CN210074588U - Power distribution equipment for modular data center machine room - Google Patents
Power distribution equipment for modular data center machine room Download PDFInfo
- Publication number
- CN210074588U CN210074588U CN201920965964.8U CN201920965964U CN210074588U CN 210074588 U CN210074588 U CN 210074588U CN 201920965964 U CN201920965964 U CN 201920965964U CN 210074588 U CN210074588 U CN 210074588U
- Authority
- CN
- China
- Prior art keywords
- power distribution
- ups
- distribution module
- data center
- base
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Patch Boards (AREA)
Abstract
The utility model relates to a distribution technical field, concretely relates to modular data center is distribution equipment for computer lab. The system comprises a mains supply power distribution module, a UPS power distribution module and a base, wherein the mains supply power distribution module and the UPS power distribution module are respectively and independently arranged and are prefabricated; the base is prefabricated and provided with a plurality of installation spaces for arranging the commercial power distribution module and the UPS power distribution module; the utility power distribution module with the UPS distribution module is installed after prefabrication is accomplished on the base. The utility model discloses a distribution equipment for modularization data center computer lab has construction cycle end, reliability height, and can adapt to the advantage of various customer demands.
Description
Technical Field
The utility model relates to a distribution technical field, concretely relates to modular data center is distribution equipment for computer lab.
Background
A data center is a complex suite of facilities. The system not only comprises a computer system and other matched equipment, but also comprises redundant data communication connection, environment control equipment, monitoring equipment and various safety devices. The data center cannot suddenly stop power, and the sudden power failure can cause serious loss to the data center, so that the requirement on power distribution equipment for supplying power to the data center is high.
At present, buildings of a plurality of data centers are built, distribution rooms are also planned, for the built traditional data center, an electric power system is in a dispersed layout, the pattern of the distribution rooms is built, distribution equipment is generally in a non-standardized design, and a field installation mode is adopted, because installation components are scattered, the installation components and installation spaces need to be subjected to installation operation with high risk and low cleanliness, such as cutting, welding and pouring, on site; the connecting cables in the distribution room are numerous and complex, so that the phenomenon of line cross overlapping in the wiring process is more, the installation of distribution equipment is influenced, meanwhile, due to the fact that installation components are scattered, the problem of butt joint is easily caused after installation, and the accuracy of construction results cannot be guaranteed due to the fact that the technical levels of construction are uneven; moreover, the field installation of the power distribution equipment requires the hierarchical debugging and testing of the power system, which results in a large amount of rectification and testing time. Therefore, the supply period of the distribution equipment of the UPS distribution room of the general data center is long, the construction period is long, the links are multiple, the reliability is poor, and the requirements of different users on the expandability of the distribution system and the grade change of the machine room cannot be met.
SUMMERY OF THE UTILITY MODEL
Therefore, the utility model provides a construction cycle is short, and good reliability adapts to the distribution equipment for the modularization data center computer lab of various user demands.
In order to solve the problems, the utility model discloses a power distribution device for a modular data center machine room, which comprises a commercial power distribution module, a UPS power distribution module and a base, wherein the commercial power distribution module and the UPS power distribution module are respectively and independently arranged and are prefabricated; the base is prefabricated and provided with a plurality of installation spaces for arranging the commercial power distribution module and the UPS power distribution module; the utility power distribution module with the UPS distribution module is installed after prefabrication is accomplished on the base.
The utility power distribution module with UPS distribution module respectively sets up for one row.
The utility power distribution module includes generating set, transformer, a plurality of first switch board and first monitoring system, generating set the transformer first switch board with the first monitoring system is prefabricated after accomplishing, sets up and is corresponding in the installation space.
The input end of the transformer is electrically connected with the external cable and the generator set, the output end of the transformer is electrically connected with the first power distribution cabinets through the conductive bars, and the first power distribution cabinets are electrically connected with each other through the conductive bars.
The UPS power distribution module comprises a UPS power supply cabinet, a UPS host, a UPS outgoing line cabinet, a second monitoring system and a plurality of second power distribution cabinets, wherein the UPS power supply cabinet is arranged in the installation space corresponding to the second monitoring system after the UPS outgoing line cabinet is prefabricated and finished by the second power distribution cabinets.
The input of UPS power supply cabinet with the transformer passes through the cable electricity and connects, the output of UPS outgoing line cabinet with a plurality of pass through the cable junction between the second switch board, it is a plurality of pass through between the second switch board electrically connect the row electricity.
And the base is provided with a heat dissipation port corresponding to each installation space.
The heat dissipation port is located on the lower side of the installation space, and a heat dissipation air duct communicated with the outside is arranged on the base.
The base comprises a frame body and a base plate, the frame body is provided with a set height, an installation space is arranged on the base plate, the heat dissipation port is arranged on the base plate, and the outlet of the heat dissipation air duct is located on the side face of the frame body.
The utility model discloses technical scheme has following advantage:
1. the utility model discloses a power distribution equipment for modular data center machine room, including commercial power distribution module, UPS distribution module and base, commercial power distribution module and UPS distribution module independently set up respectively, for prefabricated production; the base is prefabricated and provided with a plurality of installation spaces for arranging the commercial power distribution module and the UPS power distribution module; the utility power distribution module with the UPS distribution module is installed after prefabrication is accomplished on the base. That is to say, the utility power distribution module, the UPS power distribution module and the base can be prefabricated according to the use requirements of an installation site or the customization requirements when the installation site is not built, and the prefabricated UPS power distribution module and the base are directly installed on the installation site, so that the operation steps on the installation site can be reduced, the cleanness of installation operation is high, the integrity of the installed utility power distribution module and the installed UPS power distribution module is good, the butt joint problem is not easy to cause, and the precision of construction results can be ensured; as the commercial power distribution module and the UPS distribution module can be debugged, tested and the like firstly when being prefabricated, the debugging and testing time on the installation site is reduced; therefore, the utility model discloses a distribution equipment has construction cycle end, reliability height, and can adapt to the advantage of various customer demands.
2. The utility model discloses a modular distribution equipment for data center computer lab, generating set the transformer first switch board with second monitoring system to and the relative commercial power distribution module of volume and the UPS distribution module of UPS power supply cabinet, UPS host computer, UPS outgoing line cabinet, second monitoring system and a plurality of second switch boards is less, can be convenient after the prefabrication install at the installation site, and convenient transportation.
3. The utility model discloses a distribution equipment for modularization data center computer lab leads the connected mode of electrical drainage, can make in first switch board and the second switch board to and walk the line succinctly between each first switch board and each second switch board, the heat dissipation is good, and can avoid walking the line all around of electric cabinet, thereby reduce whole area, more pleasing to the eye.
4. The utility model discloses a modular distribution equipment for data center computer lab, setting up of thermovent and heat dissipation wind channel can increase the radiating effect of commercial power distribution module and UPS distribution module, prolongs the life of commercial power distribution module and UPS distribution module.
5. The utility model discloses a distribution equipment for modularization data center computer lab, the support body has the height of settlement, can set for the height of support body according to the user demand, and then can adjust the radiating efficiency in thermovent and heat dissipation wind channel.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the embodiments or the technical solutions in the prior art will be briefly described below, and it is obvious that the drawings in the following description are some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a schematic structural diagram of a utility power distribution module of the present invention;
fig. 2 is a schematic structural diagram of a UPS power distribution module according to the present invention;
FIG. 3 is a schematic structural view of the base frame of the present invention;
fig. 4 is a schematic structural view of the base substrate of the present invention;
FIG. 5 is an enlarged view of portion A of FIG. 3;
FIG. 6 is a schematic diagram of the overall layout of the power distribution equipment;
description of reference numerals:
1-a mains power distribution module; 11-a transformer; 12-a first switch board; 2-a UPS power distribution module; 21-UPS cabinet group; 22-a second switch board; 3-a base; 31-a heat dissipation port; 32-a frame body; 33-a substrate; 34-a heat dissipation air duct; 35-a wind guide pipe; 4-power consumption end.
Detailed Description
The technical solution of the present invention will be described clearly and completely with reference to the accompanying drawings, and obviously, the described embodiments are some, but not all embodiments of the present invention. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first," "second," and "third" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
The power distribution equipment for the modular data center room of the present embodiment, as shown in fig. 1 to 6, includes a utility power distribution module 1, a UPS power distribution module 2, and a base 3. UP (uninterruptible Power System/uniterrupubleppower Supply), i.e. an uninterruptible Power Supply, is a System device that connects a lead-acid maintenance-free storage battery mostly with the host, converts direct current into commercial Power through module circuits such as a host inverter, and the UPs distribution module 2 in the present application is an uninterruptible Power Supply distribution module.
Commercial power distribution module 1 independent setting, as shown in fig. 1, including generating set, transformer 11, a plurality of first switch board 12 and first monitoring system, generating set, transformer 11, a plurality of first switch board 12 and first monitoring system are prefabricated production, generating set transformer 11 first switch board 12 with first monitoring system is prefabricated after accomplishing, installs again on base 3. The input of transformer 11 with external cable with the generating set electricity is connected, transformer 11's output and a plurality of electrically conductive row electricity is connected between first switch board 12, and is a plurality of pass through between the first switch board 12 electrically conductive row electricity is connected, and the laminating setting between a plurality of first switch board 12.
UPS distribution module 2 sets up independently, as shown in fig. 2, including UPS group 21, second monitoring system and a plurality of second switch board 22, UPS group 21 includes UPS power supply cabinet, UPS host computer, UPS wire outgoing cabinet, UPS power supply cabinet the UPS host computer the UPS wire outgoing cabinet second monitoring system with second switch board 22 is prefabricated product, installs after prefabricated completion again on base 3. The input of UPS power supply cabinet with transformer 11 passes through the cable electricity and connects, the output of UPS outgoing line cabinet with a plurality of pass through cable junction between the second switch board 22, it is a plurality of pass through between the second switch board 22 electrically conductive row electricity is connected, and a plurality of laminating setting between the second switch board 22.
The conducting bar is a connecting bar made of copper bars, aluminum bars or other conducting materials.
The first monitoring system and the second monitoring system are used for collecting power distribution operation parameters so as to carry out centralized management.
The utility power distribution module 1 and the UPS power distribution module 2 are independently arranged in a row, and a plurality of rows of utility power distribution modules 1 and a plurality of rows of UPS power distribution modules 2 can be arranged on the installation site. In this embodiment, because for the prefabrication setting with adopt the electrical drainage electricity to connect, can practice thrift the space of installation scene, make the installation scene clean and tidy.
The base 3 is also prefabricated, as shown in fig. 3-5, a plurality of installation spaces are provided thereon, each installation space corresponds to the generator set, the transformer 11, the first power distribution cabinets 12 and the first monitoring system, the UPS power supply cabinet, the UPS host, the UPS outgoing line cabinet, the second monitoring system and the second power distribution cabinets 22, and after prefabricating each component of the utility power distribution module 1 and the UPS power distribution module 2, the installation site is installed on the corresponding installation space. The mounting mode can be selected from multiple modes, such as bolt connection, the mounting is convenient, and the cleanliness is high.
The base 3 includes a frame body 32 and a base plate 33, the frame body 32 has a set height, and the base plate 33 is provided with an installation space, and a lower side heat dissipation opening 31 of the installation space. The frame body 32 and the base plate 33 are provided with the heat dissipation air duct 34, the outlet of the heat dissipation air duct 34 is arranged on the side surface of the frame body 32, and the heat dissipation efficiency of the heat dissipation opening 31 can be improved due to the arrangement of the heat dissipation air duct 34.
As shown in fig. 5, in the present embodiment, an air guiding tube 35 is disposed in the heat dissipating air duct 34, and the air guiding tube 35 has an air outlet corresponding to the heat dissipating opening 31, so as to increase the heat dissipating effect of the heat dissipating opening 31.
In the power distribution equipment for the modular data center machine room of the embodiment, the input end of the transformer 11 is normally connected with an external cable of an external power supply, the output end of the transformer is electrically connected with the first power distribution cabinets 12, the first power distribution cabinets 12 are connected with the power utilization end 4, and the commercial power distribution module 1 supplies power to the power utilization end 4; when the external power supply is powered off, the output end of the UPS outgoing line cabinet is connected with the second power distribution cabinets 22 through cables, the second power distribution cabinets 22 are connected with the power utilization end 4, and the UPS power distribution module 2 supplies power to the power utilization end 4 at the moment; when UPS distribution module 2 supplies power, the generating set starts, and after the generating set started, the output of generating set was connected with transformer 11, by a plurality of first switch board 12 is connected with power consumption end 4 electricity, also supplies power for the feeder ear for commercial power distribution module 1 this moment. When the commercial power distribution module 1 supplies power, the input end of the UPS power supply cabinet is electrically connected with the transformer 11, and the electric energy output by the transformer 11 charges the UPS power supply cabinet.
The power distribution equipment for the modular data center machine room, the generator set, the transformer 11, the first power distribution cabinets 12, the first monitoring systems, the UPS power supply cabinet, the UPS host, the UPS outgoing line cabinet, the second monitoring systems and the second power distribution cabinets 22 can be prefabricated according to the use requirements of an installation site or the customization requirements when the installation site is not built yet, the prefabricated power distribution equipment is directly installed on the installation site after the prefabrication is completed, the operation steps on the installation site can be reduced, the installation operation cleanliness is high, the integrity of the installed commercial power distribution module 1 and the installed UPS distribution module 2 is good, the butt joint problem is not easily caused, and the precision of construction results can be ensured; because the commercial power distribution module 1 and the UPS distribution module 2 can be debugged, tested and the like firstly when being prefabricated, the debugging and testing time on the installation site is reduced; therefore, the utility model discloses a distribution equipment has construction cycle end, reliability height, and can adapt to the advantage of various customer demands.
It should be understood that the above examples are only for clarity of illustration and are not intended to limit the embodiments. Other variations and modifications will be apparent to persons skilled in the art in light of the above description. And are neither required nor exhaustive of all embodiments. And obvious variations or modifications can be made without departing from the scope of the invention.
Claims (9)
1. A modular power distribution equipment for a data center room, comprising:
the commercial power distribution module (1) and the UPS distribution module (2) are respectively and independently arranged and are prefabricated;
the base (3) is prefabricated and provided with a plurality of installation spaces for arranging the commercial power distribution module (1) and the UPS distribution module (2);
commercial power distribution module (1) with after UPS distribution module (2) prefabrication is accomplished, install on base (3).
2. Modular data centre room power distribution apparatus according to claim 1, wherein the mains power distribution modules (1) and the UPS power distribution modules (2) are each arranged in a row.
3. The modular power distribution equipment for the data center room as claimed in claim 1, wherein the utility power distribution module (1) comprises a generator set, a transformer (11), a plurality of first power distribution cabinets (12) and a first monitoring system, and the generator set, the transformer (11), the first power distribution cabinets (12) and the first monitoring system are arranged in the corresponding installation space after prefabrication.
4. The power distribution equipment for modular data center room according to claim 3, wherein an input end of the transformer (11) is electrically connected to an external cable and the generator set, an output end of the transformer (11) is electrically connected to the first power distribution cabinets (12) through a conductive bar, and the first power distribution cabinets (12) are electrically connected to each other through the conductive bar.
5. The power distribution equipment for the modular data center machine room according to claim 4, wherein the UPS power distribution module (2) comprises a UPS power supply cabinet, a UPS host, a UPS outgoing line cabinet, a second monitoring system and a plurality of second power distribution cabinets (22), and the UPS power supply cabinet, the UPS host, the UPS outgoing line cabinet, the second monitoring system and the second power distribution cabinets (22) are arranged in the corresponding installation spaces after prefabrication is completed.
6. The distribution equipment for modular data center room according to claim 5, wherein the input terminal of the UPS power supply cabinet is electrically connected to the transformer (11) through a cable, the output terminal of the UPS outgoing line cabinet is electrically connected to the second distribution cabinets (22) through a cable, and the second distribution cabinets (22) are electrically connected to each other through the conductive bar.
7. The modular data center room power distribution apparatus as claimed in any one of claims 1 to 6, wherein a heat sink (31) is disposed on the base (3) corresponding to each installation space.
8. The modular data center room power distribution equipment according to claim 7, wherein the heat dissipation opening (31) is located at a lower side of the installation space, and the base (3) is provided with a heat dissipation air duct (34) communicated with the outside.
9. The power distribution equipment for the modular data center room according to claim 8, wherein the base (3) comprises a frame body (32) and a base plate (33), the frame body (32) has a set height, the base plate (33) is provided with an installation space, the heat dissipation opening (31) is arranged on the base plate (33), and the outlet of the heat dissipation air duct (34) is located at the side of the frame body (32).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920965964.8U CN210074588U (en) | 2019-06-25 | 2019-06-25 | Power distribution equipment for modular data center machine room |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920965964.8U CN210074588U (en) | 2019-06-25 | 2019-06-25 | Power distribution equipment for modular data center machine room |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210074588U true CN210074588U (en) | 2020-02-14 |
Family
ID=69428601
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920965964.8U Active CN210074588U (en) | 2019-06-25 | 2019-06-25 | Power distribution equipment for modular data center machine room |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210074588U (en) |
-
2019
- 2019-06-25 CN CN201920965964.8U patent/CN210074588U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8700224B2 (en) | System for a single point plug-in, connection of any combination of electric energy supply sources combined with smart load management and control of both supply and consumption of electric energy by a home or small business | |
US10521001B2 (en) | System and method for rack mountable modular DC power unit | |
US7701083B2 (en) | Portable hybrid applications for AC/DC load sharing | |
KR100970005B1 (en) | Distributing board of smart grid type | |
CN213521301U (en) | Data center power distribution system | |
CN215897051U (en) | Novel switch board is used in energy storage | |
US11334136B1 (en) | Power loss siren | |
CN111488049A (en) | Server cabinet power supply system and control method | |
CN107134933A (en) | A kind of power-supply device exported with multiple voltage grade | |
CN210074588U (en) | Power distribution equipment for modular data center machine room | |
CN212009422U (en) | Power compensation device and cabinet system | |
CN116545097A (en) | Power supply system | |
CN212462270U (en) | AC power supply line and cabinet device | |
US11614783B2 (en) | Method and system for providing power from a utility power source or a photovoltaic (PV) system to information technology | |
CN201830131U (en) | High-voltage direct current power supply | |
CN113437739A (en) | Integrated power supply cabinet | |
CN207074414U (en) | A kind of server powersupply system | |
CN203456931U (en) | High-voltage DC power supply system for data center | |
CN208564072U (en) | Communications equipment room | |
CN110783827A (en) | Combined power supply and distribution system | |
KR20230028199A (en) | power distribution panel | |
CN219576654U (en) | Micro-grid circuit system sharing battery and energy storage equipment | |
CN220022343U (en) | Power supply system | |
CN221767863U (en) | Redundant high-voltage direct-current high-power combiner plate | |
CN213072425U (en) | Railway interval communication equipment direct current remote power supply local side equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |