CN210066838U - Mounting structure of template all around water-resistant board - Google Patents

Mounting structure of template all around water-resistant board Download PDF

Info

Publication number
CN210066838U
CN210066838U CN201920604742.3U CN201920604742U CN210066838U CN 210066838 U CN210066838 U CN 210066838U CN 201920604742 U CN201920604742 U CN 201920604742U CN 210066838 U CN210066838 U CN 210066838U
Authority
CN
China
Prior art keywords
template
water
fixed pipe
fixing
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920604742.3U
Other languages
Chinese (zh)
Inventor
徐博
林先祥
郭大富
王孟
张冠宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SICHUAN AEROSPACE CONSTRUCTION ENGINEERING Co Ltd
Original Assignee
SICHUAN AEROSPACE CONSTRUCTION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SICHUAN AEROSPACE CONSTRUCTION ENGINEERING Co Ltd filed Critical SICHUAN AEROSPACE CONSTRUCTION ENGINEERING Co Ltd
Priority to CN201920604742.3U priority Critical patent/CN210066838U/en
Application granted granted Critical
Publication of CN210066838U publication Critical patent/CN210066838U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The utility model relates to a mounting structure of water-resistant board template all around belongs to the construction field, including the basic bed course, be provided with first template and second template on the basic bed course, first template perpendicular to second template sets up, and the second template highly is higher than first template, is provided with a plurality of fixed pipes in first template and the second template, and the whole shape of fixed pipe is "L" shape, and the both ends of the fixed pipe of "L" shape are located first template and second template respectively, are provided with on the fixed pipe to be used for fixing fixed pipe to the first mounting in first template and the second template, the utility model discloses have the better effect of reinforcing effect.

Description

Mounting structure of template all around water-resistant board
Technical Field
The utility model belongs to the technical field of the technique of construction and specifically relates to a mounting structure of water-resistant board template all around is related to.
Background
The water-resistant plate has the main function of water proofing of a basement, foundation components such as an independent foundation and a strip foundation are arranged below bearing components such as an upper column wall, the water-resistant plate is not used as a bearing component, but is used for connecting the stressed independent foundation into a whole, the integral performance of the structure is improved, a waterproof retaining wall is usually arranged on the water-resistant plate, a template of the water-resistant plate is required to be installed firstly in the construction of the water-resistant plate, then concrete is poured, the installation and reinforcement of the template around the water-resistant plate are very important in the installation of the template of the water-resistant plate, in the prior art, the template is usually reinforced by using a screw, but the fixing effect generated by reinforcing by using the screw is poor, the condition of mold explosion is very easily generated in the process of pouring the concrete, and the construction progress is greatly influenced.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a consolidate better water-resistant board mounting structure of template all around of effect.
The utility model aims at realizing through the following technical scheme:
the utility model provides a mounting structure of template all around of water-resistant board, includes the basic bed course, be provided with first template and second template on the basic bed course, first template perpendicular to second template sets up, the second template highly be higher than first template, be provided with a plurality of fixed pipes on first template and the second template, the whole shape of fixed pipe is "L" shape, "L" shape the both ends of fixed pipe are located first template and second template respectively, be provided with on the fixed pipe and be used for fixed first mounting to first template and second template.
Through adopting above-mentioned technical scheme, when the template of the anti water board of installation, need to resist strengthening all around of water board template, the staff will fix the pipe installation to first template and second template this moment, and make the corner of fixed pipe be located the handing-over department of first template and second template, it is fixed with the position of fixed pipe to recycle first mounting, thereby make first template and second template link into whole through fixed pipe, thereby the holistic fixity of template has been increased, the condition that can reduce the mould that explodes at concreting takes place.
The utility model discloses further set up to: the first fixing piece comprises a fixing rod arranged between a fixing pipe and a first template, the fixing rod is welded with the fixing pipe and the first template, and the fixing pipe is welded with a second template through the fixing rod.
Through adopting above-mentioned technical scheme, will fix the pipe through the dead lever and weld with first template and second template respectively, realized the fixed of fixed pipe, and welded fixed effect is better, can couple together first template, second template and fixed union coupling better.
The utility model discloses further set up to: the fixed pipe slope sets up on first template and second template, the both ends of fixed pipe extend and the butt to the basic bed course towards the basic bed course on.
Through adopting above-mentioned technical scheme, will fix the slope of pipe and set up on first template and second template, can increase the reinforced (rfd) scope of fixed pipe, improved the fixed effect of fixed pipe to first template and second template.
The utility model discloses further set up to: the fixed slot has been seted up at the handing-over department of first template and second template and the position that is located fixed pipe place, fixed pipe joint is in the fixed slot.
Through adopting above-mentioned technical scheme, when the installation fixed rod pipe, can arrange fixed pipe in fixed slot inside groove to make fixed pipe can adjust the position when fixed more conveniently.
The utility model discloses further set up to: and a third template is arranged on the first template along the length direction of the second template, the top surface of the third template is flush with the top surface of the second template, and a second fixing part for fixing the third template is arranged between the second template and the third template.
Through adopting above-mentioned technical scheme, after installation and fixed first template and second template, it is fixed with first template through the second mounting with the third template, when concreting, here alright in order to form the waterproof barricade of water-resistant board for waterproof barricade can be with the shaping together of water-resistant board, make the water-proof effects that waterproof barricade played better.
The utility model discloses further set up to: the second fixing part comprises a plurality of oppositely-pulling screw rods arranged between the second template and the third template, the two ends of the oppositely-pulling screw rods penetrate through the second template and the third template, the two ends of the oppositely-pulling screw rods are respectively in threaded connection with fixing nuts, and the fixing nuts are respectively abutted to the second template and the third template.
Through adopting above-mentioned technical scheme, after the installation third template, will pass second template and third template to the screw rod that draws, then twist two fixation nut respectively to the both ends of drawing the screw rod, make two fixation nut butt joint respectively to the outside of second template and second template, so alright in order to fix the position of third template.
The utility model discloses further set up to: the opposite-pulling screw rod is a water-stopping screw rod.
Through adopting above-mentioned technical scheme, stay the stagnant water screw rod in waterproof barricade when form removal, the imperviousness of wall body can be guaranteed to the stagnant water screw rod, improves the waterproof performance of waterproof barricade.
The utility model discloses further set up to: the fixed pipe is a steel pipe.
Through adopting above-mentioned technical scheme, the steel pipe has better bending resistance, can play better fixed action, and its self weight is lighter for the construction of fixed pipe is more convenient.
To sum up, the utility model discloses a beneficial technological effect does:
1. the plurality of L-shaped fixing pipes are arranged on the first template and the second template, so that two ends of each fixing pipe are fixedly connected with the first template and the second template respectively, the fixing pipes connect the first template and the second template together, and the fixing pipes can prevent the joint position of the first template and the second template from being separated when concrete is poured, so that the condition of mold burst is reduced;
2. the fixing pipe is obliquely arranged on the first template and the second template, so that the fixing range of the fixing pipe is larger, and the fixing effect of the fixing pipe on the first template and the second template is improved;
3. through setting up the third template that highly flushes with the second template to through the position of the fixed third template of diagonal draw screw rod, make the waterproof barricade of water-resistant board can be together the shaping with water-resistant board, improved the water-proof effects of waterproof barricade.
Drawings
Fig. 1 is a schematic overall structure diagram of an embodiment of the present invention;
FIG. 2 is an enlarged partial schematic view of portion A of FIG. 1;
FIG. 3 is an enlarged partial schematic view of portion B of FIG. 1;
fig. 4 is a schematic view of a part of the structure of the embodiment of the present invention after the fixing tube is hidden.
In the figure, 1, a base mat layer; 2. a first template; 3. a second template; 4. a fixed tube; 41. fixing the rod; 42. fixing grooves; 5. a third template; 51. oppositely pulling the screw rod; 52. and (5) fixing the nut.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
Referring to fig. 1, for the utility model discloses a mounting structure of template all around of water-resistant board, including basic bed course 1, be provided with first template 2 and second template 3 on the basic bed course 1 (only state the installation of a corner template of water-resistant board in this embodiment, the template mounting structure of other corners is the same with this department), first template 2 and the setting of second template 3 mutually perpendicular, be provided with the fixed pipe 4 of "L" shape on first template 2 and the second template 3, the both ends of the fixed pipe 4 of "L" shape are located first template 2 and second template 3 respectively, and the handing-over department laminating of its notch and first template 2 and second template 3, in order to improve the fixed range and the effect of fixed pipe 4, fixed pipe 4 inclines to set up on first template 2 and second template 3 towards basic bed course 1.
Referring to fig. 1 and 2, be provided with dead lever 41 between fixed pipe 4 and the first template 2, dead lever 41 and fixed pipe 4 and the equal welding setting of first template 2, also be connected to together through dead lever 41 between fixed pipe 4 and the second template 3, for the installation of convenient fixed pipe 4, fixed slot 42 (see fig. 4) has been seted up in handing-over department of first template 2 and second template 3, but fixed pipe 4 joint is in fixed slot 42, guarantee the fixed effect of fixed pipe 4 simultaneously, set up fixed pipe 4 into the steel pipe.
Referring to fig. 1 and 3, a third template 5 is arranged on the first template 2 along the length direction of the second template 3, the third template 5 is flush with the top surface of the second template 3, a plurality of counter-pull screws 51 are arranged between the second template 3 and the third template 5, the counter-pull screws 51 are arranged through the second template 3 and the third template 5, two ends of the counter-pull screws 51 are in threaded connection with fixing nuts 52 respectively abutted to the second template 3 and the third template 5, and the counter-pull screws 51 are water stop screws; through the setting of third template 5 for the waterproof barricade of water-resistant board can be together the shaping with water-resistant board, thereby has improved the water-proof effects of waterproof barricade, and owing to draw screw rod 51 to the water screw rod, stay it in waterproof barricade when waterproof barricade form removal, can guarantee the imperviousness of waterproof barricade.
The implementation principle of the embodiment is as follows: after installing first template 2 and second template 3, with fixed 4 joints of pipe to fixed slot 42 in, then through dead lever 41 with fixed 4 and the welding of first template 2 and second template 3 of pipe, so alright consolidate with handing-over department to first template 2 and second template 3, when concreting, fixed pipe 4 alright play the effect that prevents first template 2 and second template 3 and break away from, consolidate through four corners of antagonism water board template, alright produce the condition of exploding the mould with significantly reduced.
The embodiment of this specific implementation mode is the preferred embodiment of the present invention, not limit according to this the utility model discloses a protection scope, so: all equivalent changes made according to the structure, shape and principle of the utility model are covered within the protection scope of the utility model.

Claims (8)

1. The utility model provides a mounting structure of template around water-resistant board which characterized in that: including basic bed course (1), be provided with first template (2) and second template (3) on basic bed course (1), first template (2) perpendicular to second template (3) set up, highly being higher than first template (2) of second template (3), be provided with a plurality of fixed pipes (4) on first template (2) and second template (3), the whole shape of fixed pipe (4) is "L" shape, "L" shape the both ends of fixed pipe (4) are located first template (2) and second template (3) respectively, be provided with on fixed pipe (4) and be used for fixing fixed pipe (4) to the first mounting on first template (2) and second template (3).
2. The installation structure of the water-resistant board surrounding formwork according to claim 1, characterized in that: the first fixing piece comprises a fixing rod (41) arranged between a fixing pipe (4) and a first template (2), the fixing rod (41) is welded with the fixing pipe (4) and the first template (2), and the fixing pipe (4) is welded with a second template (3) through the fixing rod (41).
3. The installation structure of the water-resistant board surrounding formwork according to claim 1, characterized in that: the fixed pipe (4) is obliquely arranged on the first template (2) and the second template (3), and two ends of the fixed pipe (4) extend towards the foundation mat layer (1) and are abutted to the foundation mat layer (1).
4. The installation structure of the water-resistant board surrounding formwork according to claim 1, characterized in that: the joint of the first template (2) and the second template (3) is positioned at the position where the fixed pipe (4) is located, and a fixed groove (42) is formed in the position where the fixed pipe (4) is located, and the fixed pipe (4) is clamped in the fixed groove (42).
5. The installation structure of the water-resistant board surrounding formwork according to claim 1, characterized in that: the template is characterized in that a third template (5) is arranged on the first template (2) along the length direction of the second template (3), the top surface of the third template (5) is flush with the top surface of the second template (3), and a second fixing part for fixing the third template (5) is arranged between the second template (3) and the third template (5).
6. The mounting structure of the water-resistant board surrounding formwork according to claim 5, wherein: the second mounting is including setting up a plurality of to drawing screw rod (51) between second template (3) and third template (5), the both ends of drawing screw rod (51) are run through second template (3) and third template (5) setting, threaded connection has fixation nut (52), two respectively to the both ends of drawing screw rod (51) fixation nut (52) butt joint respectively to on second template (3) and third template (5).
7. The mounting structure of the water-resistant board surrounding formwork of claim 6, wherein: the counter-pulling screw rod (51) is a water-stopping screw rod.
8. The installation structure of the water-resistant board surrounding formwork according to claim 1, characterized in that: the fixed pipe (4) is a steel pipe.
CN201920604742.3U 2019-04-28 2019-04-28 Mounting structure of template all around water-resistant board Expired - Fee Related CN210066838U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920604742.3U CN210066838U (en) 2019-04-28 2019-04-28 Mounting structure of template all around water-resistant board

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920604742.3U CN210066838U (en) 2019-04-28 2019-04-28 Mounting structure of template all around water-resistant board

Publications (1)

Publication Number Publication Date
CN210066838U true CN210066838U (en) 2020-02-14

Family

ID=69449582

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920604742.3U Expired - Fee Related CN210066838U (en) 2019-04-28 2019-04-28 Mounting structure of template all around water-resistant board

Country Status (1)

Country Link
CN (1) CN210066838U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111945740A (en) * 2020-07-01 2020-11-17 中国建筑一局(集团)有限公司 Foundation pit water-resistant plate structure and construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111945740A (en) * 2020-07-01 2020-11-17 中国建筑一局(集团)有限公司 Foundation pit water-resistant plate structure and construction method

Similar Documents

Publication Publication Date Title
CN110761322B (en) Cast-in-place pipe gallery side wall horizontal construction joint reinforcing structure and construction method thereof
CN201649366U (en) Steel-bar truss concrete grouting wall structure
CN108277887A (en) Assembled built-in heat insulation layer concrete composite wall-light steel frame connecting node
CN210066838U (en) Mounting structure of template all around water-resistant board
CN211690922U (en) High-performance autoclaved aerated concrete integrated plate outer wall structure for prefabricated building
CN108571063A (en) A kind of shear wall structure building assembly System Design
CN210768050U (en) Assembled building cantilever wall formula mild steel attenuator connection structure
CN208105502U (en) Assembled built-in heat insulation layer concrete composite wall-light steel frame connecting node
CN207812307U (en) The construction system of Cable stayed Bridge Main Tower and steel anchor beam
CN211421637U (en) Connecting structure of prefabricated gutter
CN205421598U (en) Installation node of door opening department turning wall body
CN107035027A (en) A kind of assembled steel reinforced concrete structure light wt compound external wall panel
CN111962951A (en) Steel tube concrete column-H-shaped steel beam-steel support-Pi-shaped connecting piece combined type corner column bottom node and manufacturing method
CN110424534A (en) A kind of prefabricated assembled non-reinforced concrete frame and its construction method
CN216839907U (en) Connecting node structure of prefabricated floor slab, wall body and steel structure beam
CN112942660B (en) Steel and recycled concrete combined beam slab and assembling method thereof
CN208415493U (en) A kind of precast concrete, precast concrete wall panel and prefabricated buildings
CN213898249U (en) Reinforced structure of newly-added concrete beam
CN209397938U (en) One kind reinforcing tooling for Double-side laminated co-clip heart heat-preservation shear wall wall root
CN100392198C (en) Precast hollow unit type cast-in-situ reinforced concrete vacuum floor
RU2380494C1 (en) Butt joint of precast concrete columns with solid flooring
CN206467762U (en) A kind of modular architectural dresser mounting structure
CN217580826U (en) Prefabricated constructional column
CN220414956U (en) Camber reinforcing structure for brick-concrete wall
CN210195003U (en) Prefabricated superimposed sheet floor electric wiring structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200214