CN209941875U - Building drain pipe pull throughs - Google Patents

Building drain pipe pull throughs Download PDF

Info

Publication number
CN209941875U
CN209941875U CN201920014831.2U CN201920014831U CN209941875U CN 209941875 U CN209941875 U CN 209941875U CN 201920014831 U CN201920014831 U CN 201920014831U CN 209941875 U CN209941875 U CN 209941875U
Authority
CN
China
Prior art keywords
steel wire
internal thread
pipe
fixedly connected
end fixedly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920014831.2U
Other languages
Chinese (zh)
Inventor
王树民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201920014831.2U priority Critical patent/CN209941875U/en
Application granted granted Critical
Publication of CN209941875U publication Critical patent/CN209941875U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sink And Installation For Waste Water (AREA)

Abstract

The utility model belongs to the technical field of the pipeline mediation technique and specifically relates to a building drain pipe pull throughs, comprising a main pipe, the person in charge sets up to the gooseneck, the wherein one end fixedly connected with of the person in charge sets up rather than concentric internal thread pipe, the inside of the person in charge is inserted and is equipped with the steel wire, the one end fixedly connected with that the internal thread pipe was kept away from to the steel wire is with the conical head of being responsible for with the footpath, the steel wire is close to one side of conical head and installs multiunit clearance strip, the screw rod that the other end fixedly connected with and the internal thread pipe cooperation of steel wire are connected, the one end fixedly connected. The utility model has the advantages of simple operation, be convenient for dredge the processing to the pipeline of jam to also be convenient for take the plug in the pipeline out after the mediation, can improve the clearance effect of pipeline.

Description

Building drain pipe pull throughs
Technical Field
The utility model relates to a pipeline mediation technical field especially relates to a building drain pipe pull throughs.
Background
In a building structure, a drainage pipeline is easily blocked by deposits, so that the drainage pipeline cannot normally drain water. When the pipeline is blocked, generally a dredging tool is needed to dredge the pipeline, but the function of some dredging tools is single, and the blockage in the pipeline is not conveniently taken out after the pipeline is dredged, so that the dredging effect of the pipeline is not ideal enough.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the problem that the blockage in the pipeline is not convenient to take out in the prior art, and providing a building drain pipe dredging device.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the dredging device for the building drain pipe comprises a main pipe, wherein the main pipe is arranged into a gooseneck, one end of the main pipe is fixedly connected with an internal thread pipe concentrically arranged with the main pipe, a steel wire is inserted into the main pipe, one end, far away from the internal thread pipe, of the steel wire is fixedly connected with a conical head with the same diameter as the main pipe, one side, close to the conical head, of the steel wire is provided with a plurality of groups of cleaning strips, the other end of the steel wire is fixedly connected with a screw rod in matched connection with the internal thread pipe, and one end, far away from the steel wire, of the;
the utility model discloses a mounting structure for the internal thread pipe, including mounting sleeve, mounting sleeve and internal thread pipe, first mounting panel is all installed to mounting sleeve's both sides, and the outside of two first mounting panels all is connected with the connecting plate, and the one end that first mounting panel was kept away from to two connecting plates is connected with the second mounting panel jointly, the outside at the operating wheel is established to the support cover that second mounting panel and two connecting plates formed, the middle part of the lateral surface of second mounting panel and driving motor's output shaft fixed connection, driving motor's externally mounted has the handle.
Preferably, the cleaning strips are obliquely arranged towards the screw, and the cleaning strips are PC plastic strips.
Preferably, the length of the connecting plate is not less than that of the screw.
Preferably, a plurality of annular bulges are arranged on the outer surface of the main pipe at intervals.
The utility model provides a pair of building drain pipe pull throughs, beneficial effect lies in: the utility model has the advantages of simple operation, be convenient for dredge the processing to the pipeline of jam to also be convenient for take the plug in the pipeline out after the mediation, can improve the clearance effect of pipeline.
Drawings
FIG. 1 is a schematic structural view of a building drain pipe dredging device in an unused state according to the present invention;
fig. 2 is the utility model provides a building drain pipe pull throughs's user state structure schematic diagram.
In the figure: the device comprises a main pipe 1, an internal threaded pipe 2, a steel wire 3, a conical head 4, a plastic strip 5, a screw 6, an operating wheel 7, an installation sleeve 8, a screw 9, a first installation plate 10, a connection plate 11, a second installation plate 12, a driving motor 13, a handle 14 and an annular bulge 15.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-2, a building drain pipe pull throughs, is including being responsible for 1, is responsible for 1 and sets up to the gooseneck, and the gooseneck can be crooked wantonly, and is comparatively nimble. One end of the main pipe 1 is fixedly connected with an internal threaded pipe 2 which is concentrically arranged with the main pipe, and a steel wire 3 is inserted into the main pipe 1. The one end fixedly connected with that the internal thread pipe 2 was kept away from to steel wire 3 and the cone 4 of being responsible for 1 with the footpath, and multiunit clearance strip 5 is installed to one side that steel wire 3 is close to cone 4, and the screw rod 6 that the other end fixedly connected with of steel wire 3 and internal thread pipe 2 cooperation are connected, and the one end fixedly connected with operating wheel 7 of steel wire 3 is kept away from to screw rod 6. The cleaning strips 5 are obliquely arranged towards the screw 6, the cleaning strips 5 are PC plastic strips, and the PC plastic strips have good toughness and are not easy to break. A plurality of annular bulges 15 are arranged on the outer surface of the main pipe 1 at intervals, and the plurality of annular bulges 15 can improve the friction force of the surface of the main pipe 1, so that sundries in the pipeline can be conveniently taken out. When the device is not in use, the plurality of cleaning strips 5 are stored inside the main pipe 1 in a bent state.
The outside cover of internal thread pipe 2 is equipped with mounting sleeve 8, be connected through two screws 9 between mounting sleeve 8 and the internal thread pipe 2, first mounting panel 10 is all installed to mounting sleeve 8's both sides, the outside of two first mounting panels 10 all is connected with connecting plate 11, the one end that first mounting panel 10 was kept away from to two connecting plates 11 is connected with second mounting panel 12 jointly, the outside at operation wheel 7 is established to second mounting panel 12 and the supporting cover that two connecting plates 11 formed, the middle part of the lateral surface of second mounting panel 12 and driving motor 13's output shaft fixed connection, driving motor 13's externally mounted has handle 14. The length of the connecting plate 11 is not less than the length of the screw 6, so that the screw 6 has enough space for movement. Driving motor 13 circular telegram operation back can drive and be responsible for 1 and the whole rotation of internal thread pipe 2, insert it and establish in the pipeline that is blockked up, can dredge the pipeline fast, can manually twist screw rod 6 after the mediation, make a plurality of clearance strips 5 on the steel wire 3 shift out from the inside of being responsible for 1, a plurality of clearance strips 5 are in the expansion state after shifting out from the inside of being responsible for 1, will be responsible for 1 this moment and pull back, a plurality of clearance strips 5 alright take out the jam in being responsible for 1, the clearance effect is better, and convenient to use.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (4)

1. The utility model provides a building drain pipe pull throughs, includes and is responsible for (1), be responsible for (1) and set up to the gooseneck, its characterized in that, wherein one end fixedly connected with of being responsible for (1) rather than concentric internal thread pipe (2) that sets up, the inside of being responsible for (1) is inserted and is equipped with steel wire (3), the one end fixedly connected with of keeping away from internal thread pipe (2) of steel wire (3) is with the conical head (4) of being responsible for (1) footpath, one side that steel wire (3) are close to conical head (4) is installed multiunit clearance strip (5), the other end fixedly connected with screw rod (6) of being connected with internal thread pipe (2) cooperation, the one end fixedly connected with operation wheel (7) of steel wire (3) are kept away from to screw rod (6);
the outside cover of internal thread pipe (2) is equipped with installing sleeve pipe (8), install sleeve pipe (8) and be connected through two screws (9) between internal thread pipe (2), first mounting panel (10) are all installed to the both sides of installing sleeve pipe (8), and the outside of two first mounting panels (10) all is connected with connecting plate (11), and the one end of keeping away from first mounting panel (10) is connected with second mounting panel (12) jointly in two connecting plates (11), the outside at operation wheel (7) is established to the leg cap that second mounting panel (12) and two connecting plates (11) formed, the middle part of the lateral surface of second mounting panel (12) and the output shaft fixed connection of driving motor (13), the externally mounted of driving motor (13) has handle (14).
2. A building drain pull throughs according to claim 1, wherein the cleaning strips (5) are arranged inclined towards the screw (6) and the cleaning strips (5) are arranged as PC plastic strips.
3. A building drain pull through according to claim 1, characterised in that the length of the connection plate (11) is not less than the length of the screw (6).
4. A building drain pull through according to claim 1, characterised in that the outer surface of the main pipe (1) is fitted with a plurality of annular protrusions (15) at spaced intervals.
CN201920014831.2U 2019-01-05 2019-01-05 Building drain pipe pull throughs Expired - Fee Related CN209941875U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920014831.2U CN209941875U (en) 2019-01-05 2019-01-05 Building drain pipe pull throughs

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920014831.2U CN209941875U (en) 2019-01-05 2019-01-05 Building drain pipe pull throughs

Publications (1)

Publication Number Publication Date
CN209941875U true CN209941875U (en) 2020-01-14

Family

ID=69120811

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920014831.2U Expired - Fee Related CN209941875U (en) 2019-01-05 2019-01-05 Building drain pipe pull throughs

Country Status (1)

Country Link
CN (1) CN209941875U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112170398A (en) * 2020-09-09 2021-01-05 江西风石压缩机有限公司 Blockage dredging device for vacuum port of screw machine

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112170398A (en) * 2020-09-09 2021-01-05 江西风石压缩机有限公司 Blockage dredging device for vacuum port of screw machine

Similar Documents

Publication Publication Date Title
CN209941875U (en) Building drain pipe pull throughs
CN202324112U (en) Rotary type sewage pipe dredger
CN211344364U (en) Waterproof hammer closestool angle valve easy to assemble
CN202001396U (en) Flushing device of mechanical seal for high pressure pump
CN203222865U (en) Small-size electronic pipeline dredge machine
CN211113961U (en) Toilet bowl blow off pipe of pitch can finely tune pitch
CN210737940U (en) Roof siphon rainwater drainage system
CN210770800U (en) PVC tubular product with fastening flaring structure
CN207314463U (en) A kind of impurity remove device for inside house sewer
CN112452968A (en) Hydraulic pipeline dredger
CN213378319U (en) Simple telescopic pipeline cleaner
CN212821577U (en) Concealed conduit dredging device
CN200961287Y (en) Dredging device for sewer
CN205387736U (en) Faucet extender
CN201132999Y (en) Device for opening and closing draining valve
CN202752284U (en) Converter storage cabinet gas pipeline drain pipe nitrogen blowback device
CN217438218U (en) High-efficient convenient blast furnace taphole mud cover clearance drill bit
CN103590466B (en) Cabinet mounting structure for water supply and drainage pipe on wall surface,
CN214302156U (en) Pipeline blocks up mediation perforating device
CN201400913Y (en) Sink with hose
CN217432497U (en) A scrubbing device for pipeline mouth
CN214686319U (en) Wall-penetrating plastic pipe dismantling device
CN220908640U (en) Novel floor drain
CN2547813Y (en) Spiral top-push form-dismantling apparatus
CN213867761U (en) Quick drainage pipe network structure is handled to soft ground

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200114

Termination date: 20220105