CN210002687U - Prefabricated anti-cracking frame vertical plate for slat inner partition wall hole structure - Google Patents

Prefabricated anti-cracking frame vertical plate for slat inner partition wall hole structure Download PDF

Info

Publication number
CN210002687U
CN210002687U CN201920442810.0U CN201920442810U CN210002687U CN 210002687 U CN210002687 U CN 210002687U CN 201920442810 U CN201920442810 U CN 201920442810U CN 210002687 U CN210002687 U CN 210002687U
Authority
CN
China
Prior art keywords
prefabricated
vertical plate
groove
frame vertical
partition wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920442810.0U
Other languages
Chinese (zh)
Inventor
舒浪平
张东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201920442810.0U priority Critical patent/CN210002687U/en
Application granted granted Critical
Publication of CN210002687U publication Critical patent/CN210002687U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

The utility model discloses a kind of prefabricated crack frame riser that prevents that is used for interior partition wall hole structure of slat, including prefabricated 1 frame riser body, prefabricated frame riser body upper portion is equipped with L type breach, be convenient for with prefabricated head board staggered joint interlock connection, improve the fastness of both connections, be equipped with prefabricated slip casting groove at prefabricated frame riser body lateral surface, when the concatenation 5 hole, form hole with the plug-in connection of prefabricated head board in the L type breach of two corresponding prefabricated frame risers, hole side concatenation wall slat, closely knit the filling mortar forms the secondary connector that has the inner bolt effect in prefabricated slip storage groove and links firmly, all be equipped with the seam connection groove in L type breach outside edge, with adjacent prefabricated head board that has the seam connection groove, interior wall slat concatenation encloses synthetic anti-crack sealing groove when concatenation of concatenation, the mesh spreading in the anti-crack sealing groove and wiping the thick liquid forms anti-crack connector, strengthened the joint intensity of seam department, effectively avoided current because the frequent vibrations of hole and the concatenation appears and the easy appearance of concatenation of concatenation.

Description

Prefabricated anti-cracking frame vertical plate for slat inner partition wall hole structure
Technical Field
The utility model belongs to interior partition hole structure field especially relates to kind and is used for the prefabricated frame riser of preventing ftractureing of partition hole structure in the slat.
Background
When the inner partition wall batten is installed, holes are of important nodes, the head board of the existing inner partition wall batten is spliced at the inner corner position of holes in holes, and due to frequent opening and closing of , the transverse and vertical spliced joints of the inner corner at the upper part of holes are easy to crack, so that special construction treatment is needed when holes are installed and built, and according to market investigation, the problem that the holes crack is solved by the following scheme in the existing construction operation.
The scheme includes that rabbets are processed on existing light inner partition wall battens to form frame vertical plates, corresponding lengths are cut on the existing light inner partition wall battens to form head plates, two ends of 2 head plates are lapped on the rabbets of 4 frame vertical plates to form holes, the field-cut 6 head plates and frame vertical plates have larger geometric size deviation compared with a factory prefabricated product and are poor in mutual matching, and accordingly splicing gaps are uneven in size, splicing faces of frame vertical plates and head plates are bonded through joint mortar, due to the fact that the splicing gaps are uneven in size, the thickness of the joint mortar in the joints is not , bonding firmness of hole splicing positions cannot be guaranteed, after users use 633 of the built holes holes for the period, frequent opening and closing vibration of are found, a plurality of cracks occur at the splicing positions of inner corners of head plates, the joint positions of head plates are found, the joint faces of 686 are not prone to crack, the joint faces are required after splicing is finished, the joint of steps, the joint faces are subjected to be spliced, the joint faces are subjected to high in construction period, the joint construction period of the joint is increased, the joint of , the joint is increased, the joint face leveling mortar, the joint is increased, the joint of the joint, the joint is increased, the joint of the joint face construction cost of is increased, and the joint is increased.
The second scheme is that holes are cast in situ and holes are built in situ, and the cast-in-situ and the built in-situ belong to old wet-process operation, so that the construction waste is large, the cost is high, and the construction period is long.
Meanwhile, the operation modes of cutting, processing and building holes on site, pouring holes on site and building holes on site are large in dust and garbage pollution, and the assembly type green building guide is not met.
Therefore, the utility model provides kinds of problems that hole splicing part cracks because of frequent opening and closing vibration of the current hole structure are solved.
SUMMERY OF THE UTILITY MODEL
There is the problem of concatenation department fracture to current interior partition wall slat hole structure, the utility model provides a be applicable to interior partition wall slat hole and build, improve the efficiency of construction, improved frame riser and prefabricated headboard between the fastness of being connected, prevent the prefabricated frame riser of preventing ftractureing that is used for interior partition wall hole structure of hole structure piece fracture department.
The utility model is realized in such a way that prefabricated cracking-proof frame vertical plates for -hole structures of the inner partition walls of the battens comprise prefabricated frame vertical plate bodies, and are characterized in that the upper parts of the prefabricated frame vertical plate bodies are provided with L-shaped gaps for placing prefabricated head plates,
an th prefabricated grouting groove is formed in the inner side surface of the L-shaped notch in the height direction and the horizontal direction;
and a second prefabricated grouting groove is formed in the side surface of the prefabricated frame vertical plate body opposite to the L-shaped notch along the height direction, and joint grooves are formed in the outer edge of the L-shaped notch, the opposite edge of the L-shaped notch and the upper end edge of the prefabricated frame vertical plate body.
In the technical scheme, preferably, the plane where the center line of the groove bottom of the th prefabricated grouting groove and the second prefabricated grouting groove is located coincides with the plane where the center line of the prefabricated frame vertical plate body in the thickness direction is located, and the planes of the two sides of the th prefabricated grouting groove and the second prefabricated grouting groove, which are opposite to the plane where the center line of the groove bottom is located, are in a mirror symmetry structure.
And a third prefabricated grouting groove is formed in the upper end face of the prefabricated frame vertical plate body.
In the above technical solution, preferably, the widths of the notches of the th, second and third precast grouting grooves are greater than the width of the groove bottom.
According to the technical scheme, preferably, steel bars are embedded in the prefabricated frame vertical plate body.
Above-mentioned technical scheme, preferably, pre-buried the reinforcing bar that has the plug bush in L type breach department.
Above-mentioned technical scheme, preferably, be equipped with the prefabricated slip casting mouth with the prefabricated slip casting groove intercommunication of second on prefabricating frame riser body's the L type breach to the seam crossing of marginal.
According to the technical scheme, preferably, a plurality of anti-collapse baffles are arranged in the second prefabricated grouting groove along the height direction, and the height of each baffle is smaller than the depth of the prefabricated grouting groove.
According to the technical scheme, preferably, the prefabricated frame vertical plate body on the L-shaped notch side is of a solid structure, and a central hole is prefabricated in the prefabricated frame vertical plate body on the other side of the L-shaped notch along the height direction.
Because the utility model adopts the above technical scheme, have following advantage:
1. the upper portion of prefabricating frame riser body directly prefabricates the L type breach that is used for placing prefabricated head board, has avoided the on-the-spot cutting, has improved the efficiency of construction, and body prefabrication fashioned frame riser has realized and has prefabricated head board between the stagger joint interlock, has improved the utility model discloses with prefabricated head board's fastness of being connected.
2. Because the utility model discloses a L type breach department is equipped with prefabricated thick liquid groove with the side, the prefabricated thick liquid groove of storing up of L type breach department encloses into with the prefabricated thick liquid groove of storing up of prefabricated first board, the interior partition wall slat of concatenation mutually and stores up the thick liquid passageway when actually building hole, closely knit the packing mortar in storing up the thick liquid passageway, the utility model discloses carry out bonding connection with the mortar of closely knit packing in prefabricated first board through storing up the thick liquid passageway, the secondary connector that forms after the mortar solidification is thick and solid has stronger cohesive force, and the secondary connector that forms simultaneously is equivalent to inner bolt, and this inner bolt has stronger resistance, effectively prevents to cause because of external force the utility model discloses with take place relative aversion and deformation between prefabricated first board, the interior partition wall slat.
3. When holes are actually built, the utility model discloses form anti-crack edge sealing groove after the seam groove at prefabricated frame riser body edge splices with the seam groove at prefabricated head board, interior partition wall slat edge, mat formation net cloth and anti-crack mortar and form anti-crack connector in anti-crack edge sealing groove foretell anti-crack connector and secondary connector will the utility model discloses firmly connect in with prefabricated head board, interior partition wall slat from inside to outside, solved hole concatenation department completely and because 's frequent opening and shutting vibrations and the problem that ftractures appear, in addition, foretell anti-crack edge sealing groove still has the effect of making level the concatenation seam, need not to do layer net cloth again on the whole wall of large tracts of land again and add anti-crack mortar and wipe the face and make level the later stage, reduced construction cost, improved the efficiency of construction.
4. The utility model discloses prefabricated internal embedded steel bar of frame riser advances step and improves anti ability and the compressive strength of rolling over of prefabricated frame riser self.
5. The utility model discloses in the pre-buried reinforcing bar plug-in mounting cover of L type breach department, when actually buildding hole the utility model discloses rather than supporting prefabricated first board cooperation assembly, prefabricated first board has the reinforcing bar cartridge that stretches out terminal surface down and realizes connecting in the reinforcing bar plug-in mounting cover that the L type lacks the department, perhaps prefabricated first board is in the same pre-buried reinforcing bar plug-in mounting cover with the pre-buried reinforcing bar plug-in mounting cover of L type breach department in realize being connected through plug-in mounting reinforcing bar component, and closely knit packing mortar in the storage thick liquid passageway of their concatenation department, secondary connector and reinforcing bar component after the mortar solidification, prefabricated first board, form body structure, advance and improve the utility model discloses and prefabricated head inter-plate joint strength and wholeness, the anti-seismic activity in hole has effectively.
6. The utility model discloses a prefabricated thick liquid storage tank of L type breach offside is prefabricated to have several to separate and keeps off, it is less than prefabricated thick liquid storage tank's the degree of depth to separate the fender, the design that should separate the fender increases the resistance of mortar backward flow, it causes the problem that empty section appears in the upper end of storing up thick liquid passageway to reduce the mortar to flow back downwards along storing up thick liquid passageway because of the reason of dead weight in the short time, the design of addding segmentation separation fender can also reduce to cause the top of storing up thick liquid passageway to appear great empty section because of the mortar shrinks to sink in the solidification process, it is equivalent to interior muscle cartridge in the secondary connection body to separate the fender after the mortar solidification in the thick liquid storage tank, frame riser has improved and adjacent interior wall slat fastness of being connected, it still plays the reinforced effect to the thick liquid storage tank of prefabricated frame riser side simultaneously to separate the fender.
7. The utility model discloses an up end is equipped with the prefabricated thick liquid groove that stores up of third, is convenient for prefabricate frame riser body and back timber or floor or splice at the interior partition slat erection joint of prefabricated frame riser body top, in addition, adopts this structure can realize that the multiaspect link up continuous slip casting, has improved the efficiency of construction.
8. The prefabricated grouting opening is arranged on the joint groove at the opposite side edge of the L-shaped notch and communicated with the second prefabricated grouting groove, so that grouting operation is facilitated, drilling of the grouting opening by a drilling machine during grouting is omitted, construction efficiency is improved, and damage to the prefabricated frame vertical plate caused by drilling construction is avoided.
9. The utility model discloses an frame riser adopts the supporting prefabrication of mill, and the on-the-spot installation has ensured nature that the product sent, has avoided the on-the-spot cutting to have the great defect of geometric dimension deviation, has solved the on-the-spot and has cut to assemble hole and have the problem that the error is big, anti crack effect is poor of assembling.
In conclusion, adopt the utility model discloses a hole structure that prefabricated frame riser and supporting prefabricated head board were assembled and are formed has solved because 's frequent vibrations that open and shut and appear holes splice the problem of fracture, and it is easy each other to assemble in the actual construction moreover, improves the efficiency of construction, reduces intensity of labour, adopts the factory prefabrication to reduce that there is dust and noise pollution in traditional site cutting construction, improves the operational environment, has responded green building action scheme.
Drawings
FIG. 1 is a schematic structural diagram of embodiment 1 of the present invention;
fig. 2 is a plan view of embodiment 1 of the present invention;
FIG. 3 is a perspective view of the embodiment 1;
FIG. 4 is a schematic view of an interior wall panel construction;
fig. 5 is a schematic view of a prefabricated head panel construction;
FIG. 6 is a state diagram of use of embodiment 1;
FIG. 7 is a view taken along direction K in FIG. 6;
FIG. 8 is a schematic structural view of example 2;
FIG. 9 is a schematic perspective view of the preferred embodiment 2;
FIG. 10 is a view showing the state of installation and use in embodiment 2;
FIG. 11 is a schematic structural view of example 3;
FIG. 12 is a top view of FIG. 10;
FIG. 13 is a schematic perspective view of the structure of example 3
FIG. 14 is a state diagram for use in embodiment 3;
FIG. 15 is a schematic structural view of example 4;
FIG. 16 is a schematic structural view of example 5;
FIG. 17 is a schematic structural view of example 6.
In the drawing, 100, frame vertical plate bodies are prefabricated, 110 is an L-shaped notch, 111 is a reinforcing steel bar, 112 is a reinforcing steel bar inserting sleeve, 120 is a prefabricated grouting groove, 121 is a second prefabricated grouting groove, 122 is a third prefabricated grouting groove, 130 is a joint groove, 140 is a prefabricated grouting opening, 150 is a partition, 160 is a central hole, 200 is a light inner wall strip, 310 is a secondary connecting body, 320 is an anti-crack edge sealing groove, 321 is an anti-crack connecting body, 400 is a prefabricated head plate, and 410 is a pre-embedded reinforcing steel bar.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention is described in detail below in with reference to the following embodiments.
In order to solve the problem that the fracture appears in the interior turning piece department of current interior partition slat hole structure, the utility model discloses provide kind prefabricated cracking-proof frame riser very much, combine relevant attached drawing to go on the detailed description below:
in the embodiment 1, please refer to fig. 1 to 3, prefabricated cracking-prevention frame vertical plate for a slat inner partition wall hole structure comprises a prefabricated 1 frame vertical plate body 100, an L-shaped notch 110 for placing a prefabricated head plate is arranged at the upper part of the prefabricated 2 frame vertical plate body 100, a th prefabricated grouting groove 120 is arranged on the inner side surface of the L-shaped notch in the height direction and the horizontal direction, a th prefabricated grouting groove 120 is arranged on the inner side surface of the L-shaped notch in the height direction and the horizontal direction and can be a non-through structure or a through structure, a through structure is preferred in the embodiment, when a hole is assembled, a prefabricated grouting groove synthesis grouting channel is arranged on a prefabricated head plate spliced by an th prefabricated grouting groove and a corresponding vertical plate, mortar is densely filled in the grouting channel, mortar in the grouting channel is thicker, a secondary connecting body formed after mortar is solidified connects a th frame vertical plate and a prefabricated vertical plate , the secondary connecting body has a strong bonding force, and a strong bonding strength, and a strong secondary plugging resistance force is formed between the prefabricated hole and a prefabricated inner partition wall plug of a prefabricated 465 wall inner partition wall, and a prefabricated 465 wall plug, the prefabricated connecting body is formed by a novel connecting body, and a connecting structure which has a strong bonding force which has a durable connection structure which is formed in the prefabricated inner partition wall which is formed in the prefabricated hole which is formed in the prefabricated vertical plate.
In addition, the anti-crack sealing groove formed by splicing the L-shaped notch also has the function of leveling the crack seam, and the later stage does not need to do layers of mesh cloth and adding the anti-crack mortar surface on the whole wall surface with large area for leveling, thereby reducing the construction cost and improving the construction efficiency.
The utility model discloses a mill's prefabrication, the construction cycle is shortened greatly in the field installation, reduces intensity of labour, assembles easily each other in actual construction moreover.
In the above structure, it is preferable that the width of the notch of the pregrouting groove 120 is greater than the width of the groove bottom of the pregrouting groove. By adopting the structure, the demoulding of the formed product is facilitated, the production efficiency is improved, the cleaning of the mould is facilitated, the bonding of mortar during the mould drawing is reduced, and the quality of the product is improved.
Referring to fig. 4 to 7, when holes are actually installed, the two corresponding prefabricated frame vertical plates are fixed according to the size of holes, then the prefabricated head plate 400 is inserted into the L-shaped notches of the two corresponding prefabricated frame vertical plates to form holes, and prefabricated grouting grooves are also formed in two side faces of the selected prefabricated head plate 400 and the inner partition wall batten 200;
when actually building hole, the utility model discloses prefabricated grout storage groove of the L type breach department of prefabricated frame riser body encloses into the grout storage passageway with prefabricated head board, the prefabricated grout storage groove of interior partition wall slat of splicing mutually, closely knit packing mortar in the grout storage passageway, the utility model discloses with prefabricated head board through closely knit packing mortar in the grout storage passageway carry out bonding connection, the secondary connector that forms after the mortar solidification is thick really has stronger adhesive force, the secondary connector that forms simultaneously is equivalent to inner bolts, this inner bolt has stronger resistance, effectively prevents to cause because of external force the utility model discloses interior head board, take place relative displacement and deformation between the prefabricated wall slat, the utility model discloses the seam groove at prefabricated frame riser body edge forms anti crack sealing groove with prefabricated , after the seam groove splicing of interior partition wall slat edge forms anti crack sealing groove, and anti crack resistance sealing groove mat formation anti crack sealing connector and anti crack resistance sealing groove, anti crack sealing groove mesh cloth and anti crack resistance sealing joint sealing board and secondary connector are with the utility model discloses anti crack resistance sealing groove and make the anti crack sealing joint between the prefabricated head board, the construction of anti crack sealing groove and make the construction of the splicing of the aforesaid, the construction of the aforesaid whole crack sealing groove of the splicing has still has reduced the later stage, and has still has solved the cost of splicing in addition that the construction that the whole crack resistance of splicing in the construction of the splicing of the spliced in the splicing of the.
After the holes to be installed are maintained for 28 days, vibration, impact resistance and impact simulation tests are carried out on the periphery of the holes, and the phenomenon that joints crack does not occur.
In the structure, preferably, a third prefabricated grouting groove 122 is formed in the upper end face of the prefabricated -frame riser body 100 to facilitate installation and connection of the prefabricated -frame riser body and a top beam or a floor slab or an inner partition wall strip spliced above the prefabricated 0-frame riser body, in this embodiment, the inner partition wall strip spliced above the prefabricated 1-frame riser body is taken as an example to explain, a slurry storage channel is formed between the prefabricated -frame riser body and the matching surface of the inner partition wall strip spliced above the prefabricated -frame riser body, mortar is densely filled in the slurry storage channel, and a secondary connecting body formed after mortar solidification similarly forms inner bolts which have strong bonding force and resistance force to ensure that the assembled prefabricated -frame riser body and the inner partition wall strip spliced above the prefabricated -frame riser body have good connection firmness, the prefabricated slurry storage grooves are formed in the upper end face of the prefabricated -frame riser body to facilitate installation and connection of the prefabricated riser slab -frame riser plate and the floor slab or the prefabricated -frame riser body, and a multi-face connection structure can be connected through a prefabricated multi-face wall construction structure.
In embodiment 3, referring to fig. 11 to 14, in order to meet the requirement of for an inner partition hole with higher strength requirement, in the above structure, it is preferable that the steel bars 111 are embedded in the prefabricated frame riser body.
For advancing step improvement the utility model discloses with the joint strength of prefabricated head board, at L type breach 110 pre-buried reinforcing bar cartridge cover 112 of department, when actually buildding 0 hole the utility model discloses rather than the cooperation of supporting prefabricated 1 head board and assembling, prefabricated head board has the reinforcing bar cartridge that stretches out terminal surface down and realizes connecting in the reinforcing bar cartridge cover of L type breach, perhaps in prefabricated head board same pre-buried reinforcing bar cartridge cover with the pre-buried reinforcing bar cartridge cover of L type breach department in through the realization of cartridge reinforcing bar component being connected, closely knit packing mortar in the storage thick liquid passageway after the concatenation, secondary connector and the cartridge reinforcing bar after the mortar solidification, prefabricated head board forms body structure, advance joint strength and the wholeness between prefabricated head board and the prefabricated frame riser of step improvement, effectively improved the anti-seismic, the shock resistance in hole.
Embodiment 4, please refer to fig. 15, a prefabricated grouting opening 140 communicating with a second prefabricated grouting groove is provided on the joint groove 130 at the opposite side edge of the L-shaped notch of the prefabricated frame vertical plate body, the prefabricated grouting opening is provided for facilitating grouting operation, drilling out the grouting opening by a drilling machine during actual assembly is omitted, construction efficiency is improved, and damage to the inner wall lath due to drilling construction is avoided.
Example 5, referring to fig. 16, a plurality of anti-collapse barriers 150 are provided in the pregroove opposite to the L-shaped notch 110 in the height direction, and the height of the barriers is less than the depth of the pregroove.
The design of this separating and keeping off has following advantage:
when the grouting process is actually adopted, mortar is pressure-poured upwards from a grouting port at the lower end, a grouting head is pulled out after grouting is finished, and the grouting port is plugged, the mortar flows back downwards along a mortar storage channel within the time from pulling the grouting head to plugging the grouting port, and when the mortar flows back too fast in , an empty section appears at the upper end of the mortar storage channel
2. Because the mortar has definite shrinkage sinking in the solidification process, the design of the segmented baffles can reduce the phenomenon that the top of the mortar storage channel has a larger empty segment due to the shrinkage sinking of the mortar;
3. the mortar in the prefabricated mortar storage groove is equivalently inserted into the secondary connecting body after the mortar is solidified, so that the firmness of the connection between the prefabricated vertical plate and the adjacent inner partition wall lath is improved.
In example 6, referring to fig. 17, in this example, the prefabricated vertical plate body on the side of the L-shaped notch is a solid structure, and the prefabricated vertical plate body on the other side of the L-shaped notch is prefabricated with a central hole 160 along the height direction, so that the weight of the vertical plate is reduced due to the design of the central hole, and meanwhile, the pipe can be arranged in the central hole, so that the groove and the pipeline are not required to be drilled, and the arrangement of a power switch around holes is facilitated.
In conclusion, adopt the utility model discloses a hole structure that the prefabricated frame riser of structure and supporting prefabricated head board were assembled and are formed has solved because 's frequent vibrations of opening and shutting and has appeared holes splice the problem of department fracture, and it is easy each other to assemble in the actual construction moreover, improves the efficiency of construction, reduces intensity of labour, adopts the factory prefabrication to reduce that there is dust and noise pollution in traditional on-the-spot cutting construction, improves the operational environment, has responded the green building action scheme that the country advocated.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and is not intended to limit the present invention, and any modifications, equivalent replacements, and improvements made within the spirit and principles of the present invention, such as the notch shape of the pre-cast grouting groove, should be included in the protection scope of the present invention.

Claims (9)

1, prefabricated anti-cracking frame vertical plate for a -hole structure of a slat internal partition wall, which comprises a prefabricated frame vertical plate body (100), and is characterized in that the upper part of the prefabricated frame vertical plate body (100) is provided with an L-shaped notch (110) for placing a prefabricated head plate,
an th prefabricated grouting groove (120) is arranged on the inner side surface of the L-shaped notch along the height direction and the horizontal direction;
and a second prefabricated grouting groove (121) is formed in the side surface of the prefabricated frame vertical plate body opposite to the L-shaped notch along the height direction, and seam grooves (130) are formed in the outer edge of the L-shaped notch, the opposite side edge of the L-shaped notch and the upper end edge of the prefabricated frame vertical plate body.
2. The prefabricated anti-cracking frame vertical plate for the hole structure of the slat inner partition wall according to claim 1, wherein a plane on which a center line of a groove bottom of each of the th prefabricated grouting groove and the second prefabricated grouting groove is located coincides with a plane on which a center line of a body of the prefabricated frame vertical plate is located, and planes on two sides of each of the th prefabricated grouting groove and the second prefabricated grouting groove (120) relative to the center line of the groove bottom are in mirror symmetry.
3. The prefabricated anti-cracking frame riser for an hole structure of a batten inner partition wall according to claim 1, wherein a third prefabricated grouting groove (122) is formed in the upper end face of a prefabricated frame riser body (100).
4. The prefabricated crack-proof frame vertical plate for the hole structure of the slat internal partition wall according to claim 1 or 2, wherein the widths of the notches of the th prefabricated grouting groove, the second prefabricated grouting groove and the third prefabricated grouting groove are larger than the width of the groove bottom.
5. The prefabricated anti-cracking frame vertical plate for the hole structure of the slat internal partition wall according to claim 1, wherein steel bars are embedded in a body of the prefabricated frame vertical plate.
6. The prefabricated cracking-proof frame vertical plate for the hole structure of the slat internal partition wall is characterized in that a steel bar inserting sleeve (112) is embedded in an L-shaped notch (110).
7. The prefabricated cracking-proof frame riser for an hole structure in a batten inner partition wall according to claim 1, wherein a prefabricated grouting opening (140) communicated with a second prefabricated grouting groove is formed in a seam groove (130) at the opposite side edge of an L-shaped notch of a prefabricated frame riser body.
8. The prefabricated cracking-proof frame vertical plate for the hole structure of the slat inner partition wall as claimed in claim 1, wherein a plurality of anti-collapse barriers (150) are arranged in the second prefabricated grouting groove along the height direction, and the height of each barrier is smaller than the depth of the prefabricated grouting groove.
9. The prefabricated cracking-proof frame vertical plate for the hole structure of the slat inner partition wall is characterized in that a prefabricated frame vertical plate body on the L-shaped notch side is of a solid structure, and a central hole (160) is prefabricated in the prefabricated frame vertical plate body on the other side of the L-shaped notch in the height direction.
CN201920442810.0U 2019-04-03 2019-04-03 Prefabricated anti-cracking frame vertical plate for slat inner partition wall hole structure Active CN210002687U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920442810.0U CN210002687U (en) 2019-04-03 2019-04-03 Prefabricated anti-cracking frame vertical plate for slat inner partition wall hole structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920442810.0U CN210002687U (en) 2019-04-03 2019-04-03 Prefabricated anti-cracking frame vertical plate for slat inner partition wall hole structure

Publications (1)

Publication Number Publication Date
CN210002687U true CN210002687U (en) 2020-01-31

Family

ID=69302873

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920442810.0U Active CN210002687U (en) 2019-04-03 2019-04-03 Prefabricated anti-cracking frame vertical plate for slat inner partition wall hole structure

Country Status (1)

Country Link
CN (1) CN210002687U (en)

Similar Documents

Publication Publication Date Title
WO2012136012A1 (en) Assembled mud-rock flow debris dam and construction method thereof
CN203034494U (en) Water draining structure for basement bottom plate back watering belt
CN109555153B (en) Assembled ecological gravity type retaining wall
CN210002687U (en) Prefabricated anti-cracking frame vertical plate for slat inner partition wall hole structure
CN111520187B (en) Modified EPS module composite high-water-content sealing wall and construction method thereof
CN110029773A (en) Prefabricated crack resistence doorframe vertical plate for batten internal partition wall door opening structure
CN110241969A (en) Prefabricated crack resistence door head plate for batten internal partition wall door opening structure
CN214364434U (en) Assembled constructional column suitable for prefabricated wallboard of frame construction
CN115478561A (en) Construction method of assembled underground continuous wall
CN210195027U (en) Prevent partition wall door opening structure and interior partition wall in ftractureing slat
CN210195028U (en) Slat internal partition wall door opening structure and internal partition wall
CN210315960U (en) Precast concrete window apron connection structure that wafts
CN110029774A (en) Crack resistence batten internal partition wall door opening structure and internal partition wall
CN212026324U (en) Prefabricated box assembled structure
CN209412844U (en) A kind of assembled resin concrete drainage ditch
CN110016980A (en) Crack resistence prefabricated T-shaped corner-pillar
CN210002613U (en) Prefabricated slat internal partition wall constructional column
CN219672098U (en) Prefabricated vertical post-pouring strip template
CN210002686U (en) Prefabricated anti-cracking head plate for slat inner partition wall hole structure
CN210767358U (en) Anti-cracking prefabricated T-shaped corner column
CN212801630U (en) Assembled building block retaining wall of high-speed joint
CN212175853U (en) Assembled piping lane
CN210767359U (en) Anti-cracking prefabricated L-shaped corner column
CN218970067U (en) Prefabricated assembled underground pipe gallery
CN115162357B (en) Continuous wall system with top-down construction and construction method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant