CN209925760U - Bearing device on plant spraying pipe - Google Patents

Bearing device on plant spraying pipe Download PDF

Info

Publication number
CN209925760U
CN209925760U CN201920099391.5U CN201920099391U CN209925760U CN 209925760 U CN209925760 U CN 209925760U CN 201920099391 U CN201920099391 U CN 201920099391U CN 209925760 U CN209925760 U CN 209925760U
Authority
CN
China
Prior art keywords
bearing rod
clamping
bolt
carrier bar
bearing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920099391.5U
Other languages
Chinese (zh)
Inventor
李洁
孙盛
�田�浩
康玉岭
任龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Xinyuan Construction Development Co Ltd
Original Assignee
Tianjin Xinyuan Construction Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Xinyuan Construction Development Co Ltd filed Critical Tianjin Xinyuan Construction Development Co Ltd
Priority to CN201920099391.5U priority Critical patent/CN209925760U/en
Application granted granted Critical
Publication of CN209925760U publication Critical patent/CN209925760U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Clamps And Clips (AREA)

Abstract

The utility model provides a bear device on factory building shower, includes first carrier bar and second carrier bar, and the both ends of first carrier bar and second carrier bar all are equipped with the screw hole, and screw hole female connection has first bolt, and the extreme point department threaded connection of first bolt has first nut, and first nut butt is on the second carrier bar, be equipped with clamping device on the first carrier bar, clamping device will bear the device and fix at the factory building top. The utility model has the advantages of can erect the spray piping suspended in factory building top department.

Description

Bearing device on plant spraying pipe
Technical Field
The utility model relates to a fire-fighting pipeline field especially relates to a bear device on factory building shower.
Background
When the factory building was under construction, in order to accord with national construction standard, all can increase the fire control unit, what adopted at present was that the high altitude sprays the fire control unit, erects spray piping promptly in factory building roof department, but the facility is more on the roof of factory building, and spray piping can not directly erect on the roof.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the technical problem that overcome not enough among the prior art, provide a bear device on the factory building shower, it has can erect the advantage in factory building top department with the shower pipe is suspended.
The utility model discloses a realize through following technical scheme: the utility model provides a bear device on factory building shower, includes first carrier bar and second carrier bar, and the both ends of first carrier bar and second carrier bar all are equipped with the screw hole, and screw hole female connection has first bolt, and the extreme point department threaded connection of first bolt has first nut, and first nut butt is on the second carrier bar, be equipped with clamping device on the first carrier bar, clamping device will bear the device and fix at the factory building top.
Furthermore, a clamping rod is fixed on the second bearing rod.
Furthermore, the clamping device comprises a clamping piece, a second bolt is connected between the clamping piece and the first bearing rod in a threaded mode, a second nut is connected at the end point of the second bolt in a threaded mode and abuts against the first bearing rod, and pad steel is arranged between the first bearing rod and the clamping piece.
Further, the clamping rod is U-shaped.
Furthermore, the surface of the backing steel is provided with anti-skid lines.
Furthermore, the first bearing rod and the second bearing rod are both made of angle steel.
The utility model has the advantages that: can make whole bearing device fix at the factory building top through clamping device at first like this, the factory building top is fixed with the crossbeam usually, can press from both sides tightly on the crossbeam through clamping device, like this alright fix bearing device, establish on the second carrier bar through erectting spray piping again, alright with spray piping unsettled at the factory building top, can conveniently lay spray piping through this bearing device. And the second bearing rod can move on the first bolt by screwing the first nut, so that the height of the second bearing rod can be changed, and the height of the spray pipe can be finely adjusted.
Drawings
Fig. 1 is a schematic front view of the present invention;
in the figure: 1. a first carrier bar; 2. a second carrier bar; 3. a first bolt; 4. a first nut; 5. a clamping lever; 6. a clamping piece; 7. a second bolt; 8. a second nut; 9. steel padding; 10. a cross beam; 11. and (4) a spray pipeline.
Detailed Description
In order to make those skilled in the art better understand the technical solution of the present invention, the present invention will be further described in detail with reference to the accompanying drawings and preferred embodiments.
As shown in the figures, the utility model discloses a first carrier bar 1 and second carrier bar 2, the both ends of first carrier bar 1 and second carrier bar 2 all are equipped with the screw hole, and screw hole female connection has first bolt 3, and the extreme point department threaded connection of first bolt 3 has first nut 4, and 4 butts of first nut are on second carrier bar 2, be equipped with clamping device on first carrier bar 1, clamping device will bear the device and fix at the factory building top.
The utility model has the advantages that: can make whole bearing device fix at the factory building top through clamping device at first like this, the factory building top is fixed with crossbeam 10 usually, can press from both sides tightly on crossbeam 10 through clamping device, like this alright fix bearing device, erect on second carrier bar 2 through spraying pipe 11 again, alright with spraying pipe 11 unsettled at the factory building top, can conveniently lay spraying pipe 11 through this bearing device. And the second bearing rod 2 can move on the first bolt 3 by screwing the first nut 4, so that the height of the second bearing rod 2 can be changed, and the height of the shower pipe can be finely adjusted.
Further, a clamping rod 5 is fixed on the second bearing rod 2. When the spray pipe 11 is erected on the second bearing rod 2, the spray pipe 11 can be fixed through the clamping rod 5, and the displacement of the spray pipe 11 is prevented.
Further, the clamping device comprises a clamping piece 6, a second bolt 7 is connected between the clamping piece 6 and the first bearing rod 1 in a threaded mode, a second nut 8 is connected at the end point of the second bolt 7 in a threaded mode, the second nut 8 abuts against the first bearing rod 1, and a cushion steel 9 is arranged between the first bearing rod 1 and the clamping piece 6. By tightening the second bolt 7 and the second nut 8, the clamping force between the clamping piece 6 and the first support bar 1 can be increased and clamped to the cross beam 10. And because there is crossbeam 10 between clamping piece 6 and the first carriage bar 1, so can produce the gap, can fill up between clamping piece 6 and first carriage bar 1 through the shim steel 9 at this moment, can make second bolt 7 tighten on clamping piece 6 and thus increase the clamp force, prevent the unbalance of power.
Further, the clamping rod 5 is U-shaped. Can be attached to the spray pipeline 11 as much as possible, so that the fixing effect is improved.
Furthermore, the surface of the backing steel 9 is provided with anti-skid lines. The friction force between the clamping piece 6 and the first bearing rod 1 is increased, and the backing steel 9 is prevented from falling off.
Furthermore, the first bearing rod 1 and the second bearing rod 2 both adopt angle steel. The angle steel has high strength and can increase the bearing strength.
The foregoing is only a preferred embodiment of the present invention, and it should be noted that, for those skilled in the art, a plurality of modifications and decorations can be made without departing from the principle of the present invention, and these modifications and decorations should also be regarded as the protection scope of the present invention.

Claims (6)

1. The utility model provides a bear device on factory building shower, its characterized in that: the bearing device comprises a first bearing rod and a second bearing rod, wherein threaded holes are formed in the two ends of the first bearing rod and the two ends of the second bearing rod, a first bolt is connected with the threaded holes in an inner thread mode, a first nut is connected with the end point of the first bolt in a threaded mode, the first nut is abutted to the second bearing rod, a clamping device is arranged on the first bearing rod, and the clamping device fixes the bearing device at the top of a workshop.
2. The carrying device on the plant spraying pipe of claim 1, characterized in that: and a clamping rod is fixed on the second bearing rod.
3. The carrying device on the plant spraying pipe of claim 1, characterized in that: the clamping device comprises a clamping piece, a second bolt is connected between the clamping piece and the first bearing rod in a threaded mode, a second nut is connected to the end point of the second bolt in a threaded mode and abuts against the first bearing rod, and pad steel is arranged between the first bearing rod and the clamping piece.
4. The carrying device on the plant spraying pipe of claim 2 is characterized in that: the clamping rod is U-shaped.
5. The carrying device on the plant spraying pipe of claim 3 is characterized in that: the surface of the cushion steel is provided with anti-skid grains.
6. The carrying device on the plant spraying pipe of claim 1, characterized in that: the first bearing rod and the second bearing rod are both made of angle steel.
CN201920099391.5U 2019-01-22 2019-01-22 Bearing device on plant spraying pipe Active CN209925760U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920099391.5U CN209925760U (en) 2019-01-22 2019-01-22 Bearing device on plant spraying pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920099391.5U CN209925760U (en) 2019-01-22 2019-01-22 Bearing device on plant spraying pipe

Publications (1)

Publication Number Publication Date
CN209925760U true CN209925760U (en) 2020-01-10

Family

ID=69067028

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920099391.5U Active CN209925760U (en) 2019-01-22 2019-01-22 Bearing device on plant spraying pipe

Country Status (1)

Country Link
CN (1) CN209925760U (en)

Similar Documents

Publication Publication Date Title
CN204343650U (en) Regularization outrigger wall-connecting piece through walls
CN105650355A (en) Inclined bracing multi-tube gantry hanging bracket
CN201712043U (en) Adjustable protection cage of a construction site circular saw
CN209925760U (en) Bearing device on plant spraying pipe
CN203248848U (en) Pipeline clamp
CN204852619U (en) Can have enough to meet need pump line fixing device of use
CN104790567A (en) Flexible connecting system, external wall panel and external wall plate installing node
CN204112729U (en) Pipe well inner sleeve reserves fixed support
CN201187172Y (en) Bidirectional velocity-adjustable single arm cable railway support
CN206477582U (en) Formwork reinforcement keel fastener constructions
CN103151752A (en) General lightning arrester bracket
CN207049449U (en) A kind of antidetonation vibration isolation support
CN206817291U (en) A kind of holder device for fixing light fixture part on steel member
CN210462127U (en) Sleeve supporting component for pipe position
CN212107205U (en) Water conservancy pipeline supports connection structure
CN204152186U (en) Wall-connecting piece
CN204057560U (en) Be attached to attached wall connection structure in the jacking system of section
CN203797162U (en) Small-gap adjustable pipeline support device
CN204571013U (en) Node installed by a kind of Flexible connection system, side fascia and side fascia
CN211371475U (en) Subway tunnel interior fire-fighting pipe combination fixed bolster
CN107101047A (en) A kind of Suspenoing apparatus para-seismic support
CN203729587U (en) Horizontal tie fixing device of high-low spanned side die of building structure
CN214836065U (en) Cat ladder strutting arrangement with adjustable large-scale wind generating set length
CN204704489U (en) Pipeline staggered floor supporting structure
CN202176582U (en) Hoop coupling member

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant