CN209880090U - Engineering project progress management device for construction - Google Patents

Engineering project progress management device for construction Download PDF

Info

Publication number
CN209880090U
CN209880090U CN201920950801.2U CN201920950801U CN209880090U CN 209880090 U CN209880090 U CN 209880090U CN 201920950801 U CN201920950801 U CN 201920950801U CN 209880090 U CN209880090 U CN 209880090U
Authority
CN
China
Prior art keywords
wall
management device
mounting groove
progress management
slide
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920950801.2U
Other languages
Chinese (zh)
Inventor
王经纬
王文锦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuzhou College of Industrial Technology
Original Assignee
Xuzhou College of Industrial Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xuzhou College of Industrial Technology filed Critical Xuzhou College of Industrial Technology
Priority to CN201920950801.2U priority Critical patent/CN209880090U/en
Application granted granted Critical
Publication of CN209880090U publication Critical patent/CN209880090U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a engineering project progress management device for construction, including placing the frame, the lower extreme of placing the frame is fixed with the support base, the inboard side of placing the frame is equipped with the mounting groove, it has clear glass to bond in the mounting groove, relative inner wall all is equipped with the device groove about the mounting groove, the device inslot is equipped with clamping mechanism, the upper and lower inner wall of mounting groove all is equipped with stop gear, the back of placing the frame is equipped with displacement mechanism, be equipped with warning mechanism on the displacement mechanism. The utility model discloses rational in infrastructure, be convenient for install, convenient to use to can plan wantonly and remind.

Description

Engineering project progress management device for construction
Technical Field
The utility model relates to a construction technical field especially relates to an engineering project progress management device for construction.
Background
Along with the rapid development of society, people's life rhythm's acceleration carries out planned management to present construction progress, can effectual improvement work efficiency, and rational planning time limit for a project improves construction quality simultaneously for the construction progress guides the workman, reduces the construction risk, improves safe construction consciousness, accomplishes reasonable and orderly construction.
At present, the construction progress management is mostly printed by adopting a computer and pasted on the site, the wall is generally directly adhered to the wall at present, the adhesion can be completed only by matching two persons, the operation is troublesome, the removal is needed during the disassembly, and the reminding effect cannot be realized on some plans and time needing special attention.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the shortcoming that exists among the prior art, and the engineering project progress management device for construction that proposes, it is convenient for install, convenient to use to can plan wantonly and remind.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides an engineering project progress management device for construction, is including placing the frame, the lower extreme of placing the frame is fixed with the support base, the inboard side of placing the frame is equipped with the mounting groove, it has clear glass to bond in the mounting groove, relative inner wall all is equipped with the device groove about the mounting groove, the device inslot is equipped with clamping mechanism, the upper and lower inner wall of mounting groove all is equipped with stop gear, the back of placing the frame is equipped with displacement mechanism, be equipped with warning mechanism on the displacement mechanism.
Preferably, the upper end of the placing frame is provided with a rain cover.
Preferably, the clamping mechanism comprises a supporting plate arranged in the device groove, two pull rods penetrating through the device groove are fixed on the front side of the supporting plate, a spring is sleeved on each pull rod, pull handles are fixedly connected to the tail ends of the two pull rods, and a clamping plate is fixedly connected to the inner side wall of the supporting plate through a connecting rod.
Preferably, stop gear is including inlaying the ironbar of establishing on the inner wall about the mounting groove, place a plurality of magnetic blocks of being connected with ironbar magnetism on the transparent glass.
Preferably, the displacement mechanism includes the guide bar of fixing between the upper and lower inner walls of the placement frame, two the slide bar of vertical setting is overlapped between the guide bar, the cover is equipped with the slider on the slide bar, run through on the slider and be equipped with the slide, the slide bar runs through the slide, the inner wall that the slide is relative all is fixed with the arc shell fragment, the arc shell fragment offsets with the slide bar.
Preferably, the reminding mechanism comprises an LED lamp arranged on the front side of the sliding block, and a switch and a battery which are electrically connected with the LED lamp are arranged in the sliding block.
Compared with the prior art, the utility model, its beneficial effect does:
1. through setting up clamping mechanism and stop gear, completion installation that can be quick is convenient for change when needs adjustment show cloth, and alone can accomplish.
2. Through setting up displacement mechanism and warning mechanism, can carry out the removal of arbitrary row, row to warning mechanism, move to the place that needs special attention corresponding show cloth, play fine warning effect.
Drawings
Fig. 1 is a schematic structural view of an engineering project progress management device for building construction according to the present invention;
fig. 2 is a schematic cross-sectional view of a placement frame of the project progress management device for building construction according to the present invention;
fig. 3 is a back schematic view of a placement frame of the project progress management device for building construction according to the present invention;
fig. 4 is the utility model provides a schematic view is overlooked to slider of engineering project progress management device for construction.
In the figure: the device comprises a placement frame 1, a mounting groove 2, an iron bar 3, a support plate 4, a pull rod 5, a clamping plate 6, a device groove 7, a rainproof cover 8, a pull handle 9, a magnetic block 10, transparent glass 11, a supporting base 12, a guide rod 13, a sliding block 14, a sliding rod 15, an LED lamp 16, an arc-shaped elastic sheet 17 and a slideway 18.
Detailed Description
In order to make the above objects, features and advantages of the present invention more comprehensible, embodiments of the present invention are described in detail below with reference to the accompanying drawings. In the following description, numerous specific details are set forth in order to provide a thorough understanding of the present invention. The present invention can be embodied in many different forms other than those specifically described herein, and it will be apparent to those skilled in the art that similar modifications can be made without departing from the spirit and scope of the invention, and it is therefore not to be limited to the specific embodiments disclosed below.
It will be understood that when an element is referred to as being "secured to" another element, it can be directly on the other element or intervening elements may also be present. When an element is referred to as being "connected" to another element, it can be directly connected to the other element or intervening elements may also be present. The terms "vertical," "horizontal," "left," "right," and the like as used herein are for illustrative purposes only and do not represent the only embodiments.
Referring to fig. 1-4, an engineering project progress management device for building construction comprises a placing frame 1, a rain cover 8 is installed at the upper end of the placing frame 1 to prevent rainwater from wetting, a supporting base 12 is fixed at the lower end of the placing frame 1, a mounting groove 2 is arranged at the inner side edge of the placing frame 1, transparent glass 11 is bonded in the mounting groove 2, device grooves 7 are arranged on the left inner wall and the right inner wall of the mounting groove 2, a clamping mechanism is arranged in the device grooves 7 and comprises a supporting plate 4 arranged in the device grooves 7, two pull rods 5 penetrating through the device grooves 7 are fixed on the front side of the supporting plate 4, springs are sleeved on the pull rods 5, pull handles 9 are fixedly connected to the tail ends of the two pull rods 5, clamping plates 6 are fixedly connected to the inner side wall of the supporting plate 4 through connecting rods, a display cloth printed by a computer is laid on the surface of the transparent glass 11, the clamping plates 6 are lifted by pulling the pull handles 9, the two side edges of the display cloth are, the pull handle 9 is released, and the clamping and the fixing are carried out through the elastic action of the spring.
The upper and lower inner walls of the mounting groove 2 are provided with limiting mechanisms which are embedded in the upper and lower parts of the mounting groove 2
The back of the placing frame 1 is provided with a displacement mechanism, the displacement mechanism is provided with a reminding mechanism, the displacement mechanism comprises guide rods 13 fixed between the upper inner wall and the lower inner wall of the placing frame 1, a vertically arranged slide rod 15 is sleeved between the two guide rods 13, a slide block 14 is sleeved on the slide rod 15, a slide way 18 is arranged on the slide block 14 in a penetrating way, the slide rod 15 penetrates through the slide way 18, arc-shaped elastic sheets 17 are fixed on the inner walls opposite to the slide way 18, the arc-shaped elastic sheets 17 are abutted against the slide rod 15, the reminding mechanism comprises an LED lamp 16 arranged on the front side of the slide block 14, a switch and a battery which are electrically connected with the LED lamp 16 are arranged in the slide block 14, when a display cloth is provided with a plan needing special attention, the slide block 14 only needs to be held to move up and down, the slide block 14 can move left and right freely move left and right under the guide, the two arc-shaped elastic sheets 17 tightly abut against the sliding rod 15 and keep still, the switch is turned on, the LED lamp 16 is lightened, and the corresponding position of the display cloth is lightened, so that the reminding effect is achieved.
In the utility model, when in use, the display cloth printed by the computer is laid on the surface of the transparent glass 11, the pull handle 9 is pulled to lift the clamp plates 6, the edges of the two sides of the display cloth are respectively arranged under the two clamp plates 6, the pull handle 9 is loosened, the display cloth is clamped and fixed through the elastic action of the spring, a plurality of magnetic blocks 10 can be arranged on the upper edge and the lower edge of the display cloth according to the requirement, the magnetic blocks 10 are limited through the attraction with the iron bars 3, the installation is rapid and convenient, and the replacement is convenient; when a plan needing special attention is made on the display cloth, the sliding block 14 only needs to be held to move left and right, the sliding rod 15 freely moves left and right under the guide of the guide rod 13, the sliding block 14 only needs to be pulled up and down with slight force to move on the sliding rod 15 after moving up and down, after the sliding block moves to a corresponding position, the two arc-shaped elastic sheets 17 abut against the sliding rod 15 to keep static, the switch is turned on, the LED lamp 16 is lightened, the corresponding position of the display cloth is illuminated, and a reminding effect is achieved.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The utility model provides an engineering project progress management device for construction, is including placing frame (1), its characterized in that, the lower extreme of placing frame (1) is fixed with support base (12), the inboard side of placing frame (1) is equipped with mounting groove (2), it has clear glass (11) to bond in mounting groove (2), relative inner wall all is equipped with device groove (7) about mounting groove (2), be equipped with clamping mechanism in device groove (7), the upper and lower inner wall of mounting groove (2) all is equipped with stop gear, the back of placing frame (1) is equipped with displacement mechanism, be equipped with warning mechanism on the displacement mechanism.
2. The project progress management device for building construction according to claim 1, wherein a rain cover (8) is installed on the upper end of the placement frame (1).
3. The project progress management device for building construction according to claim 1, wherein the clamping mechanism comprises a supporting plate (4) arranged in a device groove (7), two pull rods (5) penetrating through the device groove (7) are fixed on the front side of the supporting plate (4), a spring is sleeved on each pull rod (5), pull handles (9) are fixedly connected to the tail ends of the two pull rods (5), and a clamping plate (6) is fixedly connected to the inner side wall of the supporting plate (4) through a connecting rod.
4. The engineering project progress management device for building construction according to claim 1, wherein the limiting mechanism comprises iron bars (3) embedded on the upper inner wall and the lower inner wall of the installation groove (2), and a plurality of magnetic blocks (10) magnetically connected with the iron bars (3) are placed on the transparent glass (11).
5. The engineering project progress management device for building construction according to claim 1, wherein the displacement mechanism comprises guide rods (13) fixed between the upper inner wall and the lower inner wall of the placement frame (1), a vertically arranged slide rod (15) is sleeved between the two guide rods (13), a slide block (14) is sleeved on the slide rod (15), a slide way (18) is arranged on the slide block (14) in a penetrating mode, the slide rod (15) penetrates through the slide way (18), arc-shaped elastic pieces (17) are fixed on the inner walls, opposite to the slide way (18), of the slide way (18), and the arc-shaped elastic pieces (17) abut against the slide rod (15).
6. The project schedule management device for building construction according to claim 5, characterized in that the reminding mechanism comprises an LED lamp (16) installed on the front side of the sliding block (14), and a switch and a battery electrically connected with the LED lamp (16) are arranged in the sliding block (14).
CN201920950801.2U 2019-06-21 2019-06-21 Engineering project progress management device for construction Expired - Fee Related CN209880090U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920950801.2U CN209880090U (en) 2019-06-21 2019-06-21 Engineering project progress management device for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920950801.2U CN209880090U (en) 2019-06-21 2019-06-21 Engineering project progress management device for construction

Publications (1)

Publication Number Publication Date
CN209880090U true CN209880090U (en) 2019-12-31

Family

ID=68946936

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920950801.2U Expired - Fee Related CN209880090U (en) 2019-06-21 2019-06-21 Engineering project progress management device for construction

Country Status (1)

Country Link
CN (1) CN209880090U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111288935A (en) * 2020-03-18 2020-06-16 徐州工业职业技术学院 Building area measuring device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111288935A (en) * 2020-03-18 2020-06-16 徐州工业职业技术学院 Building area measuring device
CN111288935B (en) * 2020-03-18 2021-07-20 徐州工业职业技术学院 Building area measuring device

Similar Documents

Publication Publication Date Title
CN205254369U (en) Welding jig's change device
CN209880090U (en) Engineering project progress management device for construction
CN106836823B (en) A kind of wall is to positive installation auxiliary device
CN112777535B (en) High-rise building operation platform
CN211681779U (en) Positioning tool for computer assembly
CN211788029U (en) Warning sign of removable warning poster for construction
CN210349069U (en) Label convenient to change
CN203999838U (en) Electrolytic manganese negative plate grasping jig
CN109986514B (en) Automatic maintenance platform device
CN208132699U (en) A kind of pinch-proof structure of acrylic diamond polishing machine
CN208342933U (en) A kind of electromechanical integration span-adjustable cutter device
CN208055486U (en) A kind of driving plating fixing device
CN221140876U (en) Electromechanical device installation device
CN204584957U (en) Pipe cutting equipment and grasping system thereof
CN211679853U (en) Riveting and nailing equipment for light steel structure wallboard
CN105751095B (en) A kind of battery cover board fixture
CN206032711U (en) Portable type lamp strip board collecting device
CN214728290U (en) Battery mounting and dismounting device capable of riding type intelligent vehicle
CN216961810U (en) Design is with graphic design table
CN218757106U (en) Guide board convenient for changing content
CN214235470U (en) Glass rotating frame clamp
CN216949247U (en) Decorate stone material and hang mounting structure futilely
CN215892269U (en) Unlimited extension structure of dull and stereotyped lamp
CN210010773U (en) Edge grinding equipment for grinding upper cover and face frame of street lamp
CN216583790U (en) Balancing device for electromechanical device installation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191231

Termination date: 20200621

CF01 Termination of patent right due to non-payment of annual fee