CN209958337U - Foundation pile for hydraulic engineering building - Google Patents

Foundation pile for hydraulic engineering building Download PDF

Info

Publication number
CN209958337U
CN209958337U CN201920185289.7U CN201920185289U CN209958337U CN 209958337 U CN209958337 U CN 209958337U CN 201920185289 U CN201920185289 U CN 201920185289U CN 209958337 U CN209958337 U CN 209958337U
Authority
CN
China
Prior art keywords
foundation pile
wall
hydraulic engineering
rigid coupling
block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920185289.7U
Other languages
Chinese (zh)
Inventor
于海波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Ruian Construction Industry Group Co Ltd
Original Assignee
Qingdao Ruian Construction Industry Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Ruian Construction Industry Group Co Ltd filed Critical Qingdao Ruian Construction Industry Group Co Ltd
Priority to CN201920185289.7U priority Critical patent/CN209958337U/en
Application granted granted Critical
Publication of CN209958337U publication Critical patent/CN209958337U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a foundation pile for hydraulic engineering building, including first foundation pile and extension board, the equal rigid coupling in outer wall left and right sides of first foundation pile has the extension board, the inside slide bar that has all pegged graft in the outer wall left and right sides of first foundation pile, the spout has all been opened at both ends about the outer wall of slide bar, the inside sliding connection of spout has the slider, the inboard rigid coupling of slide bar has the lug. This foundation pile for hydraulic engineering building, through the slide bar, the slider, the spout, the lug, the sleeve pipe, the screwed pipe, the cooperation of slide and montant, reached insert in the ground after fixing first foundation pile in ground, can make first foundation pile take out from the ground fast simultaneously, through the screw thread piece, the cooperation of first riser and fixture block, reached and to carry out quick adjustment to the height between second foundation pile and the first foundation pile, and easy operation only needs to rotate first riser just can adjust the height between first foundation pile and the second foundation pile just can adjust, and the cost of manufacture is low, convenient and practical.

Description

Foundation pile for hydraulic engineering building
Technical Field
The utility model relates to a foundation pile technical field for hydraulic engineering building specifically is a foundation pile for hydraulic engineering building.
Background
Foundation pile is a term of art in building construction, and to clarify its meaning, it is necessary to understand what is a pile foundation, a pile group foundation and a single pile foundation, the pile foundation: the foundation jointly composed of the pile and the bearing platform connected to the pile top is characterized in that if the pile body is completely buried in soil, the bottom surface of the bearing platform is in contact with the soil body, the foundation is called a low bearing platform pile foundation, if the upper part of the pile body is exposed out of the ground and the bottom of the bearing platform is positioned above the ground, the foundation is called a high bearing platform pile foundation, the building pile foundation is usually a low bearing platform pile foundation, the height of the existing foundation pile for the hydraulic engineering building cannot be adjusted, the foundation pile cannot be fixed, and the manufacture cost which can be achieved is too high and is not practical.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a foundation pile for hydraulic engineering building to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a foundation pile for hydraulic engineering construction comprises a first foundation pile and a support plate, wherein the support plate is fixedly connected to the left side and the right side of the outer wall of the first foundation pile, a slide rod is inserted into the left side and the right side of the outer wall of the first foundation pile, slide grooves are formed in the upper end and the lower end of the outer wall of the slide rod, slide blocks are slidably connected into the slide grooves, a convex block is fixedly connected to the inner side of each slide rod, a sleeve is fixedly connected to the inner wall of the first foundation pile, a threaded pipe is connected to the inner wall of the sleeve in a threaded manner, a pressing block is mounted at the bottom end of the threaded pipe, a vertical rod is inserted into the threaded pipe in a sliding manner, the vertical rod is slidably connected with the threaded pipe through a sliding plate, a second foundation pile is connected to the top end of the inner wall of the first foundation pile in a threaded manner, a cover plate is fixedly connected to the top end of the second foundation pile, the vertical rod, the inboard bottom rigid coupling of first riser has the screw thread piece, screw thread piece and first foundation pile slip joint, the inboard and the second foundation pile screw thread of screw thread piece link to each other.
Preferably, the left and right sides of the outer wall of the first foundation pile and the left and right sides of the outer wall of the second foundation pile are fixedly connected with inserting blocks, inserting rods are inserted into the inserting blocks, pressing plates are fixedly connected to the outer sides of the inserting rods, springs are fixedly connected to the inner sides of the pressing plates, and second vertical plates are fixedly connected between the springs.
Preferably, a rubber pad is fixedly connected to the outer side of the pressure plate.
Preferably, the outer wall of the first vertical plate is fixedly connected with a friction block.
Preferably, the bottom end of the support plate is fixedly connected with a backing plate.
Preferably, the outer wall of the top end of the vertical rod is provided with grinding grains.
Compared with the prior art, the beneficial effects of the utility model are that: this foundation pile for hydraulic engineering building, through the slide bar, the slider, the spout, the lug, the sleeve pipe, the screwed pipe, the cooperation of slide and montant, reached and made the slide bar to both sides roll-off after first foundation pile inserts in the ground, insert and fix first foundation pile in ground after inserting in the ground, can make first foundation pile take out from ground fast simultaneously, through the screw thread piece, the cooperation of first riser and fixture block, reached and to highly carrying out quick adjustment between second foundation pile and the first foundation pile, and easy operation, only need rotate first riser just can adjust the height between first foundation pile and the second foundation pile just can adjust, and the cost of manufacture is low, convenient and practical.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of a connection structure of the screw block, the first riser and the fixture block in FIG. 1;
FIG. 3 is a schematic view of a connection structure of the insert block, the insert plate and the press plate in FIG. 1;
fig. 4 is a schematic view of a connection structure of the sliding rod, the sliding block and the sliding groove in fig. 1.
In the figure: 1. the pile comprises a first foundation pile, a support plate, a backing plate, a sliding rod, a sliding block, a sliding groove, a sliding block, a projection, a sleeve, a sliding plate, a sleeve, a threaded pipe, a pressing block, a second foundation pile, a sliding plate, a threaded block, a threaded pipe, a sliding block, a threaded block, a first vertical plate, a threaded block, a clamping block, a friction block, a threaded rod, a threaded pipe, a threaded rod, a threaded block, a.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: a foundation pile for hydraulic engineering construction comprises a first foundation pile 1 and a support plate 2, wherein the support plate 2 is fixedly connected to the left side and the right side of the outer wall of the first foundation pile 1, slide rods 4 are inserted into the left side and the right side of the outer wall of the first foundation pile 1, the slide rods 4 can slide left and right inside the outer wall of the first foundation pile 1, slide grooves 6 are formed in the upper end and the lower end of the outer wall of each slide rod 4, slide blocks 5 are slidably connected inside the slide grooves 6, the slide blocks 5 can slide left and right inside the slide grooves 6, bumps 7 are fixedly connected to the inner sides of the slide rods 4, a sleeve 8 is fixedly connected to the inner wall of the first foundation pile 1, a threaded pipe 10 is in threaded connection with the inner wall of the sleeve 8, a pressing block 11 is installed at the bottom end of the threaded pipe 10, the threaded pipe 10 can move up and down inside the sleeve 8 when rotating, a vertical rod 17 is inserted inside the threaded pipe 10, the vertical rod 17, the vertical rod 17 slides up and down in the threaded pipe 10 through the sliding plate 9, the top end of the inner wall of the first base pile 1 is in threaded connection with the second base pile 12, the second base pile 12 can be connected to the top end of the inner portion of the first base pile 1 when rotating, meanwhile, rapid separation can be carried out, the top end of the second base pile 12 is fixedly connected with the cover plate 19, the vertical rod 17 is in clearance fit with the cover plate 19, the vertical rod 17 can slide up and down in the cover plate 19, the left side and the right side of the outer wall of the first base pile 1 are slidably clamped with the clamping blocks 15, the clamping blocks 15 can rotate in the outer wall of the first base pile 1, the outer side of each clamping block 15 is fixedly connected with the first vertical plate 14, the clamping blocks 15 can rotate by rotating the first vertical plates 14, the bottom end of the inner side of each first vertical plate 14 is fixedly connected with the threaded block 13, the threaded block 13 is slidably clamped with the first base pile 1, the inner side, screw block 13 rotates and to adjust first foundation pile 1 and second foundation pile 12 height, the equal rigid coupling in outer wall left and right sides of the outer wall left and right sides of first foundation pile 1 and second foundation pile 12 has inserted block 20, the inside grafting of inserted block 20 has inserted bar 21, inserted bar 21 can insert from the inside of inserted block 20 and extract, the outside rigid coupling of inserted bar 21 has clamp plate 22, clamp plate 22's inboard rigid coupling has spring 23, clamp plate 22 can extrude spring 23, spring 23's coefficient of elasticity is: 10N/CM-30N/CM, the rigid coupling has second riser 24 between the spring 23, the outside rigid coupling of clamp plate 22 has rubber pad 25, rubber pad 25 has played the effect of increasing friction power, the outer wall rigid coupling of first riser 14 has clutch blocks 16, clutch blocks 16 plays the effect of increasing friction power, the bottom rigid coupling of extension board 2 has backing plate 3, backing plate 3 plays the effect of buffering, the processing of the top outer wall of montant 17 has wear line 18, wear line 18 has played the effect of increasing friction power.
When the foundation pile for the hydraulic engineering building is used, a first foundation pile 1 is inserted into the ground to be installed, a rotating vertical rod 17 is used after the first foundation pile is inserted, the vertical rod 17 drives a threaded pipe 10 to rotate through a sliding plate 9 when the vertical rod 17 rotates, the threaded pipe 10 moves downwards when the threaded pipe 10 rotates in the sleeve 8, a pressing block 11 is driven to move downwards when the threaded pipe 10 moves downwards, the pressing block 11 extrudes a lug 7 when the pressing block 11 moves downwards, a sliding rod 4 slides leftwards and rightwards inside the outer wall of the first foundation pile 1 when the lug 7 is extruded, the sliding rod 4 slides towards two sides through the matching of a sliding block 5 and a sliding groove 6 when the first foundation pile 1 is extruded, the sliding rod 4 is inserted into soil when sliding towards two sides, installation is completed after insertion, when the height between the first foundation pile 1 and a second foundation pile 12 needs to be adjusted, a user rotates a first vertical plate 14, the clamping block 15 is driven to slide inside the outer wall of the first foundation pile 1 when the first vertical plate, the first vertical plate 14 rotates to drive the thread block 13 to rotate, and the thread block 13 rotates to drive the second foundation pile 12 to move upwards, so that height adjustment is completed.
In the description of the present invention, it is to be understood that the terms "coaxial", "bottom", "one end", "top", "middle", "other end", "upper", "one side", "top", "inner", "front", "center", "both ends", and the like, indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
In the present invention, unless otherwise expressly stated or limited, the terms "mounted," "disposed," "connected," "fixed," "screwed" and the like are to be construed broadly, e.g., as meaning fixedly connected, detachably connected, or integrally formed; can be mechanically or electrically connected; they may be directly connected or indirectly connected through an intermediate medium, and may be connected through the inside of two elements or in an interaction relationship between two elements, unless otherwise specifically defined, and the specific meaning of the above terms in the present invention will be understood by those skilled in the art according to specific situations.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a foundation pile for hydraulic engineering building, includes first foundation pile (1) and extension board (2), the equal rigid coupling in outer wall left and right sides of first foundation pile (1) has extension board (2), its characterized in that: the inner side of the left side and the right side of the outer wall of the first foundation pile (1) is respectively spliced with a sliding rod (4), the upper end and the lower end of the outer wall of the sliding rod (4) are respectively provided with a sliding groove (6), the inner side of the sliding groove (6) is slidably connected with a sliding block (5), the inner side of the sliding rod (4) is fixedly connected with a convex block (7), the inner wall of the first foundation pile (1) is fixedly connected with a sleeve (8), the inner wall of the sleeve (8) is in threaded connection with a threaded pipe (10), the bottom end of the threaded pipe (10) is provided with a pressing block (11), the inner side of the threaded pipe (10) is spliced with a vertical rod (17), the vertical rod (17) is slidably connected with the threaded pipe (10) through a sliding plate (9), the top end of the inner wall of the first foundation pile (1) is in threaded connection with a second foundation pile (12), the top end of the second foundation pile (, the equal slip joint in outer wall left and right sides of first foundation pile (1) has fixture block (15), the outside rigid coupling of fixture block (15) has first riser (14), the inboard bottom rigid coupling of first riser (14) has screw thread piece (13), screw thread piece (13) and first foundation pile (1) slip joint, the inboard and second foundation pile (12) screw thread of screw thread piece (13) link to each other.
2. The foundation pile for the hydraulic engineering construction according to claim 1, wherein: the equal rigid coupling in outer wall left and right sides of the outer wall left and right sides of first foundation pile (1) and second foundation pile (12) has inserted block (20), the inside grafting of inserted block (20) has inserted bar (21), the outside rigid coupling of inserted bar (21) has clamp plate (22), the inboard rigid coupling of clamp plate (22) has spring (23), the rigid coupling has second riser (24) between spring (23).
3. The foundation pile for the hydraulic engineering construction according to claim 2, characterized in that: and a rubber pad (25) is fixedly connected to the outer side of the pressing plate (22).
4. The foundation pile for the hydraulic engineering construction according to claim 1, wherein: and a friction block (16) is fixedly connected to the outer wall of the first vertical plate (14).
5. The foundation pile for the hydraulic engineering construction according to claim 1, wherein: the bottom end of the support plate (2) is fixedly connected with a backing plate (3).
6. The foundation pile for the hydraulic engineering construction according to claim 1, wherein: the outer wall of the top end of the vertical rod (17) is provided with grinding grains (18).
CN201920185289.7U 2019-02-02 2019-02-02 Foundation pile for hydraulic engineering building Expired - Fee Related CN209958337U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920185289.7U CN209958337U (en) 2019-02-02 2019-02-02 Foundation pile for hydraulic engineering building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920185289.7U CN209958337U (en) 2019-02-02 2019-02-02 Foundation pile for hydraulic engineering building

Publications (1)

Publication Number Publication Date
CN209958337U true CN209958337U (en) 2020-01-17

Family

ID=69237311

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920185289.7U Expired - Fee Related CN209958337U (en) 2019-02-02 2019-02-02 Foundation pile for hydraulic engineering building

Country Status (1)

Country Link
CN (1) CN209958337U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112627171A (en) * 2020-12-30 2021-04-09 中国三冶集团有限公司 High-strength steel pipe concrete precast pile
CN113005875A (en) * 2021-03-31 2021-06-22 中交一公局第七工程有限公司 Support structure for anti-deformation steel trestle platform

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112627171A (en) * 2020-12-30 2021-04-09 中国三冶集团有限公司 High-strength steel pipe concrete precast pile
CN113005875A (en) * 2021-03-31 2021-06-22 中交一公局第七工程有限公司 Support structure for anti-deformation steel trestle platform

Similar Documents

Publication Publication Date Title
CN209958337U (en) Foundation pile for hydraulic engineering building
CN210715719U (en) Speed reducer with base is convenient for install
CN108036172B (en) A kind of better electronic product support device of fixed effect
CN210567011U (en) Direct-buried polyurethane thermal insulation pipe
CN105823019A (en) Lamp holder convenient to mount
CN211428485U (en) Anti-drop structure of computer power supply line
CN210450714U (en) Electronic components pin crib crimper
CN111063378B (en) Wisdom city monitoring data backstage storage device
CN214412092U (en) Pipeline laying auxiliary device for communication construction
CN216991599U (en) Auxiliary clamp assembly and connecting pipe mounting base using same
CN212656237U (en) Concrete sheet pile reinforcing apparatus for water conservancy construction
CN205782696U (en) A kind of lamp socket being easily installed
CN213562239U (en) Scraper installation auxiliary positioning mechanism for treadmill table top scraper
CN208932651U (en) A kind of heat shrink films cutting mechanism
CN211684454U (en) Wallpaper pressing die
CN212138091U (en) Movable video screen control terminal
CN212562160U (en) Hollow slab convenient to install
CN210629236U (en) Motor side plate structure convenient to installation
CN210890773U (en) Column type audio amplifier mounting structure
CN215635360U (en) Pipeline fixing device for water conservancy construction
CN218758793U (en) Supporting lead screw structure for assembly building
CN219395020U (en) Tragus pressing type noise reduction equipment
CN215335629U (en) Indoor and outdoor position sensing and positioning device
CN213828789U (en) Sewer line assists installation device
CN210403994U (en) Waveguide cover adjustable waveguide coaxial converter

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200117

Termination date: 20210202

CF01 Termination of patent right due to non-payment of annual fee