CN209924395U - Scaffold for building construction - Google Patents

Scaffold for building construction Download PDF

Info

Publication number
CN209924395U
CN209924395U CN201920282693.6U CN201920282693U CN209924395U CN 209924395 U CN209924395 U CN 209924395U CN 201920282693 U CN201920282693 U CN 201920282693U CN 209924395 U CN209924395 U CN 209924395U
Authority
CN
China
Prior art keywords
scaffold
construction
fixedly mounted
motor
rods
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920282693.6U
Other languages
Chinese (zh)
Inventor
肖丽丽
杜昆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian Fanyi University
Original Assignee
Xian Fanyi University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian Fanyi University filed Critical Xian Fanyi University
Priority to CN201920282693.6U priority Critical patent/CN209924395U/en
Application granted granted Critical
Publication of CN209924395U publication Critical patent/CN209924395U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model discloses a scaffold for building construction, which comprises four support rods and four bases, wherein the surfaces of the four support rods are all provided with a chute, the top ends of the four support rods are fixedly provided with four support plates, the insides of two corresponding first preformed holes are all fixedly provided with installation rods, a guardrail is fixedly arranged between the two installation rods, a bottom plate is fixedly arranged between two corresponding second preformed holes, two sides of the top ends of a plurality of bottom plates are both fixedly provided with fixed plates through bolts, the outer side of one fixed plate is fixedly provided with a crawling ladder, the scaffold for building construction has simple structure and rapid and convenient assembly, the pressure of the support rods is reduced by arranging an expansion sleeve in the base, a connecting rod is arranged between the support rods, the support rods are prevented from being greatly deformed due to being pressed, and a hanging basket is driven by a motor to move up and down by arranging the motor, convenient quick material loading greatly improves work efficiency.

Description

Scaffold for building construction
Technical Field
The utility model relates to a scaffold, in particular to scaffold for construction.
Background
The scaffold is a device widely applied in the field of building construction. When the building construction, through the equipment of many scaffold horizontal poles and many scaffold montants, can form frame construction's scaffold, the constructor of being convenient for construction of standing.
The existing scaffold needs to be locked through a connecting fastener and a bolt. Such structure, it is not hard up when the in use atress is too big easily, and the dismouting is all very loaded down with trivial details moreover, and efficiency is influenced, when the construction number is too much or construction material is too much on the scaffold, can lead to the support frame bottom to be crooked, has certain potential safety hazard, passes through artifical material loading mostly when carrying out the material loading, and artifical material loading is wasted time and energy, and work efficiency is low.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a scaffold for construction to solve the current loaded down with trivial details resistance to compression of scaffold dismouting that proposes among the above-mentioned background art problem that wastes time and energy with artifical material loading.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a scaffold for construction, includes four spinal branch vaulting poles and four bases, four the bottom of bracing piece respectively with four corresponding base fixed connection, four the spout has all been seted up on the surface of bracing piece, four the top fixed mounting of bracing piece has four backup pads, corresponding two set up the first preformed hole of a plurality of and a plurality of second preformed hole in the backup pad respectively, wherein two are corresponding the equal fixed mounting in inside of first preformed hole has the installation pole, two fixed mounting has the guardrail between the installation pole, wherein two are corresponding fixed mounting has a bottom plate, a plurality of between the second preformed hole the both sides on bottom plate top all have the fixed plate through bolt fixed mounting, one of them the outside fixed mounting of fixed plate has the cat ladder.
As a preferred technical scheme of the utility model, four the inside middle part of base all alternates and is connected with the baffle, four the top of baffle is the fixed sleeve that is equipped with all, four the sleeve is connected with the bottom of four corresponding bracing pieces respectively, four the bottom of baffle is through the bottom fixed connection of a plurality of telescope tube and base.
As an optimized technical scheme of the utility model, a plurality of telescopic sleeve's the equal fixed mounting in inside has compression spring.
As an optimal technical scheme of the utility model, wherein corresponding two all there is the connecting rod through a plurality of fastening screw fixed mounting between the spout.
As an optimal technical scheme of the utility model, another the top fixed mounting of fixed plate has the motor, fixed mounting has the receipts line roller on the output shaft of motor, the inboard winding of receiving the line roller has a plurality of steel wire line, the one end fixed mounting of steel wire line has the hanging flower basket.
As a preferred technical scheme of the utility model, one of them the outside fixed mounting of bracing piece has motor control button, the motor passes through motor control button and external power supply electric connection.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model relates to a scaffold for construction, simple structure, the assembly is swiftly convenient, through setting up the telescope tube in base inside, slows down the pressure of bracing piece, sets up the connecting rod between the bracing piece, prevents that the bracing piece from being pressed too big emergence deformation, through setting up the motor, the motor drives the hanging flower basket up-and-down motion, and convenient quick material loading greatly improves work efficiency.
Drawings
Fig. 1 is a schematic front structural view of the present invention;
FIG. 2 is a schematic side view of the present invention;
fig. 3 is a schematic top view of the present invention;
fig. 4 is a schematic view of the internal structure of the base of the present invention.
In the figure: 1. a support bar; 2. a base; 3. a chute; 4. a connecting rod; 5. fastening screws; 6. a first preformed hole; 7. mounting a rod; 8. a guardrail; 9. a motor; 10. a wire take-up roller; 11. a hanging basket; 12. a telescopic sleeve; 13. a compression spring; 14. a baffle plate; 15. a sleeve; 16. a second preformed hole; 17. climbing a ladder; 18. a base plate; 19. a fixing plate; 20. and (4) bolts.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the utility model provides a construction frame for building construction, comprising four support rods 1 and four bases 2, wherein the bottom ends of the four support rods 1 are respectively fixedly connected with the corresponding four bases 2, the surfaces of the four support rods 1 are respectively provided with a chute 3, the top ends of the four support rods 1 are fixedly provided with four support plates, the corresponding two support plates are respectively provided with a plurality of first preformed holes 6 and a plurality of second preformed holes 16, wherein the insides of two corresponding first preformed holes 6 are fixedly provided with mounting rods 7, a guardrail 8 is fixedly arranged between the two mounting rods 7, a bottom plate 18 is fixedly installed between two corresponding second preformed holes 16, fixing plates 19 are fixedly installed on two sides of the top ends of the plurality of bottom plates 18 through bolts 20, and a ladder stand 17 is fixedly installed on the outer side of one fixing plate 19.
Preferably, the inside middle part of four bases 2 all alternates and is connected with baffle 14, and the top of four baffles 14 is all fixed and is equipped with sleeve 15, and four sleeves 15 are connected with four corresponding bracing pieces 1's bottom respectively, and the bottom of four baffles 14 is through the bottom fixed connection of a plurality of telescope tube 12 with base 2, slows down bracing piece 1 pressure of giving through the telescope tube 12 that is equipped with, alleviates base 2's load.
Preferably, the compression springs 13 are fixedly mounted inside the plurality of telescopic sleeves 12, and the compression springs 13 improve the elastic performance of the telescopic sleeves 12 and better reduce pressure.
Preferably, wherein all there is connecting rod 4 through 5 fixed mounting of a plurality of fastening screw between two corresponding spouts 3, prevents through being equipped with connecting rod 4 that the load of bracing piece 1 top is too big, leads to bracing piece 1 to take place to deform, causes certain incident.
Preferably, the top end of the other fixing plate 19 is fixedly provided with a motor 9, an output shaft of the motor 9 is fixedly provided with a wire take-up roller 10, the inner side of the wire take-up roller 10 is wound with a plurality of steel wires, one end of each steel wire is fixedly provided with a hanging basket 11, and the hanging baskets 11 are arranged to reduce the workload of workers, so that the feeding is simpler and faster, and the working efficiency is improved.
Preferably, a motor control button is fixedly mounted on the outer side of one of the support rods 1, the motor 9 is electrically connected with an external power supply through the motor control button, and the external power supply provides electric power support for the motor 9, so that the motor 9 works normally.
When the scaffold for building construction is used, before the scaffold is used, the bottom end of a support rod 1 is embedded into a sleeve 15 on a baffle 14, the scaffold is fixed and stable, two ends of a connecting rod 4 slide up and down, a proper included angle is adjusted, the stability of the scaffold is improved, two ends of the connecting rod 4 are fixedly connected with a chute 3 by fastening screws 5, a bottom plate 18 is arranged inside a second reserved hole 16 and is fixed by a fixing plate 19 through bolts 20, an installation rod 7 is arranged inside a first reserved hole 6, a guardrail 8 is arranged between the installation rods 7, accidents of workers are prevented, construction articles are placed inside a hanging basket 11, a motor control button is pressed, a motor 9 starts to work, an output shaft of the motor 9 drives a wire receiving roller 10 to rotate, a steel wire drives the hanging basket 11 to quickly lift up, quick feeding is carried out, time and labor are saved, when the top pressure of the support rod 1 is too high, connecting rod 4 gives with the pulling force, prevents that bracing piece 1 from taking place deformation, and the accident appears, bracing piece 1 transmits pressure to baffle 14, and baffle 14 downstream makes telescope tube 12 shrink, leads to compression spring 13 to contract, slows down the pressure of bracing piece 1.
In the description of the present invention, it should be understood that the indicated orientation or positional relationship is based on the orientation or positional relationship shown in the drawings, and is only for convenience of description and simplification of description, and does not indicate or imply that the indicated device or element must have a particular orientation, be constructed and operated in a particular orientation, and thus should not be construed as limiting the present invention.
In the present invention, unless otherwise explicitly specified or limited, for example, it may be fixedly connected, detachably connected, or integrated; can be mechanically or electrically connected; they may be directly connected or indirectly connected through an intermediate medium, and may be connected through the inside of two elements or in an interaction relationship between two elements, unless otherwise specifically defined, and the specific meaning of the above terms in the present invention will be understood by those skilled in the art according to specific situations.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. A construction frame for building construction comprises four supporting rods (1) and four bases (2), and is characterized in that the bottom ends of the four supporting rods (1) are fixedly connected with the four corresponding bases (2) respectively, sliding grooves (3) are formed in the surfaces of the four supporting rods (1), four supporting plates are fixedly mounted at the top ends of the four supporting rods (1), a plurality of first preformed holes (6) and a plurality of second preformed holes (16) are formed in the corresponding two supporting plates respectively, mounting rods (7) are fixedly mounted in the corresponding first preformed holes (6), a guardrail (8) is fixedly mounted between the two mounting rods (7), a bottom plate (18) is fixedly mounted between the corresponding second preformed holes (16), fixing plates (19) are fixedly mounted on two sides of the top end of the bottom plate (18) through bolts (20), a ladder (17) is fixedly arranged on the outer side of one of the fixing plates (19).
2. A scaffold for construction as claimed in claim 1, wherein: four the inside middle part of base (2) all alternates and is connected with baffle (14), four the top of baffle (14) is all fixed and is equipped with sleeve (15), four sleeve (15) are connected with the bottom of four corresponding bracing pieces (1) respectively, four the bottom of baffle (14) is through the bottom fixed connection of a plurality of telescope tube (12) and base (2).
3. A scaffold for construction as claimed in claim 2, wherein: and compression springs (13) are fixedly arranged in the telescopic sleeves (12).
4. A scaffold for construction as claimed in claim 1, wherein: wherein a connecting rod (4) is fixedly arranged between the two corresponding sliding chutes (3) through a plurality of fastening screws (5).
5. A scaffold for construction as claimed in claim 1, wherein: and a motor (9) is fixedly mounted at the top end of the other fixing plate (19), a wire take-up roller (10) is fixedly mounted on an output shaft of the motor (9), a plurality of steel wires are wound on the inner side of the wire take-up roller (10), and a hanging basket (11) is fixedly mounted at one end of each steel wire.
6. A scaffold for construction as claimed in claim 1, wherein: one of them the outside fixed mounting of bracing piece (1) has motor control button, motor (9) pass through motor control button and external power electric connection.
CN201920282693.6U 2019-03-06 2019-03-06 Scaffold for building construction Expired - Fee Related CN209924395U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920282693.6U CN209924395U (en) 2019-03-06 2019-03-06 Scaffold for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920282693.6U CN209924395U (en) 2019-03-06 2019-03-06 Scaffold for building construction

Publications (1)

Publication Number Publication Date
CN209924395U true CN209924395U (en) 2020-01-10

Family

ID=69069546

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920282693.6U Expired - Fee Related CN209924395U (en) 2019-03-06 2019-03-06 Scaffold for building construction

Country Status (1)

Country Link
CN (1) CN209924395U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112854701A (en) * 2021-01-15 2021-05-28 施明娣 But height-adjusting's stable form engineering construction scaffold
CN114809559A (en) * 2022-04-27 2022-07-29 安徽捷创晟建筑工程有限公司 Use firm assembled construction frame

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112854701A (en) * 2021-01-15 2021-05-28 施明娣 But height-adjusting's stable form engineering construction scaffold
CN114809559A (en) * 2022-04-27 2022-07-29 安徽捷创晟建筑工程有限公司 Use firm assembled construction frame

Similar Documents

Publication Publication Date Title
CN209924395U (en) Scaffold for building construction
CN109577485B (en) Steel structure net rack
CN110844798B (en) Stable lifting mechanism for steel for electric power iron tower construction
CN212317658U (en) Safety net rail mount that construction used
CN211257774U (en) Assembly type building external hanging platform
CN111792557A (en) Outer quick-witted suspension mechanism of air conditioner
CN216406364U (en) Telegraph pole righting device
CN212743482U (en) Electric power engineering construction is with device of rectifying
CN106452307B (en) A kind of anti-dust accumulation photovoltaic panel
CN212689635U (en) Anti-falling device for building construction
CN214169682U (en) Lightning protection fulcrum mounting structure for housing construction
CN211666402U (en) Telegraph pole inclination correcting device for electric power engineering construction
CN211549090U (en) On-spot safety device for construction
CN208267523U (en) A kind of adjustable prestressed electric wire pole
CN112059061A (en) Bending mechanism with gravity pressurizing mechanism for processing reinforcing steel bars
CN207339750U (en) A kind of photovoltaic battery plate fixing bracket
CN211818552U (en) Safety barrier is used in construction of building outer wall
CN219060823U (en) Operation platform
CN211313028U (en) Assembled building floor support plate support die
CN112049394A (en) Noise reduction type building construction platform
CN221072993U (en) Spliced steel structure frame
CN214942222U (en) Climbing frame equipment convenient to install
CN213209022U (en) Steel construction gradient detection device
CN218843707U (en) Building construction protection network
CN208585939U (en) Large-scale hydroelectric generator rotor lifting plate workbench

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200110

Termination date: 20210306

CF01 Termination of patent right due to non-payment of annual fee