CN210069179U - Building waterproof construction pipeline - Google Patents

Building waterproof construction pipeline Download PDF

Info

Publication number
CN210069179U
CN210069179U CN201920896600.9U CN201920896600U CN210069179U CN 210069179 U CN210069179 U CN 210069179U CN 201920896600 U CN201920896600 U CN 201920896600U CN 210069179 U CN210069179 U CN 210069179U
Authority
CN
China
Prior art keywords
connecting pipe
clamp
pipeline body
waterproof construction
pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920896600.9U
Other languages
Chinese (zh)
Inventor
黄建英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Huiyuan Water Conservancy And Hydropower Construction Engineering Co Ltd
Original Assignee
Hubei Huiyuan Water Conservancy And Hydropower Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Huiyuan Water Conservancy And Hydropower Construction Engineering Co Ltd filed Critical Hubei Huiyuan Water Conservancy And Hydropower Construction Engineering Co Ltd
Priority to CN201920896600.9U priority Critical patent/CN210069179U/en
Application granted granted Critical
Publication of CN210069179U publication Critical patent/CN210069179U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Thermal Insulation (AREA)

Abstract

The utility model discloses a building waterproof construction pipeline, including pipeline body, first connecting pipe, second connecting pipe and third connecting pipe, the insulating layer is installed in the inner wall laminating of pipeline body, the welding of the top face of third connecting pipe has the second clamp, rotate on the second clamp and install first bolt, second connecting pipe slidable mounting is in the third connecting pipe, first connecting pipe slidable mounting is in the second connecting pipe, the welding of the bottom face of first connecting pipe has first clamp, rotate on the first clamp and install the second bolt. The utility model discloses possess simple structure, the simple operation, the practicality is better and prevent the advantage of the deformation of leaking.

Description

Building waterproof construction pipeline
Technical Field
The utility model relates to the technical field of pipelines, specifically be a building waterproof construction pipeline.
Background
The building waterproof construction pipeline is as follows: according to the current situation of the facilities under the municipal roads in China, different pipelines such as electric power, communication, coal gas, water supply and drainage pipelines are generally arranged, and the drainage pipelines take measures of rainwater and sewage diversion into consideration, namely rainwater is generally discharged into rivers nearby, and sewage is discharged into a sewage treatment plant, so that the municipal drainage pipelines comprise two pipelines of rainwater and sewage.
However, after the existing pipeline is installed, the pipeline is easy to loosen and leak due to the corrosive force of sewage, and the material is easy to deform after long-time use, so that the practicability is poor.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a building waterproof construction pipeline possesses simple structure, the simple operation, and the practicality is better and prevent to leak the advantage of deformation, has solved behind the current piping erection because the corrosive force of sewage causes the pipeline not hard up easily and leaks, and the material warp easily after long-time the use, causes the not good problem of practicality.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a building waterproof construction pipeline, includes pipeline body, first connecting pipe, second connecting pipe and third connecting pipe, the insulating layer is installed in the inner wall laminating of pipeline body, the welding of the top face of third connecting pipe has the second clamp, rotate on the second clamp and install first bolt, second connecting pipe slidable mounting is in the third connecting pipe, first connecting pipe slidable mounting is in the second connecting pipe, the welding of the bottom face of first connecting pipe has first clamp, rotate on the first clamp and install the second bolt.
Preferably, the thermal-protective layer adopts ceramic fiber material, and the inner wall laminating of thermal-protective layer installs the anticorrosive coating, and the anticorrosive coating adopts polytetrafluoroethylene material.
Preferably, the first sealing gasket is installed in the laminating of second clamp inner wall, and the second clamp is installed on the pipeline body through the laminating of first sealing gasket.
Preferably, a second limiting ring is welded on the top end face of the second connecting pipe, and the second connecting pipe is limited and fixed in the third connecting pipe through the second limiting ring.
Preferably, a first limiting ring is attached to the top end face of the first connecting pipe, and the first connecting pipe is limited and fixed in the second connecting pipe through the first limiting ring.
Preferably, the second sealing gasket is installed in the laminating of the inner wall of first clamp, and first clamp passes through the laminating of second sealing gasket and installs on the pipeline body.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model discloses a through setting up the pipeline body, when having reached building waterproof construction pipeline use, the pipeline body reduces the harm that natural environment brought through anticorrosive coating and the insulating layer of inner wall, simultaneously in order to prevent the condition that the pipeline body corrodes and appear leaking, operating personnel installs the third connecting pipe on the pipeline body in a sliding manner, operating personnel installs the back in the second clamp through laminating the first sealed pad simultaneously, and the third connecting pipe can be installed at the arbitrary position of pipeline body in a sliding manner, operating personnel rotates first bolt and fixes the second clamp on the pipeline body, operating personnel pull out the second connecting pipe and the first connecting pipe simultaneously, can strengthen the stability and the intensity of pipeline body after pulling out the first connecting pipe and the second connecting pipe simultaneously, operating personnel places the second sealed pad in the first clamp simultaneously, operating personnel rotates the second bolt and installs on the first clamp simultaneously, fix first clamp laminating on the pipeline body, collect leaking and prevent that liquid from directly flowing out the pipeline body through second connecting pipe, first connecting pipe and third connecting pipe when making the pipeline body leak, simple structure when making the waterproof construction pipeline of building use, the simple operation, pipeline stability is stronger and the better effect of practicality.
Drawings
Fig. 1 is a schematic view of the structure of the present invention;
fig. 2 is a schematic view of the internal structure of the third connecting tube of the present invention;
fig. 3 is a schematic top view of the present invention;
fig. 4 is a schematic bottom view of the present invention.
In the figure: 1. a pipe body; 2. a first clamp; 3. a first connecting pipe; 4. a second connecting pipe; 5. a third connecting pipe; 6. a second clamp; 7. a first bolt; 8. a second bolt; 9. a first spacing collar; 10. a second limit ring; 11. a first gasket; 12. an anticorrosive layer; 13. a thermal insulation layer; 14. a second gasket.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "both ends", "one end", "the other end" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element to which the reference is made must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "disposed," "connected," and the like are to be construed broadly, and for example, "connected" may be either fixedly connected or detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Referring to fig. 1 to 4, the present invention provides an embodiment: a building waterproof construction pipeline comprises a pipeline body 1, a first connecting pipe 3, a second connecting pipe 4 and a third connecting pipe 5, wherein a heat insulation layer 13 is installed on the inner wall of the pipeline body 1 in a fitting mode, the heat insulation layer 13 is made of ceramic fiber materials, an anticorrosion layer 12 is installed on the inner wall of the heat insulation layer 13 in a fitting mode, the anticorrosion layer 12 is made of polytetrafluoroethylene materials, a second clamp 6 is welded on the top end face of the third connecting pipe 5, a first bolt 7 is installed on the second clamp 6 in a rotating mode, a first sealing gasket 11 is installed on the inner wall of the second clamp 6 in a fitting mode, the second clamp 6 is installed on the pipeline body 1 in a fitting mode through the first sealing gasket 11, the second connecting pipe 4 is installed in the third connecting pipe 5 in a sliding mode, a second limiting ring 10 is welded on the top end face of the second connecting pipe 4, the second connecting pipe 4 is fixed in the third connecting pipe 5 in a limiting mode, the top end face of the first connecting pipe 3 is provided with a first limiting ring 9 in an attaching mode, the first connecting pipe 3 is limited and fixed in the second connecting pipe 4 through the first limiting ring 9, the bottom end face of the first connecting pipe 3 is welded with a first clamp 2, a second bolt 8 is rotatably arranged on the first clamp 2, a second sealing gasket 14 is attached and arranged on the inner wall of the first clamp 2, the first clamp 2 is attached and arranged on the pipeline body 1 through the second sealing gasket 14, when the building waterproof construction pipeline is used, the pipeline body 1 reduces damage brought by natural environment through an anticorrosive coating 12 and a heat insulation coating 13 on the inner wall, meanwhile, in order to prevent water leakage caused by corrosion of the pipeline body 1, an operator slidably installs the third connecting pipe 5 on the pipeline body 1, and simultaneously, after the operator attaches and installs the first sealing gasket 11 in the second clamp 6, and the third connecting pipe 5 is slidably installed at any position of the pipe body 1, the operator rotates the first bolt 7 to fix the second clamp 6 to the pipe body 1, meanwhile, an operator pulls the second connecting pipe 4 and the first connecting pipe 3 out, the stability and the strength of the pipeline body 1 can be enhanced after the first connecting pipe 3 and the second connecting pipe 4 are pulled out, simultaneously operating personnel places the sealed 14 of second packing in first clamp 2, operating personnel rotates second bolt 8 and installs on first clamp 2 simultaneously, fix the laminating of first clamp 2 on pipeline body 1, through second connecting pipe 4 when making pipeline body 1 leak, first connecting pipe 3 and third connecting pipe 5 are collected leaking and are prevented that liquid from directly flowing out pipeline body 1, simple structure when making the waterproof construction pipeline of building use, the simple operation, pipeline stability is stronger and the better effect of practicality.
The working principle is as follows: the pipeline body 1 reduces the damage caused by the natural environment through the anticorrosive coating 12 and the thermal insulating coating 13 on the inner wall, meanwhile, in order to prevent the water leakage of the pipeline body 1 caused by corrosion, an operator slidably installs the third connecting pipe 5 on the pipeline body 1, and simultaneously, the operator installs the first sealing gasket 11 in the second clamp 6 in an attaching manner, and the third connecting pipe 5 can be slidably installed at any position of the pipeline body 1, the operator rotates the first bolt 7 to fix the second clamp 6 on the pipeline body 1, simultaneously, the operator pulls out the second connecting pipe 4 and the first connecting pipe 3, the stability and the strength of the pipeline body 1 can be enhanced after the first connecting pipe 3 and the second connecting pipe 4 are pulled out, simultaneously, the operator places the second sealing gasket 14 in the first clamp 2, and simultaneously, the operator rotatably installs the second bolt 8 on the first clamp 2, fix first clamp 2 laminating on pipeline body 1, make pipeline body 1 leak when through second connecting pipe 4, first connecting pipe 3 and third connecting pipe 5 to leaking collect and prevent that liquid from directly flowing out pipeline body 1.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (6)

1. The utility model provides a waterproof construction pipeline of building, includes pipeline body (1), first connecting pipe (3), second connecting pipe (4) and third connecting pipe (5), its characterized in that: insulating layer (13) are installed in the inner wall laminating of pipeline body (1), the top face welding of third connecting pipe (5) has second clamp (6), rotate on second clamp (6) and install first bolt (7), second connecting pipe (4) slidable mounting is in third connecting pipe (5), first connecting pipe (3) slidable mounting is in second connecting pipe (4), the bottom face welding of first connecting pipe (3) has first clamp (2), rotate on first clamp (2) and install second bolt (8).
2. The waterproof construction pipe for building of claim 1, wherein: the heat insulation layer (13) is made of ceramic fiber materials, the inner wall of the heat insulation layer (13) is attached with an anticorrosive layer (12), and the anticorrosive layer (12) is made of polytetrafluoroethylene materials.
3. The waterproof construction pipe for building of claim 1, wherein: the first sealing gasket (11) is installed in the laminating of second clamp (6) inner wall, and installs on pipeline body (1) second clamp (6) through the laminating of first sealing gasket (11).
4. The waterproof construction pipe for building of claim 1, wherein: the top end face of the second connecting pipe (4) is welded with a second limiting ring (10), and the second connecting pipe (4) is limited and fixed in the third connecting pipe (5) through the second limiting ring (10).
5. The waterproof construction pipe for building of claim 1, wherein: the top end face of the first connecting pipe (3) is attached with a first limiting ring (9), and the first connecting pipe (3) is limited and fixed in the second connecting pipe (4) through the first limiting ring (9).
6. The waterproof construction pipe for building of claim 1, wherein: the inner wall laminating of first clamp (2) is installed the sealed pad (14) of second, and first clamp (2) are installed on pipeline body (1) through the laminating of the sealed pad (14) of second.
CN201920896600.9U 2019-06-14 2019-06-14 Building waterproof construction pipeline Expired - Fee Related CN210069179U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920896600.9U CN210069179U (en) 2019-06-14 2019-06-14 Building waterproof construction pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920896600.9U CN210069179U (en) 2019-06-14 2019-06-14 Building waterproof construction pipeline

Publications (1)

Publication Number Publication Date
CN210069179U true CN210069179U (en) 2020-02-14

Family

ID=69427527

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920896600.9U Expired - Fee Related CN210069179U (en) 2019-06-14 2019-06-14 Building waterproof construction pipeline

Country Status (1)

Country Link
CN (1) CN210069179U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114562674A (en) * 2020-11-27 2022-05-31 恩凯 Thermal insulation structure for flange joint of extremely low temperature gas

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114562674A (en) * 2020-11-27 2022-05-31 恩凯 Thermal insulation structure for flange joint of extremely low temperature gas

Similar Documents

Publication Publication Date Title
CN210069179U (en) Building waterproof construction pipeline
KR100663859B1 (en) Groundwater well-sealed top protection device with a water supply pocket.
CN208502680U (en) A kind of geothermal well water intaking pump tube device
CN210221178U (en) Gas meter with safety protection device
CN214146574U (en) Specially-made waterproof gasket with strong sealing performance
CN205244643U (en) Municipal administration is with having drainage pipe who prevents corrosive effects
CN213236436U (en) Connecting device for municipal drainage pipeline
CN208793816U (en) A kind of Prestressed concrete cylinder pipe and matched sealing ring
CN214743959U (en) High-strength waterproof structure for water conservancy construction
CN217330301U (en) Waterproof device for foundation penetrating through flexible pipe
CN112325006A (en) Environment-friendly directly-buried heat preservation pipe convenient to install quickly and using method thereof
CN218116625U (en) Portable siphon reservoir water taking and discharging device
CN212960395U (en) Well wall sealing device
CN206563146U (en) A kind of rotary sealing appts
CN206386588U (en) The multi-sealed cutting ferrule of one kind combination
CN218409031U (en) Leakage-proof pipeline and pipeline leakage stopping device
CN201096245Y (en) Metal corrugated pipe quick-mounting joint for on-site mounting
CN215217741U (en) Water level gauge pipeline installation structure convenient to maintain and overhaul
CN216156740U (en) Corrosion-resistant effectual municipal drainage pipe
CN214889540U (en) Municipal administration heating pipeline mounting structure
CN216201355U (en) Water supply and drainage pipe joint with good sealing performance
CN218645005U (en) Pipeline connecting structure
CN217601518U (en) Sealing device for underground well chamber of direct-buried heat supply pipeline
CN210661693U (en) Pipeline for building waterproof construction
CN221127061U (en) 700MW hydroelectric set stator bar prevents revealing evaporative cooling system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200214

Termination date: 20200614