CN209878367U - Geological detection sampling device - Google Patents
Geological detection sampling device Download PDFInfo
- Publication number
- CN209878367U CN209878367U CN201920295860.0U CN201920295860U CN209878367U CN 209878367 U CN209878367 U CN 209878367U CN 201920295860 U CN201920295860 U CN 201920295860U CN 209878367 U CN209878367 U CN 209878367U
- Authority
- CN
- China
- Prior art keywords
- handle
- pipe
- sliding groove
- fixing
- fixedly arranged
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000005070 sampling Methods 0.000 title claims abstract description 20
- 238000001514 detection method Methods 0.000 title claims description 12
- 241000979122 Bembrops anatirostris Species 0.000 claims description 5
- 239000002689 soil Substances 0.000 abstract description 15
- 239000011435 rock Substances 0.000 abstract description 10
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 abstract 2
- 241000405070 Percophidae Species 0.000 abstract 1
- 229910052742 iron Inorganic materials 0.000 abstract 1
- 125000003003 spiro group Chemical group 0.000 abstract 1
- 238000004891 communication Methods 0.000 description 12
- 101100008047 Caenorhabditis elegans cut-3 gene Proteins 0.000 description 2
- 229920000742 Cotton Polymers 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 238000005299 abrasion Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000004744 fabric Substances 0.000 description 1
- 239000003292 glue Substances 0.000 description 1
- 238000011835 investigation Methods 0.000 description 1
- 238000005527 soil sampling Methods 0.000 description 1
Landscapes
- Sampling And Sample Adjustment (AREA)
Abstract
The utility model discloses a sampling device is surveyed to geology, the electric iron comprises a handle, one side fixed surface of handle installs the tup, the opposite side surface spiro union of handle has the stopper, the upper end fixed surface of tup installs the duckbill crew cut, one side fixed surface of tup installs square pipe, the equal movable mounting in both ends surface has adjusting nut around the square pipe, the front end surface of handle is close to the fixed position of one side surface and has anti-skidding handle, the inside of handle is provided with first pipe, one side fixed surface of first pipe installs the tip, the inside movable mounting of first pipe has the second pipe. The utility model discloses a be provided with a series of structures and make this device can do the mark on the rock in the use, can gather soil, avoided the staff to take off the hand when gathering the rock sample, optimize the use.
Description
Technical Field
The utility model relates to a sampling device technical field is surveyed to the geology specifically is a sampling device is surveyed to geology.
Background
The geological detection and sampling means that the geological exploration and detection are carried out through various means and methods, a proper holding layer is determined, the foundation type is determined according to the foundation bearing capacity of the holding layer, and the investigation and research activities of basic parameters are calculated.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a sampling device is surveyed to geology to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a geological detection sampling device comprises a handle, wherein a hammer head is fixedly arranged on the outer surface of one side of the handle, a plug is screwed on the outer surface of the other side of the handle, a duckbill flat head is fixedly arranged on the outer surface of the upper end of the hammer head, a square pipe is fixedly arranged on the outer surface of one side of the hammer head, adjusting nuts are movably arranged on the outer surfaces of the front end and the rear end of the square pipe respectively, an anti-slip handle is fixedly arranged at the position, close to the outer surface of one side, of the outer surface of the front end of the handle, a first circular pipe is arranged inside the handle, a pointed end is fixedly arranged on the outer surface of one side of the first circular pipe, a second circular pipe is movably arranged inside the first circular pipe, a ring is fixedly arranged on the outer surface of one side of the second circular pipe, the third spout has been seted up to the rear end surface of first pipe, first spout, second spout and third spout intercommunication, the inside movable mounting of third spout has the slider, the rear end surface fixed mounting of handle has first fixed block and second fixed block, and first fixed block is located one side of second fixed block, the rear end surface fixed mounting of first fixed block has first fixed band, the rear end surface of first fixed band covers has the female subsides of magic, the rear end surface fixed mounting of second fixed block has the second fixed band, the front end surface fixed mounting of second fixed band has the magic to paste.
Through adopting above-mentioned technical scheme, but current geological survey sampling device can do the mark on the rock, can gather soil, has avoided the staff to take off the hand at handle when gathering the rock sample.
Preferably, the outer surface of one end of each of the two adjusting nuts is movably provided with a fixing plate, and the middle part of each fixing plate is provided with a radian.
Through adopting above-mentioned technical scheme, made things convenient for the staff to clip the chalk through two fixed plates on two adjusting nut, and then fixed the chalk, made things convenient for the staff to make the mark on the rock through the chalk.
Preferably, the handle, the hammer head and the duckbill flat head are of an integrated structure.
Through adopting above-mentioned technical scheme, make handle, tup and duckbilled crew cut firmer, more durable.
Preferably, a sponge block is fixedly arranged on the outer surface of one side of the plug.
Through adopting above-mentioned technical scheme, avoided the ring to cause the wearing and tearing to the stopper.
Preferably, a first opening is formed in the outer surface of the upper end of the first circular tube, a second opening is formed in the outer surface of the upper end of the second circular tube, and the first opening and the second opening are identical in size and specification.
Work as through adopting above-mentioned technical scheme, the coincidence of the first opening on the first pipe and the second opening on the second pipe, soil can first opening and second opening flow in the inside of second pipe, makes things convenient for the staff to the collection of soil.
Preferably, the first fixed block and the second fixed block are two sets of fixed blocks, the first fixed block and the second fixed block are identical in size and specification, and the first fixing band and the second fixing band are identical in size and specification.
Through adopting above-mentioned technical scheme, made things convenient for the magic on the second fixed band to paste and paste on the female subsides of magic on first fixed band, and then fixed staff's hand on the antiskid handle.
To sum up, the utility model discloses following beneficial effect has:
1. the chalk is placed in the square tube by workers, and the chalk is clamped by the two fixing plates on the two adjusting nuts by rotating the adjusting nuts at the front end and the rear end of the square tube, so that the chalk is fixed, and the workers can conveniently mark on the rock by the chalk;
2. the plug is opened by a worker, the first round pipe is taken out from the inside of the handle, the sliding block on the second round pipe slides to the communication position of the first sliding groove and the third sliding groove from the communication position of the second sliding groove and the third sliding groove, at the moment, the second opening does not coincide with the first opening, the pointed end faces downwards, the first round pipe is inserted into soft soil, the sliding block on the second round pipe slides to the communication position of the second sliding groove and the third sliding groove from the communication position of the first sliding groove and the third sliding groove, at the moment, the first opening on the first round pipe coincides with the second opening on the second round pipe, soil flows into the inside of the second round pipe from the first opening and the second opening, the bottom of the second round pipe is closed, the worker slides the sliding block on the second round pipe to the communication position of the first sliding groove and the third sliding groove from the communication position of the second sliding groove and the third sliding groove again, and the worker hooks the round ring by hand, the second round pipe is moved out of the first round pipe through the sliding block and the first sliding chute, soil in the second round pipe is poured into the corresponding sampling bag, the first round pipe is taken out, and a worker uncovers the sampling bag to finish sampling soil in soft soil;
3. through holding on anti-skidding handle at the staff, first fixed band and second fixed band are the cotton and make, have avoided causing the harm to staff's hand, paste with the son magic on the second fixed band and paste the female subsides of magic on first fixed band, can fix staff's hand on the anti-skidding handle, avoided the staff to take off the hand when gathering the rock sample.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a view of the square tube and the adjusting nut;
FIG. 3 is a view showing the ring and the first circular tube of the present invention;
fig. 4 is an enlarged view of fig. 3 a according to the present invention;
fig. 5 is a view showing the first fixing block and the second fixing block of the present invention;
figure 6 is the utility model discloses a female subsides of magic and the female cooperation view of pasting of magic.
In the figure: 1. a handle; 2. a hammer head; 3. a duckbill flat head; 4. a square tube; 5. adjusting the nut; 6. a fixing plate; 7. an anti-slip handle; 8. a plug; 9. a sponge block; 10. a first circular tube; 11. a circular ring; 12. a tip; 13. a first chute; 14. a second chute; 15. a third chute; 16. a slider; 17. a second circular tube; 18. a first opening; 19. a second opening; 20. a first fixed block; 21. a second fixed block; 22. a first securing strap; 23. a second securing strap; 24. a magic female sticker; 25. a magic tape.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "both ends", "one end", "the other end" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element to which the reference is made must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "disposed," "connected," and the like are to be construed broadly, and for example, "connected" may be either fixedly connected or detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Referring to fig. 1-6, the present invention provides an embodiment: a geological detection sampling device comprises a handle 1, a hammer head 2 is fixedly arranged on the outer surface of one side of the handle 1, a plug 8 is screwed on the outer surface of the other side of the handle 1, a square pipe 4 is fixedly arranged on the outer surface of one side of the hammer head 2, workers can conveniently clamp chalk through two fixing plates 6 on two adjusting nuts 5 on the square pipe 4 so as to fix the chalk, adjusting nuts 5 are movably arranged on the outer surfaces of the front end and the rear end of the square pipe 4, a duckbill flat head 3 is fixedly arranged on the outer surface of the upper end of the hammer head 2, a first fixing block 20 and a second fixing block 21 are fixedly arranged on the outer surface of the rear end of the handle 1, the first fixing block 20 is positioned on one side of the second fixing block 21, a first fixing belt 22 is fixedly arranged on the outer surface of the rear end of the first fixing block 20, a second fixing belt 23 is fixedly arranged on the, the magic tape 25 is fixedly arranged on the outer surface of the front end of the second fixing band 23, the magic tape 25 and the magic female tape 24 facilitate the fixation of the first fixing band 22 and the second fixing band 23, the first round tube 10 is arranged in the handle 1, the pointed end 12 is fixedly arranged on the outer surface of one side of the first round tube 10, the first round tube 10 is conveniently inserted into the soil, the anti-slip handle 7 is fixedly arranged at the position, close to the outer surface of one side, of the outer surface of the front end of the handle 1, the second round tube 17 is movably arranged in the first round tube 10, the circular ring 11 is fixedly arranged on the outer surface of one side of the second round tube 17, the second round tube 17 is conveniently pulled out of the first round tube 10, the first chute 13 is arranged on the inner surface of the lower end of the first round tube 10, the second chute 14 is arranged on the inner surface of the upper end of the first round tube 10, the third chute 15 is arranged on the outer surface of the rear end of the, the slider 16 is movably arranged in the third sliding groove 15, so that the overall use performance of the device is improved, and the use process is optimized.
Furthermore, the outer surfaces of the two ends of the two adjusting nuts 5 are movably provided with the fixing plates 6, and the middle parts of the fixing plates 6 are provided with radians, so that the chalk is clamped by the workers through the two fixing plates 6 on the two adjusting nuts 5, the chalk is fixed, and the workers can mark on the rock through the chalk.
Further, handle 1, tup 2 and duckbilled crew cut 3 integrated structure make handle 1, tup 2 and duckbilled crew cut 3 firmer, more durable.
Further, the sponge block 9 is fixedly arranged on the outer surface of one side of the plug 8, and abrasion of the circular ring 11 to the plug 8 is avoided.
Further, first opening 18 has been seted up to the upper end surface of first pipe 10, and second opening 19 has been seted up to the upper end surface of second pipe 17, and first opening 18 is the same with the big or small specification of second opening 19, and the coincidence of the second opening 19 on first opening 18 on the first pipe 10 and the second pipe 17, soil can first opening 18 and second opening 19 flow into the inside of second pipe 17, makes things convenient for the staff to the collection of soil.
Further, first fixed block 20 and second fixed block 21 all have two sets ofly, and first fixed block 20 is the same with 21 size specifications of second fixed block, and the size specifications of first fixed band 22 and second fixed band 23 are the same, have made things convenient for the magic on the second fixed band 23 to paste 25 and glue on the female subsides 24 of magic on first fixed band 22, and then fix staff's hand on the anti-skidding handle 7.
It should be noted that, when the utility model is used, firstly, the working personnel places the chalk in the square tube 4, the chalk is clamped by the two fixing plates 6 on the two adjusting nuts 5 by rotating the adjusting nuts 5 at the front end and the rear end of the square tube 4, and then the chalk is fixed, so that the working personnel can mark the rock with the chalk, secondly, the working personnel opens the plug 8, takes the first round tube 10 out of the handle 1, slides the slide block 16 on the second round tube 17 from the communication position of the second sliding groove 14 and the third sliding groove 15 to the communication position of the first sliding groove 13 and the third sliding groove 15, at the moment, the second opening 19 is not overlapped with the first opening 18, the tip 12 faces downwards, inserts the first round tube 10 into the soft land, and slides the slide block 16 on the second round tube 17 from the communication position of the first sliding groove 13 and the third sliding groove 15 to the communication position of the second sliding groove 14 and the third sliding groove 15, at the moment, a first opening 18 on the first round pipe 10 is overlapped with a second opening 19 on the second round pipe 17, soil flows into the second round pipe 17 from the first opening 18 and the second opening 19, the bottom of the second round pipe 17 is closed, a worker slides a sliding block 16 on the second round pipe 17 to a communication position of a first sliding groove 13 and a third sliding groove 15 from a communication position of a second sliding groove 14 and a third sliding groove 15 again, the worker hooks the ring 11 with hands, the second round pipe 17 is moved out from the first round pipe 10 through the sliding block 16 and the first sliding groove 13, the soil in the second round pipe 17 is poured into a corresponding sampling bag, the first round pipe 10 is taken out, the worker uncovers the soil sampling on soft soil, finally, the worker holds the anti-slip handle 7 with hands, the first fixing belt 22 and the second fixing belt 23 are both made of cotton cloth, and damage to the hands of the worker is avoided, the magic tape 25 on the second fixing band 23 is adhered to the magic female tape 24 on the first fixing band 22, so that the hands of the workers on the anti-slip handle 7 can be fixed, the situation that the handle 1 is separated from the hands when the workers collect rock samples is avoided, the functionality of the workers is effectively improved, and the anti-slip handle is practical.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Claims (6)
1. Geological detection sampling device, comprising a handle (1), characterized in that: the anti-skidding handle is characterized in that a hammer head (2) is fixedly arranged on the outer surface of one side of the handle (1), a plug (8) is screwed on the outer surface of the other side of the handle (1), a duckbill flat head (3) is fixedly arranged on the outer surface of the upper end of the hammer head (2), a square pipe (4) is fixedly arranged on the outer surface of one side of the hammer head (2), adjusting nuts (5) are movably arranged on the outer surfaces of the front end and the rear end of the square pipe (4), an anti-skidding handle (7) is fixedly arranged on the outer surface of the front end of the handle (1) close to the outer surface of one side of the handle, a first circular pipe (10) is arranged inside the handle (1), a pointed end (12) is fixedly arranged on the outer surface of one side of the first circular pipe (10), a second circular pipe (17) is movably arranged, a first sliding groove (13) is formed in the inner surface of the lower end of the first circular tube (10), a second sliding groove (14) is formed in the inner surface of the upper end of the first circular tube (10), a third sliding groove (15) is formed in the outer surface of the rear end of the first circular tube (10), the first sliding groove (13), the second sliding groove (14) and the third sliding groove (15) are communicated, a sliding block (16) is movably mounted inside the third sliding groove (15), a first fixing block (20) and a second fixing block (21) are fixedly mounted on the outer surface of the rear end of the handle (1), the first fixing block (20) is located on one side of the second fixing block (21), a first fixing band (22) is fixedly mounted on the outer surface of the rear end of the first fixing block (20), a magic nut sticker (24) covers the outer surface of the rear end of the first fixing band (22), a second fixing band (23) is fixedly mounted on the outer surface of the rear end of, and a magic tape (25) is fixedly arranged on the outer surface of the front end of the second fixing belt (23).
2. A geological detection sampling apparatus according to claim 1, wherein: the outer surface of one end of each of the two adjusting nuts (5) is movably provided with a fixing plate (6), and the middle part of each fixing plate (6) is provided with a radian.
3. A geological detection sampling apparatus according to claim 1, wherein: the handle (1), the hammer head (2) and the duckbilled flat head (3) are of an integrated structure.
4. A geological detection sampling apparatus according to claim 1, wherein: and a sponge block (9) is fixedly arranged on the outer surface of one side of the plug (8).
5. A geological detection sampling apparatus according to claim 1, wherein: first opening (18) have been seted up to the upper end surface of first pipe (10), second opening (19) have been seted up to the upper end surface of second pipe (17), the size and specification homogeneous phase of first opening (18) and second opening (19) is the same.
6. A geological detection sampling apparatus according to claim 1, wherein: the first fixing block (20) and the second fixing block (21) are two in number, the first fixing block (20) and the second fixing block (21) are identical in size and specification, and the first fixing belt (22) and the second fixing belt (23) are identical in size and specification.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920295860.0U CN209878367U (en) | 2019-03-08 | 2019-03-08 | Geological detection sampling device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920295860.0U CN209878367U (en) | 2019-03-08 | 2019-03-08 | Geological detection sampling device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209878367U true CN209878367U (en) | 2019-12-31 |
Family
ID=68954367
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920295860.0U Expired - Fee Related CN209878367U (en) | 2019-03-08 | 2019-03-08 | Geological detection sampling device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209878367U (en) |
-
2019
- 2019-03-08 CN CN201920295860.0U patent/CN209878367U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209878367U (en) | Geological detection sampling device | |
CN202959260U (en) | Kit for electrician | |
CN206630157U (en) | A kind of gardens pruning kit | |
CN205597391U (en) | Novel accomodate bag | |
CN207826878U (en) | Intelligent auxiliary tool for measuring environmental water sample by ICP-MS method | |
CN106175043A (en) | A kind of site environment monitors multi-functional sampling knapsack | |
CN209950573U (en) | Measuring tool case for civil engineering | |
CN209473948U (en) | Poisoning detection and occupational health sample multifunctional backpack | |
CN202035649U (en) | Tool back strap | |
CN210407454U (en) | Can dismantle bicycle top tube list package of touch screen cell-phone bag | |
CN209342107U (en) | A kind of figure plotting board of urban and rural planning | |
CN206230480U (en) | Holding tools arm band | |
CN213208806U (en) | Portable steel ruler for surveying and mapping | |
CN212311990U (en) | Portable geological box | |
CN213128197U (en) | Open-air geology geography plotting tool carries waistband | |
CN205053179U (en) | Fire control detects apparatus waist -carrying package | |
CN212647021U (en) | Geological mineral exploration is with multi-functional geological compass | |
CN212735967U (en) | Novel portable safety tool bag | |
CN214604284U (en) | Portable tool box for outdoor measurement | |
CN211841914U (en) | Concrete carbonization degree of depth measuring tool storage device | |
CN217900817U (en) | Portable land area measuring instrument | |
CN220109850U (en) | Braces formula nucleic acid sampling package | |
CN213902669U (en) | Thermometer with bluetooth beacon | |
CN217879422U (en) | Portable electric power system loop resistance tester | |
CN212553777U (en) | Foundation pit deformation detection equipment tool box |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20191231 |
|
CF01 | Termination of patent right due to non-payment of annual fee |