CN209893057U - High altitude crimping camera support - Google Patents

High altitude crimping camera support Download PDF

Info

Publication number
CN209893057U
CN209893057U CN201920165077.2U CN201920165077U CN209893057U CN 209893057 U CN209893057 U CN 209893057U CN 201920165077 U CN201920165077 U CN 201920165077U CN 209893057 U CN209893057 U CN 209893057U
Authority
CN
China
Prior art keywords
straight pipe
camera
elbow
ring
fixing piece
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920165077.2U
Other languages
Chinese (zh)
Inventor
肖利军
高源辉
陈增烁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Chengyu Engineering Consulting And Supervision Co Ltd
Original Assignee
Guangdong Chengyu Engineering Consulting And Supervision Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Chengyu Engineering Consulting And Supervision Co Ltd filed Critical Guangdong Chengyu Engineering Consulting And Supervision Co Ltd
Priority to CN201920165077.2U priority Critical patent/CN209893057U/en
Application granted granted Critical
Publication of CN209893057U publication Critical patent/CN209893057U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Studio Devices (AREA)

Abstract

A high altitude crimping camera bracket comprises a first straight pipe, a second straight pipe, a third straight pipe, a hoop component, a first elbow, a second elbow, a connecting fixing piece, a first rotary connector, a camera mounting seat, a camera, a wireless signal emitter and a power supply, the hoop component is fixedly arranged on the first straight pipe, the connecting and fixing piece is fixedly arranged above the first straight pipe, the second straight pipe is connected with the connecting and fixing piece, the second straight pipe is inserted into the first straight pipe, can move up and down under the limit of the connecting and fixing piece, by designing a high-altitude compression joint camera bracket and adopting visual whole-process video monitoring and inspection, when in high altitude compression joint, the camera is arranged in a hanging basket for construction operation, the whole process of operation is monitored, and guides personnel to check and record the crimping quality, and the whole-process sound image data for manufacturing the single lead crimping pipe is formed so as to be convenient to trace.

Description

High altitude crimping camera support
Technical Field
The utility model belongs to the technical field of overhead transmission line construction and specifically relates to a high altitude crimping camera support.
Background
In overhead transmission line work progress, the mode that the connection of wire generally adopted hydraulic pressure crimping connects, because of overhead line condition restriction is more, like 1, region restriction: mostly, the mountain hilly area can't set up level and smooth perfect place, 2, the operation mode restriction: the wire frame is established to the continuity and is drawn the unwrapping wire, and the wire needs the tight line rear after putting through to carry out the crimping hanging wire, and the tight line is accomplished the back wire and is had great tension, can't reserve line tail and carry out the crimping operation to ground, 3, the operation place restriction: the length of an overhead line is dozens of kilometers, the length of the overhead line is dozens of kilometers, the tower height is dozens of foundations, the tower height is dozens of meters to more than 100 meters, each foundation iron tower needs to be crimped with a wire, construction points are multiple, the feasibility of fixing ground crimping points is insufficient, and therefore the wire crimping operation is mostly high-altitude operation.
The crimping of the wire is also an important quality control point, and if the crimping is not reliable, the wire crimping point is easy to fall off, break, electrically burn, leak electricity and the like, so the operation is an important control check item for monitoring a side station when the wire is crimped.
Because overhead transmission line installation operating point is many, not concentrated, mountain hills, high altitude construction, operating time are short etc. reason, can not install fixed camera and accomplish the control, if all install high definition digtal camera also can greatly increased the cost of maintenance on every circuit or the basic station, the electromagnetic interference who produces at the basic station high frequency circuit is also not favorable to video information's transmission and collection moreover.
SUMMERY OF THE UTILITY MODEL
The utility model aims at: in order to solve the problems, the aerial compression joint camera support is designed, visual whole-process video monitoring and checking are adopted, a camera is installed in a hanging basket for construction operation during aerial compression joint, the operation process is monitored in the whole process, and a guide person checks and records the compression joint quality, so that the whole-process acoustic image data for manufacturing a single lead compression joint pipe is formed and can be traced conveniently.
The utility model discloses a following technical scheme of purpose accessible realizes:
a high-altitude crimping camera bracket comprises a first straight pipe, a second straight pipe, a third straight pipe, a hoop component, a first elbow, a second elbow, a connecting fixing piece, a first rotary connector, a camera mounting seat, a camera, a wireless signal transmitter and a power supply, wherein the hoop component is fixedly arranged on the first straight pipe, the connecting fixing piece is fixedly arranged above the first straight pipe, the second straight pipe is connected with the connecting fixing piece, the second straight pipe is inserted into the first straight pipe and can move up and down under the limitation of the connecting fixing piece, the first elbow is fixedly arranged above the second straight pipe, the other end of the first elbow is bolted with the third straight pipe, the other end of the third straight pipe is provided with a first rotary connector, the other end of the first rotary connector is connected with the second elbow, the camera mounting seat is arranged below the second elbow, the camera install on the camera mount pad, the power setting inside the third straight tube, wireless signal transmitter install in the inside of third straight tube, wireless signal transmitter, camera and power electricity connect.
Further, staple bolt subassembly include fixed ring, second swivelling joint head, stationary half ring, rubber sleeve and bolt, the stationary ring include ring, head rod and first rotating head, first rotating head set up the inside at second swivelling joint head, stationary half ring include screw thread mouth, semicircle ring, second connecting rod and second rotating head, the second rotating head set up the inside at second swivelling joint head, the one side of first rotating head and second rotating head all be provided with the inside groove, be provided with the ball on the inside groove, the inboard of ring and semicircle ring be provided with the rubber sleeve, bolt and the screw thread mouth bolt joint on the stationary half ring for the elasticity and the rotating head that stationary half ring can control connection can make the support rotate after fixed.
Further, the hoop components are provided with two, the two hoop components are arranged on the first straight pipe, and the plurality of hoop components can be used for more effectively stabilizing the support.
Furthermore, the first straight pipe, the second straight pipe and the third straight pipe are made of aluminum alloy materials, and the aluminum alloy materials can effectively guarantee the stability of the support and simultaneously guarantee the moisture-proof and corrosion-proof effects in the high-altitude environment.
Has the advantages that:
1. is convenient to carry, and can be carried about in mountains and hills.
2. The power lasts, inlays the big battery of 50000mA direct current 5V in the support and for removable form, provides continuous power for the camera system, can protect camera system 24 hours all power again.
3. The video transmission is synchronous, and wireless WIFI transmitter is embedded in the support, and the data transmission who shoots the camera system is to the internet in the whole journey anytime and anywhere for ground and remote personnel to supervise and control.
4. The support mounting is simple, only need simply pull out the mobile jib then inlay on the hanging flower basket through the staple bolt, the staple bolt is the hanging flower basket form of the adaptable multiple difference of multi-angle rotating of design.
5. The wide coverage of camera is ensured to the support, through 360 degrees rotations of horizontal pole and camera support, realizes the purpose of operation full coverage in the whole hanging flower basket.
Description of the drawings:
fig. 1 is an exploded view of the present invention.
Fig. 2 is a schematic structural view of the hoop assembly of the present invention.
Fig. 3 is the utility model discloses staple bolt subassembly's decomposition structure schematic diagram.
In the figure: 1. first straight tube 2, second straight tube 3, third straight tube 4, staple bolt subassembly 401, fixed ring 4011, ring 4012, head rod 4013, first rotating head 402, second swivelling joint head 403, stationary half collar 4031, screw mouth 4032, semicircle ring 4033, second connecting rod 4034, second rotating head 404, rubber sleeve 405, bolt 5, first elbow 6, second elbow 7, connect mounting 8, first swivelling joint head 9, camera mount pad 10, camera 11, wireless signal transmitter 12, power 13, inside groove 14, ball.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts belong to the protection scope of the present invention.
It should be noted that, if directional indications (such as upper, lower, left, right, front and rear … …) are involved in the embodiment of the present invention, the directional indications are only used to explain the relative position relationship between the components, the motion situation, etc. in a specific posture (as shown in the drawings), and if the specific posture is changed, the directional indications are changed accordingly.
A high altitude crimping camera support comprises a first straight pipe 1, a second straight pipe 2, a third straight pipe 3, a hoop component 4, a first elbow 5, a second elbow 6, a connecting fixing piece 7, a first rotary connector 8, a camera mounting seat 9, a camera, a wireless signal transmitter 11 and a power supply 12, wherein the hoop component 4 is fixedly arranged on the first straight pipe 1, the connecting fixing piece 7 is fixedly arranged above the first straight pipe 1, the second straight pipe 2 is connected with the connecting fixing piece 7, the second straight pipe 2 is inserted into the first straight pipe 1 and can move up and down under the limitation of the connecting fixing piece 7, the first elbow 5 is fixedly arranged above the second straight pipe 2, the other end of the first elbow 5 is bolted with the third straight pipe 3, the other end of the third straight pipe 3 is provided with the first rotary connector 8, the other end of the first rotary connector 8 is connected with the second elbow 6, the below of second elbow 6 be provided with camera mount pad 9, camera 10 install on camera mount pad 9, power 12 set up inside third straight tube 3, wireless signal transmitter 11 install in the inside of third straight tube 3, wireless signal transmitter 11, camera 10 and power 12 electricity connect.
Staple bolt subassembly 4 include stationary ring 401, second swivelling joint 402, stationary half collar 403, rubber sleeve 404 and bolt 405, stationary ring 401 include ring 4011, head rod 4012 and first rotating head 4013, first rotating head 4013 set up the inside at second swivelling joint 402, stationary half collar 403 include screw mouth 4031, semicircle ring 4032, second connecting rod 4033 and second rotating head 4034, second rotating head 4034 set up the inside at second swivelling joint 402, the one side of first rotating head 4013 and second rotating head 4034 all be provided with interior groove 13, be provided with ball 14 on the interior groove 13, the inboard of ring and semicircle ring 4032 be provided with rubber sleeve 404, bolt 405 and the bolted connection of screw mouth 4031 on the stationary half collar 403.
Staple bolt subassembly 4 be provided with two, two staple bolt subassemblies 4 are all installed on first straight tube 1.
The first straight pipe 1, the second straight pipe 2 and the third straight pipe 3 are made of aluminum alloy materials.
Before work begins, a person in a side station carries support equipment to a high-pressure contact point, the support equipment is installed on a hanging basket, the installation position is arranged in the middle of the long side edge of the hanging basket, the installation position is required to avoid an operation construction touch position as far as possible, the camera position is adjusted after the support equipment is installed, and it is ensured that each operation range of each angle can be within the camera coverage range.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and is not intended to limit the scope of the present invention, which is defined by the appended claims.

Claims (4)

1. A high altitude crimping camera bracket is characterized by comprising a first straight pipe, a second straight pipe, a third straight pipe, a hoop component, a first elbow, a second elbow, a connecting fixing piece, a first rotating connector, a camera mounting seat, a camera, a wireless signal transmitter and a power supply, wherein the hoop component is fixedly arranged on the first straight pipe, the connecting fixing piece is fixedly arranged above the first straight pipe, the second straight pipe is connected with the connecting fixing piece, the second straight pipe is inserted into the first straight pipe and can move up and down under the limitation of the connecting fixing piece, the first elbow is fixedly arranged above the second straight pipe, the other end of the first elbow is bolted with the third straight pipe, the other end of the third straight pipe is provided with the first rotating connector, the other end of the first rotating connector is connected with the second elbow, the camera mounting seat is arranged below the second elbow, the camera install on the camera mount pad, the power setting inside the third straight tube, wireless signal transmitter install in the inside of third straight tube, wireless signal transmitter, camera and power electricity connect.
2. The high altitude crimping camera support of claim 1, characterized in that, staple bolt subassembly include fixed ring, second rotary joint head, stationary semi-ring, rubber sleeve and bolt, fixed ring include ring, head rod and first rotating head, the first rotating head set up the inside at second rotary joint head, stationary semi-ring include screw thread mouth, semicircle ring, second connecting rod and second rotating head, the second rotating head set up the inside at second rotary joint head, the one side of first rotating head and second rotating head all be provided with the inside groove, be provided with the ball on the inside groove, the inboard of ring and semicircle ring be provided with the rubber sleeve, the bolt with fixed semi-ring on screw thread mouth bolt.
3. An overhead crimping camera bracket according to claim 1 or 2, wherein two hoop assemblies are provided, and both hoop assemblies are mounted on the first straight tube.
4. The aerial compression joint camera bracket as claimed in claim 1, wherein the first straight tube, the second straight tube and the third straight tube are made of aluminum alloy materials.
CN201920165077.2U 2019-01-30 2019-01-30 High altitude crimping camera support Active CN209893057U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920165077.2U CN209893057U (en) 2019-01-30 2019-01-30 High altitude crimping camera support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920165077.2U CN209893057U (en) 2019-01-30 2019-01-30 High altitude crimping camera support

Publications (1)

Publication Number Publication Date
CN209893057U true CN209893057U (en) 2020-01-03

Family

ID=69016185

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920165077.2U Active CN209893057U (en) 2019-01-30 2019-01-30 High altitude crimping camera support

Country Status (1)

Country Link
CN (1) CN209893057U (en)

Similar Documents

Publication Publication Date Title
CN206847588U (en) A kind of transmission line of electricity aerial condutor sag measuring device
CN209893057U (en) High altitude crimping camera support
CN206594254U (en) A kind of distribution line failure monitoring device
CN206099861U (en) Miniature video on -line monitoring device of transmission line
CN208206366U (en) It is a kind of based on the fastener shaft of technology of Internet of things to stress monitoring system
CN205160549U (en) Portable network detection device of flip formula
CN209590196U (en) A kind of breakpoint of cable positioning detection device
CN202998277U (en) Traffic integrated video detecting device
CN211502253U (en) Anti-drop's security protection monitoring device
CN204795378U (en) Electric power control security protection integration system based on wireless network
CN208206294U (en) A kind of building construction being easily installed ground noise detection device
CN203798965U (en) Line fault finding device
CN209486297U (en) A kind of high bar of contactless aerial cable survey
CN210668889U (en) Real-time simulator with stable connection function for developing full-bridge inverter power supply
CN209805965U (en) Portable video terminal device
CN205986838U (en) Outdoor wireless device
CN206820400U (en) One kind is easy to fixed penetration pipe
CN109060224A (en) It is a kind of based on the fastener shaft of technology of Internet of things to stress monitoring system
CN205105333U (en) Supervisory equipment is sent in wireless real -time collection
CN206246982U (en) The shooting tripod head for easily extending
CN204887098U (en) Camera mounting structure of cell -phone
CN103780876A (en) Mobile mine monitoring system
CN212900829U (en) Camera adjusting type mounting bracket for monitoring of Internet of things
CN202871216U (en) Monoplane external power supply display device capable of freely rotating
CN208253073U (en) Anti-theft wireless monitor instrument in a kind of garden

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant