CN210067193U - Suspender reinforcing device - Google Patents

Suspender reinforcing device Download PDF

Info

Publication number
CN210067193U
CN210067193U CN201920630364.6U CN201920630364U CN210067193U CN 210067193 U CN210067193 U CN 210067193U CN 201920630364 U CN201920630364 U CN 201920630364U CN 210067193 U CN210067193 U CN 210067193U
Authority
CN
China
Prior art keywords
fastener
jib
horizontal support
support piece
boom
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920630364.6U
Other languages
Chinese (zh)
Inventor
侯阳
李光
赵晓娟
宋波
宋繁华
何均
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN201920630364.6U priority Critical patent/CN210067193U/en
Application granted granted Critical
Publication of CN210067193U publication Critical patent/CN210067193U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model relates to a jib reinforcing apparatus. This jib reinforcing apparatus includes and follows the perpendicular horizontal support piece who sets up of jib that same direction parallel laid the corresponding jib in the horizontal support piece outside is equipped with a fastener, and the fastener is established with horizontal support piece cooperation cover and is linked to each other, is equipped with the trompil that supplies the jib to pass on the fastener, is equipped with the screw hole on the fastener lateral wall, and a threaded fastener passes screw hole and horizontal support piece lateral wall butt, horizontal support piece is fixed with the jib butt under threaded fastener and fastener cooperation. This jib reinforcing apparatus can reduce the steel consumption of furred ceiling engineering, increases furred ceiling stability, and simple to operate is succinct.

Description

Suspender reinforcing device
Technical Field
The utility model relates to a jib reinforcing apparatus.
Background
Along with the building trade development, for making building pleasing to the eye can set up the furred ceiling, the furred ceiling fossil fragments and structural connection most often are the jib, and the pipeline is more and more synthesized in the building, for satisfying the requirement of synthesizing the pipeline installation, can suitably lengthen jib length, and when its length is greater than 1.5m, jib overlength and diameter ratio are less, and length and diameter (slenderness ratio) proportion is maladjusted, and the stability of furred ceiling skeleton will weaken like this. When the ceiling panel is subjected to upward thrust or negative wind pressure indoors, upward displacement (deformation) can be generated, so that the suspension rod is easy to bend to a certain extent; remove this power, receive the influence furred ceiling of gravity to resume original vertical state again, go round and begin again, the roughness of furred ceiling panel can receive certain influence, warp even. At this moment, a ceiling conversion layer or a reverse support is required to be arranged so as to increase the stability of the ceiling, the conversion layer or the reverse support is usually made of angle steel, the steel consumption and the labor quantity are large, and the engineering cost is greatly increased.
SUMMERY OF THE UTILITY MODEL
The utility model discloses a remedy prior art not enough, provide a jib reinforcing apparatus, can reduce the steel volume that uses of furred ceiling engineering, increase furred ceiling stability, simple to operate is succinct, has solved the problem that exists among the prior art.
The utility model discloses a realize through following technical scheme:
the utility model provides a jib reinforcing apparatus, includes horizontal support piece the horizontal support piece outside corresponds each jib and is equipped with a fastener, and the fastener is established with horizontal support piece cooperation cover and is linked to each other, is equipped with the trompil that supplies the jib to pass on the fastener, is equipped with the screw hole on the fastener lateral wall, and a threaded fastener passes screw hole and horizontal support piece lateral wall butt, horizontal support piece is fixed with the jib butt under threaded fastener and fastener cooperation.
The transverse supporting piece is perpendicular to the suspension rods which are arranged in parallel along the same direction.
The transverse supports support at least the connecting 2 spaced or adjacent booms.
The transverse supporting piece is a supporting rod, the supporting rod comprises a first vertical plate and a first transverse plate arranged at the upper end and the lower end of the same side of the first vertical plate, and the outer end of the first transverse plate is connected with the outer side wall of the hanging rod in an abutting mode;
the fastener includes a second riser and locates the second diaphragm at the upper and lower both ends of second riser homonymy, all opens at the one end of two second diaphragms and is equipped with a fluting, and the fluting end on each second diaphragm communicates the trompil, trompil upper and lower relative setting on two second diaphragms.
The opening comprises an arc-shaped section matched with the outer side wall of the suspender.
The first transverse plate is in clearance fit with the second transverse plate.
The threaded fastener is a screw, a bolt or a bolt.
The clamping pieces are continuously or alternately arranged on the hanging rods which are arranged in parallel in the same direction.
The supporting rod and the clamping piece are respectively a light steel supporting rod and a light steel clamping piece.
The wall thickness of the light steel supporting rod and the wall thickness of the light steel clamping piece are both 1.2-3 mm.
The utility model has the advantages that:
this jib reinforcing apparatus installs through threaded fastener, bracing piece, and the interval can be adjusted according to actual conditions, has realized the horizontal support of jib and has stabilized, and fixed mounting is convenient succinct. The trompil setting of fluting and fluting end on the fastener can make things convenient for the jib to pass, because the trompil has set up the segmental arc, is fit for the jib of different diameters to place, simultaneously, supports tight bracing piece through threaded fastener, makes bracing piece, fastener and jib monolithic stationary then. The supporting rod and the clamping piece are respectively a light steel supporting rod and a light steel clamping piece, the texture is light, materials are saved, the engineering cost is reduced, and the weight burden is not caused on the whole supporting body.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic side view of the structure of FIG. 1;
FIG. 3 is a schematic view of the card of FIG. 1;
fig. 4 is a schematic view of the installation of the system for reinforcing the suspender of the present invention.
In the figure, 1 transverse supporting piece, 2 clamping pieces, 3 holes, 4 threaded holes, 5 threaded fasteners, 6 first vertical plates, 7 first transverse plates, 8 second vertical plates, 9 second transverse plates, 10 grooves, 11 arc sections, 12 suspension rods and 13 main keels.
Detailed Description
In order to clearly illustrate the technical features of the present invention, the present invention is explained in detail by the following embodiments in combination with the accompanying drawings.
As shown in fig. 1-4, the suspender reinforcing device comprises transverse supporting members 1 which are perpendicular to suspenders 12 which are arranged in parallel along the same direction, wherein a clamping member 2 is arranged on the outer side of each transverse supporting member corresponding to each suspender, the clamping member is matched and sleeved with the transverse supporting member to be connected, an opening 3 for the suspender to pass through is arranged on the clamping member, a threaded hole 4 is arranged on the side wall of the clamping member, a threaded fastener 5 passes through the threaded hole to be abutted against the outer side wall of the transverse supporting member, and the transverse supporting member is abutted and fixed with the suspenders under the matching of the threaded fastener and the.
The transverse supporting piece is a supporting rod, the supporting rod comprises a first vertical plate 6 and a first transverse plate 7 arranged at the upper end and the lower end of the same side of the first vertical plate, and the outer end of the first transverse plate is connected with the outer side wall of the hanging rod in an abutting mode;
the fastener includes a second riser 8 and locates the second diaphragm 9 at the upper and lower both ends of second riser homonymy, all opens at the one end of two second diaphragms and is equipped with a fluting 10, and the fluting end on each second diaphragm communicates the trompil, trompil upper and lower relative setting on two second diaphragms.
The opening comprises an arcuate section 11 which engages the outer side wall of the boom.
The first transverse plate is in clearance fit with the second transverse plate.
The threaded fastener 5 is a flat head screw.
The clamping pieces 2 are continuously or alternately arranged on the hanging rods which are arranged in parallel in the same direction.
The supporting rod and the clamping piece are respectively a light steel supporting rod and a light steel clamping piece.
The wall thickness of the light steel support rod and the wall thickness of the light steel clamping piece are both 10 mm.
The use and installation process comprises the following steps: after the suspender is installed, the construction of the suspender reinforcing device is needed before the main keel is installed. The clamping pieces 2 are preferentially installed on the suspension rods which are arranged in parallel in the same direction, after the clamping pieces are installed, the supporting rods are inserted into the clamping pieces, the height positions of the clamping pieces can be adjusted after the installation is finished, and the clamping pieces and the supporting rods are horizontally arranged; and finally, fixing by adopting a flat head screw, enabling the flat head screw to pass through the threaded hole 4 and tightly support the first vertical plate 6 of the supporting rod, tightly supporting the outer end of the first transverse plate 7 of the first vertical plate 6 and further tightly supporting the outer side wall of the suspender, tightly supporting the arc-shaped section 11 of the open hole 3 of the clamping piece 2 by using the other outer side wall of the suspender, and finally realizing the transverse support of the installation fastening and the completion of the suspender.
As shown in fig. 4, for the system installation schematic diagram of this scheme jib reinforcing apparatus of adoption, jib length that is connected with main joist 13 in the picture is longer, for the stability of guaranteeing follow-up installation furred ceiling, has installed above-mentioned reinforced structure on the jib, has guaranteed the firm support of longer jib transverse direction, installs convenient, economical and practical.
The above installation method can also be changed as follows, for example, the support rods can be arranged firstly, then the clamping pieces 2 are sleeved on the support rods at the outer sides of the hanger rods corresponding to the support rods, then the clamping pieces 2 are horizontally slid, so that the hanger rods are gradually slid into the open holes 3 from the open grooves 10 on the second transverse plate 9 of the clamping pieces, and then the threaded fasteners are screwed to adjust and install the support rods.
The above-mentioned specific embodiments can not be regarded as the restriction to the scope of protection of the utility model, to technical personnel in this technical field, it is right the utility model discloses any replacement improvement or transform that embodiment made all fall within the scope of protection of the utility model.
The parts of the present invention not described in detail are the known techniques of those skilled in the art.

Claims (7)

1. The utility model provides a jib reinforcing apparatus, its characterized in that includes horizontal support piece the corresponding jib in the horizontal support piece outside is equipped with a fastener, and the fastener is established with horizontal support piece cooperation cover and is linked to each other, is equipped with the trompil that supplies the jib to pass on the fastener, is equipped with the screw hole on the fastener lateral wall, and a threaded fastener passes screw hole and horizontal support piece lateral wall butt, horizontal support piece is fixed with the jib butt under threaded fastener and fastener cooperation.
2. The suspender reinforcing device of claim 1, wherein the transverse supporting member is a supporting rod, the supporting rod comprises a first vertical plate and a first transverse plate arranged at the upper end and the lower end of the same side of the first vertical plate, and the outer end of the first transverse plate is connected with the outer side wall of the suspender in an abutting manner;
the fastener includes a second riser and locates the second diaphragm at the upper and lower both ends of second riser homonymy, all opens at the one end of two second diaphragms and is equipped with a fluting, and the fluting end on each second diaphragm communicates the trompil, trompil upper and lower relative setting on two second diaphragms.
3. The boom reinforcement of claim 2, wherein said opening comprises an arcuate section that engages an outer sidewall of the boom.
4. The boom reinforcement of claim 2, wherein the first cross plate is a clearance fit with the second cross plate.
5. The boom reinforcement of claim 1, wherein the threaded fasteners are screws, bolts or bolts.
6. The boom reinforcement apparatus of claim 1, wherein the clamps are provided continuously or at intervals on the boom arranged in parallel in the same direction.
7. The boom reinforcement of claim 1, wherein the cross supports and catches are light steel cross supports and light steel catches, respectively.
CN201920630364.6U 2019-04-30 2019-04-30 Suspender reinforcing device Expired - Fee Related CN210067193U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920630364.6U CN210067193U (en) 2019-04-30 2019-04-30 Suspender reinforcing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920630364.6U CN210067193U (en) 2019-04-30 2019-04-30 Suspender reinforcing device

Publications (1)

Publication Number Publication Date
CN210067193U true CN210067193U (en) 2020-02-14

Family

ID=69450221

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920630364.6U Expired - Fee Related CN210067193U (en) 2019-04-30 2019-04-30 Suspender reinforcing device

Country Status (1)

Country Link
CN (1) CN210067193U (en)

Similar Documents

Publication Publication Date Title
CN110512790B (en) High and large space multi-curvature suspended ceiling structure and construction method thereof
CN108049552A (en) Top hangs drop level furred ceiling and installation method
CN112064856B (en) Suspended ceiling pre-hanging piece and floor structure of building with same
CN204475846U (en) A kind of conversion support system for socket joint dish button steel tube frame
CN212897123U (en) Adjustable conversion floor unit plate ceiling
CN111456425A (en) Temporary supporting device, temporary supporting structure and temporary supporting method for floor bearing plate
CN208899928U (en) Stage building structure
CN210067193U (en) Suspender reinforcing device
CN204781548U (en) Aluminum plate furred ceiling suspended structure
CN210002670U (en) assembled ceiling structure
CN109083323A (en) A kind of install convenient and the movable villa furred ceiling composite plate with pooling feature
CN110512766B (en) Fabricated structure system of steel plate concrete shear wall and construction method thereof
CN109555257B (en) Combined supporting and hanging rod type suspended ceiling and construction method
CN110820567A (en) Bearing type hanging basket for PC box girder part with corrugated steel web plate
CN207863266U (en) Connector for furred ceiling conversion layer
CN206971499U (en) A kind of copper plate curtain wall system for being mounted in parallel plate
CN209874218U (en) Light keel decorative structure
CN204960324U (en) Suspension type floor formwork support device
CN110212843B (en) Reinforcing device of photovoltaic support template and positioning method thereof
CN113293923A (en) Lifting point dislocation adjusting structure of keel and mounting method
CN208251617U (en) A kind of deformation joint dual-shear force wall template assembling and disassembling device
CN110359548A (en) A kind of steel truss suspension hybrid system and construction method
CN204782011U (en) Bed -jig is assembled to height -adjustable steel construction
CN206016262U (en) A kind of civil engineering building template link
CN210263476U (en) Mounting structure of high wall body in large tracts of land unidirectional flow toilet

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200214