CN209907212U - Lifting and anchoring system for large-span front supporting point guyed cradle - Google Patents

Lifting and anchoring system for large-span front supporting point guyed cradle Download PDF

Info

Publication number
CN209907212U
CN209907212U CN201920366303.3U CN201920366303U CN209907212U CN 209907212 U CN209907212 U CN 209907212U CN 201920366303 U CN201920366303 U CN 201920366303U CN 209907212 U CN209907212 U CN 209907212U
Authority
CN
China
Prior art keywords
piece
clamping piece
seat
lifting
basket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920366303.3U
Other languages
Chinese (zh)
Inventor
陈东龙
何英
张竹浓
方玉先
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Unibuit Construction Investment Co Ltd
Original Assignee
Unibuit Construction Investment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Unibuit Construction Investment Co Ltd filed Critical Unibuit Construction Investment Co Ltd
Priority to CN201920366303.3U priority Critical patent/CN209907212U/en
Application granted granted Critical
Publication of CN209907212U publication Critical patent/CN209907212U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a basket promotion and anchoring system are hung to long-span fore-stock guy cable, its technical essential is: the hanging basket is reinforced through the lifting piece and placed on the sliding rail, then the hanging basket is pushed to the anchoring point position of the next road section by means of the pushing jack, the hanging rod and the upper clamping piece are integrally transferred to the next anchoring point under the action of the moving piece, the hanging basket is lifted and fixed, the disassembling and assembling steps of the upper clamping piece are saved, and the operation is simple, convenient and fast.

Description

Lifting and anchoring system for large-span front supporting point guyed cradle
Technical Field
The utility model relates to a bridge string basket technical field, more specifically say, it relates to a long-span fore-stock stay cable string basket promotes and anchor system.
Background
The guyed cradle is the main equipment for casting construction in concrete bridge cantilever construction, and the lifting and lowering of the cradle are mainly completed by the front anchor cooperating with the jacking mechanism at the tail part of the main longitudinal beam. When the hanging basket is poured, the hanging basket is lifted by a jacking mechanism, and the tail part of a hanging basket template is tightly attached to the poured section concrete, so that the hanging basket is in a high position; after concrete pouring is finished, the lower portion of the cradle is required to be separated from the poured section concrete by means of the jacking mechanism, the tail portion of the cradle template is required to be separated from the poured section concrete, the hanging lugs of the cradle are placed on the sliding rail, the cradle is located at a low position, preparation before walking is finished, the cradle is pushed to slide along the sliding rail under the action of the jacking jack, the cradle moves on the sliding rail and walks to a specified position, then the cradle is integrally lifted by means of the jacking mechanism, the tail portion of the cradle template is tightly attached to the poured section concrete, the cradle is located at a high position again, and pouring work of concrete of the next section is continued.
Before concrete pouring of the next road section is carried out, firstly, an anchoring structure for connecting the hanging basket and the bridge floor is dismantled, the hanging basket is placed by means of the jacking jack so that the hanging lugs are hung on the sliding tracks, then the hanging basket is pushed to the next road section by means of the jacking jack, and the anchoring structure for connecting the hanging basket and the bridge floor is composed of structural columns such as steel bar suspenders, so that the dismantled anchoring structure is large in size and heavy in weight, and therefore, the transportation of constructors is inconvenient, and space is improved.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art exists, the utility model aims to provide a fulcrum guy cable hanging basket promotes and anchor system before large-span has the advantage of making things convenient for the constructor transport.
In order to achieve the above purpose, the utility model provides a following technical scheme:
a large-span front supporting point guy cable hanging basket lifting and anchoring system comprises a plurality of connecting pieces penetrating through a concrete bridge floor and a hanging basket, wherein the connecting pieces are all in sliding connection with an upper clamping piece and a lower clamping piece used for tightly attaching the hanging basket to the bridge floor, the lower clamping piece is detachably connected with the connecting piece, the upper clamping piece is provided with a lifting piece which drives the connecting piece to move along the vertical direction, a plurality of connecting pieces are in threaded connection with locking pieces which are used for fixing the upper clamping piece or the lower clamping piece and the connecting piece relatively, the upper clamping piece is provided with a moving piece, the inner part of the moving piece is hollow to form a cavity, a linkage piece which is rotationally connected with the moving piece is arranged in the cavity, the linkage piece is in threaded connection with the upper clamping piece, and the linkage piece is further provided with a driving piece for driving the upper clamping piece to move along the vertical direction.
By adopting the technical scheme, the hanging basket is connected with the bridge floor through the connecting piece, the upper clamping piece and the lower clamping piece which are in sliding connection with the connecting piece are locked and fixed on the hanging basket and the bridge floor through the threaded connection between the locking piece and the connecting piece, the upper clamping piece moves in the vertical direction relative to the moving piece through the driving piece driving the linkage piece, when the upper clamping piece moves upwards in the vertical direction relative to the moving piece, the moving piece is contacted with the ground, the upper clamping piece is suspended with the ground, constructors can transfer the upper clamping piece and the connecting piece to the next place needing anchoring, and compared with a transportation tool, such as a carrier, the cost is saved, and the carrying of constructors is facilitated; when concrete pouring is carried out on the next section of pavement, a constructor firstly enables a lifting piece to play a role in supporting an upper clamping piece by virtue of the lifting piece, then rotates a locking piece to enable the locking piece to be separated from the surface of the upper clamping piece, the constructor only needs to disassemble the locking piece which is tightly fixed with a lower clamping piece from the connecting piece, moves the connecting piece upwards along the vertical direction to enable the end part of the connecting piece to be higher than a bridge floor, then enables a hanging basket to move downwards along the vertical direction by virtue of the lifting piece, enables hanging basket hangers to be lapped on a sliding track, enables the hanging basket to slide along the sliding track under the action of a pushing jack, and transfers the upper clamping piece to the next anchoring point under the action of the moving piece, the constructor does not need to completely disassemble the upper clamping piece and the lower clamping piece, and then carries out re-installation at the next anchoring point, a large amount of time for dismounting and mounting is saved; meanwhile, the upper clamping piece and the connecting piece are convenient to move under the action of the moving piece, and an anchoring structure system is not required to be installed at each anchoring point, so that the waste of materials is saved to a certain extent.
The utility model discloses further set up to: the connecting piece is the jib, it includes supporting seat and undersetting to go up the clamping piece, promote the piece install in the undersetting, promote the piece other end with go up the supporting seat butt.
By adopting the technical scheme, the lower supporting seat plays a role in placing a lifting piece, the lifting piece is placed on the lower supporting seat, before concrete pouring of the next section of pavement is carried out, the lifting piece placed on the lower supporting seat is firstly placed downwards along the vertical direction to the upper supporting seat, the upper supporting seat moves downwards along the vertical direction, the suspender also moves downwards along the vertical direction along with the upper supporting seat, so that the separation between the cradle and the bridge is realized, the hangers of the cradle are lapped on the sliding rail, the cradle is pushed to slide along the sliding rail under the action of the jacking jack, after the cradle moves to the next anchoring point, the lifting piece lifts the upper supporting seat upwards along the vertical direction, the suspender also moves upwards along the vertical direction along with the upper supporting seat, so that the attachment between the cradle and the bridge is realized, and the locking piece is rotated to ensure that the locking piece is attached to one side of the locking piece far away from the ground, constructors can pour concrete on the next section of pavement, and the operation is simple, convenient and fast.
The utility model discloses further set up to: the linkage piece comprises a plurality of lead screws, one ends of the lead screws are rotatably connected with the moving piece, the lower support base is in threaded connection with the lead screws, the lead screws are coaxially connected with gears, the gears are meshed with chains, and one end of the lead screw penetrates out of the lower support base and is connected with the driving piece.
By adopting the technical scheme, the screw rod plays a supporting role for the lower supporting seat and the moving part on one hand; on the other hand, constructors drive the screw rods connected with the constructors to rotate by means of the driving parts, and drive the screw rods to synchronously rotate under the action of the chains and the gears, so that the lower support base moves along the length direction of the screw rods; when the supporting seat is applied to one side close to the ground along the length direction of the lead screw, the lower supporting seat is in contact with the ground, the moving part is suspended in the air with the ground, a constructor can rotate the locking part to lock and fix the upper clamping part and the lower clamping part to the bridge and the hanging basket, when the supporting seat moves towards one side far away from the ground along the length direction of the lead screw, the moving part is in contact with the ground, the lower supporting seat is suspended in the air with the ground, the constructor lifts the suspender to a proper position, even though both ends of the suspender are higher than the bridge floor, the constructor can transfer the whole upper clamping part and the suspender to.
The utility model discloses further set up to: the connection part of the lower supporting seat and the plurality of screw rods is outwards convexly provided with a threaded sleeve which is in one-to-one correspondence with the screw rods and is in threaded connection with the screw rods.
Through adopting above-mentioned technical scheme, the driving piece drives the lead screw and rotates, drives a plurality of lead screws under the meshing effect of chain and gear and rotate the removal that realizes the under bracing seat along lead screw length direction in step, because the under bracing seat has born the weight of last week supporting seat and a plurality of jib, so through the setting of screw thread sleeve, the screw thread sleeve has increased the area of contact between under bracing seat and the lead screw, has strengthened the stability of being connected between under bracing seat and the lead screw, in handling, the safety in the transportation has been guaranteed.
The utility model discloses further set up to: the retaining member is the latch segment that "cylindrical" set up for structural shape, and the latch segment is equipped with and holds the piece, it includes a plurality of holding rods of evenly arranging along latch segment circumference to hold the piece.
By adopting the technical scheme, the locking block in threaded connection with the suspender has the function of fixing the position of the upper clamping piece and the lower clamping piece which are in sliding connection with the suspender, and a constructor drives the locking block to rotate along the length direction of the suspender by virtue of the holding rod to realize the adjustment and the change of the position of the locking block in the length direction of the suspender, so that the locking block has the function of tightly abutting against the upper clamping piece or the lower clamping piece, and the upper clamping piece and the lower clamping piece clamp the hanging basket and the bridge; the setting of holding the pole is convenient for the constructor with the help of holding the pole and rotate the latch segment and adjust the relative position between latch segment and the jib, labour saving and time saving, easy operation.
The utility model discloses further set up to: and a plurality of limiting blocks are arranged at the ends, far away from the ground, of the screw rods, and the diameter of the radial cross sections of the limiting blocks is larger than that of the screw rods.
By adopting the technical scheme, a constructor rotates the driving piece, the driving piece drives the lead screws connected with the driving piece to rotate, the plurality of lead screws synchronously rotate under the meshing connection action of the chain and the gear, so that the movement of the lower support seat along the length direction of the lead screws is realized, when the lower support seat moves upwards along the length direction of the lead screws, the limit block plays a role in limiting the lower support seat moving on the lead screws through the arrangement of the limit block, the situation that the lower support seat is separated from the lead screws due to the overlarge rotation angle of the lead screws is reduced, and the connection stability between the lower support seat and the lead screws is enhanced; the radial cross-section diameter size of stopper is greater than the radial cross-section diameter size of threaded sleeve pipe for the stopper plays the effect of a restriction to the threaded sleeve pipe, and then strengthens the stability of being connected between lower carriage and the lead screw.
The utility model discloses further set up to: the retaining member with be equipped with between the upper bracket and wear to locate the elastic component of jib, the retaining member with also be equipped with between the lower clamping piece and wear to locate the elastic component of jib.
Through adopting above-mentioned technical scheme, hang basket and bridge laminating, press from both sides tightly fixedly to the bridge and hang the basket through lower clamping piece and under bracing seat, then adjust the relative position between retaining member and the jib through rotating the retaining member and support tightly fixedly to lower clamping piece and under bracing seat, because the retaining member is at the in-process that contacts with lower clamping piece or under bracing seat, the retaining member can lead to the fact wearing and tearing to lower clamping piece and under bracing seat, setting through the elastic component, the elastic component has reduced the direct contact friction between retaining member and lower clamping piece or the under bracing seat, the elastic component is to retaining member itself, the effect of a protection is played to lower clamping piece and under bracing seat, the retaining member has been prolonged, the life of lower clamping piece and under bracing seat.
The utility model discloses further set up to: the lower supporting seat is provided with a first fastener for locking and fixing the lower supporting seat and the bridge deck in a penetrating mode, and the lower clamping piece is provided with a second fastener for locking and fixing the lower clamping piece and the hanging basket in a penetrating mode.
Through adopting above-mentioned technical scheme, through the setting of first fastener, be in the same place lower support seat and bridge floor fixed connection to through the second fastener with lower clamping piece with hang basket fixed connection together, strengthened between lower support seat and the bridge floor, lower clamping piece and hang the stability of being connected between the basket, thereby the stability of being connected between basket and the bridge is hung in the reinforcing, when carrying out concrete placement, reduce and hang the basket from the danger that the bridge breaks away from, reduce the potential safety hazard.
To sum up, the utility model discloses following beneficial effect has:
1. the driving part is rotated to drive the lead screws connected with the driving part to rotate, synchronous rotation of the lead screws is realized under the meshing connection effect of the chain and the gear, and further the movement of the lower supporting seat along the length direction of the lead screws is realized;
2. the elastic piece plays a role in protecting the locking block, the upper support seat, the lower support seat and the lower clamping piece, so that the abrasion among the locking block, the upper support seat, the lower support seat and the lower clamping piece is reduced, and the service life is prolonged;
3. because the lower supporting seat bears the weight of the upper supporting seat and the suspender, the contact area between the lower supporting seat and the screw rod is increased through the threaded connection between the threaded sleeve and the screw rod, and the connection stability between the lower supporting seat and the screw rod is further enhanced;
4. because the lower supporting seat is rotationally connected with the plurality of screw rods, compared with the situation that the lower supporting seat moves along the length direction of the screw rods only by using one screw rod and the plurality of guide rods, the plurality of screw rods increase the stress points between the lower supporting seat and the screw rods, so that the stable movement of the lower supporting seat along the length direction of the screw rods is realized by the uniform stress on the surface of the lower supporting seat in the process that the lower supporting seat moves along the length direction of the screw rods;
5. due to the fact that the holding rod is arranged, a constructor can rotate the locking block to adjust the relative position between the locking block and the hanging rod by means of the holding rod, time and labor are saved, and operation is simple.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic structural view of an upper clamp and a lower clamp;
FIG. 3 is a schematic structural view of the upper clamp;
FIG. 4 is a schematic view of the internal structure of the lower support base;
fig. 5 is a partially enlarged view of a in fig. 4.
Reference numerals: 1. a connecting member; 2. an upper clamp member; 21. an upper support base; 22. A lower support seat; 222. A first flange; 223. a first fastener; 23. a threaded bushing; 3. a lower clamp member; 31. a third perforation; 32. a second flange; 33. a second fastener; 41. a groove; 42. a cavity; 5. a linkage member; 51. a screw rod; 52. a gear; 53. a chain; 54. a limiting block; 6. a drive member; 7. a moving member; 71. moving the plate; 72. a pulley; 81. a locking member; 82. a grip member; 83. an elastic member; 9. a lifting member.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
The utility model provides a basket lift and anchor system is hung to pivot guyed before large-span, as shown in figure 1, including running through in concrete bridge floor and a plurality of connecting piece 1 of hanging the basket, a plurality of connecting piece 1 sliding connection have last clamping piece 2 and demountable installation's lower clamping piece 3, it is located the top of bridge floor to go up clamping piece 2, lower clamping piece 3 is located the below of hanging the basket, a plurality of connecting piece 1 threaded connection have retaining member 81 (not marked in the picture), it installs lifting member 9 (not marked in the picture) that is used for promoting to hang the basket to go up clamping piece 2, it still installs moving member 7 (not marked in the picture) to go up clamping piece 2, moving member 7 rotates and is connected with linkage 5 (not marked in the picture), the linkage 5 other end and the last clamping piece 2 threaded connection, linkage 5 is equipped with.
As shown in fig. 2-3, the connecting member 1 is a suspension rod, the outer wall of the suspension rod is provided with an external thread, the bridge floor penetrates through an anchoring through hole, the suspension rod penetrates through the bridge floor and the hanging basket through the anchoring through hole, the upper clamping member 2 is slidably connected to the suspension rod, the upper clamping member 2 is located above the bridge floor, and the lower clamping member 3 is slidably connected to the suspension rod, and the lower clamping member 3 is located below the hanging basket.
The upper clamping member 2 includes an upper support 21 and a lower support 22, the upper support 21 is slidably connected to the boom, the lower support 22 is also slidably connected to the boom, and the upper support 21 is located above the lower support 22.
Go up supporting seat 21's structural shape and be the setting of class "square form", go up supporting seat 21 and the parallel two sides that are parallel to each other of bridge floor and all seted up four first perforation, four first perforations are close to four angles of going up supporting seat 21 and are central symmetry about the central axis that goes up supporting seat 21 along vertical direction.
The lower support seat 22 is also arranged in a similar square shape, four second through holes are formed in two parallel side faces of the lower support seat 22 parallel to the bridge deck, the four second through holes are close to four corners of the lower support seat 22 and are in central symmetry with respect to the central axis of the lower support seat 22 in the vertical direction; one end, close to the bridge floor, of one of the parallel side surfaces of the lower support seat 22 perpendicular to the bridge floor is fixedly welded with a first rib 222 along the length direction thereof, and a plurality of first fasteners 223 fastened and fixed with the bridge floor are arranged on the first rib 222 in a penetrating manner, in this embodiment, the first fasteners 223 may be bolts, and in other embodiments, the first fasteners 223 may be anchor bolts, screws, and the like; one side surface of the lower support seat 22 close to the bridge floor is provided with a groove 41 in an upward concave mode along the vertical direction, and the notch of the groove 41 faces downwards.
The side that the bridge floor was kept away from to bottom suspension seat 22 is installed and is promoted piece 9, promotes piece 9 and is hydraulic jack, when needs promote and transfer the operation to hanging the basket, hydraulic jack keeps away from the one end and the 21 butt of top suspension seat of bottom suspension seat 22.
As shown in fig. 4-5, a moving member 7 is arranged in the groove 41, the moving member 7 includes a moving plate 71 and four pulleys 72, and the four pulleys 72 are located on one side of the moving plate 71 close to the bridge floor and are in central symmetry with respect to a central axis of the moving plate 71 in the vertical direction; the moving plate 71 is rotatably connected with a link 5 for driving the lower support base 22 to move along the length direction of the hanger rod.
The moving plate 71 is hollow at the inner part to form a cavity 42, the linkage piece 5 comprises four screw rods 51, one ends of the four screw rods 51 penetrate into the cavity 42 to be rotatably connected with the inner bottom of the moving plate 71, and the other ends of the four screw rods 51 penetrate out of the cavity 42 to be in threaded connection with the lower support seat 22; the linkage piece 5 further comprises four gears 52 which are in one-to-one correspondence with the four screw rods 51 and are coaxially and fixedly connected, and the four gears 52 are meshed and connected with the same chain 53.
And a threaded sleeve 23 in threaded connection with the screw rod 51 is outwards convexly arranged at the joint of one side surface of the lower support seat 22 away from the bridge deck and the screw rod 51.
One end of the four screw rods 51 penetrating through the cavity 42 is fixed with a limiting block 54, the radial section of the limiting block 54 is in a circular shape, and the radial section area of the limiting block 54 is larger than that of the screw rods 51.
One end of the screw rod 51 penetrating through the cavity 42 is fixed with a driving piece 6 for driving the screw rod 51 to rotate, and the driving piece 6 is a driving handle.
The structural shape of the lower clamping member 3 is the same as that of the upper support 21. The lower clamping piece 3 is arranged in a square shape, four third through holes 31 penetrate through two parallel side surfaces of the lower clamping piece 3 and the hanging basket along the vertical direction, and the four third through holes 31 are close to four corners of the lower clamping piece 3 and are in central symmetry with the central axis of the lower clamping piece 3 along the vertical direction; one end, close to the hanging basket, of one of the parallel side surfaces of the lower clamping member 3 perpendicular to the hanging basket is welded and fixed with a second retaining edge 32 along the length direction thereof, and a plurality of second fastening pieces 33 fixed with the hanging basket in a locking manner penetrate through the second retaining edge 32, wherein the second fastening pieces 33 can be bolts in the embodiment, and the second fastening pieces 33 can be foundation bolts, screws and the like in other embodiments.
The suspender is arranged on the lower support seat 22 through the first perforation, the bridge floor and the hanging basket through the anchoring through hole, and the lower clamping part 3 through the third perforation 31.
The jib threaded connection has four groups of locking Assembly, and every group locking Assembly includes four retaining members 81 with four jib one-to-one threaded connection, and retaining member 81 is "columniform" latch segment for structural shape, and the radial cross section diameter size of latch segment is greater than the radial cross section diameter size of first perforation, second perforation and third perforation 31, and the radial cross section diameter size of first perforation, second perforation, third perforation 31 is the same.
A holding piece 82 is fixedly welded on each locking block, and each holding piece 82 comprises a plurality of holding rods which are arranged along the circumferential direction of the locking block.
Two groups of locking pieces 81 are respectively positioned at two sides of the upper supporting seat 21, the locking pieces 81 play a role in supporting the upper supporting seat 21, and the relative position between the upper supporting seat 21 and the suspender is adjusted by rotating the locking blocks at two sides of the upper supporting seat 21; the group of locking pieces 81 are positioned on one side of the lower supporting seat 22 far away from the bridge floor, and the locking blocks abut against the lower supporting seat 22 through rotating the locking blocks, so that the lower supporting seat 22 clamps the bridge floor; and a set of retaining member 81 is located one side that lower clamping piece 3 kept away from the hanging basket, and through rotatory locking block, on the one hand the locking block supports tight lower clamping piece 3 and makes lower clamping piece 3 press from both sides tightly hanging basket, and on the other hand the locking block plays a supporting role to lower clamping piece 3, and support piece drops from the jib down in the reduction.
The suspender is also provided with a plurality of elastic elements 83 in a penetrating way, the elastic elements 83 are elastic rubber blocks with radial cross sections in a square shape, and the elastic rubber blocks are positioned between the upper supporting seat 21 and the locking block, between the lower supporting seat 22 and the locking block, and between the lower clamping element 3 and the locking block.
The concrete working principle and the beneficial effects of the embodiment are as follows:
the working principle is as follows:
and (3) anchoring and disassembling: before the concrete placement on the next section road surface, at first install hydraulic jack on last supporting seat 21, make hydraulic jack one end and last supporting seat 21 butt, the constructor rotates the latch segment that compresses tightly with lower supporting seat 22 with the help of controlling the pole, after the latch segment moves one section distance along vertical direction upward, with the help of hydraulic jack, make hydraulic jack's hydraulic stem along vertical direction downstream, the string basket also is vertical downstream under hydraulic jack's effect, string basket hangers overlap joint is on the track that slides, the string basket breaks away from with the bridge floor.
Operating personnel can begin to dismantle anchor structure, constructor unscrews the latch segment of lower extreme under the bridge floor with the help of devices such as steel foot rest, dismantle clamping piece 3 from the jib down, operating personnel continues to rotate the latch segment that compresses tightly with under bracing seat 22 with the help of holding the pole, then upwards lift the jib along vertical direction, make the jib lower extreme be higher than the bridge floor, then make latch segment butt elastic rubber piece compress tightly under bracing seat 22 with the help of holding the rotatory latch segment of pole, constructor can rotate the actuating handle this moment, under bracing seat 22 is along the vertical upward movement of lead screw 51 length direction, pulley 72 and bridge floor contact, under bracing seat 22 is unsettled with ground, constructor with whole upper latch member 81 and jib transfer to next anchor point can.
And (3) anchoring and mounting: the constructor firstly rotates the locking block tightly attached to the surface of the lower support seat 22 by the holding rod, slowly lowers the suspender downwards, the movable plate 71 is slowly pushed during the lowering of the hanger rod so that the hanger rod is aligned with the anchoring through hole penetrating through the bridge deck, the hanger rod penetrates through the hanging basket after penetrating through the bridge deck, the constructor can slide the disassembled lower clamping piece 3 on the hanger rod again, the lower clamping piece 3 is pressed and fixed by the locking block, the second fastening piece 33 passes through the second flange 32 to enable the lower clamping piece 3 to be locked and fixed with the hanging basket, the locking block is rotated by the holding rod, the locking block is tightly abutted against the surface of the lower support seat 22, a constructor rotates the screw rod 51 by the driving handle, the lower support seat 22 moves towards one end close to the bridge floor along the vertical direction, the lower support seat 22 is abutted against the bridge floor, the pulley 72 is suspended, and at the moment, a constructor fixes the lower support seat 22 and the bridge floor by penetrating the first rib 222 through the first fastener 223; then install hydraulic jack on lower support seat 22, support seat 21 makes support seat 21 and jack butt through the position control of adjusting the latch segment, then support tight latch segment with lower support seat 22 with the help of holding the pole rotation, adjust the latch segment towards one side of keeping away from the bridge floor, hydraulic jack upwards jacks up along vertical direction and hangs the basket, it breaks away from with the track that slides to hang the basket hangers, it laminates with the bridge floor to hang the basket, then rotatory latch segment makes latch segment and lower support seat 22 surface support tight, treat that the basket installation is stable after, take off hydraulic jack, constructor can carry out the concrete placement on next section road surface.
Has the advantages that:
through rotating driving piece 6, driving piece 6 drives the lead screw 51 rotation of being connected with it, realize the synchronous rotation of many lead screws 51 under the meshing connection effect of chain 53 and gear 52, and then realize the motion of lower carriage 22 along lead screw 51 length direction, when lower carriage 22 contacts with the bridge floor, moving member 7 is unsettled with the bridge floor, and then make the steady placing on the bridge floor of whole upper clamping piece 2, threaded connection between jib and the latch segment realizes that upper clamping piece 2 and lower clamping piece 3 are fixed to the locking between string basket and the bridge, when moving member 7 contacts with the bridge floor, lower clamping piece is empty with the bridge floor suspension, constructor just can shift whole upper clamping piece 2 and jib to next anchor point and anchor the installation, and easy operation is convenient and fast, the cost has been saved to a certain extent.
Because the elastic piece 83 plays a role in protecting the locking block, the upper support seat 21, the lower support seat 22 and the lower clamping piece 3, the abrasion between the locking block and the upper support seat 21, between the locking block and the lower support seat 22 and between the locking block and the lower clamping piece 3 is reduced, and the service life is prolonged.
Through installing chain 53 and gear 52 in cavity 42, cavity 42 plays a effect of accomodating to chain 53 and gear 52, has reduced outside cement mortar and has entered into to spatter and spill on gear 52 and chain 53, and then has guaranteed that lower support seat 22 is along ascending normal clear with the decline of lead screw 51 length direction.
Because when carrying out anchor installation and dismantlement, need not all demolish whole anchor system completely, only need dismantle lower clamping piece 3 from the jib, compare in dismantling whole anchor system, simplified constructor's operating procedure for anchor structure's installation and dismantlement are convenient and simple swift more.
Because the lower support seat 22 is to bear the weight of the upper support seat 21 and the suspension rod, the threaded connection between the threaded sleeve 23 and the screw rod 51 increases the contact area between the lower support seat 22 and the screw rod 51, thereby enhancing the connection stability between the lower support seat 22 and the screw rod 51.
Because the lower support seat 22 is rotatably connected with the plurality of screw rods 51, compared with the situation that the lower support seat 22 moves along the length direction of the screw rods 51 only by using one screw rod 51 and a plurality of guide rods, the plurality of screw rods 51 increase the stress points between the lower support seat 22 and the screw rods 51, so that the stable movement of the lower support seat 22 along the length direction of the screw rods 51 is realized by the uniform stress on the surface of the lower support seat 22 in the process that the lower support seat 22 moves along the length direction of the screw rods 51.
Due to the fact that the holding rod is arranged, a constructor can rotate the locking block to adjust the relative position between the locking block and the hanging rod by means of the holding rod, time and labor are saved, and operation is simple.
The present embodiment is only for explaining the present invention, and it is not limited to the present invention, and those skilled in the art can make modifications to the present embodiment without inventive contribution as required after reading the present specification, but all of them are protected by patent laws within the scope of the claims of the present invention.

Claims (8)

1. The utility model provides a long-span front support point guyed basket promotes and anchor system which characterized in that: the device comprises a plurality of connecting pieces (1) penetrating through a concrete bridge deck and a hanging basket, wherein each connecting piece (1) is connected with an upper clamping piece (2) and a lower clamping piece (3) which are used for tightly attaching the hanging basket to the bridge deck in a sliding manner, each lower clamping piece (3) is detachably connected with the corresponding connecting piece (1), each upper clamping piece (2) is provided with a lifting piece (9) for driving the corresponding connecting piece (1) to move along the vertical direction, each connecting piece (1) is connected with a locking piece (81) which is used for fixing the corresponding upper clamping piece (2) or the corresponding lower clamping piece (3) to the corresponding connecting piece (1) in a threaded manner, each upper clamping piece (2) is provided with a moving piece (7), a hollow cavity (42) is formed in the inner part of the moving piece (7), a linkage piece (5) rotatably connected with the moving piece (7) is arranged in the cavity (42), and the linkage piece (5), the linkage piece (5) is also provided with a driving piece (6) for driving the upper clamping piece (2) to move along the vertical direction.
2. The large-span front pivot guy line pannier lifting and anchoring system of claim 1, wherein: connecting piece (1) is the jib, go up clamping piece (2) including support seat (21) and under bracing seat (22), lifting member (9) install in under bracing seat (22), lifting member (9) other end with go up support seat (21) butt.
3. The large-span forward pivot guy cable basket lift and anchor system of claim 2, wherein: the linkage piece (5) comprises a plurality of lead screws (51), one ends of the lead screws (51) are rotatably connected with the moving piece (7), the lower support seat (22) is in threaded connection with the lead screws (51), the lead screws (51) are all coaxially connected with a gear (52), the gear (52) is meshed with a chain (53), and one end of the lead screw (51) penetrates out of the lower support seat (22) and is connected with the driving piece (6).
4. The large-span forward pivot guy cable basket lift and anchor system of claim 3, wherein: the connection parts of the lower supporting seat (22) and the plurality of screw rods (51) are outwards provided with threaded sleeves (23) which correspond to the screw rods (51) one by one and are in threaded connection in a protruding mode.
5. The large-span front pivot guy line pannier lifting and anchoring system of claim 1, wherein: retaining member (81) are the latch segment of "cylindrical" setting for the structural shape, and the latch segment is equipped with and holds piece (82), hold piece (82) including a plurality of holding rods of evenly arranging along latch segment circumference.
6. The large-span forward pivot guy line pannier lifting and anchoring system of claim 4, wherein: and one end of each of the plurality of screw rods (51) far away from the ground is provided with a limiting block (54), and the diameter of the radial section of each limiting block (54) is larger than that of the radial section of the threaded sleeve (23).
7. The large-span forward pivot guy cable basket lift and anchor system of claim 2, wherein: retaining member (81) with be equipped with between upper bracket (21) and wear to locate elastic component (83) of jib, retaining member (81) with also be equipped with between lower clamping piece (3) and wear to locate elastic component (83) of jib.
8. The large-span forward pivot guy cable basket lift and anchor system of claim 2, wherein: the lower supporting seat (22) is provided with a first fastener (223) for locking and fixing the lower supporting seat (22) and the bridge deck in a penetrating mode, and the lower clamping piece (3) is provided with a second fastener (33) for locking and fixing the lower clamping piece (3) and the hanging basket in a penetrating mode.
CN201920366303.3U 2019-03-21 2019-03-21 Lifting and anchoring system for large-span front supporting point guyed cradle Active CN209907212U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920366303.3U CN209907212U (en) 2019-03-21 2019-03-21 Lifting and anchoring system for large-span front supporting point guyed cradle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920366303.3U CN209907212U (en) 2019-03-21 2019-03-21 Lifting and anchoring system for large-span front supporting point guyed cradle

Publications (1)

Publication Number Publication Date
CN209907212U true CN209907212U (en) 2020-01-07

Family

ID=69033276

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920366303.3U Active CN209907212U (en) 2019-03-21 2019-03-21 Lifting and anchoring system for large-span front supporting point guyed cradle

Country Status (1)

Country Link
CN (1) CN209907212U (en)

Similar Documents

Publication Publication Date Title
CN108952184B (en) Assembled building decoration stone material wood-based plate curtain mounting bracket
CN109680967B (en) Jacking equipment of steel structure beam for mounting small-sized factory building
CN201411900Y (en) Hydraulic die lifter for chimneys
KR102115380B1 (en) Hydraulic slipform safety locking device and virtical structure and slab construction method using the same
CN110685433A (en) Chimney construction device and construction method applying hydraulic lifting and rollover technology
CN101566005B (en) Chimney hydraulic mould lifting device
CN102444310A (en) Method for constructing concrete chimney cylinder body through formwork lifting process
CN211286601U (en) Chimney construction device applying hydraulic lifting and rollover technology
CN108002244B (en) Hoisting system and method for high pier column steel bar formwork
CN114086772B (en) Installation and construction method of herringbone steel truss
CN213679576U (en) Aerated concrete wallboard transportation construction equipment
CN113006145B (en) Reverse construction method construction process for large-diameter working well movable formwork
CN209907212U (en) Lifting and anchoring system for large-span front supporting point guyed cradle
KR20110087164A (en) Apparatus for constructing a bridge by using precast segmental method
CN213417832U (en) Enclosing purlin mounting structure
CN112627484A (en) Two-point type triangular hanging rack platform and construction method
CN112459504B (en) Aerated concrete wallboard installation method
CN105905849A (en) Prestressed tensioning jack movable mounting trolley and application method thereof
CN113235460B (en) Prefabricated segment swinging method for bridge cantilever assembly
CN115162406A (en) Whole template portal suitable for box culvert structure
CN112761187A (en) Electric lifting movable mould frame for large-diameter working well
CN112813838B (en) Integral concrete vibrating device for viaduct pier body and construction method thereof
CN220266312U (en) Device for bridge deck wet joint template construction
CN115522459A (en) Sliding method hoisting construction method for cable saddle support of suspension bridge in large-inclination-angle deep hole
CN220166700U (en) Bridge wet joint template construction device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant