CN210049593U - Pre-buried stagnant water festival fixing device - Google Patents

Pre-buried stagnant water festival fixing device Download PDF

Info

Publication number
CN210049593U
CN210049593U CN201920691079.5U CN201920691079U CN210049593U CN 210049593 U CN210049593 U CN 210049593U CN 201920691079 U CN201920691079 U CN 201920691079U CN 210049593 U CN210049593 U CN 210049593U
Authority
CN
China
Prior art keywords
base
cover plate
water stop
template
fixing bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920691079.5U
Other languages
Chinese (zh)
Inventor
董浩
张松
鲁欧阳
李彦斌
贾蒙
安红印
张秀平
黄冶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction First Group Corp Ltd
Third Construction Co Ltd of China Construction First Group Co Ltd
Original Assignee
China Construction First Group Corp Ltd
Third Construction Co Ltd of China Construction First Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction First Group Corp Ltd, Third Construction Co Ltd of China Construction First Group Co Ltd filed Critical China Construction First Group Corp Ltd
Priority to CN201920691079.5U priority Critical patent/CN210049593U/en
Application granted granted Critical
Publication of CN210049593U publication Critical patent/CN210049593U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Building Environments (AREA)

Abstract

The utility model discloses a pre-buried water stop joint fixing device which is fixed on a template and comprises a base, a fixing bolt, a cover plate and a water stop joint; the water stopping joint is arranged perpendicular to the top of the template; the base is arranged inside the water stop joint and fixedly connected to the top of the template, a first through hole is formed in the center of the base, and a positioning nut is arranged on the outer side of the first through hole; the cover plate is arranged at the top end of the water stop joint, and a second through hole is formed in the center of the cover plate; the fixing bolt is vertically arranged between the base and the cover plate, the upper end and the lower end of the fixing bolt are respectively arranged in the first through hole and the second through hole, the upper end of the fixing bolt is fastened through a fixing nut on the outer side of the cover plate, and the lower end of the fixing bolt is fastened through a positioning nut, so that the base is fixedly connected with the cover plate. The utility model discloses a set up the fixed stagnant water festival of base, fixed effectual, the location is accurate, easy operation installs and removes in a flexible way, rapidly, and the standardization level is high, has practiced thrift a large amount of manual works, has reduced the management degree of difficulty.

Description

Pre-buried stagnant water festival fixing device
Technical Field
The utility model relates to a construction technical field, concretely relates to pre-buried stagnant water festival fixing device.
Background
At present, most high-rise buildings adopt an aluminum alloy template construction technology, a pre-embedded water stop joint is adopted for water heating subsection construction, and the accuracy of a pre-embedded mode is directly related to the installation of a pipeline in the later period and the normal use of a water heating facility. When using the wooden model to carry out the construction, can fix or drill fixedly through the nail, but aluminum alloy template's use makes above-mentioned fixed mode no longer be suitable for, and to aluminum alloy template goes up the fixed mode of stagnant water festival, generally adopts the trompil fixed or the ligature is fixed, and the fixed hidden danger that has the thick liquid that leaks of trompil, the ligature exists fixed insecure, complex operation, easy off normal and the problem that needs frequent maintenance. The utility model provides a pre-buried stagnant water festival fixing device solves the fixed problem of stagnant water festival on the aluminum alloy template, overcomes above-mentioned defect to have high efficiency, stable advantage.
SUMMERY OF THE UTILITY MODEL
The utility model provides a pre-buried stagnant water festival fixing device has easy operation, construction quality firmly reliably, the fast advantage of efficiency of construction.
The utility model provides a technical scheme that above-mentioned technical problem adopted is:
a pre-buried water stop joint fixing device is fixed on a template and is characterized by comprising a base, a fixing bolt, a cover plate and a water stop joint;
the water stopping section is arranged perpendicular to the template;
the base is arranged inside the water stop joint and fixedly connected to the template, a first through hole is formed in the center of the base, and a positioning nut is arranged on the outer side of the first through hole;
the cover plate is arranged at the top end of the water stop joint, and a second through hole is formed in the center of the cover plate;
the fixing bolt is vertically arranged between the base and the cover plate, the upper end and the lower end of the fixing bolt are respectively arranged in the first through hole and the second through hole, the upper end of the fixing bolt is fastened through a fixing nut on the outer side of the cover plate, and the lower end of the fixing bolt is fastened through a positioning nut, so that the base is fixedly connected with the cover plate.
Furthermore, the base is long strip-shaped, the left end face and the right end face of the base are cambered surfaces matched with the inner side walls of the water stop sections, and the cambered surfaces are in seamless fit with the water stop sections.
Furthermore, a transition slope surface is arranged between the left end surface and the right end surface of the base and the top surface of the base.
Further, the base is fixedly connected with the template through split bolts, and the split bolts are arranged in a central symmetry mode through the first through holes.
Further, the outer diameter of the cover plate is larger than that of the top end of the water stop joint.
Further, the base is square steel, the fixing bolt is a screw rod, and the cover plate is a wood plate.
Further, the template is an aluminum alloy template.
The utility model discloses beneficial effect as follows:
the base is arranged on the template and used for fixing the water stopping section, the fixing effect is good, the positioning is accurate, the slope is arranged on the base, the water stopping section is more convenient to place, and the construction efficiency is improved;
the utility model is simple in operation, install and remove nimble, rapidly, the standardization level is high, has practiced thrift a large amount of manual works, great improvement the installation accuracy, reduced the management degree of difficulty for the construction progress.
Drawings
FIG. 1 is a sectional view of the overall structure of the present invention;
fig. 2 is a sectional view a-a of fig. 1.
Reference numerals: 1-base, 11-nut, 2-fixing bolt, 3-cover plate, 31-fastening bolt, 4-water stop joint and 5-template.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings, and obviously, the described embodiments are only some embodiments, not all embodiments, of the present invention. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
As shown in fig. 1 and 2, a pre-buried water stop fixing device is fixed on a template 5, and is characterized by comprising a base 1, a fixing bolt 2, a cover plate 3 and a water stop 4;
the water stopping joint 4 is arranged perpendicular to the top of the template 5;
the base 1 is arranged inside the water stop section 4 and fixedly connected to the top of the template 5, a first through hole is formed in the center of the base 1, and a positioning nut 11 is arranged on the outer side of the first through hole;
the cover plate 3 is arranged at the top end of the water stop joint 4, and a second through hole is formed in the center of the cover plate;
the fixing bolt 2 is vertically arranged between the base 1 and the cover plate 3, the upper end and the lower end of the fixing bolt are respectively arranged in the first through hole and the second through hole, the upper end of the fixing bolt is fastened through a fixing nut 31 on the outer side of the cover plate 3, and the lower end of the fixing bolt is fastened through a positioning nut 11, so that the base 1 and the cover plate 3 are fixedly connected.
As shown in fig. 1, further, the base 1 is a long strip, the left and right end faces of the base are arc faces matched with the inner side walls of the water stopping section 4, and the arc faces are in seamless fit with the inner walls of the water stopping section 4. Utilize the cambered surface chucking stagnant water festival 4 at base 1 both ends, fix a position and fix stagnant water festival 4, guarantee the stability of stagnant water festival 4 when the template is pour.
Furthermore, a transition slope surface is arranged between the left end surface and the right end surface of the base 1 and the top surface. Set up domatic installation location that is favorable to stagnant water festival 4, because of the cambered surface size unanimity at 4 inside walls of stagnant water festival and base 1 both ends, just can place stagnant water festival 4 after the accurate alignment during installation, set up excessive domatic can make 4 bottoms of stagnant water festival slide down along the inclined plane, need not accurate alignment, the simple operation avoids stagnant water festival 4 to be damaged to can effectively promote the efficiency of construction.
Further, the base 1 and the template 5 are fixedly connected through split bolts, and the split bolts are arranged in a central symmetry mode through the first through holes.
Further, the outer diameter of the cover plate 3 is larger than that of the top end of the water stop joint 4. Preferably, the outer diameter of the cover plate 3 is 10mm larger than the outer diameter of the top end of the water stop joint 4.
Further, the base 1 is made of square steel, the fixing bolt 2 is a screw rod, and the cover plate 3 is a wood plate. Preferably, base 1 is solid square steel, and is better to stable gim peg 2 effect, guarantees that gim peg 2 easier keeps vertical state.
Further, the template 5 is an aluminum alloy template.
When the utility model is manufactured, square steel is selected and processed, and the two ends of the square steel are cut into an arc shape matched with the inner cavity of the water stop joint 4 and are provided with a slope; then, a first through hole is formed in the center of the square steel, the nut 11 is welded on the outer side of the first through hole, and during welding, the nut 11 and the through hole are ensured to be coaxial; through holes are arranged on two sides of the nut 11 and corresponding split bolts are selected.
A wood board is selected and processed into the cover plate 3, and the outer diameter of the cover plate is ensured to be 10mm larger than the outer diameter of the top end of the water stop joint 4.
An independent nut identical to the nut 11 is selected as the fixing nut 31, and a screw rod matched with the nut 11 is selected.
During the installation, confirm stagnant water festival 4 according to the construction drawing and set up the position, when confirming stagnant water festival 4's position, will measure repeatedly, guarantee the position accuracy because during the follow-up turnover of aluminum mould board was used, no longer measured position size.
The base 1 is fastened to the formwork 5 using tie bolts through-holes on both sides of the base 1.
Blocking the water stop joint 4 on the base 1, screwing the lower end of the fixing bolt 2 on the nut of the base 1, penetrating the cover plate 3 through the upper end of the fixing bolt 2 to be in contact with the water stop joint 4, screwing the fixing nut 31 on the fixing bolt 2, pressing the cover plate 3, and installing the template. After pouring is finished, the cover plate 3 and the fixing bolts 2 are taken down according to the reverse operation, and the base 1 is still fixed on the template 5 for turnover use.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein, and any reference signs in the claims are not intended to be construed as limiting the claim concerned.

Claims (7)

1. A pre-buried water stop joint fixing device is fixed on a template (5) and is characterized by comprising a base (1), a fixing bolt (2), a cover plate (3) and a water stop joint (4);
the water stopping joint (4) is arranged perpendicular to the template (5);
the base (1) is arranged inside the water stop joint (4) and fixedly connected to the template (5), a first through hole is formed in the center of the base (1), and a positioning nut (11) is arranged on the outer side of the first through hole;
the cover plate (3) is arranged at the top end of the water stop joint (4), and a second through hole is formed in the center of the cover plate;
the fixing bolt (2) is vertically arranged between the base (1) and the cover plate (3), the upper end and the lower end of the fixing bolt are respectively arranged in the first through hole and the second through hole, the upper end of the fixing bolt is fastened through a fixing nut (31) on the outer side of the cover plate (3), and the lower end of the fixing bolt is fastened through a positioning nut (11), so that the base (1) is fixedly connected with the cover plate (3).
2. The pre-buried water stop fixing device according to claim 1, characterized in that: the base (1) is long-strip-shaped, the left end face and the right end face of the base are cambered surfaces matched with the inner side walls of the water stopping joints (4), and the cambered surfaces are seamlessly attached to the water stopping joints (4).
3. The pre-buried water stop fixing device according to claim 1, characterized in that: a transition slope surface is arranged between the left end surface and the right end surface of the base (1) and the top surface.
4. The pre-buried water stop fixing device according to claim 1, characterized in that: the base (1) is fixedly connected with the template (5) through split bolts, and the split bolts are arranged in a central symmetry mode through the first through holes.
5. The pre-buried water stop fixing device according to claim 1, characterized in that: the outer diameter of the cover plate (3) is larger than that of the top end of the water stop joint (4).
6. The pre-buried water stop fixing device according to claim 1, characterized in that: the base (1) is made of square steel, the fixing bolt (2) is a screw rod, and the cover plate (3) is a wood plate.
7. The pre-buried water stop fixing device according to claim 1, characterized in that: the template (5) is an aluminum alloy template.
CN201920691079.5U 2019-05-14 2019-05-14 Pre-buried stagnant water festival fixing device Expired - Fee Related CN210049593U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920691079.5U CN210049593U (en) 2019-05-14 2019-05-14 Pre-buried stagnant water festival fixing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920691079.5U CN210049593U (en) 2019-05-14 2019-05-14 Pre-buried stagnant water festival fixing device

Publications (1)

Publication Number Publication Date
CN210049593U true CN210049593U (en) 2020-02-11

Family

ID=69395329

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920691079.5U Expired - Fee Related CN210049593U (en) 2019-05-14 2019-05-14 Pre-buried stagnant water festival fixing device

Country Status (1)

Country Link
CN (1) CN210049593U (en)

Similar Documents

Publication Publication Date Title
CN207314833U (en) A kind of construction Novel scissors blade square column shuttering fastening member
CN103147763A (en) Tunnel inverted arch end combined steel mould
CN218236612U (en) Reinforced concrete pipeline repairing device
CN103061357B (en) Connection joint between basement base plate and underground diaphragm wall
CN210917458U (en) City utility tunnel unilateral side mould frock subassembly
CN210049593U (en) Pre-buried stagnant water festival fixing device
CN208105909U (en) Installation positioning device of pre-buried channel
CN211201169U (en) Prefabricated assembled window that wafts
CN205776797U (en) The preburied component of secondary structure tension rib
CN208267362U (en) A kind of constructing device of deformation joint concrete wall formwork
CN215330055U (en) Concatenation formula post-cast strip shutoff instrument
CN214575760U (en) General base of floor formwork
CN210530338U (en) Angle aluminium structure for building
CN214883695U (en) Foundation pit supporting and reinforcing device convenient to disassemble and assemble
CN211548764U (en) Stiffened column base integral template structure
CN212428075U (en) Combined template for cast-in-situ top beam door opening lintel
CN211341267U (en) Connecting piece for steel wire welding net built-in heat insulation wall
CN211173094U (en) Novel high-low grade concrete interception tool
CN211007079U (en) A pre-buried component structure for secondary structure wall lacing wire
CN208305438U (en) Ceramic tile perforating positioning apparatus
CN204418670U (en) The sealing concrete pad used in a kind of building operations
CN210239143U (en) Reserved hole sleeve fixing part for laminated floor slab
CN207003245U (en) A kind of bridge fence-slab fixing device
CN215168091U (en) Bracing fixed knot constructs and aluminum alloy template bracing device
CN110241977B (en) Steel bar connecting assembly allowing concrete to contract and translate

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200211