CN209958800U - Interim stair rail guard - Google Patents
Interim stair rail guard Download PDFInfo
- Publication number
- CN209958800U CN209958800U CN201920703476.XU CN201920703476U CN209958800U CN 209958800 U CN209958800 U CN 209958800U CN 201920703476 U CN201920703476 U CN 201920703476U CN 209958800 U CN209958800 U CN 209958800U
- Authority
- CN
- China
- Prior art keywords
- sleeve
- guardrail
- rod
- connecting pipe
- pole setting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000000149 penetrating effect Effects 0.000 claims abstract description 5
- 230000001681 protective effect Effects 0.000 claims 1
- 238000009434 installation Methods 0.000 abstract description 4
- 230000000694 effects Effects 0.000 abstract description 3
- 235000017166 Bambusa arundinacea Nutrition 0.000 description 2
- 235000017491 Bambusa tulda Nutrition 0.000 description 2
- 241001330002 Bambuseae Species 0.000 description 2
- 235000015334 Phyllostachys viridis Nutrition 0.000 description 2
- 239000011425 bamboo Substances 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 239000000428 dust Substances 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- TVEXGJYMHHTVKP-UHFFFAOYSA-N 6-oxabicyclo[3.2.1]oct-3-en-7-one Chemical compound C1C2C(=O)OC1C=CC2 TVEXGJYMHHTVKP-UHFFFAOYSA-N 0.000 description 1
- 230000000712 assembly Effects 0.000 description 1
- 238000000429 assembly Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
Images
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
The utility model relates to an interim stair rail guard, relate to building engineering's technical field, the problem of people can follow the quantity of freely customizing the guardrail and the distance between the guardrail according to different demands is solved, it includes the pole setting, the guardrail, the connecting pipe, the positioning seat, the pole setting is connected on the positioning seat, the pole setting comprises the body of rod and loop bar, the body of rod cup joints on the loop bar, be equipped with on the body of rod and perforate for two at least and the second more than, be equipped with the first perforation the same with the second perforation diameter on the loop bar, interim stair rail guard is still including being used for simultaneously penetrating the second and perforate the bolt in order to realize body of rod location, be equipped with the sleeve pipe in the pole setting, sleeve pipe intermediate position fixedly connected with is the dead lever that mutual symmetry set up. The utility model discloses have the height that can freely adjust pole setting and guardrail, and the effect of stair rail guard convenient to detach and installation.
Description
Technical Field
The utility model belongs to the technical field of building engineering's technique and specifically relates to a temporary stair rail guard is related to.
Background
At present, in the building construction process, the main part construction stage, the stair position construction is accomplished the back, need in time install the protection railing additional, plays the guard action to constructor's safety.
The conventional stair guard rail is customized according to the actual engineering, the stair guard rail is fixed in height and fixed in length and can only be used for the engineering, and when the height of a stair changes or the height of each floor is not constant, the customized guard rail is not high in applicability and has an improved space.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a can freely adjust interim stair rail guard of stair rail guard height.
The above utility model discloses an above-mentioned utility model purpose can realize through following technical scheme:
the utility model provides an interim stair rail guard, includes pole setting, guardrail, connecting pipe, positioning seat, the pole setting is connected on the positioning seat, connecting pipe one end is cup jointed the guardrail, the other end cup joints the pole setting, the pole setting comprises the body of rod and loop bar, the body of rod cup joints on the loop bar, be equipped with on the body of rod and perforate for two at least and more second, be equipped with on the loop bar with the second perforates the first perforation that the diameter is the same, and interim stair rail guard is still including being used for penetrating simultaneously the second perforate with the first bolt of perforating in order to realize the 4 location of the body of rod.
Through adopting above-mentioned technical scheme, because the pole setting of stair rail guard comprises the body of rod and loop bar, the body of rod cup joints on the loop bar, and the body of rod can freely move from top to bottom, because loop bar upper end and the body of rod all are equipped with the perforation that is the level setting, and the perforation is two and above, and the body of rod can pass the location of penetrating the perforation realization body of rod on the body of rod and the loop bar simultaneously through the bolt, reaches the effect that can adjust the pole setting height.
The utility model discloses further set up to: the pole setting is provided with a sleeve, the diameter of the sleeve is larger than that of the loop bar, the outer wall of the sleeve is provided with a first screw hole, a bolt penetrates through the first screw hole, and the middle position of the sleeve is fixedly connected with fixing rods which are symmetrically arranged.
Through adopting above-mentioned technical scheme, owing to be equipped with the sleeve pipe in the pole setting, the sleeve pipe can reciprocate in the pole setting, owing to be equipped with first screw on the sleeve pipe outer wall, first screw is provided with the bolt, can fix the sleeve pipe in the pole setting after adjusting the position of sleeve pipe in the pole setting, can make things convenient for sheathed tube dismantlement simultaneously.
The utility model discloses further set up to: the connecting pipe is characterized in that a pipe orifice at one end of the connecting pipe is provided with positive threads, one end of the guardrail is provided with reverse threads matched with the connecting pipe, one end of the connecting pipe is sleeved with the guardrail, the other end of the connecting pipe is sleeved on the fixed rod, and the reverse threads are matched with the connecting pipe.
Through adopting above-mentioned technical scheme, because connecting pipe one end mouth of pipe is equipped with positive screw thread, guardrail one end be equipped with connecting pipe complex reverse thread, connecting pipe pot head is established and threaded connection on the guardrail, and the connecting pipe other end cup joints on the dead lever, through the degree of depth of adjusting connecting pipe and guardrail screw thread, can adjust the length of guardrail, makes things convenient for the dismantlement and the installation of stair rail guard simultaneously.
The utility model discloses further set up to: the guardrail is provided with a sleeve, the sleeve openings at two ends of the sleeve are provided with positive threads, one end of the guardrail is provided with reverse threads matched with the sleeve, and the sleeve is sleeved with the sleeve and is in threaded connection with the guardrail.
Through adopting above-mentioned technical scheme, because be provided with the sleeve on the guardrail, sleeve both ends nozzle all is equipped with positive screw thread, guardrail one end be equipped with sleeve complex anti-thread, the muffjoint is established and threaded connection on the guardrail, can pass through sleeve one-to-one with the guardrail, selects the guardrail of different quantity according to different user demands, can adjust the length of guardrail through the degree of depth of adjusting sleeve pipe and guardrail screw thread simultaneously, makes things convenient for the dismantlement and the installation of stair rail guard simultaneously.
The utility model discloses further set up to: the upright rod is hinged with a cover plate at the position of the second through hole.
Through adopting above-mentioned technical scheme, because the dust is more on the building site, the pole setting articulates in second perforation position department has the apron, can prevent that the dust from leading to the fact the jam in entering into the pole setting through the second perforation, can keep the inside clean of pole setting simultaneously.
The utility model discloses further set up to: the connecting pipe is a bent pipe.
Through adopting above-mentioned technical scheme, because the connecting rod sets to the return bend, there is not obvious edges and corners in corner, can avoid causing the potential safety hazard.
The utility model discloses further set up to: the positioning seat is provided with a sleeving barrel for sleeving the vertical rod.
Through adopting above-mentioned technical scheme, because the positioning seat is fixed subaerial, use the positioning seat for a long time and damage very easily, sometimes even the positioning seat is difficult to be dismantled from subaerial, owing to be provided with the cover that is used for the cover to establish the pole setting on the positioning seat and establish a section of thick bamboo, can be very easy dismantle the pole setting from the positioning seat.
The utility model discloses further set up to: and a second screw hole is formed in the positioning seat.
Through adopting above-mentioned technical scheme, because be provided with the second screw on the positioning seat, can fix the positioning seat subaerial through the bolt, reach the purpose that the positioning seat was dismantled and was installed easily.
To sum up, the utility model discloses a beneficial technological effect does: the temporary stair guard rail is divided into a plurality of assemblies, the structure is simple, the temporary stair guard rail is convenient to detach and install, the transportation is also convenient, the height and the length of the temporary stair guard rail can be freely adjusted, and different numbers of guard rails can be arranged according to user requirements.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention.
Figure 2 is a schematic view of a partial structure of the pole of figure 1.
Fig. 3 is a partially enlarged schematic view of the area a in fig. 2.
In the figure, 1, a positioning seat; 2. erecting a rod; 3. a loop bar; 4. a rod body; 5. a connecting pipe; 6. a guardrail; 7. a sleeve; 8. a sleeve; 9. sleeving a cylinder; 10. a second screw hole; 11. fixing the rod; 12. a first screw hole; 13. a bolt; 14. a second perforation; 15. a cover plate; 16. a first perforation.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
Referring to fig. 1 and 2, for the utility model discloses an interim stair rail guard, including the tubular pole setting 2 of vertical setting, the tubular guardrail 6 of horizontal setting, connecting pipe 5, positioning seat 1, pole setting 2 and guardrail 6 splice as an organic wholely through connecting pipe 5, fixedly connected with is used for the cover of establishing pole setting 2 to establish a section of thick bamboo 9 on the positioning seat 1, and connecting pipe 5 is the return bend, and pole setting 2 comprises the body of rod 4 and loop bar 3, and the body of rod 4 cup joints on loop bar 3, be equipped with on the body of rod 4 at least for two and more than the second perforates 14, be equipped with on the loop bar 3 with the same first perforation 16 of the second perforation 14 diameter, interim stair rail guard is still including being used for penetrating simultaneously and perforate 14 on the body of rod 4 and the bolt 13 of the first perforation 16 on the loop bar 3 in order to realize the body of.
Wherein, the upright rod 2 is hinged with a cover plate 14 for opening and closing the opening at the position of the second through hole 14.
Referring to fig. 1 and 2, be equipped with sleeve pipe 8 in pole setting 2, sleeve pipe 8's pipe diameter is greater than loop bar 3's pipe diameter, be equipped with first screw 12 on the 8 outer walls of sleeve pipe, it is provided with the bolt to pass first screw 12, 8 intermediate position fixedly connected with of sleeve pipe are the dead lever 11 that mutual symmetry set up, sleeve pipe 8 is the cylinder pipe of cover in pole setting 2, can free movement in pole setting 2, the bolt realizes sleeve pipe 8's location in pole setting 2 through 12 butt of first screw on the 8 outer walls of sleeve pipe, the 5 one end mouths of pipe of connecting pipe are equipped with the positive screw thread, 6 one end of guardrail is equipped with the anti-thread with 5 complex of connecting pipe, 5 pot heads of connecting pipe are established and threaded connection is on.
Referring to fig. 1, be provided with sleeve 7 on guardrail 6, the nozzle in sleeve 7 both ends all is equipped with positive screw thread, 6 one end of guardrail be equipped with sleeve 7 complex anti-thread, 7 covers of sleeve establish and threaded connection on guardrail 6, guardrail 6 is all connected at 7 both ends of sleeve.
The implementation principle of the embodiment is as follows: during installation, a bolt penetrates through a second screw hole 10 on the positioning seat 1 to fix the positioning seat 1 on the ground, the upright post 2 is divided into a rod body 4 part and a sleeve 8 part, a sleeve barrel 9 on the positioning seat 1 is connected with a sleeve rod 3 part of the upright post 2, a bolt 13 simultaneously passes through a first perforation 16 of the sleeve rod 3 and a second perforation 14 on the rod body 4 to realize positioning of the rod body 4, the number of the second perforation 14 and the distance between the second perforation 14 can be set according to different requirements, then the rod body 4 is put into the sleeve rod 3, the proper putting length of the rod body 4 is selected, different numbers of sleeves 8 can be selected according to different requirements, then the sleeves 8 on the upright post 2 are moved, the proper height of the sleeves 8 is selected, the bolt penetrates through a first screw hole 12 on the sleeves 8 to position the sleeves 8 on the upright post 2, the first perforation 16 on the rod body 4 and the sleeves 8, then block the body of rod 4 through bolt 13, cup joint the one end of connecting pipe 5 on dead lever 11 on sleeve pipe 8, the other end of connecting pipe 5 passes through threaded connection 6 one end of guardrail, and the 6 other end of guardrail passes through 7 one ends of threaded connection sleeve, and another guardrail 6 of sleeve 7 other end connection can select different quantity's guardrail 6 and sleeve pipe 8 to connect gradually according to different demands.
The embodiment of this specific implementation mode is the preferred embodiment of the present invention, not limit according to this the utility model discloses a protection scope, so: all equivalent changes made according to the structure, shape and principle of the utility model are covered within the protection scope of the utility model.
Claims (8)
1. The utility model provides an interim stair rail guard, includes pole setting (2), guardrail (6), connecting pipe (5), positioning seat (1), pole setting (2) are connected perpendicularly on positioning seat (1), connecting pipe (5) one end is cup jointed guardrail (6), connecting pipe (5) other end cup joints pole setting (2), its characterized in that: pole setting (2) comprise the body of rod (4) and loop bar (3), the body of rod (4) cup joints on loop bar (3), be equipped with on the body of rod (4) and perforate (14) for two at least second more than, be equipped with on loop bar (3) with first perforation (16) that second perforation (14) aperture is the same, interim stair rail guard is still including being used for penetrating simultaneously second perforation (14) with first perforation (16) are in order to realize bolt (13) of the body of rod (4) location.
2. A temporary stair guard rail according to claim 1, wherein: be equipped with sleeve pipe (8) on pole setting (2), first screw (12) have been seted up on sleeve pipe (8) outer wall, sleeve pipe (8) fixedly connected with is dead lever (11) that mutual symmetry set up.
3. A temporary stair guard rail according to claim 2, wherein: the connecting pipe is characterized in that a pipe orifice at one end of the connecting pipe (5) is provided with positive threads, one end of the guardrail (6) is provided with reverse threads matched with the connecting pipe (5), one end of the connecting pipe (5) is sleeved with the connecting pipe and is connected to the guardrail (6) in a threaded mode, and the other end of the connecting pipe (5) is sleeved on the fixing rod (11).
4. A temporary stair guard rail according to claim 1, wherein: the temporary stair protective guard further comprises a sleeve (7), the sleeve openings at two ends of the sleeve (7) are provided with positive threads, one end of the guardrail (6) is provided with reverse threads matched with the sleeve (7), and the sleeve (7) is sleeved with the sleeve and connected to the guardrail (6) in a threaded mode.
5. A temporary stair guard rail according to claim 1, wherein: the upright rod (2) is hinged with a cover plate (15) at the position of the second through hole (14).
6. A temporary stair guard rail according to claim 2, wherein: the connecting pipe (5) is a bent pipe.
7. A temporary stair guard rail according to claim 1, wherein: the positioning seat (1) is provided with a sleeving barrel (9) for sleeving the upright rod (2).
8. A temporary stair guard rail according to claim 1, wherein: and a second screw hole (10) for screw thread connection to realize positioning is formed in the positioning seat (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920703476.XU CN209958800U (en) | 2019-05-15 | 2019-05-15 | Interim stair rail guard |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920703476.XU CN209958800U (en) | 2019-05-15 | 2019-05-15 | Interim stair rail guard |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209958800U true CN209958800U (en) | 2020-01-17 |
Family
ID=69246085
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920703476.XU Expired - Fee Related CN209958800U (en) | 2019-05-15 | 2019-05-15 | Interim stair rail guard |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209958800U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113104656A (en) * | 2021-03-30 | 2021-07-13 | 标龙建设集团有限公司 | Cable collection device for civil engineering |
-
2019
- 2019-05-15 CN CN201920703476.XU patent/CN209958800U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113104656A (en) * | 2021-03-30 | 2021-07-13 | 标龙建设集团有限公司 | Cable collection device for civil engineering |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106661896B (en) | The structure of support system and support system support | |
US2117798A (en) | Railing and the like | |
CN110005254A (en) | Piece for assembling type fence | |
CN209958800U (en) | Interim stair rail guard | |
CN214740451U (en) | Guardrail anti-climbing device for real estate building | |
CN205623689U (en) | But rail is kept apart to height -adjusting's sheep trough | |
CN211666324U (en) | Basement antidetonation reinforcing building structure | |
CN210828466U (en) | Multifunctional outdoor enclosure corridor frame facility | |
CN210370143U (en) | Protective railing for constructional engineering | |
CN217840625U (en) | Prefabricated staircase | |
CN218092178U (en) | But escape way steel construction protection canopy that fast ann was dismantled | |
CN218406866U (en) | Assembled fence | |
CN207609103U (en) | A kind of movable railing of flooring platform | |
CN207277974U (en) | A kind of fence | |
EP2096235B1 (en) | Console front-end railing | |
CN206619373U (en) | Billboard and banner are manually from screw device | |
CN211447861U (en) | Fast assembly and disassembly face limit entrance to a cave protection railing device | |
CN217499964U (en) | Limit retractable safety protection railing is faced to bridge construction bent cap | |
CN205531637U (en) | Can dismantle outdoor tent who collects on spot fast | |
CN219241139U (en) | Be used for building engineering fast assembly formula railing | |
CN220790692U (en) | Deep foundation pit operation safety device | |
CN210808684U (en) | Convenient livestock-raising who adjusts uses safety isolation fence | |
CN204876524U (en) | Band steel scaffold drawknot dot structure | |
CN218991002U (en) | General pre-buried device of protection railing | |
KR20200052713A (en) | Prefabricated spiral staircase |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200117 |
|
CF01 | Termination of patent right due to non-payment of annual fee |