CN210066744U - Novel steel structure anchor pier for supporting slope prestressed anchor cable - Google Patents
Novel steel structure anchor pier for supporting slope prestressed anchor cable Download PDFInfo
- Publication number
- CN210066744U CN210066744U CN201920364911.0U CN201920364911U CN210066744U CN 210066744 U CN210066744 U CN 210066744U CN 201920364911 U CN201920364911 U CN 201920364911U CN 210066744 U CN210066744 U CN 210066744U
- Authority
- CN
- China
- Prior art keywords
- steel
- pipe
- anchor
- fixed
- plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
A novel steel structure anchor pier for supporting a pre-stressed anchor cable on a side slope comprises an anchor body, a through pipe, a fixing steel plate, a plurality of steel strands, an anchorage device and the through pipe, wherein a plurality of fixing steel bars are fixedly connected to two sides of the through pipe; the utility model discloses simple to operate easily carries, and the volume is less, has alleviateed staff's working strength, and the device can be tightly fixed with steel strand wires, prevents that steel strand wires from droing, is favorable to improving the security of engineering, protection staff's life safety.
Description
Technical Field
The utility model belongs to the technical field of the engineering apparatus, especially, relate to a novel steel construction anchor pier is used in side slope prestressed anchorage cable support.
Background
At present, steel cable structures are needed in many projects, for example, when the supporting frame and the engineering machine are installed in a fixed place, the steel cable structures are needed. However, when the support frame and the engineering machine are fixed by using the steel cable, the steel cable also needs to be fixed, most of the existing steel cable fixing devices use an anchor pier of a reinforced concrete structure, the anchor pier is used for transmitting the concentrated load of an anchor to a rock surface and adjusting the stress direction of the rock surface, in order to enable the upper surface of the anchor pier to be vertical to the axis of the anchor cable, a thin-walled steel pipe with the same outer diameter as that of a drill bit and a backing plate are welded in an orthogonal mode in advance, and the other end of the steel pipe is inserted into a drill hole before the anchor pier is poured. When the cable is used, the cable is easy to separate, is not firm to fix, is large in size, is not easy to carry, is troublesome to install, wastes a lot of time, and increases the working difficulty of workers.
Disclosure of Invention
To the above problem, the utility model provides a novel side slope prestressed anchorage cable is strutted and is used steel construction anchor pier.
The technical proposal of the utility model is that a novel steel structure anchor pier for supporting the pre-stressed anchor cable of the side slope comprises an anchor body, a through pipe, a fixed steel plate, a plurality of steel strands and an anchorage device,
the two sides of the through pipe are fixedly connected with a plurality of fixing steel bars, the left end of the through pipe is fixedly connected with a supporting plate, the supporting plate is provided with an opening corresponding to the through hole of the through pipe, the through pipe is fixedly connected inside the anchor body, the supporting plate is positioned on the left end surface of the anchor body,
the fixed steel plate is fixedly connected with the left side of the supporting plate, a plurality of through holes are arranged on the fixed steel plate corresponding to the positions of the holes of the supporting plate,
one end of the steel strand penetrates out of the through hole in the fixed steel plate through the through hole of the through pipe, and the penetrating end of the steel strand is connected with the anchorage device and fixed on the left side of the fixed steel plate through the anchorage device.
Further, the anchorage device comprises a tray, a fixing clamp and a fastening bolt, wherein the fixing clamp is vertically welded on the side face of the tray, and the fastening bolt penetrates through the fixing clamp and is used for clamping the steel strand.
Further, the right end of the through pipe is welded with a fixed steel ring, and the fixed steel ring is used for welding the steel strand.
Further, a steel base plate is welded to the right side of the supporting plate and sleeved on the outer side of the through pipe.
The utility model discloses simple to operate easily carries, and the volume is less, has alleviateed staff's working strength, and the device can be tightly fixed with steel strand wires, prevents that steel strand wires from droing, is favorable to improving the security of engineering, protection staff's life safety.
Drawings
Fig. 1 is a schematic structural diagram of the present invention;
FIG. 2 is a schematic view of the present invention;
FIG. 3 is a schematic view of the anchor device of the present invention;
in the figure: 1. an anchor body; 2. fixing the steel bars; 3. a steel backing plate; 4. fixing a steel plate; 5. an anchorage device; 6. fixing a steel ring; 7. steel strand wires; 8. a tray; 9. a fixing clip; 10. fastening a bolt; 11. pipe passing; 12. and a support plate.
Detailed Description
In order to further understand the contents, features and functions of the present invention, the structure of the present invention will be described in detail with reference to the accompanying drawings.
As shown in fig. 1-3, the embodiment of the utility model provides a novel steel construction anchor pier is used in side slope prestressed anchorage cable support, include: anchor body 1, fixed reinforcing bar 2, steel backing plate 3, fixed steel sheet 4, ground tackle 5, fixed steel ring 6, steel strand wires 7, tray 8, fixation clamp 9, fastening bolt 10, siphunculus 11, backup pad 12.
The inside of the anchor body 1 is fixedly connected with a through pipe 11, the two sides of the through pipe 11 are welded with fixing steel bars 2, the left end of the through pipe is fixedly connected with a supporting plate 12, the position of the supporting plate 12 corresponding to the through hole of the through pipe 11 is provided with a hole, the through pipe 11 is fixedly connected inside the anchor body 1, and the supporting plate 12 is positioned on the left end surface of the anchor body 1; the left side of the supporting plate 12 is welded with the fixing steel plate 4, the fixing steel plate 4 is provided with a plurality of through holes corresponding to the positions of the holes of the supporting plate 12, the firmness of the supporting plate in the anchor body can be improved through the fixing steel plate, and the supporting plate is prevented from deforming or welding; the steel strand 7 penetrates out of the through hole of the fixed steel plate 4 through the through pipe 11, and the left end of the steel strand 7 is fixed on the left side of the fixed steel plate 4 through the anchorage device 5. Ground tackle 5 includes tray 8, fixation clamp 9 and fastening bolt 10, and the vertical welding of fixation clamp 9 is in 8 sides of tray, and fastening bolt 10 runs through fixation clamp 9, is located the fixation clamp both sides end, the utility model discloses a tray can increase ground tackle and fixed steel sheet area of contact for the whole atress of fixed steel sheet is even, makes the fixation clamp fixed more firm through fastening bolt, prevents to thread off. The welding of 11 right-hand members of siphunculus has fixed steel ring 6, the utility model discloses a fixed steel ring can play limiting displacement to inside steel strand wires, prevents to rock about to cause wearing and tearing to the siphunculus mouth. The welding of 12 right sides in backup pad has steel backing plate 3, and steel backing plate 3 cup joints in the siphunculus 11 outside, the utility model discloses a steel backing plate can improve the fastness through left end welding position, reduces and opens and welds the risk.
The utility model discloses during the use, anchor body 1 uses the fix with screw on the wall body, insert steel strand wires 7 in fixed steel ring 6, inside steel strand wires 7 entered into anchor body 1 through siphunculus 11, through steel backing plate 3 and solid fixed steel plate 4, fix steel strand wires 7 through ground tackle 5 in the solid fixed steel plate 4 outside, put into steel strand wires 7 in ground tackle 5's fixation clamp 9, it presss from both sides tightly to make fixation clamp 9 through fastening bolt 10, weld steel strand wires 7 and fixed steel ring 6 together, make the cable wire can not take place to remove and slide, the fixed back that finishes of each device in the anchor body, with anchor body monolithic stationary be in the side slope side can, fixed effect is firm. The utility model discloses simple to operate easily carries, and the volume is less, has alleviateed staff's working strength, and the device can be tightly fixed with steel strand wires 7, prevents that steel strand wires 7 from droing, and in a lot of projects, slope prestressed anchorage cable is strutted and is played very big effect with steel construction anchor mound, is favorable to improving the security of engineering, protection staff's life safety.
The above description is only for the preferred embodiment of the present invention, and is not intended to limit the present invention in any way, and all the modifications and equivalents of the technical spirit of the present invention to any simple modifications of the above embodiments are within the scope of the technical solution of the present invention.
Claims (4)
1. The utility model provides a novel side slope prestressed anchorage cable is strutted and is used steel construction anchor pier which characterized in that: comprises an anchor body, a through pipe, a fixed steel plate, a plurality of steel strands and an anchorage device,
the two sides of the through pipe are fixedly connected with a plurality of fixing steel bars, the left end of the through pipe is fixedly connected with a supporting plate, the supporting plate is provided with an opening corresponding to the through hole of the through pipe, the through pipe is fixedly connected inside the anchor body, the supporting plate is positioned on the left end surface of the anchor body,
the fixed steel plate is fixedly connected with the left side of the supporting plate, a plurality of through holes are arranged on the fixed steel plate corresponding to the positions of the holes of the supporting plate,
one end of the steel strand penetrates out of the through hole in the fixed steel plate through the through hole of the through pipe, and the penetrating end of the steel strand is connected with the anchorage device and fixed on the left side of the fixed steel plate through the anchorage device.
2. The novel steel structure anchor pier for the slope prestressed anchor cable support of claim 1, which is characterized in that: the anchorage device comprises a tray, a fixing clamp and a fastening bolt, wherein the fixing clamp is vertically welded on the side face of the tray, and the fastening bolt penetrates through the fixing clamp and is used for clamping the steel strand.
3. The novel steel structure anchor pier for the slope prestressed anchor cable support of claim 1, which is characterized in that: the right end of the through pipe is welded with a fixed steel ring, and the fixed steel ring is used for welding steel strands.
4. The novel steel structure anchor pier for the slope prestressed anchor cable support of claim 1, which is characterized in that: the right side of the supporting plate is welded with a steel base plate which is sleeved outside the through pipe.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920364911.0U CN210066744U (en) | 2019-03-21 | 2019-03-21 | Novel steel structure anchor pier for supporting slope prestressed anchor cable |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920364911.0U CN210066744U (en) | 2019-03-21 | 2019-03-21 | Novel steel structure anchor pier for supporting slope prestressed anchor cable |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210066744U true CN210066744U (en) | 2020-02-14 |
Family
ID=69434054
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920364911.0U Active CN210066744U (en) | 2019-03-21 | 2019-03-21 | Novel steel structure anchor pier for supporting slope prestressed anchor cable |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210066744U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113756852A (en) * | 2021-09-28 | 2021-12-07 | 辽宁工程技术大学 | Mining glass fiber reinforced plastic grouting anchor cable lock |
-
2019
- 2019-03-21 CN CN201920364911.0U patent/CN210066744U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113756852A (en) * | 2021-09-28 | 2021-12-07 | 辽宁工程技术大学 | Mining glass fiber reinforced plastic grouting anchor cable lock |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210066744U (en) | Novel steel structure anchor pier for supporting slope prestressed anchor cable | |
CN107059880A (en) | The ruggedized construction and its construction method of the concrete assembled shaped steel mixing support system of super-sized foundation pit | |
KR100394072B1 (en) | The connectors for steel pile head embedded in concrete footing and thereof structure | |
CN108930540A (en) | Just prop up-two lining contact pressure measuring devices and its method for embedding in tunnel | |
CN206635790U (en) | Pile tube and cushion cap attachment structure | |
CN110939261B (en) | Double outer scaffold of dish knot formula structure of encorbelmenting | |
CN209798509U (en) | Steel bar anchorage device for prefabricating bridge plate | |
CN208561506U (en) | A kind of bracing means for tower crane headframe type pedestal | |
CN217128211U (en) | Prestressed anchorage cable device | |
CN216157227U (en) | Protecting net hanging device for bridge foundation pile construction | |
CN213682119U (en) | Foundation pile pours and uses steel reinforcement cage fixing device | |
CN112267486B (en) | Steel pipe concrete anti-seismic bridge pile foundation and pile foundation construction method | |
CN204676875U (en) | For the removable shaped steel anchor ring of builder's jack | |
CN211158255U (en) | Portable high-altitude anti-falling anchorage suitable for steel structure part | |
CN210529689U (en) | Manual hole digging pile construction protection device | |
CN113235574A (en) | Multifunctional anti-floating device for water bored concrete pile reinforcement cage | |
CN212773178U (en) | Building foundation steel bar connecting device | |
CN206667028U (en) | A kind of suspension bridge cat road anchor | |
CN220013656U (en) | Recoverable pressure type anchor rope structure | |
CN218562387U (en) | Pile foundation engineering foundation reinforcing apparatus | |
CN220035405U (en) | Slope protection anchor assembly | |
CN220437371U (en) | Dynamic monitoring device for reinforced concrete of hydraulic building | |
CN212129124U (en) | Device for fastening safety belt in manual hole digging pile plane operation | |
CN211498849U (en) | Cast-in-place bridge underwater steel pipe pile support dismantling system | |
CN217419591U (en) | Bored concrete pile longitudinal reinforcement welding equidistance controller |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |