CN209891719U - Well pit inner mould box is built in room - Google Patents

Well pit inner mould box is built in room Download PDF

Info

Publication number
CN209891719U
CN209891719U CN201920591200.7U CN201920591200U CN209891719U CN 209891719 U CN209891719 U CN 209891719U CN 201920591200 U CN201920591200 U CN 201920591200U CN 209891719 U CN209891719 U CN 209891719U
Authority
CN
China
Prior art keywords
box
steel pipe
flitch
inside wall
built
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920591200.7U
Other languages
Chinese (zh)
Inventor
陈诺
张奎
于福生
李聪聪
安晓阳
陈清明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Third Construction Co Ltd of CTCE Group
Original Assignee
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Third Construction Co Ltd of CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Tiesiju Civil Engineering Group Co Ltd CTCE Group, Third Construction Co Ltd of CTCE Group filed Critical China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Priority to CN201920591200.7U priority Critical patent/CN209891719U/en
Application granted granted Critical
Publication of CN209891719U publication Critical patent/CN209891719U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a well pit inner mould case is built in room, including plank sheathing, flitch and steel pipe, five plank sheathing constitute the box of the open cube structure of suitable for reading, and every inside wall of box all vertical laminating has a plurality of flitches, and a plurality of steel pipe vertical cross supports are in the box, and the both ends of steel pipe respectively with the inside wall or the flitch butt of the box that corresponds, the anti hole of floating of inner chamber intercommunication with the box is seted up to the bottom of box, and anti downthehole wall connection that floats has the wire net piece. The utility model adopts off-site centralized processing and integral hoisting, has high construction efficiency, saves labor, can effectively save construction period, and has safe and reliable construction; and the active exhaust is performed in the concrete pouring process, so that the vibration effect can be observed.

Description

Well pit inner mould box is built in room
Technical Field
The utility model belongs to the technical field of the construction, in particular to well pit inner mould case is built in room.
Background
Along with the rapid development of urban construction, building project floors in cities are higher and higher, the demand on underground parking lots is also increased, in the building project basic construction, the depths of elevator shafts or water collecting pits which are frequently involved are larger, the net size is smaller, the elevator shafts are generally 2 x 1.65m, the water collecting pits are generally 1(1.5) x 2 x 1.55(3.45) different, the assembling operation space is small by adopting site templates, an integral template supporting system is difficult to construct, the installation difficulty of bottom templates is large, and when concrete is poured, the time consumed for side wall concrete formwork lifting pouring is long. Therefore, a new method is urgently needed to be adopted for well pit template construction, work efficiency is improved, and quality safety is ensured.
SUMMERY OF THE UTILITY MODEL
Aiming at the technical problems in the prior art, the utility model provides a well pit inner mould box for house building, which can avoid the small operation space in the well pit and the difficult operation of assembling the mould plate, and improve the work efficiency of the mould plate construction; the method can avoid the concrete pouring of the suspended formwork and improve the concrete pouring efficiency.
In order to solve the technical problem, the utility model discloses a technical scheme is:
the utility model provides a well pit inner mould case is built in room, includes plank sheathing, flitch and steel pipe, five the plank sheathing constitutes the box of the open cube structure of suitable for reading, every inside wall of box all vertical laminating has a plurality of flitches, and is a plurality of steel pipe vertical cross supports in the box, just the both ends of steel pipe respectively with the inside wall or the flitch butt of the box that corresponds, the anti hole of floating that communicates with the inner chamber of box is seted up to the bottom of box, anti downthehole wall connection that floats has the wire net piece.
Preferably, the top of the box body is provided with a steel wire mesh observation hole.
Preferably, the steel pipe is a butt-bracing fastener type steel pipe.
Preferably, the top of the box body is provided with a steel pipe cross arm so as to be welded with the bottom plate steel bars or the pile anchor steel bars through steel bars.
Preferably, the steel wire mesh is fixed with the box body through a formwork strip.
Compared with the prior art, the utility model discloses the beneficial effect who has is: the utility model adopts off-site centralized processing and integral hoisting, has high construction efficiency, saves labor, can effectively save construction period, and has safe and reliable construction; and the active exhaust is performed in the concrete pouring process, so that the vibration effect can be observed.
Drawings
FIG. 1 is a schematic structural view of the inner mold box of the well pit for middle building of the present invention;
FIG. 2 is a schematic sectional view taken along line A-A of FIG. 1;
FIG. 3 is a schematic sectional view taken along line B-B of FIG. 1.
In the figure, 1. a template; 2. wood block; 3. a steel pipe; 4. anti-floating observation holes; 5. a steel wire mesh sheet; 6. a slat; 7. a steel pipe cross arm; 8. a steel bar pull rod.
Detailed Description
In order to make the technical solution of the present invention better understood by those skilled in the art, the present invention will be described in detail with reference to the accompanying drawings and specific embodiments.
As shown in fig. 1 to 3, the embodiment of the utility model discloses a mould case in well pit is built in room, including plank sheathing 1, flitch 2 and steel pipe 3, five plank sheathing 1 constitute the box of the open cube structure of suitable for reading, every inside wall of box all vertical laminating has a plurality of flitches 2, flitch 2 adopts the iron nail to be connected fixedly with plank sheathing 1, a plurality of steel pipe 3 vertical cross support is in the box, and the both ends of steel pipe 3 respectively with the inside wall or the 2 butts of flitch of the box that correspond, butt department adopts 2 steel nail part nails to go into the square timber, the steel nail tail end presss from both sides tight steel pipe, the interval that is used for between a plurality of steel pipes 3 of support in the box need enter through concrete side pressure and calculate the back rational arrangement. The steel pipe 3 can be selected from a butt-bracing fastener type steel pipe. The bottom of box is seted up with the anti observation hole 4 that floats of the inner chamber intercommunication of box, and the anti 4 inner wall connections in observation hole that float have steel mesh 5. The steel wire mesh 5 is fixed with the box body through a template strip 6. The anti-floating observation hole 4 is designed by adopting a 30cm multiplied by 30cm steel wire mesh 6 and a 5cm multiplied by 20cmD template strip 6 to be fixed and sealed with the box body. The anti-floating observation hole 4 can be used as an exhaust hole to play an exhaust role, so that bubbles at the bottom of the box body are timely removed through the anti-floating observation hole 4 in the pouring and vibrating processes, the quality of a bottom concrete finished product is prevented from being poor, and the phenomena of holes, honeycombs and the like are avoided.
In this embodiment, wire net anti observation hole 4 that floats has been seted up at the top of box to the condition in the observation box is favorable to.
In this embodiment, the top of box is equipped with steel pipe cross arm 7 to through reinforcing bar pull rod 8 and bottom plate reinforcing bar or stake anchor steel bar welding.
The utility model provides a mould case in well hole is built in room takes off the off-site centralized processing when the construction, then whole hoist and mount get into the basic well hole internal fixation that has accomplished reinforcement. And (3) carrying out anti-floating reinforcement according to anti-floating calculation: firstly, the upper part of the box body is additionally provided with a steel pipe cross arm so as to be welded and connected with a bottom plate steel bar or a pile anchor steel bar through a steel bar; secondly, the upper part of the box body adopts a counter weight measure. And after the reinforcement is finished, performing concrete pouring construction. In specific implementation, the anti-floating reinforcement of the box body is reasonably arranged through calculation. The concrete should be symmetrically poured on four sides in the construction process, the concrete should be vibrated, the hole state should be observed, and the release agent is coated on the outer surface of the wood formwork 1, so that the formwork can be conveniently detached.
The utility model provides a well pit centre form case is built in room has following technological effect:
1. compared with the conventional formwork, the construction method has the advantages that the centralized processing outside the field and the integral hoisting are adopted, the construction efficiency is high, the cross interference on the site is avoided, and the labor is saved. The existing group tower is adopted for hoisting, and the mechanical cost is not increased.
2. Because centralized processing and integral hoisting effectively avoid the crossed construction of steel bar workers and woodworkers, only advance processing is needed, the pit inner formwork box is installed after the steel bar construction is finished, if the formwork is assembled on site, the time consumption is long when the formwork, the inner ribs and the outer ribs, the supports and the like are assembled after the steel bar construction is finished, and therefore the construction period can be effectively saved. Meanwhile, the bottom die is not erected in the traditional erecting mode, the side wall of the pit at the position is used as formwork lifting concrete for construction during concrete pouring, and waiting time is long, so that time can be effectively saved.
3. The active air exhaust can be realized in the concrete pouring process, the vibration effect can be observed, and the concrete pouring quality can be effectively ensured.
4. The construction is safe, and the requirements of site construction are met.
The above embodiments are only exemplary embodiments of the present invention, and are not intended to limit the present invention, and the protection scope of the present invention is defined by the claims. Various modifications and equivalents of the invention can be made by those skilled in the art within the spirit and scope of the invention, and such modifications and equivalents should also be considered as falling within the scope of the invention.

Claims (5)

1. The utility model provides a well pit inner mould case is built in room, its characterized in that, including plank sheathing, flitch and steel pipe, five the plank sheathing constitutes the box of the open cube structure of suitable for reading, every inside wall of box all vertical laminating has a plurality of flitches, and is a plurality of steel pipe vertical cross support is in the box, just the both ends of steel pipe respectively with inside wall or the flitch butt of the box that corresponds, the anti hole of floating that communicates with the inner chamber of box is seted up to the bottom of box, anti downthehole wall connection that floats has the wire net piece.
2. The inner mold box for a house-building well pit according to claim 1, wherein a steel wire mesh observation hole is formed at the top of the box body.
3. The inner mold box for a house pit according to claim 1, wherein the steel pipe is a butt-bracing fastener type steel pipe.
4. The inner mold box for a house pit according to claim 1, wherein a steel pipe cross arm is provided on the top of the box body to be welded with a bottom plate reinforcement or a pile anchor reinforcement by a reinforcement.
5. The in-house building pit mould box of claim 1, wherein the steel wire mesh sheets are fixed with the box body through mould plate strips.
CN201920591200.7U 2019-04-28 2019-04-28 Well pit inner mould box is built in room Expired - Fee Related CN209891719U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920591200.7U CN209891719U (en) 2019-04-28 2019-04-28 Well pit inner mould box is built in room

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920591200.7U CN209891719U (en) 2019-04-28 2019-04-28 Well pit inner mould box is built in room

Publications (1)

Publication Number Publication Date
CN209891719U true CN209891719U (en) 2020-01-03

Family

ID=68999795

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920591200.7U Expired - Fee Related CN209891719U (en) 2019-04-28 2019-04-28 Well pit inner mould box is built in room

Country Status (1)

Country Link
CN (1) CN209891719U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112359874A (en) * 2020-11-18 2021-02-12 中建八局第三建设有限公司 Construction method of basement sump structure
CN112663869A (en) * 2021-03-01 2021-04-16 中国建筑第四工程局有限公司 Pre-buried folded cascade pre-buried device of groove of shearing

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112359874A (en) * 2020-11-18 2021-02-12 中建八局第三建设有限公司 Construction method of basement sump structure
CN112663869A (en) * 2021-03-01 2021-04-16 中国建筑第四工程局有限公司 Pre-buried folded cascade pre-buried device of groove of shearing

Similar Documents

Publication Publication Date Title
WO2013166658A1 (en) Method of casting in-situ steel wire mesh cement slab with spliced rack and suspended formwork
CN201474292U (en) Midsize template assembled large template
CN107217815B (en) Resistance to compression, safe type assembled steel construction elevartor shaft
CN209891719U (en) Well pit inner mould box is built in room
CN202787570U (en) Prefabricated integral reinforced concrete load bearing wall
CN107989238A (en) A kind of cast-in-place sandwiched heat-preservation shear wall structure, assembled architecture and engineering method
CN103669872A (en) Walling method and walling device
CN203808291U (en) Prefabricated lattice shear wallboard
CN104727446A (en) Construction method of large aluminum alloy formwork at settlement joint
CN101881060B (en) Prestressed concrete mansard rigid-frame beam
CN201236492Y (en) House building structure
CN216810535U (en) Prestressed PC truss bidirectional laminated slab
CN205400094U (en) Pothook formula ligature device of glomeration mode hoist and mount building block brickwork wall piece
CN212957172U (en) Template box-type superstructure is exempted from to assembled
CN213174397U (en) Whole prefabricated coincide floor of UHPC concrete
CN203684687U (en) Walling device
CN207597652U (en) A kind of cast-in-place sandwiched heat-preservation shear wall structure and assembled architecture
CN106522411A (en) Concrete wall provided with truss bar in prefabricated formwork shell
CN206289777U (en) The prefabricated girder-embedded reinforced concrete wall of formwork
CN111535581A (en) Convenient and fast mounting and dismounting type combined prefabricated formwork applicable to building floor lowering position
CN113152728A (en) Wallboard and floor exempt from to fall to ground supporting template system
CN201198612Y (en) Light energy-saving large module combined type external wall body
CN201679227U (en) Template-supporting device of cast-in-place concrete floor slab of box-shaped beam with steel frame structure
CN220814539U (en) Light-weight light-transmitting concrete slab
CN201722843U (en) Prestressed concrete polygonal-shaped rigid-frame beam

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200103

Termination date: 20210428

CF01 Termination of patent right due to non-payment of annual fee