CN210049275U - Structure for secondary filling of skid-mounted reciprocating compressor unit - Google Patents

Structure for secondary filling of skid-mounted reciprocating compressor unit Download PDF

Info

Publication number
CN210049275U
CN210049275U CN201920537421.6U CN201920537421U CN210049275U CN 210049275 U CN210049275 U CN 210049275U CN 201920537421 U CN201920537421 U CN 201920537421U CN 210049275 U CN210049275 U CN 210049275U
Authority
CN
China
Prior art keywords
driving
skid
pry
seat
reciprocating compressor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920537421.6U
Other languages
Chinese (zh)
Inventor
刘冲
王志勇
李璐
张宁
张永康
李长峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG KERUI COMPRESSOR CO Ltd
Original Assignee
SHANDONG KERUI COMPRESSOR CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG KERUI COMPRESSOR CO Ltd filed Critical SHANDONG KERUI COMPRESSOR CO Ltd
Priority to CN201920537421.6U priority Critical patent/CN210049275U/en
Application granted granted Critical
Publication of CN210049275U publication Critical patent/CN210049275U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

The utility model belongs to the technical field of skid-mounted formula reciprocating compressor group technique and specifically relates to a structure that is used for skid-mounted formula reciprocating compressor group secondary filling. The structure for the secondary filling of the skid-mounted reciprocating compressor unit comprises the following components: the device comprises a primary grouting layer, a driving pry seat, a jackscrew base plate pre-embedded in the primary grouting layer, a leveling jackscrew used for separating the primary grouting layer from the driving pry seat, a spacer block additionally plugged between the jackscrew base plate and the driving pry seat and an anchor bolt assembly used for connecting the driving pry seat and the secondary grouting layer, wherein the anchor bolt assembly is installed at the tail included angle parts of two side edges of a bottom pry of the driving pry seat, and the leveling jackscrew is installed on the bottom pry of the driving pry seat and is positioned on one side of the anchor bolt assembly. The utility model discloses a structure for skid-mounted formula reciprocating compressor group secondary filling adopts the general material of lower price, and it is little to have the site operation degree of difficulty, and operating cost is low and advantages such as equipment suitability is strong can extensively be applicable to on the skid-mounted formula moves equipment.

Description

Structure for secondary filling of skid-mounted reciprocating compressor unit
Technical Field
The utility model belongs to the technical field of skid-mounted formula reciprocating compressor group technique and specifically relates to a structure that is used for skid-mounted formula reciprocating compressor group secondary filling.
Background
The reciprocating compressor set has many installation modes, which mainly comprises: (1) the foundation skid-mounted is that a driving machine and a compressor are mounted on a structure skid seat and integrally mounted on a concrete foundation; (2) vehicle-mounted, namely: the driving machine and the compressor are arranged on the transportable equipment; (3) the installation without a pry seat is that: the driver and compressor are integrally located on the concrete foundation.
In the existing equipment occupation ratio of the market, basic skid-mounted equipment occupies the largest proportion, and for a skid-mounted reciprocating compressor unit, due to the fact that reciprocating torque exists in the operation process, epoxy resin or high-strength cement needs to be filled between a skid seat and concrete in the installation process, a technician calls the process of filling the epoxy resin or the high-strength cement as secondary grouting of the unit, and in order to meet the strength requirement and the economic requirement of the secondary grouting, the thickness of the secondary grouting is required to be set to be 50mm in general industries.
For the skid-mounted reciprocating compressor unit, as more main equipment is integrated on the skid seat, the whole equipment is heavy, the equipment installation difficulty is increased, the equipment foundation is damaged irreparably, and the condition that the grouting thickness cannot reach the expected thickness of 50mm and the like often easily occurs, so that the method for safely and conveniently performing secondary grouting on the skid-mounted reciprocating compressor unit on site is provided as a technical problem to be urgently solved in the industry.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a structure for skid-mounted formula reciprocating compressor group secondary filling overcomes aforementioned prior art basis skid-mounted in-process, because of integrated more main equipment on the sledge seat, whole equipment seems to be heavy, has not only increased the equipment fixing degree of difficulty, and what more even has caused unrepairable destruction to the equipment foundation to the condition such as grout thickness can not reach anticipated 50mm often appears easily.
The utility model provides a technical scheme that its technical problem adopted is:
a structure for skid-mounted reciprocating compressor unit secondary filling comprises the following components: the device comprises a primary grouting layer, a driving pry seat, a jackscrew base plate embedded in the primary grouting layer, a leveling jackscrew for separating the primary grouting layer from the driving pry seat, a spacer block additionally plugged between the jackscrew base plate and the driving pry seat and an anchor bolt assembly for connecting the driving pry seat with a secondary grouting layer; the jackscrew base plate is used for providing a contact surface between the gauge block and the leveling jackscrew and protecting the surface of the primary grouting layer from being damaged; the leveling jackscrew is used for obtaining a certain clearance for secondary grouting; the spacing blocks are used for ensuring the minimum thickness of the secondary grouting layer.
A structure for secondary filling of a skid-mounted reciprocating compressor unit comprises the following steps in the mounting process of the skid-mounted reciprocating compressor unit:
(1) pre-embedding a top thread base plate into the primary grouting layer;
(2) uniformly placing spacing blocks on the upper surface of the jackscrew base plate;
(3) mounting a leveling jackscrew and a foundation bolt assembly on a driving sledge seat, then placing the driving sledge seat on a gauge block, and checking a gap between the driving sledge seat and a primary grouting layer;
(4) adjusting the pitch of a leveling jackscrew on a driving sledge seat to obtain the flatness required by the bottom sledge;
(5) performing secondary grouting between the lower end of the driving sledge seat and the primary grouting layer, and filling epoxy resin or high-strength cement;
(6) performing routine maintenance on the secondary grouting layer;
(7) and loosening the leveling jackscrew, checking the soft foot, and locking the foundation bolt through a torque wrench.
Further, in the step (1), the upper surface of the jackscrew base plate and the upper surface of the primary grouting layer are ensured to be in the same horizontal plane.
Further, the gauge block in the step (2) has a thickness of 50 mm.
Further, the distance block in the step (2) is made of metal.
Further, the foundation bolt assemblies in the step (3) are arranged at included angles of the tail ends of the two side edges of the bottom skid of the driving skid seat.
Further, in the step (3), the leveling jackscrew is installed on the bottom skid of the driving skid seat and is located on one side of the foundation bolt assembly.
The utility model has the advantages that: compared with the prior art, the structure for the skid-mounted reciprocating compressor unit for secondary filling adopts the general material with lower price, and utilizes the leveling jackscrew to separate the primary grouting layer from the driving skid seat so as to obtain a certain gap for secondary grouting; the jackscrew base plate is pre-embedded in the primary grouting layer, the upper surface of the jackscrew base plate is flush with the upper surface of the primary grouting layer, and the jackscrew base plate is used for providing a contact surface between the spacer block and the jackscrew and protecting the surface of the primary grouting layer from being damaged; the gauge block is a metal block with the thickness of 50mm, and is additionally plugged between the jackscrew base plate and the skid seat to ensure the minimum thickness of a secondary grouting layer; connecting the driving pry seat with the secondary grouting layer by using the foundation bolt assembly; the utility model discloses a structure for skid-mounted formula reciprocating compressor group secondary filling has the site operation degree of difficulty little, and operating cost is low and equipment suitability advantage such as strong, can extensively be applicable to on the skid-mounted formula moves equipment.
Drawings
FIG. 1 is a schematic view of the position relationship of the mounting assembly of the present invention;
FIG. 2 is a sectional view showing the positional relationship of the mounting assembly of the present invention;
wherein, 1 primary grouting layer, 2 jackscrew backing plates, 3 drive sledge seats, 4 leveling jackscrews, 5 gauge blocks, 6 secondary grouting layers and 7 foundation bolt assemblies.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the drawings in the embodiments of the present invention are combined below to clearly and completely describe the technical solutions in the embodiments of the present invention.
In the embodiment shown in fig. 1 and 2, a structure for secondary filling of a skid-mounted reciprocating compressor unit comprises the following components: the grouting device comprises a primary grouting layer 1, a driving pry seat 3, a jackscrew base plate 2 pre-embedded in the primary grouting layer 1, a leveling jackscrew 4 for separating the primary grouting layer 1 from the driving pry seat 3, a spacer block 5 additionally plugged between the jackscrew base plate 2 and the driving pry seat 3 and an anchor bolt assembly 7 for connecting the driving pry seat 3 with a secondary grouting layer 6; the jackscrew base plate 2 is used for providing a contact surface between the gauge block 5 and the leveling jackscrew 4 and protecting the surface of the primary grouting layer 1 from being damaged; the leveling jackscrew 4 is used for obtaining a certain clearance for secondary grouting; the spacer 5 is used to ensure a minimum thickness of the secondary grout layer 6.
The upper surface of the top thread base plate 2 and the upper surface of the primary grouting layer 1 are in the same horizontal plane. The gauge block 5 is 50mm thick. The distance blocks 5 are made of metal. And the foundation bolt assembly 7 is arranged at the included angle between the tail ends of the two side edges of the bottom skid of the driving skid seat 3. The leveling jackscrew 4 is installed on the bottom sledge of the driving sledge base 3 and is positioned at one side of the foundation bolt assembly 7.
A structure for secondary filling of a skid-mounted reciprocating compressor unit comprises the following steps in the mounting process of the skid-mounted reciprocating compressor unit:
(1) pre-burying a top thread base plate 2 into the primary grouting layer 1;
(2) uniformly placing spacing blocks 5 on the upper surface of the jackscrew base plate 2;
(3) mounting a leveling jackscrew 4 and a foundation bolt assembly 7 on a driving pry seat 3, then placing the driving pry seat 3 on a gauge block 5, and checking a gap between the driving pry seat 3 and a primary grouting layer 1;
(4) adjusting the pitch of a leveling jackscrew 4 on a driving sledge seat 3 to obtain the planeness required by the bottom sledge;
(5) secondary grouting 6 is carried out between the lower end of the driving sledge base 3 and the primary grouting layer 1, and epoxy resin or high-strength cement is filled;
(6) performing conventional maintenance on the secondary grouting layer 6, wherein the maintenance process is a maintenance mode in a common filling process, is a conventional technology mastered by a person skilled in the art, and is not described herein again;
(7) and loosening the leveling jackscrew 4, checking the soft foot, and locking the foundation bolt through a torque wrench.
The above embodiments are only specific cases of the present invention, and the protection scope of the present invention includes but is not limited to the forms and styles of the above embodiments, and any suitable changes or modifications made thereto by those skilled in the art according to the claims of the present invention shall fall within the protection scope of the present invention.

Claims (4)

1. The utility model provides a structure that is used for skid-mounted formula reciprocating compressor group secondary filling which characterized in that: the method comprises the following components: the anchor bolt assembly comprises a primary grouting layer, a driving pry seat, a top thread base plate embedded in the primary grouting layer, a leveling top thread used for separating the primary grouting layer from the driving pry seat, a spacer block additionally plugged between the top thread base plate and the driving pry seat and an anchor bolt assembly used for connecting the driving pry seat and a secondary grouting layer, wherein the anchor bolt assembly is installed at the tail included angle parts of two side edges of a bottom pry of the driving pry seat, and the leveling top thread is installed on the bottom pry of the driving pry seat and is located on one side of the anchor bolt assembly.
2. The structure for the secondary filling of the skid-mounted reciprocating compressor unit as claimed in claim 1, wherein: the upper surface of the jackscrew base plate and the upper surface of the primary grouting layer are positioned on the same horizontal plane.
3. The structure for the secondary filling of the skid-mounted reciprocating compressor unit as claimed in claim 1, wherein: the gauge block is 50mm thick.
4. The structure for the secondary filling of the skid-mounted reciprocating compressor unit as claimed in claim 1, wherein: the spacing blocks are made of metal materials.
CN201920537421.6U 2019-04-19 2019-04-19 Structure for secondary filling of skid-mounted reciprocating compressor unit Active CN210049275U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920537421.6U CN210049275U (en) 2019-04-19 2019-04-19 Structure for secondary filling of skid-mounted reciprocating compressor unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920537421.6U CN210049275U (en) 2019-04-19 2019-04-19 Structure for secondary filling of skid-mounted reciprocating compressor unit

Publications (1)

Publication Number Publication Date
CN210049275U true CN210049275U (en) 2020-02-11

Family

ID=69381228

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920537421.6U Active CN210049275U (en) 2019-04-19 2019-04-19 Structure for secondary filling of skid-mounted reciprocating compressor unit

Country Status (1)

Country Link
CN (1) CN210049275U (en)

Similar Documents

Publication Publication Date Title
CN110042858A (en) A kind of installation method of skid-mounted reciprocating flow
CA2880553A1 (en) Method and apparatus for lifting and leveling a concrete panel
CN210049275U (en) Structure for secondary filling of skid-mounted reciprocating compressor unit
CN102828623A (en) Construction method for maintaining and locally reinforcing reinforced concrete structure
CN213297268U (en) Support device applied to building jacking engineering
JP4553978B1 (en) Support device for height adjustment
JP2008285931A (en) Height adjusting device for bearing
KR101756272B1 (en) System for restoration of disparity sinking construction
CN111677324A (en) Construction method for modifying bonded steel plate through structural reinforcement
JP5412307B2 (en) Installation method of bridge support device and fixing jig used in the method
CN105986539A (en) Assembled temporary pavement
CN212507485U (en) Steel column leveling device
CN214887572U (en) Reciprocating compressor unit installation component without prying seat
CN210002828U (en) adjustable I-steel embedded device that encorbelments
CN112376940A (en) Reinforcing and protecting device for post-disaster brick house roof
CN213951786U (en) Structure for fixing portal bridge crane track
JP2002332645A (en) Foundation structure of rail for ground-traveling crane and laying method for foundation
CN219774340U (en) Base structure is reformed transform to pump
CN101913533A (en) Design improvement of crane heavy-duty truck traveling steel rail base
KR20090089702A (en) Method for constructing floor
CN206052675U (en) A kind of seat structure of vertical ship lift locking device hydraulic push rod
JPH01290803A (en) Device for lifting up concrete pavement slab
CN220266240U (en) Precast concrete pavement slab lays adjustment mechanism that makes level
CN214996176U (en) Municipal administration public facilities built-in fitting mounting tool
CN106638650B (en) Fabricated concrete foundation structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PP01 Preservation of patent right

Effective date of registration: 20200710

Granted publication date: 20200211

PP01 Preservation of patent right