CN210032654U - Concrete pouring equipment for building construction - Google Patents

Concrete pouring equipment for building construction Download PDF

Info

Publication number
CN210032654U
CN210032654U CN201920706650.6U CN201920706650U CN210032654U CN 210032654 U CN210032654 U CN 210032654U CN 201920706650 U CN201920706650 U CN 201920706650U CN 210032654 U CN210032654 U CN 210032654U
Authority
CN
China
Prior art keywords
groove
gear
seat
fixedly installed
pouring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920706650.6U
Other languages
Chinese (zh)
Inventor
徐银禄
邵津津
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201920706650.6U priority Critical patent/CN210032654U/en
Application granted granted Critical
Publication of CN210032654U publication Critical patent/CN210032654U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model belongs to the concrete placement field, especially, building construction concrete placement equipment, to current concrete placement equipment pour the rigidity and all pour from the eminence toward low, can not control the speed of pouring, lead to the different problem of concrete density of the different level of concrete pouring process easily, the scheme is put forward now, it includes the bottom plate, the top of bottom plate is seted up flutedly, and slidable mounting has the removal seat in the recess, and one side of removing the seat is equipped with drive arrangement, and the standing groove has been seted up at the top of removing the seat, and slidable mounting has the lift post in the standing groove, and the top fixed mounting of lift post has the lifter plate, removes one side fixed mounting of seat and has hydraulic push rod, and hydraulic push rod's output shaft fixed mounting is in the bottom of lifter plate. The utility model discloses simple structure, convenient operation, this concrete placement equipment function is abundant, pours the position nimble and can evenly pour to can control and pour speed, guaranteed the quality of pouring.

Description

Concrete pouring equipment for building construction
Technical Field
The utility model relates to a concrete placement technical field especially relates to a construction concrete placement equipment.
Background
The concrete pouring equipment is a device for pouring concrete, is used in building construction, and is used for pouring the stirred concrete into a built building frame, so that the labor input can be effectively reduced, and the working efficiency is improved;
however, the existing concrete pouring equipment has single function, the pouring positions are fixed and all the concrete is poured from a high position to a low position, the pouring speed cannot be controlled, and the concrete density of different horizontal heights in the concrete pouring process is easily different, so that the building quality is different.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the problem that the pouring position of the concrete pouring equipment in the prior art is fixed and all pour from the eminence toward the low place, can not control the pouring speed, easily leads to the different shortcomings of concrete density of the different level of concrete pouring process, and the construction concrete pouring equipment who proposes.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
building construction concrete placement equipment comprises a bottom plate, wherein a groove is formed in the top of the bottom plate, a moving seat is slidably mounted in the groove, a driving device is arranged on one side of the moving seat, a placing groove is formed in the top of the moving seat, a lifting column is slidably mounted in the placing groove, a lifting plate is fixedly mounted at the top of the lifting column, a hydraulic push rod is fixedly mounted on one side of the moving seat, an output shaft of the hydraulic push rod is fixedly mounted at the bottom of the lifting plate, a stirring box is fixedly mounted at the top of the lifting plate, a pouring pipe is fixedly mounted at the bottom of the lifting plate, a blanking hole is formed in the top of the lifting plate and communicated with the pouring pipe, a discharging pipe of the stirring box extends into the blanking hole, a material control device is arranged in the blanking hole, the driving device comprises a control seat, a moving block, a stepping motor, a first gear and, the bottom of control seat has seted up the spread groove, and the movable block slidable mounting is in the spread groove, and step motor fixed mounting is in the bottom of movable block, and first gear fixed mounting has been seted up at the top of bottom plate on step motor's output shaft, and first rack fixed mounting is in the cooperation inslot, and first gear extends to the cooperation inslot and meshes with first rack.
Preferably, the material control device comprises two speed control plates, two first bevel gears, two second bevel gears, two movable plates, a connecting rod, two rotating rods, a speed reduction motor and two second gears, mounting grooves are formed in the inner walls of the two sides of the blanking hole, the speed control plates are rotatably mounted in the mounting grooves, and the first bevel gears are fixedly mounted on the corresponding speed control plates.
Preferably, two fixed cavities have been seted up on the lifter plate, movable plate slidable mounting is in the fixed intracavity that corresponds, the equal fixed mounting in one side of two movable plates has the second rack, connecting rod fixed mounting is at the top of two movable plates, the dwang rotates to be installed in the fixed intracavity that corresponds, the fixed cover of second gear is established on the dwang that corresponds, second bevel gear welds the one end at the dwang that corresponds, second bevel gear and first bevel gear mesh, gear motor fixed mounting is in one side of lifter plate, dwang fixed mounting is on gear motor's output shaft, second gear and the second rack meshing that corresponds.
Preferably, a plurality of universal wheels are installed to the bottom of bottom plate, have seted up the slide opening on one side inner wall in fixed chamber, and connecting rod slidable mounting is in the slide opening, and the universal wheel conveniently drives equipment shift position, slides in the slide opening when the connecting rod removes, can stabilize the position when the connecting rod removes.
The utility model discloses in, when building construction concrete placement equipment is carrying out concrete placement, start hydraulic push rod and can drive the lifter plate and move, the height of adjustable pouring, start step motor, step motor drives first gear and rotates, step motor drives the removal seat and moves back, can drive the pouring pipe back and forth with this is reciprocal and move, when needs adjust the pouring speed, start gear motor, gear motor drives the dwang and rotates, the dwang drives the second gear and rotates, two first gears drive two corresponding second bevel gears and rotate, first bevel gear drives the rotation of corresponding accuse speedboard, two distance between the accuse speedboard is big more, the unloading speed is fast, two distance between the accuse speedboard is little more, the unloading speed is slow more;
the utility model discloses simple structure, convenient operation, this concrete placement equipment function is abundant, pours the position nimble and can evenly pour to can control and pour speed, guaranteed the quality of pouring.
Drawings
Fig. 1 is a schematic structural view of a construction concrete pouring apparatus according to the present invention;
FIG. 2 is a schematic structural view of part A of the construction concrete pouring equipment provided by the utility model;
fig. 3 is the utility model provides a building construction concrete placement equipment's B part schematic structure.
In the figure: the device comprises a base plate 1, a groove 2, a moving seat 3, a lifting column 4, a lifting plate 5, a hydraulic push rod 6, a control seat 7, a moving block 8, a stepping motor 9, a first gear 10, a fixed groove 11, a stirring box 12, a pouring pipe 13, a blanking hole 14, a mounting groove 15, a speed control plate 16, a moving plate 17, a connecting rod 18, a speed reducing motor 19 and a second gear 20.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Example 1
Referring to fig. 1-3, the building construction concrete pouring device comprises a bottom plate 1, a groove 2 is formed in the top of the bottom plate 1, a moving seat 3 is installed in the groove 2 in a sliding mode, a driving device is arranged on one side of the moving seat 3, a placing groove is formed in the top of the moving seat 3, a lifting column 4 is installed in the placing groove in a sliding mode, a lifting plate 5 is fixedly installed on the top of the lifting column 4, a hydraulic push rod 6 is fixedly installed on one side of the moving seat 3, an output shaft of the hydraulic push rod 6 is fixedly installed at the bottom of the lifting plate 5, a stirring box 12 is fixedly installed on the top of the lifting plate 5, a pouring pipe 13 is fixedly installed at the bottom of the lifting plate 5, a blanking hole 14 is formed in the top of the lifting plate 5, the blanking hole 14 is communicated with the pouring pipe 13, a discharging pipe of the stirring box 12 extends into the blanking hole, Step motor 9, first gear 10 and first rack, control seat 7 fixed mounting has been seted up at one side of removing seat 3 in the bottom of control seat 7, moving block 8 slidable mounting has been in the spread groove, step motor 9 fixed mounting is in the bottom of moving block 8, first gear 10 fixed mounting is on step motor 9's output shaft, the cooperation groove has been seted up at the top of bottom plate 1, first rack fixed mounting is in the cooperation inslot, first gear 10 extend to the cooperation inslot and with first rack toothing.
In this embodiment, the material control device includes two speed control plates 16, two first bevel gears, two second bevel gears, two moving plates 17, connecting rod 18, two dwang, gear motor 19 and two second gears 20, mounting groove 15 has all been seted up on the both sides inner wall of unloading hole 14, and speed control plate 16 rotates and installs in mounting groove 15, and first bevel gear fixed mounting is on the speed control plate 16 that corresponds.
In this embodiment, two fixed chambeies have been seted up on lifter plate 5, movable plate 17 slidable mounting is in the fixed intracavity that corresponds, the equal fixed mounting in one side of two movable plates 17 has the second rack, connecting rod 18 fixed mounting is at the top of two movable plates 17, the dwang rotates and installs in the fixed intracavity that corresponds, the fixed cover of second gear 20 is established on the dwang that corresponds, second bevel gear welds the one end at the dwang that corresponds, second bevel gear and first bevel gear mesh, gear motor 19 fixed mounting is in one side of lifter plate 5, dwang fixed mounting is on gear motor 19's output shaft, second gear 20 meshes with the second rack that corresponds.
In this embodiment, a plurality of universal wheels are installed to the bottom of bottom plate 1, have seted up the slide opening on one side inner wall in fixed chamber, and connecting rod 18 slidable mounting is in the slide opening, and the universal wheel conveniently drives equipment shift position, slides in the slide opening when connecting rod 18 removes, can stabilize the position when connecting rod 18 removes.
In this embodiment, when concrete pouring is performed, the hydraulic push rod 6 is started to drive the lifting plate 5 to move, the lifting plate 5 drives the pouring pipe 13 to move, so as to adjust the pouring height, the stepping motor 9 is started, the stepping motor 9 drives the first gear 10 to rotate, the first gear 10 is meshed with the first rack and drives the control seat 7 to move, the control seat 7 drives the moving seat 3 to move, the moving seat 3 drives the pouring pipe 13 on the lifting plate 5 to move, when the first rack 10 moves to a corner of the fixed groove 11, the stepping motor 9 drives the moving block 8 to slide in the connecting groove, the stepping motor 9 drives the moving seat 3 to move back, so as to reciprocate to drive the pouring pipe 13 to move back and forth, when the pouring speed needs to be adjusted, the decelerating motor 19 is started, the decelerating motor 19 drives the rotating rod to rotate, the rotating rod drives the second gear 20 to rotate, the second gear 20 drives the moving plate 17 to, the moving plate 17 drives the connecting rod 18 to move, the connecting rod 18 drives the other moving plate 17 to move, the two moving plates 17 respectively drive the two corresponding first gears 10 to rotate, the two first gears 10 drive the two corresponding second bevel gears to rotate, the second bevel gears drive the corresponding first bevel gears to rotate, the first bevel gears drive the corresponding speed control plates 16 to rotate, the larger the distance between the two speed control plates 16 is, the faster the blanking speed is, the smaller the distance between the two speed control plates 16 is, and the slower the blanking speed is; the concrete pouring equipment has rich functions, can pour flexibly and uniformly in the pouring position, can control the pouring speed and ensures the pouring quality.
Example 2
Referring to fig. 1-3, a further improvement is made on the basis of example 1:
construction concrete placement equipment, comprising a base plate 1, recess 2 has been seted up at the top of bottom plate 1, slidable mounting has the removal seat 3 in the recess 2, one side of removing seat 3 is equipped with drive arrangement, the standing groove has been seted up at the top of removing seat 3, slidable mounting has lifting column 4 in the standing groove, there is lifter plate 5 at the top of lifting column 4 through bolt fixed mounting, there is hydraulic push rod 6 one side of removing seat 3 through bolt fixed mounting, hydraulic push rod 6's output shaft passes through bolt fixed mounting in the bottom of lifter plate 5, there is agitator tank 12 at the top of lifter plate 5 through bolt fixed mounting, there is pouring pipe 13 at the bottom of lifter plate 5 through bolt fixed mounting, blanking hole 14 has been seted up at the top of lifter plate 5, blanking hole 14 is linked together with pouring pipe 13, the discharging pipe of agitator tank 12 extends to in blanking hole 14, be equipped with the accuse material device in blanking hole 14, drive arrangement includes control seat, The movable block 8, step motor 9, first gear 10 and first rack, control seat 7 passes through bolt fixed mounting in one side of removing seat 3, the spread groove has been seted up to the bottom of control seat 7, movable block 8 slidable mounting is in the spread groove, step motor 9 passes through bolt fixed mounting in the bottom of movable block 8, first gear 10 passes through bolt fixed mounting on step motor 9's output shaft, the cooperation groove has been seted up at the top of bottom plate 1, first rack passes through bolt fixed mounting in the cooperation groove, first gear 10 extends to the cooperation inslot and meshes with first rack.
In this embodiment, accuse material device includes that two accuse are fast board 16, two first bevel gears, two second bevel gears, two movable plates 17, connecting rod 18, two dwang, gear motor 19 and two second gears 20, has all seted up mounting groove 15 on the both sides inner wall of unloading hole 14, and accuse is fast board 16 and rotates and install in mounting groove 15, and first bevel gear passes through bolt fixed mounting on the fast board 16 of accuse that corresponds.
In this embodiment, two fixed chambeies have been seted up on lifter plate 5, movable plate 17 slidable mounting is in the fixed intracavity that corresponds, there is the second rack one side of two movable plates 17 all through bolt fixed mounting, connecting rod 18 passes through bolt fixed mounting at the top of two movable plates 17, the dwang rotates and installs in the fixed intracavity that corresponds, the fixed cover of second gear 20 is established on the dwang that corresponds, the welding of second bevel gear is in the one end of the dwang that corresponds, second bevel gear and first bevel gear meshing, gear motor 19 passes through bolt fixed mounting in one side of lifter plate 5, the dwang passes through bolt fixed mounting on gear motor 19's output shaft, second gear 20 meshes with the second rack that corresponds.
In this embodiment, a plurality of universal wheels are installed to the bottom of bottom plate 1, have seted up the slide opening on one side inner wall in fixed chamber, and connecting rod 18 slidable mounting is in the slide opening, and the universal wheel conveniently drives equipment shift position, slides in the slide opening when connecting rod 18 removes, can stabilize the position when connecting rod 18 removes.
In this embodiment, when concrete pouring is performed, the hydraulic push rod 6 is started to drive the lifting plate 5 to move, the lifting plate 5 drives the pouring pipe 13 to move, so as to adjust the pouring height, the stepping motor 9 is started, the stepping motor 9 drives the first gear 10 to rotate, the first gear 10 is meshed with the first rack and drives the control seat 7 to move, the control seat 7 drives the moving seat 3 to move, the moving seat 3 drives the pouring pipe 13 on the lifting plate 5 to move, when the first rack 10 moves to a corner of the fixed groove 11, the stepping motor 9 drives the moving block 8 to slide in the connecting groove, the stepping motor 9 drives the moving seat 3 to move back, so as to reciprocate to drive the pouring pipe 13 to move back and forth, when the pouring speed needs to be adjusted, the decelerating motor 19 is started, the decelerating motor 19 drives the rotating rod to rotate, the rotating rod drives the second gear 20 to rotate, the second gear 20 drives the moving plate 17 to, the moving plate 17 drives the connecting rod 18 to move, the connecting rod 18 drives the other moving plate 17 to move, the two moving plates 17 respectively drive the two corresponding first gears 10 to rotate, the two first gears 10 drive the two corresponding second bevel gears to rotate, the second bevel gears drive the corresponding first bevel gears to rotate, the first bevel gears drive the corresponding speed control plates 16 to rotate, the larger the distance between the two speed control plates 16 is, the faster the blanking speed is, the smaller the distance between the two speed control plates 16 is, and the slower the blanking speed is; the concrete pouring equipment has rich functions, can pour flexibly and uniformly in the pouring position, can control the pouring speed and ensures the pouring quality.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (5)

1. Building construction concrete pouring equipment comprises a bottom plate (1) and is characterized in that a groove (2) is formed in the top of the bottom plate (1), a moving seat (3) is installed in the groove (2) in a sliding mode, a driving device is arranged on one side of the moving seat (3), a placing groove is formed in the top of the moving seat (3), a lifting column (4) is installed in the placing groove in a sliding mode, a lifting plate (5) is fixedly installed on the top of the lifting column (4), a hydraulic push rod (6) is fixedly installed on one side of the moving seat (3), an output shaft of the hydraulic push rod (6) is fixedly installed at the bottom of the lifting plate (5), a stirring box (12) is fixedly installed at the top of the lifting plate (5), a pouring pipe (13) is fixedly installed at the bottom of the lifting plate (5), a discharging hole (14) is formed in the top of the lifting plate (5), and the discharging hole (14, the discharging pipe of the stirring box (12) extends into the discharging hole (14), and a material control device is arranged in the discharging hole (14).
2. The building construction concrete pouring device according to claim 1, characterized in that the driving device comprises a control base (7), a moving block (8), a stepping motor (9), a first gear (10) and a first rack, the control base (7) is fixedly installed on one side of the moving base (3), a connecting groove is formed in the bottom of the control base (7), the moving block (8) is slidably installed in the connecting groove, the stepping motor (9) is fixedly installed at the bottom of the moving block (8), the first gear (10) is fixedly installed on an output shaft of the stepping motor (9), a matching groove is formed in the top of the bottom plate (1), the first rack is fixedly installed in the matching groove, and the first gear (10) extends into the matching groove and is meshed with the first rack.
3. The building construction concrete pouring equipment according to claim 1, wherein the material control device comprises two speed control plates (16), two first bevel gears, two second bevel gears, two moving plates (17), a connecting rod (18), two rotating rods, a speed reduction motor (19) and two second gears (20), mounting grooves (15) are formed in the inner walls of two sides of the blanking hole (14), the speed control plates (16) are rotatably mounted in the mounting grooves (15), and the first bevel gears are fixedly mounted on the corresponding speed control plates (16).
4. The building construction concrete pouring equipment according to claim 1, characterized in that two fixed cavities are formed in the lifting plate (5), the movable plates (17) are slidably mounted in the corresponding fixed cavities, a second rack is fixedly mounted on one side of each of the two movable plates (17), the connecting rod (18) is fixedly mounted on the tops of the two movable plates (17), the rotating rods are rotatably mounted in the corresponding fixed cavities, the second gears (20) are fixedly sleeved on the corresponding rotating rods, the second bevel gears are welded at one ends of the corresponding rotating rods, the second bevel gears are meshed with the first bevel gears, the speed reduction motor (19) is fixedly mounted on one side of the lifting plate (5), the rotating rods are fixedly mounted on an output shaft of the speed reduction motor (19), and the second gears (20) are meshed with the corresponding second racks.
5. The building construction concrete pouring device according to claim 1, characterized in that a plurality of universal wheels are installed at the bottom of the bottom plate (1), a slide hole is opened on one side inner wall of the fixing cavity, and the connecting rod (18) is slidably installed in the slide hole.
CN201920706650.6U 2019-05-10 2019-05-10 Concrete pouring equipment for building construction Active CN210032654U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920706650.6U CN210032654U (en) 2019-05-10 2019-05-10 Concrete pouring equipment for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920706650.6U CN210032654U (en) 2019-05-10 2019-05-10 Concrete pouring equipment for building construction

Publications (1)

Publication Number Publication Date
CN210032654U true CN210032654U (en) 2020-02-07

Family

ID=69366028

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920706650.6U Active CN210032654U (en) 2019-05-10 2019-05-10 Concrete pouring equipment for building construction

Country Status (1)

Country Link
CN (1) CN210032654U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113417467A (en) * 2021-07-26 2021-09-21 温州市阳光建设有限公司 Concrete pouring workbench for house construction

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113417467A (en) * 2021-07-26 2021-09-21 温州市阳光建设有限公司 Concrete pouring workbench for house construction

Similar Documents

Publication Publication Date Title
CN2765753Y (en) Assembly line apparatus for gypsum hollow wall plate
CN202984228U (en) Cleaning machine for oil tank inner wall
CN210032654U (en) Concrete pouring equipment for building construction
CN210708887U (en) Discharging device with anti-blocking function
CN216461636U (en) Aluminum ingot casting mould
CN211362765U (en) Mould for building concrete precast slab
CN219402196U (en) Metal casting forming device
CN218109271U (en) Casting die utensil
CN217058353U (en) Material elevator for preparing metal-based composite material
CN213033481U (en) Continuous punching machine capable of automatically removing waste
CN210755152U (en) Different capacity ladle vacuum pouring device
CN211004281U (en) Road and bridge construction is with lifting by crane equipment
CN216065064U (en) Automatic die for aluminum profile production
CN215107428U (en) Concrete cast-in-place floor thickness control device
CN216369797U (en) Cold stamping die capable of being continuously processed
CN217910071U (en) Device based on steel grit aluminum processing
CN216968428U (en) Automatic shake thick liquid device
CN215395896U (en) Suspension device for switching multiple working positions of die
CN215836957U (en) Multifunctional pickling machine
CN215325702U (en) High temperature resistant steel sheet section bar production loading attachment
CN216472090U (en) Fork double-acting forklift with bucket rotating device
CN218503159U (en) Positioning mechanism for automobile plate part thermal forming die
CN221133364U (en) Cleaning device for automobile mold
CN219188580U (en) Die set with external pull rod
CN221066788U (en) Real-time adjusting and controlling device for concrete material proportion

Legal Events

Date Code Title Description
GR01 Patent grant