CN210005915U CN201920971844.9U CN201920971844U CN210005915U CN 210005915 U CN210005915 U CN 210005915U CN 201920971844 U CN201920971844 U CN 201920971844U CN 210005915 U CN210005915 U CN 210005915U
Authority
CN
China
Prior art keywords
power
test module
test
mainboard
plc
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920971844.9U
Other languages
Chinese (zh)
Inventor
马洪涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shunda Computer Factory Co Ltd
Original Assignee
Shunda Computer Factory Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shunda Computer Factory Co Ltd filed Critical Shunda Computer Factory Co Ltd
Priority to CN201920971844.9U priority Critical patent/CN210005915U/en
Application granted granted Critical
Publication of CN210005915U publication Critical patent/CN210005915U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Programmable Controllers (AREA)

Abstract

The utility model provides an automatic power-off power-on device, it is used for test mainboard in-process automatic power-off power-on, this automatic power-off power-on device includes power supply unit subassembly, it inserts commercial power and provides the electric power that work needs for other work modules, test module, this power supply unit subassembly is connected to its electricity, this mainboard electricity that awaits measuring can be installed in this test module, this test module execution predetermines test program test this mainboard that awaits measuring, and PLC subassembly, this test module and this power supply unit subassembly are connected to its electricity, it presets this test module of control program control and carries out the outage and the power-on of each item test beginning and ending and control this test module to this mainboard that awaits measuring to be provided with in the PLC subassembly.

Description

Automatic power-off and power-on device
Technical Field
The utility model relates to an electricity device, especially can improve the electricity device on the automatic power-off of efficiency of software testing on kinds of automatic power-off.
Background
At present, many products in a production line need to record Media Access Control (MAC) addresses, Field Replaceable Unit (FRU) information, World Wide Name (WWN) numbers and the like in a BFT (bidirectional Forwarding test) jig, recording contents can take effect only when recording is needed to be powered off, the production line test flow is that a program can prompt a tester to power off manually firstly, then the tester cuts off power by pressing a power switch, after waiting for 10 seconds, the tester presses the power switch to power on again, and after 2 seconds, the tester presses a Power Key to start up and continue testing. The operation of the tester takes about 20 seconds in the whole process, but if the tester is testing another machine, the machine waits for the machine, the testing time is wasted, and the testing efficiency is reduced.
In view of this, the utility model provides an kind can improve the automatic power off power-on device of efficiency of software testing.
Disclosure of Invention
The to-be-solved technical problem of the utility model is to provide kinds of automatic power-off power-on devices that can improve efficiency of software testing.
In order to solve the above technical problem, kinds of automatic power-off and power-on devices are used for automatically powering off and on in the process of testing mainboard to be tested, and the automatic power-off and power-on devices include:
power supply device assembly, which is connected with commercial power and provides power needed by work for other work modules;
test module electrically connected to the power supply device assembly, the mainboard to be tested being electrically mountable to the test module, the test module executing preset test program to test the mainboard to be tested, and
PLC component electrically connected with the test module and the power supply device component, wherein preset control program is provided in the PLC component to control the test module to start and end various tests on the mainboard to be tested and control the power-off and power-on of the test module.
Preferably, an relay is provided within the PLC assembly for directly controlling the powering down and up of the test module.
Compared with the prior art, the utility model discloses power-on device on the auto-power-off borrows by this PLC subassembly and predetermines this test module's of control program control auto-power-off and last electricity, and this test module of deuterogamying and this use of predetermineeing test program have replaced originally and have needed the manual power-off and the last electricity of pressing switch of staff, are favorable to improving the efficiency of software testing.
[ description of the drawings ]
Fig. 1 is the utility model discloses each module connection schematic diagram of electric installation on the auto-power-off.
[ detailed description ] embodiments
Please refer to fig. 1, the utility model provides an kinds of automatic power-off power-on devices, it is used for the test mainboard in-process automatic power-off power-on, this automatic power-off power-on devices includes:
power supply unit assembly 1, which is connected with commercial power 4 and provides power needed by work for other work modules;
test module 2 electrically connected to the power device assembly 1, the mainboard to be tested can be installed on the test module 2, the test module 2 executes preset test program to test the mainboard to be tested, and
PLC (Programmable Logic Controller) component 3 electrically connected to the test module 2 and the power device component 1, wherein preset control program is provided in the PLC component 3 to control the test module 2 to perform various tests on the motherboard to be tested and to control the power-off and power-on of the test module 2.
In this embodiment, an relay 31 is disposed in the PLC component 3 and electrically connected to the test module for directly controlling the power-off and power-on of the test module 2.
When the automatic power-off and power-on device is used, the mainboard to be tested is firstly installed on the test module 2, a power switch of the PLC component 3 is turned on, after the mains supply 4 is switched on, the PLC component 3 is firstly switched on to start working, then the PLC component 3 controls the relay 31 to be switched on, so that the mains supply 4 provides power to the test module 2 through the control of the relay 31, then the PLC component 3 detects whether voltage exists on the test module 2, if not, the test module 2 is switched on and power-on, the test module 2 is automatically operated to test the mainboard to be tested after being switched on, when the preset test program is executed to a required power-off action, the preset control program automatically instructs the test module 2 to be switched off, namely, when the preset test program is executed to be switched off, the PLC component 3 is controlled to automatically switch off the relay 31, so that the test module 2 is switched off, after waiting for 10 seconds, the PLC component 3 judges whether the power-on needs to be continued according to the preset control program, if the power-off needs to be switched on, the relay 31 is switched on, the power-on process is repeatedly, and the power-on state of the PLC component is kept to be switched off, and the power-on of a power-on person can be tested, and.
To sum up, the utility model discloses power-on device on the auto-power-off borrows by this PLC subassembly and this auto-power-off and the power-on of predetermineeing control program control board, and this test module of deuterogamying and this use of predetermineeing test program have replaced originally and have needed the manual power-off and power-on of pressing switch of staff, are favorable to improving the efficiency of software testing.
The above description is only for the specific embodiments of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art can easily think of the changes or substitutions within the technical scope of the present invention, and all should be covered within the protection scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.

Claims (2)

1, kind of auto-power-off power-on device, its auto-power-off power-on that is arranged in test mainboard in-process that awaits measuring, its characterized in that, this auto-power-off power-on device includes:
power supply device assembly, which is connected with commercial power;
test module electrically connected to the power supply device assembly, the mainboard to be tested can be installed on the test module, the test module executes preset test program to test the mainboard to be tested, and
PLC component electrically connected with the test module and the power supply device component, wherein preset control program is provided in the PLC component to control the test module to perform various tests on the mainboard to be tested and control the power-off and power-on of the test module.
2. The auto-power-off and-on device of claim 1, wherein an relay is disposed in the PLC module and electrically connected to the test module for controlling power-off and power-on of the test module.
CN201920971844.9U 2019-06-25 2019-06-25 Automatic power-off and power-on device Expired - Fee Related CN210005915U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920971844.9U CN210005915U (en) 2019-06-25 2019-06-25 Automatic power-off and power-on device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920971844.9U CN210005915U (en) 2019-06-25 2019-06-25 Automatic power-off and power-on device

Publications (1)

Publication Number Publication Date
CN210005915U true CN210005915U (en) 2020-01-31

Family

ID=69310159

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920971844.9U Expired - Fee Related CN210005915U (en) 2019-06-25 2019-06-25 Automatic power-off and power-on device

Country Status (1)

Country Link
CN (1) CN210005915U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115587001A (en) * 2022-12-12 2023-01-10 深圳华北工控软件技术有限公司 Automatic startup and shutdown testing method and system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115587001A (en) * 2022-12-12 2023-01-10 深圳华北工控软件技术有限公司 Automatic startup and shutdown testing method and system

Similar Documents

Publication Publication Date Title
CN104849580A (en) System and method for testing function of protecting card
CN209590584U (en) Automatic controller for electric consumption up and down
CN103412203B (en) Motor variable-frequency driver ageing tester and method of testing thereof
TWI531131B (en) Current detection and management device
CN210005915U (en) Automatic power-off and power-on device
CN102236087A (en) Withstand voltage test device and method of three-phase electric energy meter
CN111880516A (en) Automatic detection device and method based on lithium battery controller of electric vehicle
TW200923391A (en) Method and apparatus for power testing
CN116149228A (en) Control device and control method of microwave system
CN201369043Y (en) Testing device for mainboard
CN203054537U (en) Automatic lathe control system
CN101826685B (en) Power supply socket device special for computer
CN109213646A (en) Hard disk intelligence power failure test equipment
CN210627179U (en) Programmable startup and shutdown test circuit and device
CN105203943A (en) Electric energy meter main board detection device and method based on electromagnet drive
CN209014703U (en) Fan motor finished product endurance testing device
CN209728111U (en) A kind of single-board testing equipment
CN209767564U (en) Automatic detection device for VPN network equipment
CN108243358A (en) Pluggable business board
CN214201698U (en) Testing device
CN216434289U (en) Circuit board detection device
CN110471326A (en) A kind of more hoistable platform control systems and control method
CN214983253U (en) Power-on self-checking protection circuit and 3D printer
CN213934061U (en) Detection apparatus for elevator stopper
CN216566874U (en) Automatic circulating power-on and power-off jig for PC mainboard

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200131

Termination date: 20210625