CN210103741U - Auxiliary insertion device for process cooling water pipe for producing plate glass - Google Patents

Auxiliary insertion device for process cooling water pipe for producing plate glass Download PDF

Info

Publication number
CN210103741U
CN210103741U CN201920557970.XU CN201920557970U CN210103741U CN 210103741 U CN210103741 U CN 210103741U CN 201920557970 U CN201920557970 U CN 201920557970U CN 210103741 U CN210103741 U CN 210103741U
Authority
CN
China
Prior art keywords
plate
water pipe
bottom plate
insertion device
auxiliary insertion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920557970.XU
Other languages
Chinese (zh)
Inventor
何志锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Irico Hefei LCD Glass Co Ltd
Original Assignee
Irico Hefei LCD Glass Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Irico Hefei LCD Glass Co Ltd filed Critical Irico Hefei LCD Glass Co Ltd
Priority to CN201920557970.XU priority Critical patent/CN210103741U/en
Application granted granted Critical
Publication of CN210103741U publication Critical patent/CN210103741U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Re-Forming, After-Treatment, Cutting And Transporting Of Glass Products (AREA)

Abstract

The utility model discloses an auxiliary insertion device of technology condenser tube for sheet glass production, including the forming furnace, the auxiliary insertion device of water pipe is installed to forming furnace one side, and the fixed subassembly of installation is installed to the auxiliary insertion device one side of water pipe, and the reinforcing stabilizing component is installed to the auxiliary insertion device opposite side of water pipe, and sliding connection has fixed fastener on the fixed subassembly of installation. The utility model discloses a water pipe is assisted and is inserted device, installation fixed subassembly, fixed fastener, is strengthened the common cooperation of stabilizing the subassembly and can guarantee that technology condenser tube can stretch into smoothly by forming furnace one side jack and fall into forming furnace opposite side jack, can not cause equipment such as heater strip, thermocouple in the forming furnace and bruise or damage, then can not cause the interference to field personnel and equipment when not using, convenient and practical.

Description

Auxiliary insertion device for process cooling water pipe for producing plate glass
Technical Field
The utility model belongs to the sheet glass makes the field, especially relates to a supplementary insertion device of technology condenser tube for sheet glass production.
Background
In the production process of producing the flat glass substrate by adopting the overflow downdraw method, glass liquid flows down through two sides of an overflow brick and flows together at the brick tip, a drawing edge machine quickly cools and shapes the edge part, the glass plate flows down to a flow plate under the double action of self gravity and traction force of a traction roller and sequentially passes through a forming furnace, an annealing furnace, transverse cutting and other equipment to form a plain plate, wherein the forming section needs to quickly cool and shape the liquid glass flowing down from the brick tip, and the warping grade of the flat glass is ensured by reasonable flow direction temperature gradient and non-flow direction temperature collocation, so that the forming furnace is the key of flat glass production, and the forming furnace is sometimes called as the forming furnace.
In the known prior art, when the forming furnace is in normal production, in order to realize rapid cooling and shaping of glass within a limited flowing time in the furnace, the process cooling water pipes are generally inserted into the corresponding two sides of the glass plate at corresponding positions in the furnace, and the power of the heater in the furnace is finely adjusted, so as to meet the process requirements of rapid cooling and precise temperature control. However, when the conditions of plate breakage or equipment replacement and maintenance occur in the furnace, the process cooling water pipe needs to be pulled out, the power of the heater in the furnace needs to be increased, and the temperature in the cavity of the forming furnace is rapidly increased, so that the requirement of stable flow material clamping by the through roller is met.
As the process cooling water pipe needs to cross two ends of the cavity of the forming furnace, for high-generation plate glass production equipment, the length of the forming furnace equipment reaches 4000mm-6000mm, and personnel need to hold the stainless steel process cooling water pipe with the diameter of 10mm-50mm and the length of more than 4000mm during operation, the stainless steel process cooling water pipe penetrates through the insertion hole in the furnace wall at one end of the forming furnace and the middle cavity and is inserted into the insertion hole at the corresponding height position of the furnace wall at the other end of the forming furnace, and the process cooling water pipe utilizes the insertion holes at two ends of the furnace wall of the forming furnace as support fixing to rapidly cool and shape the glass. The biggest difficulty of inserting the process cooling water pipe by an operator is that in the process of delivering the water pipe to the insertion hole of the furnace wall at the other end continuously through the insertion hole after the end part of the water pipe is held by the operator, the center of gravity continuously deviates, the process water pipe sags or swings due to lack of support and balance, the process water pipe is difficult to be inserted into the insertion hole at the other end of the furnace wall timely and accurately, equipment such as a heater heating wire, a thermocouple and the like in the forming furnace is easy to be damaged or damaged, and the risks of leading plate failure and furnace plate breakage exist.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to overcome the above problem that prior art exists, provide a supplementary insertion device of technology condenser tube for sheet glass production, guarantee that technology condenser tube can stretch into down forming furnace opposite side jack smoothly by forming furnace one side jack in, can not cause equipment such as heater strip, thermocouple in the forming furnace to bump or damage, then can not cause the interference to field personnel and equipment when not using, convenient and practical.
For realizing above-mentioned technical purpose, reach above-mentioned technological effect, the utility model discloses a following technical scheme realizes:
a process cooling water pipe auxiliary insertion device for producing plate glass comprises a forming furnace, wherein a water pipe auxiliary insertion device is installed on one side of the forming furnace, an installation fixing assembly is installed on one side of the water pipe auxiliary insertion device, a reinforcing and stabilizing assembly is installed on the other side of the water pipe auxiliary insertion device, and a fixing clamping piece is connected to the installation fixing assembly in a sliding mode;
the auxiliary insertion device for the water pipe comprises a movable bottom plate, wherein an internal thread short connecting pipe is arranged on the outer side of the movable bottom plate, a fixed straight pipe is connected onto the internal thread short connecting pipe, an installation fixing component comprises an installation fixing plate, the installation fixing plate is fixedly connected with the outer wall of the forming furnace, the movable bottom plate is fixedly connected with the installation fixing plate through a self-locking hinge, connecting transverse plates are symmetrically arranged at the upper end and the lower end of the outer side of the installation fixing plate, a connecting vertical plate is vertically and inwardly arranged on one side, away from the installation fixing;
fixed fastener includes sliding bottom plate, sliding bottom plate one side and installation fixed plate sliding connection, both ends symmetric connection has first reset spring about the sliding bottom plate opposite side, the one end that sliding bottom plate was kept away from to first reset spring is connected with the connecting plate that resets, the one side that first reset spring was kept away from to the connecting plate that resets and the inboard sliding connection of riser are connected, both ends symmetry is equipped with the spacing post with spacing hole sliding connection about the one side that first reset spring was kept away from to the connecting plate that resets, one side center department that first reset spring was kept away from to the connecting plate that resets is equipped with the spliced pole, the one end that the connecting plate that resets was kept away from to the spliced pole is connected with arc fixed plate, it has the arc cardboard to articulate.
Furthermore, the outer wall of the arc-shaped clamping plate is provided with a hand pull ring, and the hand pull ring can conveniently pull the arc-shaped clamping plate open by hands.
Further, strengthen stabilizing component and include the connecting piece, install on the connecting piece and strengthen stabilizing component, the connecting piece is including connecting the bottom plate, connecting bottom plate and forming furnace outer wall fixed connection, connecting bottom plate outside one end and being equipped with fixed riser perpendicularly, the connecting bottom plate outside other end is equipped with the fixed block, the level runs through to open in the fixed block has the spout, strengthen stabilizing component and including stabilizing the riser, it slides and passes spout and activity bottom plate outside sliding connection to stabilize riser one end, it is equipped with swing joint board perpendicularly to stabilize the riser other end, one side that swing joint board kept away from and stabilizes the riser is through second reset spring and fixed riser fixed connection.
Furthermore, the side of the movable connecting plate, which is close to the stable vertical plate, is provided with anti-slip lines, and the anti-slip lines can enable hands to better act on the movable connecting plate without slipping.
The utility model has the advantages that:
1. when the utility model is used, the process cooling water pipe is inserted into the fixed straight pipe in the water pipe auxiliary insertion device, and then the process cooling water pipe is gradually pushed to be delivered into the forming furnace, the fixed straight pipe can prevent the center of gravity of the process cooling water pipe from being deviated, so that the process cooling water pipe cannot sag or swing, the process cooling water pipe can be ensured to smoothly extend into the jack at the other side of the forming furnace from the jack at one side of the forming furnace, and the equipment such as a heater strip, a thermocouple and the like in the forming furnace cannot be damaged or bruised;
2. when the utility model is not needed to be used, the self-locking hinge is adjusted to enable the auxiliary insertion device of the water pipe to be folded up in an angle with the forming furnace, and then the fixed straight pipe is clamped and fixed on the furnace wall of the forming furnace through the fixed clamping piece, so that the fixed straight pipe is kept parallel to the furnace wall of the forming furnace, the interference of the fixed straight pipe to field personnel and equipment is avoided, and the fixed clamping piece is connected with the installation fixing component in a sliding manner, so that the position of the fixed clamping piece can be adjusted according to the length of the fixed straight pipe, and the fixed clamping piece can better fix the fixed straight pipe;
3. use the utility model discloses make, strengthen the stabilizing mean and play the supplementary insertion device of water pipe and strengthen stable effect, strengthen the stable riser in the stabilizing mean and can further prevent that the activity bottom plate is not hard up to can make technology condenser tube insert the forming furnace more stably, not using the utility model discloses the time, promote swing joint board, under second reset spring's effect, stabilize the riser and break away from the activity bottom plate, thereby can roll over the activity bottom plate.
Drawings
The accompanying drawings, which are included to provide a further understanding of the invention and are incorporated in and constitute a part of this application, illustrate embodiment(s) of the invention and together with the description serve to explain the invention without undue limitation to the invention. In the drawings:
fig. 1 is a schematic structural diagram of the present invention;
FIG. 2 is an exploded view of the local structure of the present invention;
fig. 3 is a partial structural schematic diagram of the present invention;
fig. 4 is a partial structural schematic diagram of the present invention;
fig. 5 is a partial structural schematic diagram of the present invention;
fig. 6 is a schematic view of a partial structure of the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by a person of ordinary skill in the art without creative efforts belong to the protection scope of the present invention.
In the description of the present invention, it is to be understood that the terms "open hole", "upper", "lower", "thickness", "top", "middle", "length", "inner", "around", and the like, indicate positional or positional relationships, are merely for convenience in describing the present invention and to simplify the description, and do not indicate or imply that the components or elements referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore should not be construed as limiting the present invention.
As shown in fig. 1, the auxiliary insertion device for the process cooling water pipe for producing the plate glass comprises a forming furnace 1, wherein an auxiliary insertion device 2 for the water pipe is installed on one side of the forming furnace 1, an installation fixing component 3 is installed on one side of the auxiliary insertion device 2 for the water pipe, a reinforcing and stabilizing component 5 is installed on the other side of the auxiliary insertion device 2 for the water pipe, and a fixing clamping piece 4 is slidably connected to the installation fixing component 3.
As shown in fig. 2, the auxiliary insertion device 2 for water pipes comprises a movable bottom plate 21, an internal thread connecting short pipe 22 is arranged on the outer side of the movable bottom plate 21, a fixed straight pipe 23 is connected to the internal thread connecting short pipe 22, the fixed straight pipe 23 is in threaded connection with the internal thread connecting short pipe 22, the installation fixing component 3 comprises an installation fixing plate 31, the installation fixing plate 31 is fixedly connected with the outer wall of the forming furnace 1, the movable bottom plate 21 is fixedly connected with the installation fixing plate 31 through a self-locking hinge 6, connecting transverse plates 32 are symmetrically arranged at the upper end and the lower end of the outer side of the installation fixing plate 31, one side, far away from the installation fixing plate 31, of each connecting transverse.
As shown in fig. 3, the fixing clip 4 includes a sliding bottom plate 41, one side of the sliding bottom plate 41 is slidably connected to the mounting fixing plate 31, the upper and lower ends of the other side of the sliding bottom plate 41 are symmetrically connected to first return springs 42, one end of the first return spring 42 away from the sliding bottom plate 41 is connected to a return connecting plate 43, one side of the return connecting plate 43 away from the first return spring 42 is slidably connected to the inner side of the connecting upright plate 33, the upper and lower ends of one side of the return connecting plate 43 away from the first return spring 42 are symmetrically provided with limit posts 431 slidably connected to the limit holes 331, the center of one side of the return connecting plate 43 away from the first return spring 42 is provided with a connecting post 44, one end of the connecting post 44 away from the return connecting plate 43 is connected to an arc-shaped fixing plate 45, the upper and lower ends of the arc-shaped fixing plate 45 are symmetrically hinged to arc-, the hinge shaft 47 is provided with a torsion spring, the torsion spring is not shown in the figure, and the outer wall of the arc-shaped catch plate 46 is provided with a hand-pulling ring 461.
As shown in fig. 4 to 6, the reinforcing and stabilizing assembly 5 includes a connecting member 51, a reinforcing and stabilizing member 52 is installed on the connecting member 51, the connecting member 51 includes a connecting bottom plate 511, the connecting bottom plate 511 is fixedly connected to the outer wall of the forming furnace 1, a fixed vertical plate 512 is vertically disposed at one end of the outer side of the connecting bottom plate 511, a fixed block 513 is disposed at the other end of the outer side of the connecting bottom plate 511, a sliding groove 5131 is horizontally opened in the fixed block 513, the reinforcing and stabilizing member 52 includes a stabilizing vertical plate 521, one end of the stabilizing vertical plate 521 slidably penetrates through the sliding groove 5131 to be slidably connected to the outer side of the movable bottom plate 21, a movable connecting plate 522 is vertically disposed at the other end of the stabilizing vertical plate 521, one side of the movable connecting plate 522, which is far away from the stabilizing.
When the utility model is used, the process cooling water pipe is inserted into the fixed straight pipe 23 in the water pipe auxiliary insertion device 2, then the process cooling water pipe is pushed to the forming furnace 1 to be delivered step by step, so that the process cooling water pipe extends into the jack at the other side of the forming furnace 1 from the jack at one side of the forming furnace 1, in the process, the fixed straight pipe 23 can prevent the gravity center of the process cooling water pipe from shifting, the process cooling water pipe cannot droop or swing due to the supporting effect of the fixed straight pipe 23, the process cooling water pipe can be ensured to smoothly extend into the jack at the other side of the forming furnace 1 from the jack at one side of the forming furnace 1, the fixed straight pipe 23 and the movable bottom plate 21 are in threaded connection through the internal thread short connecting pipe 22, therefore, the fixed straight pipes 23 with different lengths can be replaced according to the distance between the jacks at the two sides of the forming furnace 1; when the utility model is not needed, the self-locking hinge 6 is adjusted to enable the water pipe auxiliary insertion device 2 and the forming furnace 1 to be folded up in 90 degrees, then the fixed straight pipe 23 is clamped and fixed on the furnace wall of the forming furnace 1 through the fixed clamping piece 4, so that the fixed straight pipe 23 and the furnace wall of the forming furnace 1 are kept parallel, the interference of the fixed straight pipe 23 on site personnel and equipment is avoided, the fixed clamping piece 4 is in sliding connection with the installation fixing component 3, therefore, the position of the fixed clamping piece 4 can be adjusted according to the length of the fixed straight pipe 23, and the fixed straight pipe 23 can be better fixed by the fixed clamping piece 4; use the utility model discloses make, strengthen stabilizing component 5 and play the supplementary insertion device 2 of enhancement to the water pipe and strengthen stable effect, strengthen stabilizing riser 521 in stabilizing component 5 and can further prevent that activity bottom plate 21 is not hard up to can make technology condenser tube insert in forming furnace 1 more stably, not using the utility model discloses the time, promote swing joint board 522, under the effect of second reset spring 523, stabilize riser 521 and break away from activity bottom plate 21, thereby can roll over activity bottom plate 21.
In the description herein, references to the description of "one embodiment," "an example," "a specific example," etc., mean that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the invention. In this specification, the schematic representations of the terms used above do not necessarily refer to the same embodiment or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
The foregoing shows and describes the general principles, essential features, and advantages of the invention. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention.

Claims (4)

1. The utility model provides an auxiliary insertion device of technology condenser tube for sheet glass production, includes forming furnace (1), its characterized in that: a water pipe auxiliary insertion device (2) is installed on one side of the forming furnace (1), an installation fixing component (3) is installed on one side of the water pipe auxiliary insertion device (2), a reinforcing and stabilizing component (5) is installed on the other side of the water pipe auxiliary insertion device (2), and a fixing clamping piece (4) is connected to the installation fixing component (3) in a sliding mode;
the auxiliary insertion device (2) for the water pipe comprises a movable bottom plate (21), an internal thread connecting short pipe (22) is arranged on the outer side of the movable bottom plate (21), a fixed straight pipe (23) is connected onto the internal thread connecting short pipe (22), an installation fixing assembly (3) comprises an installation fixing plate (31), the installation fixing plate (31) is fixedly connected with the outer wall of the forming furnace (1), the movable bottom plate (21) is fixedly connected with the installation fixing plate (31) through a self-locking hinge (6), connecting transverse plates (32) are symmetrically arranged at the upper end and the lower end of the outer side of the installation fixing plate (31), a connecting vertical plate (33) is vertically and inwardly arranged on one side, away from the installation fixing plate (31), of each connecting transverse plate (32), and limiting;
the fixing clamping piece (4) comprises a sliding bottom plate (41), one side of the sliding bottom plate (41) is connected with the installation fixing plate (31) in a sliding mode, the upper end and the lower end of the other side of the sliding bottom plate (41) are symmetrically connected with first reset springs (42), one ends, far away from the sliding bottom plate (41), of the first reset springs (42) are connected with reset connecting plates (43), one sides, far away from the first reset springs (42), of the reset connecting plates (43) are connected with the inner sides of the connecting vertical plates (33) in a sliding mode, limiting columns (431) which are connected with the limiting holes (331) in a sliding mode are symmetrically arranged at the upper end and the lower end of one sides, far away from the first reset springs (42), of the reset connecting plates (43) are provided with connecting columns (44) in the center, one ends, far away from the reset connecting plates (43), of the connecting columns (44) are connected with arc-shaped fixing plates (45), the upper, a torsion spring is arranged on the hinge shaft (47).
2. The auxiliary insertion device for the process cooling water pipe for producing the plate glass as claimed in claim 1, wherein: the outer wall of the arc-shaped clamping plate (46) is provided with a hand pull ring (461).
3. The auxiliary insertion device for the process cooling water pipe for producing the plate glass as claimed in claim 1, wherein: strengthen stable subassembly (5) including connecting piece (51), install on connecting piece (51) and strengthen stabilizing member (52), connecting piece (51) are including connecting bottom plate (511), connect bottom plate (511) and forming furnace (1) outer wall fixed connection, it is equipped with fixed riser (512) perpendicularly to connect bottom plate (511) outside one end, it is equipped with fixed block (513) to connect bottom plate (511) outside other end, horizontal run-through has spout (5131) in fixed block (513), strengthen stabilizing member (52) including stabilizing riser (521), it passes spout (5131) and activity bottom plate (21) outside sliding connection to stabilize riser (521) one end slip, it is equipped with swing joint board (522) perpendicularly to stabilize the riser (521) other end, one side that swing joint board (522) kept away from stable riser (521) is through second reset spring (523) and fixed riser (512) fixed connection.
4. The auxiliary insertion device for the process cooling water pipe for producing the plate glass as claimed in claim 3, wherein: and anti-skid grains (5221) are arranged on one side, close to the stable vertical plate (521), of the movable connecting plate (522).
CN201920557970.XU 2019-04-23 2019-04-23 Auxiliary insertion device for process cooling water pipe for producing plate glass Active CN210103741U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920557970.XU CN210103741U (en) 2019-04-23 2019-04-23 Auxiliary insertion device for process cooling water pipe for producing plate glass

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920557970.XU CN210103741U (en) 2019-04-23 2019-04-23 Auxiliary insertion device for process cooling water pipe for producing plate glass

Publications (1)

Publication Number Publication Date
CN210103741U true CN210103741U (en) 2020-02-21

Family

ID=69536905

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920557970.XU Active CN210103741U (en) 2019-04-23 2019-04-23 Auxiliary insertion device for process cooling water pipe for producing plate glass

Country Status (1)

Country Link
CN (1) CN210103741U (en)

Similar Documents

Publication Publication Date Title
CN210506050U (en) Device for controlling thickness of substrate glass on line
CN210103741U (en) Auxiliary insertion device for process cooling water pipe for producing plate glass
CN205049782U (en) Fiber distribution case
CN203927339U (en) Vertical TV bracket
CN104465065B (en) Produce transformator film threading equipment
CN205024841U (en) Vestibule sliding connection support
CN102889461B (en) Adjustable LCD TV bracket
CN201262308Y (en) Inclination self-locking apparatus of panel TV wall hanging frame
CN204125345U (en) Split type glass heating furnace
CN207175770U (en) Upper change arc air grid and reverse curved steel equipment
CN207512063U (en) A kind of water packet for producing thin glass float tin groove
CN205049783U (en) Optical fiber distribution case
CN204983435U (en) A lift strutting arrangement for various coil of strip die mould
CN209097515U (en) The pallet of traction roller in a kind of manufacture of liquid crystal substrate glass
CN214117529U (en) Supporting mechanism for building templates
CN205046859U (en) Steel longeron upper chord erection jack
CN204270863U (en) Produce transformer film threading equipment
CN209291761U (en) A kind of segmentation brake forming cover board
CN202927424U (en) Adjustable liquid crystal display (LCD) television bracket
CN108360468B (en) Concrete panel pouring surface heat insulation material laying device
CN105178614A (en) Jack for steel truss girder upper chord member installation and steel truss girder upper chord member installation process
CN207615976U (en) A kind of lift aluminum alloy pattern plate welding tooling platform
CN214643558U (en) Civil engineering pipeline that is difficult for droing puts frame
CN219673499U (en) Be used for tuber pipe strutting arrangement
CN218355219U (en) Drawing hanging device

Legal Events

Date Code Title Description
GR01 Patent grant