CN209891737U - Electric binding hook for binding construction steel bars - Google Patents
Electric binding hook for binding construction steel bars Download PDFInfo
- Publication number
- CN209891737U CN209891737U CN201822158711.8U CN201822158711U CN209891737U CN 209891737 U CN209891737 U CN 209891737U CN 201822158711 U CN201822158711 U CN 201822158711U CN 209891737 U CN209891737 U CN 209891737U
- Authority
- CN
- China
- Prior art keywords
- hook
- electrically connected
- shell
- control module
- binding
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
The utility model belongs to building site construction tool field, concretely relates to electronic hook of pricking for construction steel reinforcement. In order to solve the problem that the binding hook is inconvenient to use, the utility model provides an electronic binding hook that can screw is carried out to reinforcement automatically. In order to realize above-mentioned purpose, the utility model discloses a technical scheme is, an electronic hook of pricking for construction steel reinforcement, including the shell, still include: the bundling hook is sleeved with the shell; a charging port installed on the housing; a storage battery electrically connected to the charging port; the control module is electrically connected with the storage battery; the switch is electrically connected with the control module and is arranged at the tail part of the shell; the indicating lamp module is electrically connected with the control module; the sensor module is electrically connected with the control module; and the power module is electrically connected with the control module and is arranged in the shell.
Description
Technical Field
The utility model belongs to building site construction tool field, concretely relates to electronic hook of pricking for construction steel reinforcement.
Background
The reinforcement is a very important process in building, but in reinforcement, all be artifical the completion, in reinforcement moreover, because some position problems etc. when the manual work goes to the reinforcing bar use and pricks the hook, the application of force can be more hard and also can not the assurance quality, also causes the influence to workman's safety simultaneously.
SUMMERY OF THE UTILITY MODEL
In order to solve the problem that the binding hook is inconvenient to use, the utility model provides an electronic binding hook that can screw to the reinforcement automatically.
In order to realize above-mentioned purpose, the utility model discloses a technical scheme is, an electronic hook of pricking for construction steel reinforcement, including the shell, still include: the bundling hook is sleeved with the shell; a charging port installed on the housing; a storage battery electrically connected to the charging port; the control module is electrically connected with the storage battery; the switch is electrically connected with the control module and is arranged at the tail part of the shell; the indicating lamp module is electrically connected with the control module; the sensor module is electrically connected with the control module; and the power module is electrically connected with the control module and is arranged in the shell.
Preferably, the pricking hook comprises: the hook body is sleeved with the shell; the transmission gear is welded with the tail end of the hook body and is meshed with the power module; the first bearing limiting interval consists of two limiting sheets and is welded on the hook body; the second bearing limiting interval consists of two limiting sheets and is welded on the hook body; the first bearing is sleeved with the hook body, sleeved on the first bearing limiting interval and clamped with the shell; and the second bearing is sleeved with the hook body, and the sleeve machine is clamped with the shell on the limiting interval of the second bearing.
Preferably, the power module comprises: the driving gear is meshed with the bundling hook; the motor bracket is welded in the shell; and the driving motor is screwed on the motor bracket, is sleeved with the driving gear and is electrically connected with the control module.
Preferably, the sensor module is a pressure sensor, is mounted at the front end of the pricking hook, is electrically connected with the control module, and is used for detecting the pressure applied to the front end of the pricking hook.
Preferably, the front end of the hook body is in a hook shape.
Preferably, the indicator light module includes: the electric quantity indicator lamp is used for displaying the residual electric quantity of the storage battery; and the working state indicator light is used for displaying the completion condition of the binding work of the construction steel bars.
The utility model has the advantages that: (1) the utility model saves the working procedure of manually turning the iron wire by the staff; (2) the practical motor drives the binding hook to bind, so that the binding speed is increased, the efficiency is improved, and fatigue caused by manual work can be avoided; (3) when the binding is carried out, the number of screwing times is not too large, otherwise the binding is easy to break, and the screwing is stopped to a certain extent, so that the pressure sensor is adopted, when the pressure sensed by the sensor reaches a certain value, the motor is automatically stopped, the binding wire is prevented from breaking, and the working indicator lamp is lightened; (4) the two bearings are used for stabilizing the rotating shaft of the binding hook, so that the binding hook can stably rotate and cannot deviate; (5) the electric quantity indicator lamp is used for displaying the residual electric quantity of the storage battery.
Drawings
FIG. 1: a electronic hook overall structure sketch map of pricking for construction steel bar ligature
In the figure: 1. switch, 2, operating condition pilot lamp, 3, drive gear, 4, driving gear, 5, driving motor, 6, motor bracket, 7, shell, 8, a bearing, 9, No. two bearings, 10, prick the hook, 11, the spacing interval of first bearing, 12, the spacing interval of second bearing.
Detailed Description
Examples
An electric binding hook 10 for binding construction steel bars, comprising a housing 7, and further comprising: a binding hook 10 sleeved with the shell 7; a charging port mounted on the housing 7; a storage battery electrically connected to the charging port; the control module is electrically connected with the storage battery; the switch 1 is electrically connected with the control module and is arranged at the tail part of the shell 7; the indicating lamp module is electrically connected with the control module; the sensor module is electrically connected with the control module; and the power module is electrically connected with the control module and is arranged in the shell 7.
The pricking hook 10 comprises: the hook body is sleeved with the shell 7; the transmission gear 3 is welded with the tail end of the hook body and meshed with the power module; the first bearing fiber area 11 consists of two limiting sheets and is welded on the hook body; the second bearing limiting area 12 consists of two limiting sheets and is welded on the hook body; the first bearing 8 is sleeved with the hook body, sleeved on the first bearing fiber section 11 and clamped with the shell 7; and the second bearing 9 is sleeved with the hook body, and the sleeve machine is arranged on the second bearing limiting area 12 and is clamped with the shell 7.
The power module comprises: a driving gear 4 engaged with the binding hook 10; the motor bracket 6 is welded in the shell 7; and the driving motor 5 is screwed on the motor bracket 6, sleeved with the driving gear 4 and electrically connected with the control module.
The sensor module is a pressure sensor, is arranged at the front end of the pricking hook 10, is electrically connected with the control module, and is used for detecting the pressure applied to the front end of the pricking hook 10. The front end of the hook body is in a hook shape.
The indicator light module includes: the electric quantity indicator lamp is used for displaying the residual electric quantity of the storage battery; and the working state indicator light 2 is used for displaying the completion condition of the binding work of the construction steel bars.
The utility model saves the working procedure of manually turning the iron wire by the staff; the practical motor drives the binding hook 10 to bind, so that the binding speed is increased, the efficiency is improved, and fatigue caused by manual work can be avoided; when the binding is carried out, the number of screwing times is not too large, otherwise the binding is easy to break, and the screwing is stopped to a certain extent, so that the pressure sensor is adopted, when the pressure sensed by the sensor reaches a certain value, the motor is automatically stopped, the binding wire is prevented from breaking, and the working indicator lamp is lightened; the two bearings are used for stabilizing the rotating shaft of the binding hook 10, so that the binding hook 10 can stably rotate without deviation; the electric quantity indicator lamp is used for displaying the residual electric quantity of the storage battery.
In practical, will prick hook 10 collude the portion embolia in the ring that the ligature silk was reserved, press switch 1 motor start, the motor drives and pricks hook 10 rotatory for the ligature silk screws, and pressure sensor detects the pressure that prick hook 10 hook portion bore simultaneously, and when pressure to a definite value, the power of disconnection motor makes the motor stall, and switch 1 bounces, and lights the status indicator lamp simultaneously, notifies the staff and has accomplished ligature work.
The foregoing has described in detail preferred embodiments of the present invention. It should be understood that numerous modifications and variations can be devised by those skilled in the art in light of the teachings of the present invention without undue experimentation. Therefore, the technical solutions that can be obtained by a person skilled in the art through logic analysis, reasoning or limited experiments based on the prior art according to the concepts of the present invention should be within the scope of protection defined by the claims.
Claims (6)
1. The utility model provides an electronic hook of pricking for construction steel reinforcement, includes the shell, its characterized in that still includes:
the bundling hook is sleeved with the shell;
a charging port installed on the housing;
a storage battery electrically connected to the charging port;
the control module is electrically connected with the storage battery;
the switch is electrically connected with the control module and is arranged at the tail part of the shell;
the indicating lamp module is electrically connected with the control module;
the sensor module is electrically connected with the control module;
and the power module is electrically connected with the control module and is arranged in the shell.
2. An electric binder for construction rebar tying according to claim 1, wherein said binder comprises:
the hook body is sleeved with the shell;
the transmission gear is welded with the tail end of the hook body and is meshed with the power module;
the first bearing limiting interval consists of two limiting sheets and is welded on the hook body;
the second bearing limiting interval consists of two limiting sheets and is welded on the hook body;
the first bearing is sleeved with the hook body, sleeved on the first bearing limiting interval and clamped with the shell;
and the second bearing is sleeved with the hook body, and the sleeve machine is clamped with the shell on the limiting interval of the second bearing.
3. An electric lashing hook for construction rebar tying according to claim 1, wherein said power module comprises:
the driving gear is meshed with the bundling hook;
the motor bracket is welded in the shell;
and the driving motor is screwed on the motor bracket, is sleeved with the driving gear and is electrically connected with the control module.
4. The electric binding hook for binding construction steel bars according to claim 1, wherein the sensor module is a pressure sensor, is installed at the front end of the binding hook, is electrically connected with the control module, and is used for detecting the pressure applied to the front end of the binding hook.
5. An electric bundling hook for construction steel bar bundling according to claim 2, wherein said hook body front end is hook-shaped.
6. An electric tiehook for construction rebar tying according to claim 1, wherein said indicator light module comprises:
the electric quantity indicator lamp is used for displaying the residual electric quantity of the storage battery;
and the working state indicator light is used for displaying the completion condition of the binding work of the construction steel bars.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822158711.8U CN209891737U (en) | 2018-12-21 | 2018-12-21 | Electric binding hook for binding construction steel bars |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822158711.8U CN209891737U (en) | 2018-12-21 | 2018-12-21 | Electric binding hook for binding construction steel bars |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209891737U true CN209891737U (en) | 2020-01-03 |
Family
ID=68989463
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201822158711.8U Expired - Fee Related CN209891737U (en) | 2018-12-21 | 2018-12-21 | Electric binding hook for binding construction steel bars |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209891737U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112267686A (en) * | 2020-10-16 | 2021-01-26 | 重庆旭歌科技有限公司 | Automatic steel bar binding device and method for building construction |
-
2018
- 2018-12-21 CN CN201822158711.8U patent/CN209891737U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112267686A (en) * | 2020-10-16 | 2021-01-26 | 重庆旭歌科技有限公司 | Automatic steel bar binding device and method for building construction |
CN112267686B (en) * | 2020-10-16 | 2021-11-19 | 浙江广厦建设职业技术大学 | Automatic steel bar binding device and method for building construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209891737U (en) | Electric binding hook for binding construction steel bars | |
CN201215143Y (en) | Connecting structure of motor torque axis | |
CN209969402U (en) | Intelligent control circuit of electric pipe expander | |
CN208961155U (en) | A kind of full-automation all-in-one machine reinforced bar straight thread die head threading machine | |
CN108145032B (en) | Automatic bending machine for power line tower stay wire elbow | |
CN214560436U (en) | Wrench for steel bar joint sleeve | |
CN215249637U (en) | Be applied to sewage treatment's wind-force agitating unit | |
CN220701435U (en) | Handheld automatic wire binding fixing device | |
CN107681520B (en) | Transformer equipment fastening tool | |
CN208758719U (en) | A kind of handheld metal cutting machine | |
CN206016960U (en) | Generator set frame structure | |
CN203203732U (en) | Portable torque detection apparatus | |
CN204369320U (en) | A kind of can the cable bracket of bidirectional outlet | |
CN205742334U (en) | A kind of Diesel engine throttle energy-saving control system of excavator | |
CN209799401U (en) | Reinforcing steel bar binding tool | |
CN214365030U (en) | Steel bar hook pricking device for building engineering | |
CN220601061U (en) | Monitoring device for gas pressure regulating cabinet | |
CN208718390U (en) | A kind of binding of multi-functional bar and the elastic all-in-one machine of bolt | |
CN216267161U (en) | Curtain coating membrane machine device | |
CN205362248U (en) | Reinforcing bar is cold -drawing length photo -electric control mechanism for first time | |
CN211949659U (en) | Reinforcing steel bar binding device for concrete prefabricated part production | |
CN215558621U (en) | Lever block booster unit | |
CN217204915U (en) | Semi-automatic device of plugging into of reinforcing bar | |
CN216673932U (en) | Grafting device for grafting female populus diversifolia into male populus diversifolia | |
CN213224628U (en) | Quick pipe connecting device of accurate steel pipe of hand-held type |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200103 Termination date: 20211221 |
|
CF01 | Termination of patent right due to non-payment of annual fee |