CN210059134U - Security protection camera system for construction site - Google Patents

Security protection camera system for construction site Download PDF

Info

Publication number
CN210059134U
CN210059134U CN201920891237.1U CN201920891237U CN210059134U CN 210059134 U CN210059134 U CN 210059134U CN 201920891237 U CN201920891237 U CN 201920891237U CN 210059134 U CN210059134 U CN 210059134U
Authority
CN
China
Prior art keywords
water tank
construction site
camera system
pipe
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920891237.1U
Other languages
Chinese (zh)
Inventor
温秋填
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Ensheng Technology Co Ltd
Original Assignee
Guangdong Ensheng Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Ensheng Technology Co Ltd filed Critical Guangdong Ensheng Technology Co Ltd
Priority to CN201920891237.1U priority Critical patent/CN210059134U/en
Application granted granted Critical
Publication of CN210059134U publication Critical patent/CN210059134U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to a security protection equipment technical field, more specifically say, it relates to a security protection camera system for construction site, and its technical scheme main points are: including video monitoring server host computer and a plurality of cameras of being connected with the video monitoring server host computer, every the camera is all installed in ground through the installation pole, the camera is including the installation shell, install the camera in the installation shell and set up the glass cover at the installation shell, be provided with the shower nozzle towards the glass cover on the mount pad, installation pole upper end is provided with the water tank, through water piping connection between water tank and the shower nozzle, be provided with the solenoid valve on the water pipe, solenoid valve electric connection has the timer. The utility model discloses a security protection camera system for construction site has the advantage that improves the definition that the video picture was shot to the camera.

Description

Security protection camera system for construction site
Technical Field
The utility model relates to a security protection equipment technical field, more specifically say, it relates to a security protection camera system for construction site.
Background
Along with the development of society, building sites are more and more, and therefore, the safety problem of the building sites is more and more prominent. Therefore, the security camera system is used for construction sites and plays an active role. The security camera system comprises a camera and a video monitoring server host, and can process the theft behavior to the site of a building site in time through the security camera system, but dust is more on the building site, and a glass cover in the camera arranged on the building site is easily stuck with dust, so that a video monitoring picture is fuzzy.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art exists, the utility model aims to provide a security protection camera system for construction site has the advantage that improves the definition that the video picture was shot to the camera.
The above technical purpose of the present invention can be achieved by the following technical solutions: the utility model provides a security protection camera system for construction site, includes video monitoring server host computer and a plurality of cameras of being connected with the video monitoring server host computer, every the camera all installs in ground through the installation pole, the camera is including the installation shell, install the camera in the installation shell and set up the glass cover at the installation shell, be provided with the shower nozzle towards the glass cover on the mount pad, installation pole upper end is provided with the water tank, lead to water piping connection between water tank and the shower nozzle, be provided with the solenoid valve on the water pipe, solenoid valve electric connection has the timer.
By adopting the technical scheme, the timer controls the electromagnetic valve to work, so that the timing control spray head sprays water to the glass cover for cleaning, dust on the glass cover is reduced, and the definition of a video picture shot by the camera is improved.
The utility model discloses further set up to: the water tank is characterized in that an opening is formed in the upper portion of the water tank, two partition plates which incline downwards relatively are arranged at the opening of the water tank, and a gap for water inlet is reserved between the two partition plates.
By adopting the technical scheme, the opening at the upper part of the water tank can collect rainwater in rainy days, and the two inclined partition plates arranged at the opening of the water tank facilitate the collection of the rainwater and reduce the evaporation of water in the water tank in sunny days.
The utility model discloses further set up to: the lower side edges of the upper surfaces of the two clapboards are provided with a grid baffle plate.
Through adopting above-mentioned technical scheme, can filter the water that enters into the water tank through the check otter board to reduce rubbish and enter into the water tank, avoid blockking up the shower nozzle.
The utility model discloses further set up to: the lateral wall has seted up the overflow hole on the water tank.
Through adopting above-mentioned technical scheme, can discharge unnecessary water in the water tank through the overflow hole.
The utility model discloses further set up to: the water tank side wall is provided with a communicating pipe which is L-shaped, the upper end of the communicating pipe is provided with a mounting hole downwards, the mounting hole is vertically movably inserted with a floating rod, the lower end of the floating rod is provided with a floating ball, and the floating ball is positioned in the communicating pipe.
Through adopting above-mentioned technical scheme, through setting up the float lever on communicating pipe, the staff conveniently observes how much of the water yield in the water tank through the float lever.
The utility model discloses further set up to: and the annular pipe is fixedly arranged on the installation shell above the glass cover, the spray heads are arranged in a plurality of and a plurality of intervals, the spray heads are arranged on the annular pipe, one end of the water pipe is connected with the annular pipe, and the other end of the water pipe is connected with the side wall at the lower side of the water tank.
Through adopting above-mentioned technical scheme, through a plurality of shower nozzles that set up on the ring pipe to improve the clean effect to the glass cover.
The utility model discloses further set up to: the bottom of the water tank is funnel-shaped, a sewage discharge pipe is arranged in the middle of the water tank, and a ball valve is arranged on the sewage discharge pipe.
Through adopting above-mentioned technical scheme, through opening the ball valve on the blow off pipe to make things convenient for the inside cleanness of water tank.
To sum up, the utility model discloses following beneficial effect has:
firstly, the work of the electromagnetic valve is controlled by a timer in a timing way, so that the spray head is controlled in a timing way to spray water to clean the glass cover, thereby reducing dust on the glass cover and improving the definition of a video picture shot by a camera;
secondly, through a plurality of shower nozzles that set up on the ring pipe to improve the clean effect to the glass cover.
Drawings
Fig. 1 is a schematic block diagram of a security camera system in the present embodiment;
fig. 2 is a schematic view of the mounting structure of the camera and the mounting pole in the present embodiment;
fig. 3 is a schematic view of the mounting structure of the water tank and the camera on the mounting rod in the present embodiment.
In the figure: 1. a video monitoring server host; 2. a camera; 3. mounting a rod; 4. mounting a shell; 5. a glass cover; 6. a spray head; 7. a water tank; 8. a water pipe; 9. an electromagnetic valve; 10. an annular tube; 11. a partition plate; 12. a grid plate; 13. an overflow aperture; 14. a communicating pipe; 15. mounting holes; 16. a float rod; 17. a blow-off pipe; 18. a ball valve.
Detailed Description
The present invention will be described in detail with reference to the accompanying drawings and examples.
The utility model provides a security protection camera system for construction site, as shown in fig. 1 and fig. 2, including video monitoring server host computer 1 and a plurality of cameras 2 of being connected with video monitoring server host computer 1, every camera 2 all installs in ground through installation pole 3, camera 2 is including installation shell 4, install camera (not shown in the figure) and the glass cover 5 of setting at installation shell 4 in installation shell 4, be provided with shower nozzle 6 towards glass cover 5 on the mount pad, installation pole 3 upper end one side is provided with water tank 7, connect through water pipe 8 between water tank 7 and the shower nozzle 6, be provided with solenoid valve 9 on the water pipe 8, solenoid valve 9 electric connection has the timer (not shown in the figure). Through the work of timer timing control solenoid valve 9 to timing control shower nozzle 6 carries out water spray cleaning to glass cover 5, thereby reduces the dust on the glass cover 5, thereby improves the definition that camera 2 shot the video picture.
As shown in fig. 2, further, a ring pipe 10 is fixedly arranged on the mounting shell 4 above the glass cover 5, the spray heads 6 are arranged in a plurality, the spray heads 6 are arranged on the ring pipe 10 at intervals, one end of the water pipe 8 is connected with the ring pipe 10, the other end of the water pipe is connected with the side wall of the lower side of the water tank 7, and the cleaning effect on the glass cover 5 is improved through the plurality of spray heads 6 arranged on the ring pipe 10.
As shown in fig. 3, an opening is formed in the upper portion of the water tank 7, two relatively inclined downward partition plates 11 are arranged at the opening of the water tank 7, a gap for water inflow is reserved between the two partition plates 11, the opening in the upper portion of the water tank 7 can collect rainwater in rainy days, and the two inclined partition plates 11 arranged at the opening of the water tank 7 facilitate the collection of rainwater and reduce the evaporation of water in the water tank 7 in sunny days. Furthermore, the lower side edges of the upper surfaces of the two partition boards 11 are provided with a grid plate 12. The water entering the water tank 7 can be filtered through the screen 12 to reduce the entry of waste into the water tank 7 and avoid clogging the spray head 6. The upper side wall of the water tank 7 is provided with an overflow hole 13, and redundant water in the water tank 7 can be discharged through the overflow hole 13.
As shown in fig. 3, furthermore, a communicating pipe 14 that is L-shaped is arranged on the lower side of the side wall of the water tank 7, a mounting hole 15 has been opened downwards at the upper end of the communicating pipe 14, a floating rod 16 is inserted into the mounting hole 15 in a vertical movable manner, a floating ball (not shown in the figure) is arranged at the lower end of the floating rod 16, the floating ball is located in the communicating pipe 14, and through the floating rod 16 arranged on the communicating pipe 14, a worker can conveniently observe the amount of water in the water tank 7 through the floating rod 16, and can conveniently and timely add. The bottom of the water tank 7 is arranged in a funnel shape, a sewage discharge pipe 17 is arranged in the middle of the water tank, and a ball valve 18 is arranged on the sewage discharge pipe 17. The inside of the water tank 7 is easily cleaned by opening the ball valve 18 on the soil discharge pipe 17.
The implementation principle of the embodiment is as follows: can carry out the rainwater through water tank 7 and collect or artifically add water, then the work of rethread timer timing control solenoid valve 9 to timing control shower nozzle 6 carries out water spray cleaning to glass cover 5, thereby reduces the dust on the glass cover 5, thereby improves the definition that camera 2 shot the video picture.
The embodiment of this specific implementation mode is the preferred embodiment of the present invention, not limit according to this the utility model discloses a protection scope, so: all equivalent changes made according to the structure, shape and principle of the utility model are covered within the protection scope of the utility model.

Claims (7)

1. The utility model provides a security protection camera system for construction site, includes video monitoring server host computer (1) and a plurality of cameras (2) of being connected with video monitoring server host computer (1), its characterized in that: every camera (2) all install in ground through installation pole (3), camera (2) are including installation shell (4), install camera in installation shell (4) and set up glass cover (5) at installation shell (4), be provided with shower nozzle (6) towards glass cover (5) on installation shell (4), installation pole (3) upper end is provided with water tank (7), connect through water pipe (8) between water tank (7) and shower nozzle (6), be provided with solenoid valve (9) on water pipe (8), solenoid valve (9) electric connection has the timer.
2. The security camera system for the construction site according to claim 1, wherein: the water tank is characterized in that an opening is formed in the upper portion of the water tank (7), two partition plates (11) which incline downwards relatively are arranged at the opening of the water tank (7), and a gap for water to enter is reserved between the two partition plates (11).
3. The security camera system for the construction site according to claim 2, wherein: the lower side edges of the upper surfaces of the two clapboards (11) are provided with a grid baffle plate (12).
4. The security camera system for the construction site according to claim 1, wherein: an overflow hole (13) is formed in the upper side wall of the water tank (7).
5. The security camera system for the construction site according to claim 1, wherein: the water tank is characterized in that an L-shaped communicating pipe (14) is arranged on the side wall of the water tank (7), a mounting hole (15) is formed in the upper end of the communicating pipe (14) downwards, a floating rod (16) is vertically and movably inserted into the mounting hole (15), a floating ball is arranged at the lower end of the floating rod (16), and the floating ball is located in the communicating pipe (14).
6. The security camera system for the construction site according to claim 1, wherein: be located glass cover (5) top the fixed annular pipe (10) that is provided with on installation shell (4), shower nozzle (6) set up a plurality ofly, and is a plurality of shower nozzle (6) interval sets up on annular pipe (10), water pipe (8) one end is connected with annular pipe (10), and water tank (7) downside lateral wall is connected to the other end.
7. The security camera system for the construction site according to claim 1, wherein: the bottom of the water tank (7) is funnel-shaped, a sewage discharge pipe (17) is arranged in the middle of the water tank, and a ball valve (18) is arranged on the sewage discharge pipe (17).
CN201920891237.1U 2019-06-13 2019-06-13 Security protection camera system for construction site Expired - Fee Related CN210059134U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920891237.1U CN210059134U (en) 2019-06-13 2019-06-13 Security protection camera system for construction site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920891237.1U CN210059134U (en) 2019-06-13 2019-06-13 Security protection camera system for construction site

Publications (1)

Publication Number Publication Date
CN210059134U true CN210059134U (en) 2020-02-14

Family

ID=69457463

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920891237.1U Expired - Fee Related CN210059134U (en) 2019-06-13 2019-06-13 Security protection camera system for construction site

Country Status (1)

Country Link
CN (1) CN210059134U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113489944A (en) * 2021-06-03 2021-10-08 浙江喜鹊云互联系统科技有限公司 Parking monitoring system with function of improving shooting definition

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113489944A (en) * 2021-06-03 2021-10-08 浙江喜鹊云互联系统科技有限公司 Parking monitoring system with function of improving shooting definition
CN113489944B (en) * 2021-06-03 2024-02-23 浙江喜鹊云互联系统科技有限公司 Parking monitoring system with shooting definition improving function

Similar Documents

Publication Publication Date Title
CN210059134U (en) Security protection camera system for construction site
CN205382501U (en) Tower crane basis automatic drainage system
CN210584213U (en) Dust removal system for building engineering construction
CN209568625U (en) A kind of rain inlet structure of environment-friendly type for building
CN212984387U (en) Roof siphon drainage system
CN205935436U (en) Property water -collection device
CN212596398U (en) Electrostatic dust removal factory building is used in glass apron processing
CN208743171U (en) A kind of recyclable metal surface water washing device
CN214835961U (en) Window with spray function
CN206613314U (en) A kind of block water plate structure that can be cleaned automatically
CN208080111U (en) A kind of landscape irrigation system
CN207812617U (en) A kind of town road drainage system
CN211358224U (en) Dust arrester installation for construction
CN218150181U (en) Energy-concerving and environment-protective rail guard for highway construction
CN218925476U (en) Grating dirt remover cleaning device and grating dirt remover
CN214423796U (en) Building drainage structure capable of avoiding water accumulation
CN113007841B (en) Formula of sinking environmental protection air purification device
CN212104456U (en) Basement roof
CN216740792U (en) Concrete outer wall maintenance spray set
CN219548610U (en) Civil engineering construction dust screen
CN109529498A (en) A kind of dust removing device for flue gas of boiler
CN220319172U (en) Sand prevention device for construction site
CN220747687U (en) Rain curtain component for construction
CN208881759U (en) A kind of mixer truck cleaning device
CN219357204U (en) Basket washing machine convenient for backwater utilization

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200214