CN210084604U - Electric power construction project management device - Google Patents

Electric power construction project management device Download PDF

Info

Publication number
CN210084604U
CN210084604U CN201920899545.9U CN201920899545U CN210084604U CN 210084604 U CN210084604 U CN 210084604U CN 201920899545 U CN201920899545 U CN 201920899545U CN 210084604 U CN210084604 U CN 210084604U
Authority
CN
China
Prior art keywords
frame
electric power
project management
power construction
rotary cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920899545.9U
Other languages
Chinese (zh)
Inventor
吴海涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201920899545.9U priority Critical patent/CN210084604U/en
Application granted granted Critical
Publication of CN210084604U publication Critical patent/CN210084604U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

The utility model discloses an electric power construction engineering project management device, including the main part frame, one side of main part frame is provided with the slope piece, there are rack, support frame, mount and cutting frame upper end difference fixed mounting of main part frame, the lower extreme of main part frame is provided with four group's walking wheels respectively, both ends all are provided with the dead lever around the rack both sides, both ends all are provided with the dead lever around the rack. An electric power construction engineering project management device, through a rotatory section of thick bamboo that sets up, can carry out automatic unwrapping wire to the cable, manpower and material resources have been saved, the efficiency of work has been improved, cylinder and telescopic link through setting up, can carry out automatic cutting to the cable, thereby the danger brought when having avoided manual operation, through the solid fixed ring that sets up, can carry out horizontal fixed to the cable that will be cut, thereby the quality of cutting cable has been improved, make things convenient for people's use, bring better use prospect.

Description

Electric power construction project management device
Technical Field
The utility model relates to an electric power construction engineering project management field, in particular to electric power construction engineering project management device.
Background
The electric power construction has obvious pulling effect on social economy, Chinese economy develops rapidly, the power supply is relatively tense, in order to meet the needs of national economy and social development, the country needs to accelerate the power construction strength, the national industry added value has a positive correlation with the electric power construction all the time, along with the increase of the power construction, especially the increase of industrial power, the industry added value also increases, at this moment, equipment capable of carrying out automatic paying-off and cutting on cables is needed, the project of the power construction can be processed more systematically and efficiently, and positive influence is brought to the subsequent production;
there is certain drawback in current electric power construction engineering project management device when using, at first, need the manual work to operate when carrying out the unwrapping wire to the cable, consume a large amount of manpower and material resources, secondly, when carrying out the cable cutting, need cut by hand, use very danger, finally, can not neatly place the cable that needs the cutting during the cable cutting, cause the damage of cable very easily when cutting, the use of giving people has brought certain influence, for this reason, we provide an electric power construction engineering project management device.
SUMMERY OF THE UTILITY MODEL
A primary object of the present invention is to provide an electric power construction project management apparatus, which can effectively solve the problems in the background art.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
an electric power construction project management device comprises a main body frame, wherein one side of the main body frame is provided with an inclined block, the upper end of the main body frame is respectively and fixedly provided with a placing frame, a supporting frame, a fixing frame and a cutting frame, the lower end of the main body frame is respectively provided with four groups of travelling wheels, the front end and the rear end of each of two sides of the placing frame are respectively provided with a fixing rod, the front end and the rear end of each placing frame are respectively provided with a fixing rod, the front end of each placing frame is respectively provided with a first rotary cylinder and a control panel, the control panel is positioned at one side of the first rotary cylinder, the upper end of the first rotary cylinder is provided with a transmission belt, the front end of the first rotary cylinder is respectively provided with a fixing groove and a rotating rod, the inside of the first rotary cylinder is provided with a rotary column, the front end of the rotary column is, a second rotary cylinder is arranged at the lower end of the first rotary cylinder, a second motor is arranged at the rear end of the second rotary cylinder, the second motor is arranged in a main body frame, a first rotating shaft at the front end of the second motor is fixedly connected with the second rotary cylinder, a pulley is fixedly mounted at the upper end of the inner wall of the support frame, a through hole is formed in one side of the fixing frame, a fixing ring is arranged at one side of the through hole, a bolt column is arranged at the upper end of the fixing ring in a penetrating manner, a supporting block is fixedly mounted at the lower end of the bolt column, fixing plates are fixedly mounted on two sides of the inner wall of the cutting frame, a sliding groove is formed in one side of each fixing plate, a cylinder is fixedly mounted at the upper end of the inner wall of the cutting frame, a telescopic rod is movably connected to the output end of the cylinder, a telescopic frame is fixedly mounted at the lower, the utility model discloses a cutting tool, including expansion bracket, No. one motor of inner wall one side fixed mounting of expansion bracket, No. three pivot fixedly connected with of a motor one side, No. two pivots, the one end setting of No. two pivots is on the expansion bracket, the upper end of No. two pivots is provided with the cutting piece.
Preferably, the placing frame is located on one side of the inclined block, the supporting frame is located on one side of the placing frame, and the fixing frame is located on one side of the supporting frame.
Preferably, the number of the fixing frames is two, and the two groups of fixing frames are respectively positioned at two sides of the cutting frame.
Preferably, inner wall one side of rack is provided with the recess, the column spinner runs through in one side of a section of thick bamboo and rack and is located the inside of recess, the rotary rod is located the inside of fixed slot and standing groove respectively, and a section of thick bamboo passes through rotary rod fixed connection with the column spinner.
Preferably, the first rotating cylinder is movably connected with the second rotating cylinder through a transmission belt, and the first rotating cylinder is movably connected with the second motor through the second rotating cylinder.
Preferably, the through hole is the same as the fixed ring in size, and the bolt column is movably connected with the fixed ring.
Preferably, the sliding block is located inside the sliding groove, and the sliding block is connected with the sliding groove in a sliding manner.
Preferably, one side fixed mounting of control panel has the power cord, the input of a motor, No. two motors and cylinder all with control panel's output electric connection.
Compared with the prior art, the utility model discloses following beneficial effect has:
1. the cable can be automatically paid off through the first rotary cylinder, so that manpower and material resources are saved, the working efficiency is improved, the second motor drives the second rotary cylinder to rotate, and the first rotary cylinder rotates, so that the automatic paying off of the cable is realized;
2. the cable can be automatically cut through the arranged cylinder and the telescopic rod, so that the danger caused by manual operation is avoided, the arranged telescopic rod reciprocates in the cylinder, so that the cable is cut through the up-and-down movement of the cutting blade, and the operation is safer and more reliable;
3. through the solid fixed ring that sets up, can carry out horizontal fixed to the cable that will be cut to improve the quality of cutting cable, rotatory in the fixed ring through the bolt post that sets up, make to support the piece and fix the cable, protect the cable not receive the damage when the operation cutting.
Drawings
Fig. 1 is a schematic view of the overall structure of a power construction project management apparatus of the present invention;
fig. 2 is a side view of a cutting frame of the electric power construction project management apparatus of the present invention;
fig. 3 is an enlarged view of the sliding block and the fixing plate of the electric power construction project management device of the present invention;
fig. 4 is an enlarged view of a first rotary cylinder and a first rotary column of the electric power construction project management apparatus of the present invention;
fig. 5 is an enlarged view of a fixing ring of the electric power construction project management apparatus of the present invention.
In the figure: 1. a main body frame; 2. an inclined block; 3. a first rotary drum; 4. a second rotary drum; 5. a first rotating shaft; 6. a transmission belt; 7. placing a rack; 8. fixing the rod; 9. a support frame; 10. a pulley; 11. a fixed mount; 12. a fixing ring; 13. a cutting frame; 14. a telescopic frame; 15. cutting the slices; 16. a traveling wheel; 17. a cylinder; 18. a telescopic rod; 19. a second rotating shaft; 20. a slider; 21. a fixing plate; 22. a sliding groove; 23. rotating the rod; 24. fixing grooves; 25. a placement groove; 26. a spin column; 27. a bolt column; 28. a resisting block; 29. a control panel; 30. a first motor; 31. and a stop block.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
As shown in fig. 1-5, an electric power construction project management device comprises a main body frame 1, one side of the main body frame 1 is provided with an inclined block 2, the upper end of the main body frame 1 is respectively and fixedly provided with a placing frame 7, a supporting frame 9, a fixing frame 11 and a cutting frame 13, the lower end of the main body frame 1 is respectively provided with four groups of traveling wheels 16, the front end and the rear end of the two sides of the placing frame 7 are respectively provided with a fixing rod 8, the front end and the rear end of the placing frame 7 are respectively provided with a first rotary drum 3 and a control panel 29, the control panel 29 is positioned at one side of the first rotary drum 3, the upper end of the first rotary drum 3 is provided with a transmission belt 6, the front end of the first rotary drum 3 is respectively provided with a fixing groove 24 and a rotating rod 23, the inside of the first rotary drum 3 is provided with a rotary column 26, the front end of the, a second rotary cylinder 4 is arranged on one side of the front end of a main body frame 1, the second rotary cylinder 4 is positioned at the lower end of a first rotary cylinder 3, a second motor is arranged at the rear end of the second rotary cylinder 4 and positioned inside the main body frame 1, a first rotating shaft 5 at the front end of the second motor is fixedly connected with the second rotary cylinder 4, the second motor drives the second rotary cylinder 4 to rotate, so that the first rotary cylinder 3 rotates, automatic paying-off of cables is realized, a pulley 10 is fixedly installed at the upper end of the inner wall of a supporting frame 9, a through hole is formed in one side of a fixing frame 11, a fixing ring 12 is arranged on one side of the through hole, a bolt column 27 penetrates through the upper end of the fixing ring 12, a support block 28 is fixedly installed at the lower end of the bolt column 27, the cables to be cut can be transversely fixed through the fixing ring 12, the quality of the cut cables is improved, the bolt column 27 rotates in the fixing ring 12, so that the abutting block 28 fixes the cable, the cable is protected from being damaged during operation cutting, fixing plates 21 are fixedly arranged on both sides of the inner wall of the cutting frame 13, a sliding groove 22 is formed in one side of each fixing plate 21, an air cylinder 17 is fixedly arranged at the upper end of the inner wall of the cutting frame 13, an expansion link 18 is movably connected to the output end of the air cylinder 17, an expansion frame 14 is fixedly arranged at the lower end of the expansion link 18, the arranged expansion link 18 reciprocates in the air cylinder 17, so that the cutting blade 15 moves up and down to cut the cable, the operation is safer and more reliable, sliding blocks 20 are arranged on both sides of the expansion frame 14, stop blocks 31 are arranged at the lower ends of the two groups of fixing plates 21, a first motor 30 is fixedly arranged on one side of the inner wall of the expansion frame 14, a third rotating shaft on one side of the first motor 30 is fixedly connected with a second rotating shaft 19, the upper end of the second rotating shaft 19 is provided with a cutting blade 15.
The placing frame 7 is positioned at one side of the inclined block 2, the supporting frame 9 is positioned at one side of the placing frame 7, the fixing frames 11 are positioned at one side of the supporting frame 9, the number of the fixing frames 11 is two, two groups of the fixing frames 11 are respectively positioned at two sides of the cutting frame 13, a groove is arranged at one side of the inner wall of the placing frame 7, the rotary column 26 penetrates through one side of the first rotary cylinder 3 and one side of the placing frame 7 and is positioned in the groove, the rotary rod 23 is respectively positioned in the fixing groove 24 and the placing groove 25, the first rotary cylinder 3 and the rotary column 26 are fixedly connected through the rotary rod 23, the first rotary cylinder 3 is movably connected with the second rotary cylinder 4 through the driving belt 6, the first rotary cylinder 3 is movably connected with the second motor through the second rotary cylinder 4, the through hole is the same as the fixing ring 12 in size, the bolt column 27 is movably connected with the fixing ring 12, the sliding block, a power line is fixedly installed on one side of the control panel 29, and the input ends of the first motor 30, the second motor and the air cylinder 17 are electrically connected with the output end of the control panel 29.
It should be noted that the utility model relates to an electric power construction project management device, promote the walking wheel 16, put the device on the level ground, check the security of device before using, after confirming safety, switch on power, push the device to main part frame 1 through the slope piece 2, control panel 29 can carry out remote control to a motor 30, a No. two motor and cylinder 17, rack 7 plays a role of supporting and fixing the cable, fix dead lever 8, then place column spinner 26 in a column spinner 3, fixed rotary rod 23 coincides with fixed slot 24 and standing groove 25 respectively, thereby make column spinner 26 fixed, a pivot 5 on a No. two motor sets up on a No. two column spinner 4, drive No. two column spinner 4 through a No. two motor and rotate, a column spinner 3 is connected with a No. two column spinner 4 through drive belt 6, and then make a column spinner 3 rotate, therefore, automatic paying-off of the cable is realized, the pulley 10 is arranged below the supporting frame 9, and the pulley 10 plays a supporting role.
The fixing frame 11 is provided with a fixing ring 12, the cable to be cut can be fixed transversely through the fixing ring 12, the quality of the cut cable is improved, the cable can be fixed through the bolt column 27 in the fixing ring 12, the cable can be protected from being damaged during operation and cutting, the cutting frame 13 is arranged to support the air cylinder 17, the cable can be cut automatically through the air cylinder 17 and the telescopic rod 18, the danger caused by manual operation is avoided, the telescopic rod 18 is arranged to reciprocate in the air cylinder 17, the telescopic frame 14 is arranged below the telescopic rod 18, the sliding block 20 slides in the sliding groove 22 on the fixing plate 21, the telescopic frame 14 can reciprocate up and down, the cutting piece 15 moves up and down, the telescopic frame 14 is internally provided with a motor 30, no. one motor 30 drives the rotation of No. two pivots 19 to drive cutting piece 15 and rotate, come to cut the cable, the device that the effect is better is got up in the safe and reliable use that the operation is got up more, and is comparatively practical.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (8)

1. The utility model provides an electric power construction engineering project management device, includes main part frame (1), its characterized in that: one side of the main body frame (1) is provided with an inclined block (2), the upper end of the main body frame (1) is respectively and fixedly provided with a placing frame (7), a supporting frame (9), a fixing frame (11) and a cutting frame (13), the lower end of the main body frame (1) is respectively provided with four groups of travelling wheels (16), the front end and the rear end of two sides of the placing frame (7) are respectively provided with a fixing rod (8), the front end and the rear end of the placing frame (7) are respectively provided with a first rotary cylinder (3) and a control panel (29), the control panel (29) is positioned on one side of the first rotary cylinder (3), the upper end of the first rotary cylinder (3) is provided with a transmission belt (6), the front end of the first rotary cylinder (3) is respectively provided with a fixing groove (24) and a rotary rod (23), a rotary column (26) is arranged inside the first rotary cylinder (3), the front end of the rotary column (26) is provided with a convex block, a placing groove (25) is formed in the middle of the convex block, one side of the front end of the main body frame (1) is provided with a second rotary cylinder (4), the second rotary cylinder (4) is positioned at the lower end of the first rotary cylinder (3), the rear end of the second rotary cylinder (4) is provided with a second motor, the second motor is positioned in the main body frame (1), a first rotating shaft (5) at the front end of the second motor is fixedly connected with the second rotary cylinder (4), the upper end of the inner wall of the support frame (9) is fixedly provided with a pulley (10), one side of the fixed frame (11) is provided with a through hole, one side of the through hole is provided with a fixed ring (12), the upper end of the fixed ring (12) is provided with a bolt column (27) in a penetrating manner, the lower end of the bolt column (27) is fixedly provided with a support block (28), and both sides of the, sliding tray (22) have been seted up to one side of fixed plate (21), the inner wall upper end fixed mounting of cutting frame (13) has cylinder (17), the output swing joint of cylinder (17) has telescopic link (18), the lower extreme fixed mounting of telescopic link (18) has expansion bracket (14), the both sides of expansion bracket (14) all are provided with sliding block (20), and are two sets of the lower extreme of fixed plate (21) all is provided with dog (31), inner wall one side fixed mounting of expansion bracket (14) has motor (30), No. three pivot fixedly connected with of motor (30) one side, No. two pivot (19), the one end of No. two pivot (19) sets up on expansion bracket (14), the upper end of No. two pivot (19) is provided with cutting piece (15).
2. The electric power construction project management apparatus according to claim 1, characterized in that: the rack (7) is located on one side of the inclined block (2), the support frame (9) is located on one side of the rack (7), and the fixing frame (11) is located on one side of the support frame (9).
3. The electric power construction project management apparatus according to claim 1, characterized in that: the number of the fixing frames (11) is two, and the two groups of fixing frames (11) are respectively positioned at two sides of the cutting frame (13).
4. The electric power construction project management apparatus according to claim 1, characterized in that: the inner wall one side of rack (7) is provided with the recess, column spinner (26) run through in one side of a section of thick bamboo (3) and rack (7) and be located the inside of recess, rotary rod (23) are located the inside of fixed slot (24) and standing groove (25) respectively, and a section of thick bamboo (3) and column spinner (26) pass through rotary rod (23) fixed connection.
5. The electric power construction project management apparatus according to claim 1, characterized in that: a rotatory section of thick bamboo (3) and No. two rotatory section of thick bamboos (4) pass through drive belt (6) swing joint, a rotatory section of thick bamboo (3) and No. two motors pass through No. two rotatory section of thick bamboos (4) swing joint.
6. The electric power construction project management apparatus according to claim 1, characterized in that: the through hole is the same as the fixed ring (12), and the bolt column (27) is movably connected with the fixed ring (12).
7. The electric power construction project management apparatus according to claim 1, characterized in that: the sliding block (20) is located inside the sliding groove (22), and the sliding block (20) is in sliding connection with the sliding groove (22).
8. The electric power construction project management apparatus according to claim 1, characterized in that: one side fixed mounting of control panel (29) has the power cord, the input of a motor (30), No. two motors and cylinder (17) all with control panel (29) output electric connection.
CN201920899545.9U 2019-06-15 2019-06-15 Electric power construction project management device Active CN210084604U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920899545.9U CN210084604U (en) 2019-06-15 2019-06-15 Electric power construction project management device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920899545.9U CN210084604U (en) 2019-06-15 2019-06-15 Electric power construction project management device

Publications (1)

Publication Number Publication Date
CN210084604U true CN210084604U (en) 2020-02-18

Family

ID=69482919

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920899545.9U Active CN210084604U (en) 2019-06-15 2019-06-15 Electric power construction project management device

Country Status (1)

Country Link
CN (1) CN210084604U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111422682A (en) * 2020-04-14 2020-07-17 邵阳学院 Electric power construction project management device
CN113237915A (en) * 2021-05-08 2021-08-10 吴海涛 Detection system for asphalt softening point for paving

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111422682A (en) * 2020-04-14 2020-07-17 邵阳学院 Electric power construction project management device
CN113237915A (en) * 2021-05-08 2021-08-10 吴海涛 Detection system for asphalt softening point for paving

Similar Documents

Publication Publication Date Title
CN210084604U (en) Electric power construction project management device
CN206014102U (en) A kind of cable unwinding device
CN113315044B (en) Cable termination for electric power construction
CN210139012U (en) Convenient reinforcing bar cutter that removes
CN109510102B (en) Electric and manual combined two-split-conductor outgoing operation platform
CN210042051U (en) Monitoring equipment with waterproof function
CN116544873B (en) Deicing device for cable
CN204367182U (en) Stone slab cutting machine
CN210939361U (en) Shearing device for high-voltage electric maintenance
CN214879145U (en) Adjustable automatic cable take-up device
CN206986871U (en) River course descaling machine
CN212366652U (en) Be applied to draw gear of cable laying
CN105866911B (en) Electric drive cable obstacle detouring actinobacillus device
CN111786311B (en) Cable draw gear for electric power construction
CN212304501U (en) Cable is with cutting skin structure
CN210594717U (en) Winding drum capable of collecting sizes of various steel cords
CN105226559A (en) A kind of intelligent distribution line foreign bodies removal device
CN206407839U (en) A kind of Fluorspar Powder processing device for lifting drug
CN204912926U (en) Lintel cutting device
CN214744745U (en) Multifunctional device for electromechanical installation of construction engineering
CN214935254U (en) Power switch installation gallows
CN108996322A (en) A kind of power engineering take-up
CN219212503U (en) Be used for wind-powered electricity generation tower section of thick bamboo to make with door frame hole cutting special plane
CN219885504U (en) Motion mechanism of automatic plugboard device for hoisting generator rotor
CN203071500U (en) Dismounting tool for cross-arm of original pole tower in power supply line migration process

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant