CN209925768U - Heating power pipeline supporting structure - Google Patents

Heating power pipeline supporting structure Download PDF

Info

Publication number
CN209925768U
CN209925768U CN201920792983.5U CN201920792983U CN209925768U CN 209925768 U CN209925768 U CN 209925768U CN 201920792983 U CN201920792983 U CN 201920792983U CN 209925768 U CN209925768 U CN 209925768U
Authority
CN
China
Prior art keywords
structures
pipe sleeve
backup pad
pipeline
frame body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920792983.5U
Other languages
Chinese (zh)
Inventor
李姿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mike Engineering Design (tianjin) Co Ltd
Original Assignee
Mike Engineering Design (tianjin) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mike Engineering Design (tianjin) Co Ltd filed Critical Mike Engineering Design (tianjin) Co Ltd
Priority to CN201920792983.5U priority Critical patent/CN209925768U/en
Application granted granted Critical
Publication of CN209925768U publication Critical patent/CN209925768U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model provides a heating power pipeline supporting structure, which comprises two fixing structures and two positioning supporting structures; the two fixed structures are detachably connected; the fixing structure comprises a claw structure and two pipe sleeve structures, the two pipe sleeve structures are arranged up and down symmetrically, the two pipe sleeve structures are detachably connected, and the claw structure is arranged on the outer sides of the two pipe sleeve structures; each fixed knot constructs the pipe sleeve structure of setting in the below and all corresponds and sets up a location bearing structure. A heating power pipeline bearing structure, solved traditional pipeline because when fixed locking in-process, pipeline outer wall stress too concentrates on the position of pipeline with the strutting arrangement contact, will lead to the holistic ageing of strutting arrangement along with time lapse, and then will influence the holistic construction quality of engineering and produce the technical problem of the unsafe factor of part.

Description

Heating power pipeline supporting structure
Technical Field
The utility model belongs to the technical field of the heating power pipeline, especially, relate to a heating power pipeline bearing structure.
Background
In recent years, along with the continuous perfection and mandatory application of heating system measurement technique, the heating mode has appeared diversely, need use partial metalwork to support fixedly to the pipeline in the fixed operation of pipeline, because traditional pipeline bearing structure's rigidity and hardness are relatively poor, and traditional pipeline bearing structure is in the locking process when fixed, pipeline outer wall stress is too concentrated in the position of pipeline and strutting arrangement contact, will lead to the holistic ageing of strutting arrangement along with the time lapse, and then will influence the holistic construction quality of engineering and produce some unsafe factors.
Disclosure of Invention
In view of this, the utility model aims at providing a heating power pipeline bearing structure has solved traditional pipeline because when fixed locking in-process, pipeline outer wall stress too concentrates on the position of pipeline with the strutting arrangement contact, will lead to the holistic ageing of strutting arrangement along with time lapse, and then will influence the holistic construction quality of engineering and produce the technical problem of part unsafe factor.
In order to achieve the above purpose, the technical scheme of the utility model is realized like this:
a heating power pipeline supporting structure comprises two fixing structures and two positioning supporting structures;
the two fixing structures are detachably connected;
the fixing structure comprises a claw structure and two pipe sleeve structures, the two pipe sleeve structures are arranged in a vertically symmetrical mode and detachably connected, and the claw structure is arranged on the outer sides of the two pipe sleeve structures;
and each pipe sleeve structure with the fixed structure arranged below is correspondingly provided with one positioning and supporting structure.
Further, the pipe sleeve structure comprises a rib plate structure, pipe sleeves and a frame body with a hollow interior, the rib plate structure is arranged in the hollow position of the frame body, the pipe sleeves are arranged on the frame body, and the pipe sleeves of the two pipe sleeve structures are opposite.
Furthermore, the rib plate structure comprises three rib plates, the two rib plates are uniformly distributed in the hollow position of the frame body, and each rib plate and the frame body are integrally formed.
Further, the pipe sleeve and the frame body are integrally formed.
Furthermore, the jack catch structure includes two the jack catch, the apex angle department in two framework outsides of same fixed knot constructs all sets up one the jack catch, jack catch through-hole L shape connecting plate with the connection can be dismantled to the framework.
Furthermore, the L-shaped connecting plate and the clamping jaws are integrally formed.
Further, location bearing structure includes the bottom plate, can install fixed knot constructs first backup pad and a plurality of second backup pad that can fix a position the pipeline, first backup pad sets up bottom plate up end middle part is a plurality of the setting is arranged to the second backup pad the bottom plate up end, it is a plurality of the second backup pad with first backup pad sets up in a staggered way, each the second backup pad all with first backup pad is perpendicular.
Furthermore, the middle part of the first supporting plate is provided with a first groove capable of installing a fixing structure.
Furthermore, each second backup pad top all is equipped with the second recess that can fix a position the pipeline.
Compared with the prior art, a heating power pipeline bearing structure have following advantage:
the utility model discloses a heating power pipeline supporting structure, can realize directly fixing the pipeline through fixed knot constructs to through two fixed knot constructs direct detachable connection, and then can further realize the simultaneous fixation of two pipelines;
the stress bearing capacity of the whole frame body can be further enhanced through the rib plate structure arranged in the hollow position of the frame body, and the pipeline can be directly clamped through the frame body through the pipe sleeve;
make bearing structure whole can be adapted to the operating mode that there is the overstock pipeline both sides through jack catch structure to bearing structure can be connected with other pipelines or column object through jack catch structure.
Drawings
The accompanying drawings, which form a part hereof, are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention and together with the description serve to explain the invention without undue limitation. In the drawings:
fig. 1 is a schematic view of a thermal pipeline supporting structure according to an embodiment of the present invention;
fig. 2 is a partial schematic view of a thermal pipeline supporting structure according to an embodiment of the present invention;
fig. 3 is a schematic view of a positioning and supporting structure according to an embodiment of the present invention.
Description of reference numerals:
101-a frame body; 102-a tube sleeve; 103-rib plate structure; 201-jaw structure; 301-a second support plate; 302-a backplane; 303-first support plate.
Detailed Description
It should be noted that, in the present invention, the embodiments and features of the embodiments may be combined with each other without conflict.
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", and the like, indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are used merely for convenience of description and for simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention. Furthermore, the terms "first", "second", etc. are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first," "second," etc. may explicitly or implicitly include one or more of that feature. In the description of the present invention, "a plurality" means two or more unless otherwise specified.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood by those of ordinary skill in the art through specific situations.
The present invention will be described in detail below with reference to the accompanying drawings in conjunction with embodiments.
A thermal pipeline support structure, as shown in fig. 1, includes two fixing structures and two positioning support structures;
two fixed knot construct can dismantle the connection, and fixed knot constructs including jack catch structure 201 and two pipe box structures, and two pipe box structure longitudinal symmetry set up, and two pipe box structures can dismantle the connection, in this embodiment, adopt bolted connection, and jack catch structure 201 sets up in two pipe box structure's the outside, through two fixed knot construct directness can dismantle the connection, and then can be further realize two pipelines fixed simultaneously.
In this embodiment, as shown in fig. 1, the two fixing structures are fixed by the clamping grooves and connected by bolts.
Each fixed knot constructs the pipe sleeve structure of setting in the below and all corresponds and sets up a location bearing structure.
The pipe sleeve structure comprises a rib plate structure 103, a pipe sleeve 102 and a frame body 101 with a hollow interior, wherein the rib plate structure 103 is arranged at the hollow position of the frame body 101, the pipe sleeve 102 is arranged on the frame body 101, and the pipe sleeves 102 of the two pipe sleeve structures are opposite.
The rib plate structure 103 comprises three rib plates, two rib plates are uniformly distributed at the hollow position of the frame body 101, each rib plate is integrally formed with the frame body 101, the integral stress bearing capacity of the frame body can be further enhanced through the rib plate structure arranged at the hollow position of the frame body, and a pipeline can be directly clamped through the frame body through the pipe sleeve; the sleeve 102 is integrally formed with the frame 101.
Jack catch structure 201 includes two jack catchs, the apex angle department in two framework 101 outsides of same fixed knot structure all sets up a jack catch, as shown in fig. 2, jack catch through-hole L shape connecting plate can be dismantled with framework 101 and be connected, in this embodiment, adopt bolted connection, make overall the working condition that can be adapted to the pipeline both sides and have the overstock of bearing structure through jack catch structure, and bearing structure can be connected with other pipelines or column object through jack catch structure, L shape connecting plate is integrated into one piece with the jack catch.
As shown in fig. 3, the positioning support structure includes a bottom plate 302, a first support plate 303 capable of installing a fixing structure, and a plurality of second support plates 301 capable of positioning the pipeline, the first support plate 303 is disposed in the middle of the upper end surface of the bottom plate 302, the plurality of second support plates 301 are arranged on the upper end surface of the bottom plate 302, the plurality of second support plates 301 and the first support plate 303 are arranged in a staggered manner, and each second support plate 301 is perpendicular to the first support plate 303. The middle part of the first supporting plate 303 is provided with a first groove 3031 capable of installing a fixing structure, and the fixing structure can be directly welded in the first groove 3031 during actual work. Each second backup pad 301 top all is equipped with the second recess that can fix a position the pipeline.
Working mode of the example
At first place fixed knot structure in first recess 3031, the pipeline is placed between the pipe box 102 of two pipe box structures, location bearing structure realizes the location through the second recess to the pipeline, first backup pad 303 and a plurality of second backup pad 301 support the pipeline simultaneously, and then can be further alleviate bearing structure and the direct stress concentration's of pipeline possibility, then lock two pipe box structures, can realize the pipeline snap-on through fixed knot structure, and connect through the direct dismantlement of two fixed knot structures, and then can be further fixed when realizing two pipelines.
The above description is only a preferred embodiment of the present invention, and should not be taken as limiting the invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (9)

1. A thermal conduit support structure, characterized by: comprises two fixed structures and two positioning and supporting structures;
the two fixing structures are detachably connected;
the fixing structure comprises a claw structure (201) and two pipe sleeve structures, the two pipe sleeve structures are arranged up and down symmetrically, the two pipe sleeve structures are detachably connected, and the claw structure (201) is arranged on the outer sides of the two pipe sleeve structures;
and each pipe sleeve structure with the fixed structure arranged below is correspondingly provided with one positioning and supporting structure.
2. A thermal conduit support structure as in claim 1, wherein: the pipe sleeve structure comprises a rib plate structure (103), pipe sleeves (102) and a frame body (101) with a hollow interior, wherein the rib plate structure (103) is arranged at the hollow position of the frame body (101), the pipe sleeves (102) are arranged on the frame body (101), and the pipe sleeves (102) of the two pipe sleeve structures are opposite.
3. A thermal conduit support structure as in claim 2, wherein: the rib plate structure (103) comprises three rib plates, the two rib plates are uniformly distributed in the hollow position of the frame body (101), and each rib plate and the frame body (101) are integrally formed.
4. A thermal conduit support structure as in claim 3, wherein: the pipe sleeve (102) and the frame body (101) are integrally formed.
5. A thermal conduit support structure as in any of claims 2-4, wherein: the clamping jaw structure (201) comprises two clamping jaws, wherein one clamping jaw is arranged at the top angle of the outer sides of two frame bodies (101) of the same fixed structure, and the clamping jaw through hole L-shaped connecting plate is detachably connected with the frame bodies (101).
6. A thermal conduit support structure as in claim 5, wherein: the L-shaped connecting plate and the clamping jaw are integrally formed.
7. A thermal conduit support structure as in claim 6, wherein: location bearing structure includes bottom plate (302), can install fixed knot constructs first backup pad (303) and a plurality of second backup pad (301) that can fix a position the pipeline, first backup pad (303) set up bottom plate (302) up end middle part is a plurality of second backup pad (301) are arranged and are set up bottom plate (302) up end is a plurality of second backup pad (301) with first backup pad (303) set up crisscross, each second backup pad (301) all with first backup pad (303) are perpendicular.
8. A thermal conduit support structure as in claim 7, wherein: a first groove (3031) capable of installing a fixing structure is arranged in the middle of the first supporting plate (303).
9. A thermal conduit support structure as in claim 8, wherein: each second backup pad (301) top all is equipped with the second recess that can fix a position the pipeline.
CN201920792983.5U 2019-05-29 2019-05-29 Heating power pipeline supporting structure Expired - Fee Related CN209925768U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920792983.5U CN209925768U (en) 2019-05-29 2019-05-29 Heating power pipeline supporting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920792983.5U CN209925768U (en) 2019-05-29 2019-05-29 Heating power pipeline supporting structure

Publications (1)

Publication Number Publication Date
CN209925768U true CN209925768U (en) 2020-01-10

Family

ID=69092113

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920792983.5U Expired - Fee Related CN209925768U (en) 2019-05-29 2019-05-29 Heating power pipeline supporting structure

Country Status (1)

Country Link
CN (1) CN209925768U (en)

Similar Documents

Publication Publication Date Title
CN204696583U (en) Fire-proof cable bridge rack
CN209925768U (en) Heating power pipeline supporting structure
KR20100011048A (en) Hook for lifting of h-beam
CN107288222A (en) A kind of modular architectural non-corner module level attachment means and connection method
CN208450940U (en) A kind of tool rack of regularization welding production sealing up screw
CN109176844A (en) The side mode and precast concrete mold of precast concrete
CN206058893U (en) Malin's bar resonating tube device for positioning and supporting
CN208457345U (en) A kind of mud tube damping gantry that cooperation steel trestle uses
CN209396033U (en) A kind of unmanned plane foot prop and unmanned plane
CN212986271U (en) Pressure pipeline with supporting structure
CN215367789U (en) Connecting component of steel member
CN207111603U (en) A kind of clamping support
CN213872212U (en) Novel buffer tank base
CN211098960U (en) Microchannel integrated reactor
CN210188900U (en) Vertical circulation type mechanical parking equipment hanging basket shaft assembly assembling and welding device
CN207900977U (en) A kind of fixed frame of Novel workpiece assembly
CN211344252U (en) Indoor warm logical pipe-line equipment
CN214297543U (en) Liquid level meter positioning tool with high accuracy
CN110227901B (en) Vertical circulation type mechanical parking equipment hanging basket shaft assembly assembling and welding device
CN220498210U (en) Positioning tool for welding
CN212070954U (en) Fixed mounting device easy for accurate butt joint of pipelines
CN218000798U (en) Pipeline butt-joint structural in heat supply steam pipeline
CN204036297U (en) The clamping and positioning device that a kind of direction is adjustable
CN211074094U (en) Positioning device for machining prefabricated inner wallboard grouting sleeve
CN210908715U (en) Welding ceramic heating tool

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200110

CF01 Termination of patent right due to non-payment of annual fee