CN209944640U - Workshop factory building air conditioning system - Google Patents

Workshop factory building air conditioning system Download PDF

Info

Publication number
CN209944640U
CN209944640U CN201920600246.0U CN201920600246U CN209944640U CN 209944640 U CN209944640 U CN 209944640U CN 201920600246 U CN201920600246 U CN 201920600246U CN 209944640 U CN209944640 U CN 209944640U
Authority
CN
China
Prior art keywords
water supply
return
water
valve
pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920600246.0U
Other languages
Chinese (zh)
Inventor
张志良
马强
白洋
张元鑫
徐伟杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Citic Dicastal Co Ltd
Original Assignee
Citic Dicastal Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Citic Dicastal Co Ltd filed Critical Citic Dicastal Co Ltd
Priority to CN201920600246.0U priority Critical patent/CN209944640U/en
Application granted granted Critical
Publication of CN209944640U publication Critical patent/CN209944640U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Other Air-Conditioning Systems (AREA)

Abstract

The utility model discloses a workshop factory building air conditioning system, which comprises a pipe network system and jet air conditioners, wherein the pipe network system comprises a main water supply pipeline, a main return water pipeline, branch pipelines, a water supply end and a return water end, the main water supply pipeline and the main return water pipeline are respectively connected with a plurality of branch pipelines, and the plurality of branch pipelines are respectively provided with a plurality of jet air conditioners; the front end of the main water supply pipeline is connected with the water supply end; the front end of the return water main pipeline is connected with a return water end. In summer, a hot water supply valve at a water supply end and a hot water return valve at a water return end are closed, a cold water supply valve at the water supply end and a cold water return valve at the water return end are opened, and cold air is generated in the jet air conditioner; in winter, a cold water supply valve at the water supply end and a cold water return valve at the water return end are closed, a hot water supply valve at the water supply end and a hot water return valve at the water return end are opened, and hot air is generated in the jet air conditioner. Through switching the supply end valve and the return end valve, switching adjustment is carried out according to different environmental temperatures, and requirements of cooling in summer and heating in winter can be met.

Description

Workshop factory building air conditioning system
Technical Field
The utility model belongs to warm logical system field in workshop, in particular to workshop factory building air conditioning system.
Background
In northern production workshops, the problems of high temperature in summer and low temperature in winter are generally involved. Aiming at the problem of low temperature in winter, a heating or jet air conditioner system is generally adopted in a workshop to keep the temperature; aiming at the problem of high temperature in summer, workshops are generally cooled through natural ventilation, but the ventilation effect of the workshops is limited to be poor sometimes, and the effect is not ideal.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a workshop factory building air conditioning system adopts the efflux air conditioner, can compromise refrigeration in summer and heating in winter.
The utility model provides a technical scheme that its problem adopted is: an air conditioning system of a workshop factory building comprises a pipe network system and jet flow air conditioners, wherein the pipe network system comprises a main water supply pipeline, a main return water pipeline, branch pipelines, a water supply end and a return water end, the main water supply pipeline and the main return water pipeline are respectively connected with a plurality of branch pipelines, and the plurality of branch pipelines are respectively connected with the plurality of jet flow air conditioners; the front end of the main water supply pipeline is connected with a water supply end, and the water supply end comprises a hot water supply valve, a hot water supply end, a cold water supply valve and a cold water supply end; the front end of the return main pipeline is connected with a return end, and the return end comprises a hot water return valve, a hot water return end, a cold water return valve and a cold water return end.
Furthermore, install corrugated compensator B on water supply main pipe and the return water trunk line, avoid expend with heat and contract with cold to cause the pipe network system to damage.
Further, a corrugated compensator A and a balance valve are arranged on the branch pipeline.
The beneficial effects of the utility model are that the utility model provides a workshop factory building air conditioning system through switching supply, return water end valve, can switch the adjustment to different ambient temperature, satisfies the workshop cooling in summer and winter simultaneously and supplies heat required, easy and simple to handle.
Drawings
Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings.
Fig. 1 is a schematic plan view of an air conditioning system for a plant.
Fig. 2 is a schematic plan view of the water supply end.
Fig. 3 is a schematic plan view of the return end.
The numbers in the figures are as follows: 1. the jet flow air conditioner comprises a jet flow air conditioner, 2, a ripple compensator A, 3, a balance valve, 4, a ripple compensator B, 5, a branch pipeline, 6, a main water supply pipeline, 7, a water supply end, 701, a hot water supply valve, 702, a hot water supply end, 703, a cold water supply valve, 704, a cold water supply end, 8, a water return end, 801, a hot water return valve, 802, a hot water return end, 803, a cold water return valve, 804, a cold water return end and 9, a return main water pipeline.
Detailed Description
The present invention will be described in further detail with reference to the following examples and drawings.
An air conditioning system of a workshop factory building comprises a pipe network system and jet flow air conditioners 1, wherein the pipe network system comprises a main water supply pipeline 6, a main return water pipeline 9, branch pipelines 5, a water supply end 7 and a return water end 8, the main water supply pipeline 6 and the main return water pipeline 9 are respectively connected with the branch pipelines 5, and the branch pipelines 5 are respectively provided with a plurality of jet flow air conditioners 1; the front end of the main water supply pipeline 6 is connected with a water supply end 7, and the water supply end 7 comprises a hot water supply valve 701, a hot water supply end 702, a cold water supply valve 703 and a cold water supply end 704; the front end of the return main pipe 9 is connected with a return end 8, and the return end 8 comprises a hot water return valve 801, a hot water return end 802, a cold water return valve 803 and a cold water return end 804. Install ripple compensator B4 on main water supply pipe 6 and the return water main pipe 9, avoid expending with heat and contract with cold to cause the damage of pipe network system. The branch pipe 5 is provided with a ripple compensator a2 and a balance valve 3.
The working principle of the device is as follows: in a high-temperature state in summer, the hot water supply valve 701 at the water supply end 7 and the hot water return valve 801 at the water return end 8 are closed, the cold water supply valve 703 at the water supply end 7 and the cold water return valve 803 at the water return end 8 are opened, cold air is generated in the jet air conditioner 1, and the temperature of a workshop is effectively reduced; in the low temperature state in winter, the cold water supply valve 703 of the water supply end 7 and the cold water return valve 803 of the water return end 8 are closed, the hot water supply valve 701 of the water supply end 7 and the hot water return valve 801 of the water return end 8 are opened, hot air is generated in the jet air conditioner 1, and the temperature of a workshop is effectively increased.
In light of the foregoing, it will be apparent to those skilled in the art from this disclosure that various changes and modifications can be made without departing from the spirit and scope of the invention. The technical scope of the present invention is not limited to the content of the specification, and must be determined according to the scope of the claims.

Claims (3)

1. The utility model provides a workshop factory building air conditioning system, includes pipe network system and jet air conditioner (1), its characterized in that: the pipe network system comprises a main water supply pipeline (6), a main return water pipeline (9), branch pipelines (5), a water supply end (7) and a return water end (8), wherein the main water supply pipeline (6) and the main return water pipeline (9) are respectively connected with the branch pipelines (5), and the branch pipelines (5) are provided with jet flow air conditioners (1); the front end of the main water supply pipeline (6) is connected with a water supply end (7), and the water supply end (7) comprises a hot water supply valve (701), a hot water supply end (702), a cold water supply valve (703) and a cold water supply end (704); the front end of the return main pipe (9) is connected with a return end (8), and the return end (8) comprises a hot water return valve (801), a hot water return end (802), a cold water return valve (803) and a cold water return end (804).
2. The plant air conditioning system of claim 1, wherein: the main water supply pipeline (6) and the main water return pipeline (9) are provided with corrugated compensators B (4).
3. The plant air conditioning system of claim 1, wherein: the branch pipeline (5) is provided with a corrugated compensator A (2) and a balance valve (3).
CN201920600246.0U 2019-04-29 2019-04-29 Workshop factory building air conditioning system Active CN209944640U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920600246.0U CN209944640U (en) 2019-04-29 2019-04-29 Workshop factory building air conditioning system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920600246.0U CN209944640U (en) 2019-04-29 2019-04-29 Workshop factory building air conditioning system

Publications (1)

Publication Number Publication Date
CN209944640U true CN209944640U (en) 2020-01-14

Family

ID=69130348

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920600246.0U Active CN209944640U (en) 2019-04-29 2019-04-29 Workshop factory building air conditioning system

Country Status (1)

Country Link
CN (1) CN209944640U (en)

Similar Documents

Publication Publication Date Title
CN201973815U (en) Data machine room air conditioning refrigerating system
CN210980430U (en) Double-heat-source heat pump circulating system of air source and ground source
CN203928227U (en) Water-cooled cooling water air conditioner system based on fire cistern and cooling tower
CN103912938A (en) Air conditioning system
CN202024625U (en) Indirect air cooling system capable of changing flow direction of cooling water
CN209944640U (en) Workshop factory building air conditioning system
JP5096803B2 (en) Air conditioning system
CN105042815A (en) Secondary heat recovery heat-tube type air conditioning system
CN205536657U (en) Energy -conserving concurrent heating device of ground -source heat pump
CN204787404U (en) Air compressor machine waste heat recovery and compound cold and hot source system of earth source heat pump
CN101042256A (en) Synthesis type air-conditioning system
CN107152875B (en) Direct air cooling unit system with expanded unit system and control method
CN202648022U (en) Connection system for auxiliary heat removal of cooling tower in ground source heat pump system
CN202392923U (en) Air-conditioner and hot-water dual purpose device
CN210241840U (en) Central air-conditioning system using cooling tower for energy saving
CN204491851U (en) Be applied to the high energy efficiency space enclosing structure that the thermal transmittance of golf calorific value building is variable
CN204526043U (en) A kind of injection machine cooling system utilizing geothermal heat pump air-conditioner
CN109282456B (en) Control method of large centralized air conditioning system capable of performing cooling decentralized control and independent operation
CN207763527U (en) Cooling tower cold supply system based on chilled water storage system
TWI620909B (en) Cooling water system
CN207540182U (en) A kind of achievable refrigeration heats, the air source hot pump water heater of water heating function
CN205536680U (en) Energy -conserving concurrent heating device of ground -source heat pump
CN204513643U (en) A kind of modularization air conditioner water device
CN205596494U (en) Take air conditioning function's novel regulator cubicle
CN215892722U (en) Self-adaptive energy recycling system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant