CN209915324U - Building engineering management comprehensive operation platform - Google Patents

Building engineering management comprehensive operation platform Download PDF

Info

Publication number
CN209915324U
CN209915324U CN201920078505.8U CN201920078505U CN209915324U CN 209915324 U CN209915324 U CN 209915324U CN 201920078505 U CN201920078505 U CN 201920078505U CN 209915324 U CN209915324 U CN 209915324U
Authority
CN
China
Prior art keywords
fixedly connected
building engineering
box
engineering management
lifting rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920078505.8U
Other languages
Chinese (zh)
Inventor
付军平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201920078505.8U priority Critical patent/CN209915324U/en
Application granted granted Critical
Publication of CN209915324U publication Critical patent/CN209915324U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Devices That Are Associated With Refrigeration Equipment (AREA)

Abstract

The utility model discloses an operation panel is synthesized in building engineering management relates to building engineering operation panel technical field, this operation panel is synthesized in building engineering management, including the bearing platform, the top fixedly connected with control box of bearing platform, the louvre has been seted up to one side of control box, louvre fixedly connected with dust screen, the middle part fixedly connected with hydraulic lifting rod of control box one side is kept away from to the bearing platform, the one end fixedly connected with base of bearing platform is kept away from to hydraulic lifting rod, one side fixedly connected with gyro wheel of hydraulic lifting rod is kept away from to the base. This operation panel is synthesized in building engineering management is through installing hydraulic lifting rod in the mounting groove for hydraulic lifting rod's installation is more accurate, and through setting up the shock pad in mounting groove inside, can effectively reduce the vibrations when removing and using and to the device's harm, has effectively improved the device's result of use, has improved the device's practicality.

Description

Building engineering management comprehensive operation platform
Technical Field
The utility model relates to a building engineering operation panel technical field specifically is a building engineering management synthesizes operation panel.
Background
The building engineering refers to an engineering entity formed by the construction of various building constructions and their auxiliary facilities and the installation of lines, pipelines and equipment matched with them. Building engineering management integrated operation panel is a device that uses the computer to carry out equipment control, inner frame deepens and places purpose-made optional, a large amount of computer host computers or other equipment for the increase and provides the possibility, inside sets up multifunctional cable management system simultaneously, realize strong and weak electricity separately, the functionality is stronger, but the height of current operation panel can not be adjusted, the operator need bend over the waist and operate, it is not very good to operator's health like this, and the people of different heights are also different to the altitude mixture requirement of operation panel, current operation panel has the defect that the practicality is low, consequently, need improve.
At present, the existing comprehensive operation table for building engineering management is inconvenient to use and is not beneficial to popularization and use.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a building engineering management synthesizes operation panel has solved current building engineering management of being used for and has synthesized operation panel, uses inconveniently, is unfavorable for the problem of using widely.
(II) technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes:
a building engineering management comprehensive operation platform comprises a bearing platform, wherein an operation box is fixedly connected to the top of the bearing platform, heat dissipation holes are formed in one side of the operation box, a dust screen is fixedly connected to the heat dissipation holes, a hydraulic lifting rod is fixedly connected to the middle of one side, away from the operation box, of the bearing platform, a base is fixedly connected to one end, away from the bearing platform, of the hydraulic lifting rod, a roller is fixedly connected to one side, away from the hydraulic lifting rod, of the base, a screw hole is formed in the edge of the base, a fixing rod is connected to the screw hole in a threaded mode, and a fixing plate is fixedly;
a refrigeration box is fixedly connected to one side, away from the operation box, of the bearing table, an air cooler is fixedly connected to the interior of the refrigeration box, and a ventilation pipe is fixedly connected to one end of the air cooler;
the inner wall of the operation box is fixedly connected with an annular pipeline, the annular pipeline is provided with an air outlet pipe, and the air outlet pipe is movably connected with a baffle;
one end of the bearing platform, which is close to the refrigeration box, is provided with a through hole.
Optionally, the number of louvres and dust screen is two, the louvre has all been seted up to the both sides of control box, the equal fixedly connected with dust screen of two louvres, two dust screens all are through screw and control box fixed connection.
Optionally, a through hole is formed in one side of the operation box, and the ventilation pipe penetrates through the through hole and is fixedly connected with the annular pipeline.
Optionally, the ventilation pipe penetrates through the through hole, and one end, far away from the air cooler, of the ventilation pipe is fixedly connected with the annular pipeline.
Optionally, a mounting groove is formed in the middle of the top of the base, and a shock pad is fixedly connected to the bottom of the mounting groove.
Optionally, the inside fixedly connected with hydraulic lifting rod of mounting groove, the bottom of hydraulic lifting rod and the top fixed connection of shock pad.
(III) advantageous effects
The utility model provides a building engineering management synthesizes operation panel possesses following beneficial effect:
(1) the comprehensive operation platform for building engineering management can ensure that the height of the operation platform arranged on the bearing platform can be freely adjusted through the hydraulic lifting rod, an operator does not need to bend over to operate when the comprehensive operation platform is used, the height requirement of personnel with different heights on the operation platform can be met, the injury to the body of the operator caused by long-time bending over to the waist can be avoided, the use effect of the device is effectively improved, the practicability of the device is improved, on the other hand, the hydraulic lifting rod is installed in the installation groove, the installation of the hydraulic lifting rod is more accurate, the damage of vibration to the device when the comprehensive operation platform is moved and used can be effectively reduced through the shock absorption pad arranged in the installation groove, the use effect of the device is effectively improved, the practicability of the device is improved, and the heat dissipation effect of the device can be effectively improved through the matching between the heat dissipation holes and the dust screen, the use of the device is prevented from being influenced by the overhigh temperature in the operation box, external dust can be effectively prevented from entering the operation box, the device is damaged, and the practicability of the device is effectively improved.
(2) This building engineering management synthesizes operation panel, on the one hand through setting up the air-cooler in the refrigerator box portion, open the air-cooler when the inside high temperature of operation box to in sending cold wind to the annular duct through the ventilation pipe, then blow off from going out the tuber pipe and cool down the operation box, can effectively reduce the inside temperature of operation box, improve the device's work efficiency, effectively improved the device's result of use, improved the device's practicality.
Drawings
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic structural view of the refrigeration box of the present invention;
FIG. 3 is a schematic structural view of the operation box of the present invention;
fig. 4 is a cross-sectional view of the base of the present invention.
In the figure: 1-bearing table, 2-operation box, 3-heat dissipation holes, 4-dust screen, 5-hydraulic lifting rod, 6-base, 7-roller, 8-screw hole, 9-fixing rod, 10-fixing plate, 11-refrigeration box, 12-air cooler, 13-ventilation pipe, 14-annular pipe, 15-air outlet pipe, 16-baffle, 17-through hole, 18-installation groove and 19-shock pad.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", "axial", "radial", "circumferential", and the like, indicate the orientation or positional relationship indicated based on the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
In the present invention, unless otherwise expressly stated or limited, the terms "disposed," "mounted," "connected," and "fixed" are to be construed broadly, e.g., as meaning either a fixed connection or a removable connection; may be a mechanical connection; may be directly connected or indirectly connected through an intermediate. The specific meaning of the above terms in the present invention can be understood according to specific situations by those skilled in the art.
Referring to fig. 1-4, the present invention provides a technical solution:
a building engineering management comprehensive operation platform comprises a bearing platform 1, an operation box 2 is fixedly connected to the top of the bearing platform 1, a heat dissipation hole 3 is formed in one side of the operation box 2, a dust screen 4 is fixedly connected to the heat dissipation hole 3, the heat dissipation effect of the device can be effectively improved through the cooperation between the heat dissipation hole 3 and the dust screen 4, the influence of overhigh temperature in the operation box 2 on the use of the device is avoided, external dust can be effectively prevented from entering the operation box 2 to damage the device, the practicability of the device is effectively improved, a hydraulic lifting rod 5 is fixedly connected to the middle of one side, away from the operation box 2, of the bearing platform 1, on one hand, the height of the operation platform 2 arranged on the bearing platform 1 can be freely adjusted through the hydraulic lifting rod 5, an operator does not need to bend over to operate during use, and the height requirements of personnel with different heights on the operation platform can be met, the injury to the body of an operator caused by long-time bending down and waist bending operation is avoided, the using effect of the device is effectively improved, and the practicability of the device is improved, one end of the hydraulic lifting rod 5, which is far away from the bearing table 1, is fixedly connected with a base 6, one side of the base 6, which is far away from the hydraulic lifting rod 5, is fixedly connected with a roller 7, the edge of the base 6 is provided with a screw hole 8, the screw hole 8 is in threaded connection with a fixed rod 9, and the bottom of the fixed rod 9 is fixedly connected with a fixed plate 10;
one side, far away from the operation box 2, of the bearing platform 1 is fixedly connected with a refrigeration box 11, the interior of the refrigeration box 11 is fixedly connected with an air cooler 12, one end of the air cooler 12 is fixedly connected with a ventilation pipe 13, on one hand, the air cooler 12 is opened through the air cooler 12 arranged inside the refrigeration box 11 when the temperature inside the operation box 2 is too high, cold air is sent into an annular pipeline 14 through the ventilation pipe 13, and then the air is blown out from an air outlet pipe 15 to cool the operation box 2, so that the temperature inside the operation box 2 can be effectively reduced, the working efficiency of the device is improved, the using effect of the device is effectively improved, and the practicability of the device is improved;
the inner wall of the operation box 2 is fixedly connected with an annular pipeline 14, the annular pipeline 14 is provided with an air outlet pipe 15, and the air outlet pipe 15 is movably connected with a baffle 16;
one end of the bearing platform 1 close to the refrigeration box 11 is provided with a through hole 17.
As an optional technical solution of the utility model:
louvre 3 and dust screen 4's quantity is two, and louvre 3 has all been seted up to the both sides of control box 2, and two equal fixedly connected with dust screens 4 of louvre 3, two dust screens 4 all through screw and 2 fixed connection of control box.
As an optional technical solution of the utility model:
one side of the operation box 2 is provided with a through hole 17, and the ventilation pipe 13 penetrates through the through hole 17 and is fixedly connected with the annular pipeline 14.
As an optional technical solution of the utility model:
the ventilation pipe 13 penetrates through the through hole 17, and one end, far away from the air cooler 12, of the ventilation pipe 13 is fixedly connected with the annular pipeline 14.
As an optional technical solution of the utility model:
mounting groove 18 has been seted up at the middle part at 6 tops of base, and according to the bottom fixedly connected with shock pad 19 of mounting groove 18, on the other hand is through installing hydraulic lifting rod 5 in mounting groove 18 for hydraulic lifting rod 5's installation is more accurate, and through setting up at the inside shock pad 19 of mounting groove 18, can effectively reduce the vibrations when removing and using the harm to the device, has effectively improved the device's result of use, has improved the device's practicality.
As an optional technical solution of the utility model:
the inside fixedly connected with hydraulic lifting rod 5 of mounting groove 18, the bottom of hydraulic lifting rod 5 and the top fixed connection of shock pad 19.
The electrical components presented in the document are all electrically connected with an external master controller and 220V mains, and the master controller can be a conventional known device controlled by a computer or the like.
To sum up, when the building engineering management comprehensive operation platform is used, a user can freely adjust the height of the operation platform 2 arranged on the bearing platform 1 through the hydraulic lifting rod 5 on one hand, does not need an operator to bend over to operate when the operation platform is used, can meet the height requirements of personnel with different heights on the operation platform, avoids the harm to the body of the operator caused by long-time bending over to the waist, effectively improves the use effect of the device, improves the practicability of the device, on the other hand, the installation of the hydraulic lifting rod 5 is more accurate by installing the hydraulic lifting rod 5 in the installation groove 18, and the damage to the heat dissipation holes of the device caused by vibration during moving and using can be effectively reduced through the shock absorption pad 19 arranged in the installation groove 18, effectively improves the use effect of the device, improves the practicability of the device, and through the matching between the dust screen 3 and the dust screen 4, can effectively improve the device's radiating effect, avoid the too high use that influences the device of 2 inside high temperatures of control box, and can effectively avoid external dust to get into inside 2 of control box, cause the harm to the device, the device's practicality has effectively been improved, on the one hand through setting up air-cooler 12 in 11 inside of refrigerator-freezer, open air-cooler 12 when 2 inside high temperatures of control box, and send cold wind to the annular duct 14 in through ventilation pipe 13, then blow off from going out tuber pipe 15 and cool down to control box 2, can effectively reduce the inside temperature of control box 2, the device's work efficiency is improved, the device's result of use has effectively been improved, the device's practicality has been improved.
It is noted that in the present disclosure, unless otherwise explicitly specified or limited, a first feature "on" or "under" a second feature may be directly contacting the first and second features or indirectly contacting the first and second features through an intermediate. Also, a first feature "on," "over," and "above" a second feature may be directly or diagonally above the second feature, or may simply indicate that the first feature is at a higher level than the second feature. A first feature being "under," "below," and "beneath" a second feature may be directly under or obliquely under the first feature, or may simply mean that the first feature is at a lesser elevation than the second feature.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The utility model provides a building engineering management integrated operation platform, includes bearing platform (1), its characterized in that:
an operation box (2) is fixedly connected to the top of the bearing table (1), a heat dissipation hole (3) is formed in one side of the operation box (2), a dust screen (4) is fixedly connected to the heat dissipation hole (3), a hydraulic lifting rod (5) is fixedly connected to the middle of one side, away from the operation box (2), of the bearing table (1), a base (6) is fixedly connected to one end, away from the bearing table (1), of the hydraulic lifting rod (5), a roller (7) is fixedly connected to one side, away from the hydraulic lifting rod (5), of the base (6), a screw hole (8) is formed in the edge of the base (6), a fixing rod (9) is in threaded connection with the screw hole (8), and a fixing plate (10) is fixedly connected to the bottom of the;
a refrigerating box (11) is fixedly connected to one side, far away from the operating box (2), of the bearing table (1), an air cooler (12) is fixedly connected to the inside of the refrigerating box (11), and one end of the air cooler (12) is fixedly connected with a ventilation pipe (13);
the inner wall of the operation box (2) is fixedly connected with an annular pipeline (14), the annular pipeline (14) is provided with an air outlet pipe (15), and the air outlet pipe (15) is movably connected with a baffle plate (16);
one end of the bearing platform (1) close to the refrigeration box (11) is provided with a through hole (17).
2. The integrated operation desk for building engineering management according to claim 1, wherein:
the number of louvre (3) and dust screen (4) is two, louvre (3) have all been seted up to the both sides of control box (2), two equal fixedly connected with dust screens (4) of louvre (3), two dust screens (4) are all through screw and control box (2) fixed connection.
3. The integrated operation desk for building engineering management according to claim 1, wherein:
one side of the operation box (2) is provided with a through hole (17), and the ventilation pipe (13) penetrates through the through hole (17) and is fixedly connected with the annular pipeline (14).
4. The integrated operation desk for building engineering management according to claim 1, wherein:
the ventilation pipe (13) penetrates through the through hole (17), and one end, far away from the air cooler (12), of the ventilation pipe (13) is fixedly connected with the annular pipeline (14).
5. The integrated operation desk for building engineering management according to claim 1, wherein:
the middle part of base (6) top has seted up mounting groove (18), the bottom fixedly connected with shock pad (19) of mounting groove (18).
6. The integrated operation desk for building engineering management according to claim 5, wherein:
the inside fixedly connected with hydraulic pressure lifter (5) of mounting groove (18), the top fixed connection of the bottom and shock pad (19) of hydraulic pressure lifter (5).
CN201920078505.8U 2019-01-17 2019-01-17 Building engineering management comprehensive operation platform Expired - Fee Related CN209915324U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920078505.8U CN209915324U (en) 2019-01-17 2019-01-17 Building engineering management comprehensive operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920078505.8U CN209915324U (en) 2019-01-17 2019-01-17 Building engineering management comprehensive operation platform

Publications (1)

Publication Number Publication Date
CN209915324U true CN209915324U (en) 2020-01-10

Family

ID=69067155

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920078505.8U Expired - Fee Related CN209915324U (en) 2019-01-17 2019-01-17 Building engineering management comprehensive operation platform

Country Status (1)

Country Link
CN (1) CN209915324U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112621915A (en) * 2020-12-04 2021-04-09 广东九潮建设有限公司 Dustless cutting device of fitment

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112621915A (en) * 2020-12-04 2021-04-09 广东九潮建设有限公司 Dustless cutting device of fitment

Similar Documents

Publication Publication Date Title
CN209915324U (en) Building engineering management comprehensive operation platform
CN115207798B (en) Electric control cabinet with liftable and self-water-guiding type cabinet top cover
CN214945175U (en) Heat dissipation mounting bracket based on air conditioner computer board control structure
CN211701049U (en) Heat abstractor of electromechanical control cabinet
CN212876458U (en) Heat dissipation device for power cabinet
CN105119169B (en) Outdoor portable power substation
CN212752833U (en) Electric automatic control system equipment
CN201289994Y (en) Mobile cable communication windbox
CN205609318U (en) Top is provided with cooling fan's transformer cabinet body
CN206388130U (en) A kind of efficient computer heat radiating device
CN212970393U (en) Electrical cabinet convenient to disassemble
CN214506171U (en) Multi-meter-position metering box convenient to install
CN221702572U (en) Non-negative pressure water supply control system
CN218630658U (en) Self-cooling machine case of computer
CN212876502U (en) Big data basis gathers auxiliary device
CN212408168U (en) Portable weak current computer lab debugging bracket
CN213786012U (en) Liftable computer desk
CN220754157U (en) Capacitance compensation box convenient to overhaul
CN213755538U (en) Energy-saving heat-dissipation exhaust device for communication machine room
CN111261371A (en) Multifunctional transformer box
CN113937732B (en) Multi-functional high overload distribution transformer's segmentation protection device
CN210148438U (en) Wall body trompil device for construction
CN213690420U (en) Computer device for power dispatching work distribution
CN220545243U (en) Electric control cabinet for industrial robot
CN219045776U (en) Noise reduction device for heating ventilation air conditioner

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200110

Termination date: 20210117