CN210032848U - Simple cross arm correction adjuster - Google Patents

Simple cross arm correction adjuster Download PDF

Info

Publication number
CN210032848U
CN210032848U CN201920569361.6U CN201920569361U CN210032848U CN 210032848 U CN210032848 U CN 210032848U CN 201920569361 U CN201920569361 U CN 201920569361U CN 210032848 U CN210032848 U CN 210032848U
Authority
CN
China
Prior art keywords
support rod
mounting
hoop
fixedly connected
mounting plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920569361.6U
Other languages
Chinese (zh)
Inventor
李凯琳
张猷生
张建强
杜立坤·亚森
许洪军
李志强
王柯
刘杰
唐琦尧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Aksu Power Supply Co of State Grid Xinjiang Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Aksu Power Supply Co of State Grid Xinjiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Aksu Power Supply Co of State Grid Xinjiang Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201920569361.6U priority Critical patent/CN210032848U/en
Application granted granted Critical
Publication of CN210032848U publication Critical patent/CN210032848U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Connection Of Plates (AREA)

Abstract

本实用新型涉及电力设备技术领域,是一种简易横担矫正调节器,包括抱箍、调节支撑杆、安装件,抱箍左右两侧分别固定安装有调节支撑杆,调节支撑杆包括第一支撑杆、连接套筒及第二支撑杆,连接套筒内壁两端分别设有旋转方向相反的螺纹,第一支撑杆上端和连接套筒下端螺接,第二支撑杆下端和连接套筒上端螺接,每个第一支撑杆下端均固定连接有抱箍,每个第二支撑杆上端均固定连接有安装件。本实用新型结构合理而紧凑,使用方便,其通过抱箍、调节支撑杆及安装件的设置,具有结构简单、操作简单、能带电作业的特点。

The utility model relates to the technical field of electrical equipment, and is a simple cross-arm rectifying adjuster, comprising a hoop, an adjustment support rod and a mounting piece. The left and right sides of the hoop are respectively fixedly installed with adjustment support rods, and the adjustment support rod comprises a first support rod. The rod, the connecting sleeve and the second supporting rod, the two ends of the inner wall of the connecting sleeve are respectively provided with threads with opposite directions of rotation, the upper end of the first supporting rod is screwed with the lower end of the connecting sleeve, and the lower end of the second supporting rod is screwed with the upper end of the connecting sleeve. The lower end of each first support rod is fixedly connected with a hoop, and the upper end of each second support rod is fixedly connected with a mounting piece. The utility model has a reasonable and compact structure, and is convenient to use. The utility model has the characteristics of simple structure, simple operation and live operation through the arrangement of the hoop, the adjusting support rod and the mounting piece.

Description

简易横担矫正调节器Simple cross arm correction adjuster

技术领域technical field

本实用新型涉及电力设备技术领域,是一种简易横担矫正调节器。The utility model relates to the technical field of electric equipment, which is a simple cross arm rectifying regulator.

背景技术Background technique

横担是杆塔中重要的组成部分,它的作用是用来安装绝缘子及金具,以支承导线,横担在长时间使用后易发生偏斜,进而无法对导线起到良好的支撑作用,现有的横担矫正器不仅结构复杂、操作困难,且在矫正作业时需要停电并解开横担上的导线,从而给社会带来巨大的经济损失。The cross arm is an important part of the tower. Its function is to install insulators and hardware to support the wire. The cross arm is prone to deflection after long-term use, and thus cannot provide a good support for the wire. The cross-arm corrector is not only complicated in structure and difficult to operate, but also needs to be powered off and the wires on the cross-arm need to be disconnected during the correction operation, thus bringing huge economic losses to the society.

发明内容SUMMARY OF THE INVENTION

本实用新型提供了一种简易横担矫正调节器,克服了上述现有技术之不足,其能有效解决现有横担矫正器存在结构复杂、操作困难、无法带电作业的问题。The utility model provides a simple cross-arm straightening adjuster, which overcomes the above-mentioned deficiencies of the prior art, and can effectively solve the problems of the existing cross-arm straightening device with complex structure, difficult operation, and inability to work with electricity.

本实用新型的技术方案是通过以下措施来实现的:一种简易横担矫正调节器,包括抱箍、调节支撑杆、安装件,抱箍左右两侧分别固定安装有调节支撑杆,调节支撑杆包括第一支撑杆、连接套筒及第二支撑杆,连接套筒内壁两端分别设有旋转方向相反的螺纹,第一支撑杆上端和连接套筒下端螺接,第二支撑杆下端和连接套筒上端螺接,每个第一支撑杆下端均固定连接有抱箍,每个第二支撑杆上端均固定连接有安装件。The technical scheme of the present utility model is realized by the following measures: a simple cross arm rectifying adjuster, comprising a hoop, an adjustment support rod, and a mounting piece, the left and right sides of the hoop are respectively fixedly installed with adjustment support rods, and the adjustment support rod It includes a first support rod, a connection sleeve and a second support rod. Both ends of the inner wall of the connection sleeve are respectively provided with threads with opposite directions of rotation. The upper end of the first support rod is screwed with the lower end of the connection sleeve, and the lower end of the second support rod is connected to The upper end of the sleeve is screwed, the lower end of each first support rod is fixedly connected with a hoop, and the upper end of each second support rod is fixedly connected with a mounting piece.

下面是对上述实用新型技术方案的进一步优化或/和改进:The following are further optimizations or/and improvements to the above-mentioned technical solutions of the utility model:

上述抱箍左右两侧的调节支撑杆可呈左右镜像对称设置。The adjusting support rods on the left and right sides of the above-mentioned hoop can be arranged in a mirror image symmetrical manner.

上述安装件可包括开口向上且左右贯通的安装夹,安装夹前后壁上设有相对应的两个安装孔,两个安装孔内穿设有销轴,每个第二支撑杆上端均和安装夹底部固定连接。The above-mentioned mounting member may include a mounting clip with an upward opening and left and right through, and two corresponding mounting holes are provided on the front and rear walls of the mounting clip, a pin shaft is passed through the two mounting holes, and the upper end of each second support rod is installed in the same way. Fixed connection at the bottom of the clip.

上述安装夹可包括前安装板、后安装板及开口向上且左右贯通弧形连接板,弧形连接板前端和前安装板下端固定连接,弧形连接板后端和后安装板下端固定连接,两个安装孔分别对应设置在前安装板和后安装板上,每个第二支撑杆上端均和弧形连接板底壁固定连接。The above-mentioned mounting clip may include a front mounting plate, a rear mounting plate and an arc-shaped connecting plate with an opening upward and left and right through the arc-shaped connecting plate, the front end of the arc-shaped connecting plate is fixedly connected with the lower end of the front mounting plate, and the rear end of the arc-shaped connecting plate is fixedly connected with the lower end of the rear mounting plate, The two mounting holes are respectively arranged on the front mounting plate and the rear mounting plate, and the upper end of each second support rod is fixedly connected with the bottom wall of the arc-shaped connecting plate.

上述前安装板、后安装板及弧形连接板可为一体设置。The above-mentioned front mounting plate, rear mounting plate and arc-shaped connecting plate can be integrated.

本实用新型结构合理而紧凑,使用方便,其通过抱箍、调节支撑杆及安装件的设置,具有结构简单、操作简单、能带电作业的特点。The utility model has the advantages of reasonable and compact structure and convenient use. The utility model has the characteristics of simple structure, simple operation and live operation through the arrangement of the hoop, the adjusting support rod and the mounting piece.

附图说明Description of drawings

附图1为本实用新型最佳实施例使用状态时的主视结构示意图。Figure 1 is a schematic diagram of the front view structure of the preferred embodiment of the present utility model when it is in use.

附图中的编码分别为:1为抱箍,2为第一支撑杆,3为连接套筒,4为第二支撑杆,5为销轴,6为前安装板,7为弧形连接板,8为电杆,9为横担。The codes in the accompanying drawings are: 1 is the hoop, 2 is the first support rod, 3 is the connecting sleeve, 4 is the second support rod, 5 is the pin shaft, 6 is the front mounting plate, and 7 is the arc connecting plate , 8 is the pole, 9 is the cross arm.

具体实施方式Detailed ways

本实用新型不受下述实施例的限制,可根据本实用新型的技术方案与实际情况来确定具体的实施方式。The present invention is not limited by the following examples, and specific implementations can be determined according to the technical solutions and actual conditions of the present invention.

在本实用新型中,为了便于描述,各部件的相对位置关系的描述均是根据说明书附图1的布图方式来进行描述的,如:前、后、上、下、左、右等的位置关系是依据说明书附图的布图方向来确定的。In the present utility model, for the convenience of description, the description of the relative positional relationship of each component is described according to the layout of Figure 1 of the specification, such as: the positions of front, rear, upper, lower, left, right, etc. The relationship is determined according to the layout direction of the drawings in the specification.

下面结合实施例及附图对本实用新型作进一步描述:Below in conjunction with embodiment and accompanying drawing, the utility model is further described:

如附图1所示,该简易横担矫正调节器包括抱箍1、调节支撑杆、安装件,抱箍1左右两侧分别固定安装有调节支撑杆,调节支撑杆包括第一支撑杆2、连接套筒3及第二支撑杆4,连接套筒3内壁两端分别设有旋转方向相反的螺纹,第一支撑杆2上端和连接套筒3下端螺接,第二支撑杆4下端和连接套筒3上端螺接,每个第一支撑杆2下端均固定连接有抱箍1,每个第二支撑杆4上端均固定连接有安装件。根据需求,抱箍1可采用快速抱箍,当要对左右两侧发生倾斜的横担9进行矫正作业时,先将抱箍1固定安装到横担9下方的电杆8上,然后将左右两侧的安装件分别固定安装到横担9的左右两侧上,通过旋转连接套筒3就可调节调节支撑杆的长度进而实现对横担9的调节作用,使得横担9能在本实用新型的支撑作用下保持左右水平的状态,从而对导线起到稳定的支撑作用,本实用新型结构简单、操作方便,且在矫正作业时可带电作业,减小了因停电而带来的经济损失。As shown in FIG. 1 , the simple cross arm correction adjuster includes a hoop 1, an adjustment support rod, and a mounting member. The left and right sides of the hoop 1 are respectively fixed with adjustment support rods. The adjustment support rod includes a first support rod 2, The connecting sleeve 3 and the second supporting rod 4 are connected. The two ends of the inner wall of the connecting sleeve 3 are respectively provided with threads with opposite directions of rotation. The upper end of the first supporting rod 2 is screwed with the lower end of the connecting sleeve 3. The lower end of the second supporting rod 4 is connected to The upper end of the sleeve 3 is screwed, the lower end of each first support rod 2 is fixedly connected with a hoop 1, and the upper end of each second support rod 4 is fixedly connected with a mounting piece. According to the demand, the hoop 1 can be a quick hoop. When the cross-arm 9 that is inclined on the left and right sides is to be corrected, the hoop 1 is firstly fixed on the pole 8 under the cross-arm 9, and then the left and right The mounting parts on both sides are respectively fixed and installed on the left and right sides of the cross arm 9, and the length of the support rod can be adjusted by rotating the connecting sleeve 3 to realize the adjustment effect on the cross arm 9, so that the cross arm 9 can be used in the utility model. The utility model maintains a horizontal state on the left and right under the supporting action, thereby playing a stable supporting role for the wire. The utility model has a simple structure, is convenient to operate, and can be operated with electricity during the correction operation, thereby reducing the economic loss caused by the power failure. .

可根据实际需要,对上述简易横担矫正调节器作进一步优化或/和改进:According to actual needs, the above-mentioned simple cross arm straightening adjuster can be further optimized or/and improved:

如附图1所示,抱箍1左右两侧的调节支撑杆呈左右镜像对称设置。由此保证横担9、抱箍1左右两侧受力更加均匀,延长了横担9和本实用新型的使用寿命。As shown in FIG. 1 , the adjusting support rods on the left and right sides of the hoop 1 are arranged symmetrically in left and right mirror images. Therefore, it is ensured that the cross arm 9 and the left and right sides of the hoop 1 are subjected to more even force, which prolongs the service life of the cross arm 9 and the utility model.

如附图1所示,安装件包括开口向上且左右贯通的安装夹,安装夹前后壁上设有相对应的两个安装孔,两个安装孔内穿设有销轴5,每个第二支撑杆4上端均和安装夹底部固定连接。由此将安装夹前后壁上的两个安装孔对准横担9上的预留孔后,再将销轴5插入到安装孔和预留孔内就可将安装夹固定安装到横担上,整个安装过程简单、便捷。As shown in FIG. 1 , the mounting part includes a mounting clip with an upward opening and passing through left and right. The front and rear walls of the mounting clip are provided with two corresponding mounting holes. The two mounting holes are provided with pin shafts 5, and each second The upper end of the support rod 4 is fixedly connected with the bottom of the mounting clip. In this way, after aligning the two mounting holes on the front and rear walls of the mounting clip with the reserved holes on the cross arm 9, and then inserting the pin 5 into the mounting holes and the reserved holes, the mounting clip can be fixedly installed on the cross arm , the whole installation process is simple and convenient.

如附图1所示,安装夹包括前安装板6、后安装板及开口向上且左右贯通弧形连接板7,弧形连接板7前端和前安装板6下端固定连接,弧形连接板7后端和后安装板下端固定连接,两个安装孔分别对应设置在前安装板6和后安装板上,每个第二支撑杆14上端均和弧形连接板7底壁固定连接。安装夹结构简单、便于制造。As shown in FIG. 1 , the mounting clip includes a front mounting plate 6, a rear mounting plate and an arc-shaped connecting plate 7 with an opening upward and left and right through the arc-shaped connecting plate 7. The front end of the arc-shaped connecting plate 7 is fixedly connected to the lower end of the front mounting plate 6, and the arc-shaped connecting plate 7 The rear end and the lower end of the rear mounting plate are fixedly connected, two mounting holes are respectively arranged on the front mounting plate 6 and the rear mounting plate, and the upper end of each second support rod 14 is fixedly connected to the bottom wall of the arc connecting plate 7 . The mounting clip has a simple structure and is easy to manufacture.

作为优选的,前安装板6、后安装板及弧形连接板7可为一体设置。由此更便于制造。Preferably, the front mounting plate 6, the rear mounting plate and the arc-shaped connecting plate 7 can be integrally provided. This makes it easier to manufacture.

以上技术特征构成了本实用新型的最佳实施例,其具有较强的适应性和最佳实施效果,可根据实际需要增减非必要的技术特征,来满足不同情况的需求。The above technical features constitute the best embodiment of the present invention, which has strong adaptability and best implementation effect, and can increase or decrease unnecessary technical features according to actual needs to meet the needs of different situations.

Claims (5)

1.一种简易横担矫正调节器,其特征在于包括抱箍、调节支撑杆、安装件,抱箍左右两侧分别固定安装有调节支撑杆,调节支撑杆包括第一支撑杆、连接套筒及第二支撑杆,连接套筒内壁两端分别设有旋转方向相反的螺纹,第一支撑杆上端和连接套筒下端螺接,第二支撑杆下端和连接套筒上端螺接,每个第一支撑杆下端均固定连接有抱箍,每个第二支撑杆上端均固定连接有安装件。1. A simple cross-arm rectifying adjuster is characterized in that it comprises a hoop, an adjustment support rod, and a mounting part, and the left and right sides of the hoop are respectively fixed and installed with an adjustment support rod, and the adjustment support rod comprises a first support rod, a connecting sleeve and the second support rod, the two ends of the inner wall of the connecting sleeve are respectively provided with threads with opposite directions of rotation, the upper end of the first support rod is screwed with the lower end of the connecting sleeve, the lower end of the second support rod is screwed with the upper end of the connecting sleeve, each No. The lower end of a support rod is fixedly connected with a hoop, and the upper end of each second support rod is fixedly connected with a mounting piece. 2.根据权利要求1所述的简易横担矫正调节器,其特征在于抱箍左右两侧的调节支撑杆呈左右镜像对称设置。2 . The simple cross arm straightening adjuster according to claim 1 , wherein the adjusting support rods on the left and right sides of the hoop are arranged symmetrically in mirror images on the left and right sides. 3 . 3.根据权利要求1或2所述的简易横担矫正调节器,其特征在于安装件包括开口向上且左右贯通的安装夹,安装夹前后壁上设有相对应的两个安装孔,两个安装孔内穿设有销轴,第二支撑杆上端和安装夹底部固定连接。3. The simple cross arm straightening adjuster according to claim 1 or 2, characterized in that the mounting part comprises a mounting clip with an upward opening and left and right through, and the front and rear walls of the mounting clip are provided with two corresponding mounting holes, two A pin shaft is pierced through the mounting hole, and the upper end of the second support rod is fixedly connected with the bottom of the mounting clip. 4.根据权利要求3所述的简易横担矫正调节器,其特征在于安装夹可包括前安装板、后安装板及开口向上且左右贯通弧形连接板,弧形连接板前端和前安装板下端固定连接,弧形连接板后端和后安装板下端固定连接,两个安装孔分别对应设置在前安装板和后安装板上,每个第二支撑杆上端均和弧形连接板底壁固定连接。4. The simple cross arm straightening adjuster according to claim 3 is characterized in that the mounting clip can comprise a front mounting plate, a rear mounting plate and an arc-shaped connecting plate with an opening upward and left and right, and the front end of the arc-shaped connecting plate and the front mounting plate. The lower end is fixedly connected, the rear end of the arc-shaped connecting plate is fixedly connected to the lower end of the rear mounting plate, the two mounting holes are respectively arranged on the front mounting plate and the rear mounting plate, and the upper end of each second support rod is connected to the bottom wall of the arc-shaped connecting plate. Fixed connection. 5.根据权利要求4所述的简易横担矫正调节器,其特征在于前安装板、后安装板及弧形连接板可为一体设置。5 . The simple cross arm straightening adjuster according to claim 4 , wherein the front mounting plate, the rear mounting plate and the arc-shaped connecting plate can be integrally arranged. 6 .
CN201920569361.6U 2019-04-24 2019-04-24 Simple cross arm correction adjuster Expired - Fee Related CN210032848U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920569361.6U CN210032848U (en) 2019-04-24 2019-04-24 Simple cross arm correction adjuster

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920569361.6U CN210032848U (en) 2019-04-24 2019-04-24 Simple cross arm correction adjuster

Publications (1)

Publication Number Publication Date
CN210032848U true CN210032848U (en) 2020-02-07

Family

ID=69361340

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920569361.6U Expired - Fee Related CN210032848U (en) 2019-04-24 2019-04-24 Simple cross arm correction adjuster

Country Status (1)

Country Link
CN (1) CN210032848U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111593934A (en) * 2020-04-07 2020-08-28 国网河南省电力公司鄢陵县供电公司 Supporting leg hoop device for electric power tower
CN115749352A (en) * 2022-11-28 2023-03-07 东北电力大学 Power transmission iron tower reinforcing device and method using prestressed stay wires

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111593934A (en) * 2020-04-07 2020-08-28 国网河南省电力公司鄢陵县供电公司 Supporting leg hoop device for electric power tower
CN115749352A (en) * 2022-11-28 2023-03-07 东北电力大学 Power transmission iron tower reinforcing device and method using prestressed stay wires

Similar Documents

Publication Publication Date Title
CN202121254U (en) Cross arm lateral side clamp of double-fission double-suspension insulator string for erecting tower
CN210032848U (en) Simple cross arm correction adjuster
CN208015268U (en) A kind of wind driven generator cable clamp
CN103439548B (en) The connection box of electric energy meter post of built-in arc spring pad
CN201708474U (en) Lead clamp splitpin installer
CN206769520U (en) A kind of firm formula power network supporting construction
CN204333550U (en) Current collector for trolley line
CN222800194U (en) A mounting structure for a wire temperature sensor
CN210798442U (en) Quick installation device of connecting piece for electric power electricity tower
CN205178029U (en) Novel electricity connection terminal
CN207432120U (en) A kind of automatic live installation of bird repeller device
CN105822131A (en) Transmission cross arm
CN109510130A (en) A kind of power communication cable fixed equipment
CN209029840U (en) A kind of power communication cable fixed equipment
CN207542424U (en) Based on the earthing or grounding means for realizing Quick-clamped
CN205558446U (en) Transmission of electricity cross arm
CN113904261A (en) Circuit arrester does not have power failure installation and changes device
CN203760913U (en) Emergency processing tool for a fault
CN219912327U (en) Dual-channel stabilized power supply controller based on environment-friendly monitoring system
CN222996480U (en) Adjustable sun Camera support
CN211743889U (en) Strain insulator pole outlet device that distribution lines construction used
CN110459908B (en) Equipotential mounting structure
CN218888505U (en) Bracket component on photovoltaic junction box
CN115621898A (en) A Multi-functional Offsetting Tool with Adjustable Angle
CN203734262U (en) Jumper socket wire clamp

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200207