also, a first feature "on," "over," and "above" a second feature may be directly or diagonally above the second feature, or may simply indicate that the first feature is at a higher level than the second feature. A first feature being "under," "below," and "beneath" a second feature may be directly under or obliquely under the first feature, or may simply mean that the first feature is at a lesser elevation than the second feature.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (8)

1. The utility model provides a municipal administration pipeline pull throughs, includes fixed frame (1), its characterized in that:
the top of the inner wall of the fixed frame (1) is fixedly connected with an electric push rod (2), one end, far away from the fixed frame (1), of the electric push rod (2) is fixedly connected with a fixed plate (3), a fixed groove (4) is formed in the fixed plate (3), a first sealing bearing (5) is fixedly connected in the fixed groove (4), the upper surface of the fixed plate (3) is fixedly connected with a protection box (6), a motor (7) is arranged in the protection box (6), and a rotating shaft of the motor (7) is fixedly connected in the first sealing bearing (5);
a connecting rod (8) is fixedly connected to one end, far away from the first sealing bearing (5), of a rotating shaft of the motor (7), a second sealing bearing (9) is fixedly connected to the outer surface of the connecting rod (8), a fixed disc (10) is fixedly connected to the outer surface of the second sealing bearing (9), and an anti-abrasion pad (11) is fixedly connected to the bottom of the fixed disc (10);
one end swing joint that motor (7) pivot was kept away from in connecting rod (8) has dredging rod (12), the equal threaded connection in inside of connecting rod (8) and dredging rod (12) has first fixing bolt (13), the quantity of first fixing bolt (13) is four.
2. The municipal pipeline dredging device of claim 1,
the outer surface fixedly connected with barb (14) of dredging rod (12), the quantity of barb (14) is a plurality of.
3. The municipal pipeline dredging device of claim 1,
the anti-abrasion pad (11) is made of rubber, and anti-slip grains are formed in the outer surface of the anti-abrasion pad (11).
4. The municipal pipeline dredging device of claim 1,
spacing groove (15) have been seted up to the both sides of fixed frame (1), the quantity of spacing groove (15) is four, four the equal swing joint in inside of spacing groove (15) has stopper (16), four one side and fixed plate (3) fixed connection that spacing groove (15) were kept away from in stopper (16).
5. The municipal pipeline dredging device of claim 1,
the bottom fixedly connected with supporting leg (17) of fixed frame (1), the one end fixedly connected with universal wheel (18) of fixed frame (1) is kept away from in supporting leg (17).
6. The municipal pipeline dredging device of claim 1,
the bottom fixedly connected with fixed sleeve (19) of fixed frame (1), the quantity of fixed sleeve (19) is two.
7. The municipal pipeline dredging device of claim 1,
the fixing hole has been seted up to the upper surface of fixed disk (10), the internal thread connection of fixed hole has telescopic link (20), the one end swing joint in the inside of fixed sleeve (19) that the fixed hole was kept away from in telescopic link (20).
8. The municipal pipeline dredging device of claim 6,
the inside equal threaded connection of fixed sleeve (19) and telescopic link (20) has second fixing bolt (21), the surface of fixed frame (1) is provided with baffle (22).
CN201920450729.7U 2019-04-04 2019-04-04 Municipal administration pipeline pull throughs Active CN210104952U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920450729.7U CN210104952U (en) 2019-04-04 2019-04-04 Municipal administration pipeline pull throughs

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920450729.7U CN210104952U (en) 2019-04-04 2019-04-04 Municipal administration pipeline pull throughs

Publications (1)

Publication Number Publication Date
CN210104952U true CN210104952U (en) 2020-02-21

Family

ID=69535734

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920450729.7U Active CN210104952U (en) 2019-04-04 2019-04-04 Municipal administration pipeline pull throughs

Country Status (1)

Country Link
CN (1) CN210104952U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112681503A (en) * 2020-12-17 2021-04-20 合肥利晟科技有限公司 A municipal pipeline pull throughs for administering environmental pollution

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112681503A (en) * 2020-12-17 2021-04-20 合肥利晟科技有限公司 A municipal pipeline pull throughs for administering environmental pollution

Similar Documents

Publication Publication Date Title
CN210104952U (en) Municipal administration pipeline pull throughs
CN206829313U (en) It is a kind of can Quick drainage municipal administration water supply and sewerage pipeline
CN204703293U (en) Pipeline cleaning equipment under small-sized well
CN205894243U (en) Municipal administration is with putting row of jam water stand
CN216615677U (en) Hydraulic engineering retaining wall
CN207017426U (en) A kind of municipal pipeline dredger
CN212838531U (en) Pollution discharge device for garden cleaning
CN212026563U (en) Municipal administration pipeline dredging device
CN218374369U (en) Drainage pipe pull throughs of treegarden irrigation usefulness
CN214430789U (en) Be used for municipal road rainwater to collect irrigation equipment
CN210356203U (en) Pit-shaped sewage cleaning device for building
CN212104277U (en) Hydraulic engineering is with high-efficient desilting device
CN208830452U (en) Floor accumulated water treatment device when a kind of high-building construction
CN212592309U (en) Constipation dredge of removable excrement strip of drawing
CN209163020U (en) A kind of anti-blocking desilting system of Municipal Road Engineering
CN207405754U (en) A kind of municipal pipeline Accrete clearing device
CN214883992U (en) Drainage ditch cleaning device for road construction
CN215719455U (en) Efficient self-hanging type water pumping device for building water supply and drainage
CN218264273U (en) Pipeline dredging device for municipal works
CN205445672U (en) But drainage blind pipe in lift -draw style tunnel blocks dirty box
CN212477959U (en) Sewage pipeline dredging device
CN220725352U (en) Pipeline dredging device for municipal engineering
CN213868254U (en) Building water supply and drainage pipe wall dredging device
CN220642725U (en) Rainwater collecting and purifying device