CN209927482U - Energy efficiency monitoring device for ground source heat pump air conditioning system - Google Patents

Energy efficiency monitoring device for ground source heat pump air conditioning system Download PDF

Info

Publication number
CN209927482U
CN209927482U CN201920873679.3U CN201920873679U CN209927482U CN 209927482 U CN209927482 U CN 209927482U CN 201920873679 U CN201920873679 U CN 201920873679U CN 209927482 U CN209927482 U CN 209927482U
Authority
CN
China
Prior art keywords
monitoring device
monitoring
conditioning system
heat pump
source heat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920873679.3U
Other languages
Chinese (zh)
Inventor
肖世强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201920873679.3U priority Critical patent/CN209927482U/en
Application granted granted Critical
Publication of CN209927482U publication Critical patent/CN209927482U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Structures Of Non-Positive Displacement Pumps (AREA)

Abstract

The utility model discloses a monitoring devices still includes monitoring devices install bin, bracing piece, elevating gear and rotary device, and monitoring devices sets up in the monitoring devices install bin, and elevating gear, rotary device and monitoring devices install bin all set up on the bracing piece. The utility model has the advantages that the whole structure of the utility model arranges the monitoring device in the mounting box of the monitoring device, the height position of the monitoring device can be adjusted by random lifting through the lifting device, and the monitoring device can be rotated by 360 degrees, thus achieving the monitoring process with all-round and high efficiency, simple operation, convenient use and easy realization; when monitoring is not needed, the height of the monitoring device can be adjusted to a high position, and the monitoring device does not occupy space.

Description

Energy efficiency monitoring device for ground source heat pump air conditioning system
Technical Field
The utility model relates to an efficiency monitoring devices, especially an efficiency monitoring devices for earth source heat pump air conditioning system.
Background
The energy efficiency monitoring of the ground source heat pump air-conditioning system is mainly used for monitoring the service condition of the ground source heat pump air-conditioning system, most energy efficiency monitoring instruments are used in the monitoring process, the purpose of monitoring the energy efficiency is to observe the energy utilization rate of the ground source heat pump air-conditioning system, so that the energy saving, emission reduction and environmental protection can be realized, most energy efficiency monitoring devices of the existing ground source heat pump air-conditioning system are arranged on a wall or an air-conditioning body, the monitoring can not be completed in an all-around and high-efficiency mode, the occupied space is also small, and the use is inconvenient.
SUMMERY OF THE UTILITY MODEL
The utility model provides a simple structure's an efficiency monitoring devices for earth source heat pump air conditioning system has solved the problem that can not all-round, the monitoring is accomplished to the high efficiency that exists among the prior art and occupation space still.
The utility model discloses a solve the technical scheme that above-mentioned technical problem adopted and be: including monitoring devices, still include monitoring devices install bin, bracing piece, elevating gear and rotary device, monitoring devices sets up in the monitoring devices install bin, and elevating gear, rotary device and monitoring devices install bin all set up on the bracing piece.
Preferably, the lifting device is a flag pole hand lifter.
Preferably, the flag pole hand-operated lifter is provided with a rocking handle, and the rocking handle can be folded into a vertical shape.
Preferably, the rotating device comprises a connecting plate and a bearing, the connecting plate is arranged on the supporting rod through the bearing, and the connecting plate is connected with the monitoring device installation box.
Preferably, the monitoring device mounting box comprises a back plate, a top plate and a bottom plate.
Preferably, one side of the back plate close to the support rod is provided with an inwards concave cambered surface.
Preferably, a handle is arranged on the outer side surface of the bottom plate.
Preferably, the monitoring devices install bin is provided with the fixed band outward, and the quantity of fixed band is 1 ~ 3.
The utility model adopts the above structure, following advantage has: the monitoring device is arranged in the monitoring device installation box in the integral structure, the height position of the monitoring device can be adjusted in an optional lifting mode through the lifting device, and the monitoring device can rotate 360 degrees, so that an all-dimensional and high-efficiency monitoring process can be achieved, and the monitoring device is simple to operate, convenient to use and easy to implement; when monitoring is not needed, the height of the monitoring device can be adjusted to a high position, and the monitoring device does not occupy space.
Drawings
Fig. 1 is a schematic elevation structure of the present invention;
FIG. 2 is a schematic top view of the monitoring device mounting box;
fig. 3 is an enlarged view of the structure in the direction a of fig. 1.
In the figure, 1, a monitoring device installation box; 2. fixing belts; 3. a connecting plate; 4. a bearing; 5. a support bar; 6. a flagpole hand-operated lifter; 7. a rocking handle; 8. a monitoring device; 11. a back plate; 12. a cambered surface; 13. a top plate; 14. a base plate; 15. a handle.
Detailed Description
In order to clearly illustrate the technical features of the present invention, the present invention is explained in detail by the following embodiments in combination with the accompanying drawings.
As shown in fig. 1, monitoring devices 8 are arranged in a monitoring device installation box 1, as shown in fig. 3, the monitoring device installation box 1 comprises a back plate 11, a top plate 13 and a bottom plate 14, as shown in fig. 2, one side of the back plate 11, which is close to a support rod 5, is provided with an inwards concave arc surface 12, a handle 15 is arranged on the outer side surface of the bottom plate 14, fixing bands 2 are arranged outside the monitoring device installation box 1, the number of the fixing bands 2 is 1-3, a lifting device, a rotating device and the monitoring device installation box 1 are arranged on the support rod 5, the lifting device is a flag pole hand-operated lifter 6, the flag pole hand-operated lifter 6 is provided with a crank 7, the crank 7 can be folded into a vertical shape, the rotating device comprises a connecting plate 3 and a bearing 4, the connecting plate 3 is arranged on the support rod 5 through the bearing.
When needing monitoring air conditioning system efficiency, at first operate rocking handle 7 according to actual need and come control flagpole hand lift 6 to adjust the high position of monitoring devices 8 of dress in monitoring devices install bin 1, open monitoring devices 8, secondly can be through handle 15 after adjusting high position in 360 within ranges slow rotation monitoring devices install bin 1's angular position, can realize all-round, efficient monitoring, need not monitor time measuring can with monitoring devices 8's altitude mixture control to the space of not touching people's eminence so do not occupy people's activity, monitoring devices 8 if damage or trouble can directly take out from monitoring devices install bin 1 and overhaul, in order to prevent that monitoring devices 8 from taking place the displacement or falling in lift or rotation process, install fixed band 2 in monitoring devices install bin 1 additional.
Wherein, bearing 4, flagpole hand lifter 6 and monitoring devices 8 are prior art.
The above-mentioned specific embodiments can not be regarded as the restriction to the scope of protection of the utility model, to technical personnel in this technical field, it is right the utility model discloses any replacement improvement or transform that embodiment made all fall within the scope of protection of the utility model.
The parts of the present invention not described in detail are the known techniques of those skilled in the art.

Claims (8)

1. The utility model provides an efficiency monitoring devices for ground source heat pump air conditioning system, includes monitoring devices, its characterized in that: the device is characterized by further comprising a monitoring device installation box, a supporting rod, a lifting device and a rotating device, wherein the monitoring device is arranged in the monitoring device installation box, and the lifting device, the rotating device and the monitoring device installation box are all arranged on the supporting rod.
2. The energy efficiency monitoring device for the ground source heat pump air conditioning system according to claim 1, characterized in that: the lifting device is a flag pole hand-operated lifter.
3. The energy efficiency monitoring device for the ground source heat pump air conditioning system according to claim 2, characterized in that: the flag pole hand-operated lifter is provided with a rocking handle, and the rocking handle can be folded into a vertical shape.
4. The energy efficiency monitoring device for the ground source heat pump air conditioning system according to claim 1, characterized in that: the rotating device comprises a connecting plate and a bearing, the connecting plate is arranged on the supporting rod through the bearing, and the connecting plate is connected with the monitoring device installation box.
5. The energy efficiency monitoring device for the ground source heat pump air conditioning system according to claim 1, characterized in that: the monitoring device installation box comprises a back plate, a top plate and a bottom plate.
6. The energy efficiency monitoring device for the ground source heat pump air conditioning system according to claim 5, characterized in that: one side of the back plate, which is close to the supporting rod, is provided with an inwards concave cambered surface.
7. The energy efficiency monitoring device for the ground source heat pump air conditioning system according to claim 5, characterized in that: the outer side surface of the bottom plate is provided with a handle.
8. The energy efficiency monitoring device for the ground source heat pump air conditioning system according to claim 1 or 5, characterized in that: the monitoring devices install the case and be provided with the fixed band outward, the quantity of fixed band be 1 ~ 3.
CN201920873679.3U 2019-06-12 2019-06-12 Energy efficiency monitoring device for ground source heat pump air conditioning system Expired - Fee Related CN209927482U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920873679.3U CN209927482U (en) 2019-06-12 2019-06-12 Energy efficiency monitoring device for ground source heat pump air conditioning system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920873679.3U CN209927482U (en) 2019-06-12 2019-06-12 Energy efficiency monitoring device for ground source heat pump air conditioning system

Publications (1)

Publication Number Publication Date
CN209927482U true CN209927482U (en) 2020-01-10

Family

ID=69092857

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920873679.3U Expired - Fee Related CN209927482U (en) 2019-06-12 2019-06-12 Energy efficiency monitoring device for ground source heat pump air conditioning system

Country Status (1)

Country Link
CN (1) CN209927482U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114200242A (en) * 2021-12-21 2022-03-18 中国标准化研究院 Air conditioner efficiency testing arrangement

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114200242A (en) * 2021-12-21 2022-03-18 中国标准化研究院 Air conditioner efficiency testing arrangement

Similar Documents

Publication Publication Date Title
CN208058306U (en) A kind of adjustable water pump support device
CN209927482U (en) Energy efficiency monitoring device for ground source heat pump air conditioning system
CN104967403A (en) Solar cell panel stretching mechanism for reel irrigation sprinkler
CN206902447U (en) A kind of Multifunctional lifting clothes airing device for being easy to automatic control to air-dry sterilization
CN204538527U (en) A kind of 180 degree of rotary concrete bar arms
CN203175905U (en) Double-layer fan blade ceiling fan
CN109515941A (en) Energy charge notification sheet storing unit in a kind of residential building
CN208735520U (en) A kind of High-Pole Lamp with bird dispelling function
CN208292178U (en) A kind of equipment turnover device of electromechanics installation
CN211128068U (en) Outdoor high-power wireless AP's fixing device
CN101556981A (en) Trimming stand
CN209962584U (en) Power grid planning area division indication board
CN210163035U (en) Vertical lifting appliance for assembling wind power impeller
CN208950432U (en) A kind of mobile 5g signal tower that coverage is wide
CN204837647U (en) Solar energy disinsector with flexible electric shock web frame
CN210512211U (en) A outer wall suspended support for photovoltaic module
CN210979224U (en) Mobile electronic advertisement publishing device
CN203855327U (en) Liftable multifunctional tool for lifting vertical rod
CN207298676U (en) A kind of lifting/lowering type suspended LED light of installation easy to disassemble
CN218492337U (en) Construction is with portable staff safety bulletin device
CN206088952U (en) Rotatable high altitude construction car
CN216112831U (en) Portable emergency power generation equipment for constructional engineering
CN209445398U (en) A kind of boiler biomass fuel automatic charging device
CN210979140U (en) Multi-angle adjustable lifting support frame
CN208840240U (en) A kind of wind-power tower flange ovality apparatus for correcting

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200110

Termination date: 20210612