CN209868340U - Shot-blasting machine lifting hook stabilizing support device - Google Patents

Shot-blasting machine lifting hook stabilizing support device Download PDF

Info

Publication number
CN209868340U
CN209868340U CN201920535423.1U CN201920535423U CN209868340U CN 209868340 U CN209868340 U CN 209868340U CN 201920535423 U CN201920535423 U CN 201920535423U CN 209868340 U CN209868340 U CN 209868340U
Authority
CN
China
Prior art keywords
supporting rod
section
plate
supporting
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920535423.1U
Other languages
Chinese (zh)
Inventor
殷雷子
杨小峥
朱志华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hefei Casting and Forging Factory of Anhui Heli Co Ltd
Original Assignee
Hefei Casting and Forging Factory of Anhui Heli Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hefei Casting and Forging Factory of Anhui Heli Co Ltd filed Critical Hefei Casting and Forging Factory of Anhui Heli Co Ltd
Priority to CN201920535423.1U priority Critical patent/CN209868340U/en
Application granted granted Critical
Publication of CN209868340U publication Critical patent/CN209868340U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model relates to a shot-blasting machine lifting hook stabilizing support device, include: hanger plate, backup pad, its characterized in that still includes: fixed plate, bearing structure. The fixed plate is installed on the hanger plate. The support structure is mounted on the fixed plate. The support structure includes: the first supporting rod, the second supporting rod and the third supporting rod. The first support bar includes: the first section is a shaft with fixed length. The second section is a threaded shaft and is in threaded connection with the supporting plate. The shaft diameter of the first section is larger than that of the second section, and a positioning surface is arranged at the joint of the first section and the second section. The first supporting rod is the same as the second supporting rod and the third supporting rod in structure, and the first supporting rod is placed in a triangular mode between the first supporting rod and the second supporting rod as well as between the first supporting rod and the third supporting rod. The utility model discloses the device realizes automatic positioning through setting up the locating surface, reduces the bracing piece through three spinal branch vaulting poles that set up the restriction of each other and runs the position, stabilizes bracing piece mounted position and triangle-shaped through setting up the fixed plate and puts the relation.

Description

Shot-blasting machine lifting hook stabilizing support device
Technical Field
The utility model relates to a lifting hook technical field specifically is a shot-blasting machine lifting hook stabilizing support device.
Background
The shot blasting machine is provided with a plurality of lifting hooks, and the replacement frequency is high due to abrasion and deformation during use, and the machine is stopped for about 1 hour when one lifting hook is replaced, so that the production is influenced. The shot blasting machine lifting hook is frequently changed, and the main reason is that the lifting hook supporting rod positioning bolt is not hard up and leads to the both ends unbalanced, and bracing piece and sprocket wearing and tearing are accelerated to the lifting hook rotation is not steady. The supporting rod is measured and positioned when the lifting hook supporting rod is installed at each time, so that the effective height of the supporting rod is guaranteed to be a certain length. The existing stable supporting device is designed to improve the unstable supporting condition of the lifting hook caused by poor positioning and screw rod running.
SUMMERY OF THE UTILITY MODEL
The utility model discloses just to prior art exist not enough, provide a shot-blasting machine lifting hook stabilizing support device.
In order to solve the above problems, the utility model adopts the following technical proposal:
a shot blasting machine lifting hook stabilizing and supporting device comprises: hanger plate, backup pad, its characterized in that still includes: fixed plate, bearing structure. The fixed plate is installed on the hanger plate. The support structure is mounted on the fixed plate. The support structure includes: the first supporting rod, the second supporting rod and the third supporting rod. The first support bar includes: the first section is a shaft with fixed length. The second section is a threaded shaft and is in threaded connection with the supporting plate. The shaft diameter of the first section is larger than that of the second section, and a positioning surface is arranged at the joint of the first section and the second section. The first supporting rod is the same as the second supporting rod and the third supporting rod in structure, and the first supporting rod is placed in a triangular mode between the second supporting rod and the third supporting rod.
As an improvement of the above technical solution, the fixing plate includes: the first fixing column, the second fixing column and the third fixing column are arranged in the shell; the first fixing column, the second fixing column and the third fixing column are arranged in a triangular structure.
As an improvement of the above technical solution, the first fixing column, the second fixing column and the third fixing column are all cylinders, and a cylindrical groove is formed in the center; the first supporting rod, the second supporting rod and the third supporting rod are respectively installed in the first fixing column, the second fixing column and the third fixing column.
As above-mentioned technical scheme's improvement, strutting arrangement still includes: a support plate; the supporting plate is connected with the first supporting rod, the second supporting rod and the third supporting rod through threads; the bottom of the supporting plate is provided with a first stabilizing plate, and the top of the supporting plate is provided with a second stabilizing plate.
As an improvement of the above technical solution, the second section is connected with a first nut, and the first nut fixes the second section in the support plate; and a second nut is arranged at the top of the first nut and is connected with the second section.
Compared with the prior art, the utility model discloses an implement the effect as follows:
the utility model discloses the device realizes automatic positioning and avoids bracing piece one end to run the position wearing and tearing through setting up the locating surface, reduces the bracing piece through three spinal branch vaulting poles that set up the restriction of each other and runs the position, puts the relation through setting up fixed plate stabilizing support pole mounted position and triangle-shaped. Through device in-service use, it is effectual to implement, has certain application and popularization value.
Drawings
Fig. 1 is a front view of the stable supporting device of the lifting hook of the present invention;
fig. 2 is a structural diagram of the hook supporting device of the present invention;
FIG. 3 is a structural view of the first support bar;
FIG. 4 is a cross-sectional view A-A of FIG. 1;
fig. 5 is a partial view B of fig. 1.
In the figure: 1-hanger plate, 11-lifting hook, 12-jib, 2-fixed plate, 21-first fixed column, 22-second fixed column, 23-third fixed column, 3-bearing structure, 31-first bracing piece, 311-first section, 312-second section, 313-locating surface, 32-second bracing piece, 33-second bracing piece, 4-backup pad, 41-first stabilizer plate, 42-second stabilizer plate, 5-first nut, 51-second nut.
Detailed Description
The present invention will be described with reference to specific embodiments.
Fig. 1 is a front view of the hook stabilizing device of the present invention, fig. 2 is a structural view of the hook stabilizing device of the present invention, and fig. 3 is a structural view of the first support rod, as shown in fig. 1 to 3.
Lifting hook stabilizing support device includes: hanger plate 1, backup pad 4 still include: a fixed plate 2 and a support structure 3. The fixed plate 2 is mounted on the hanger plate 1. The support structure 3 is mounted on the fixed plate 2. The support structure 3 comprises: a first support bar 31, a second support bar 32, and a third support bar 33.
The first support bar 31 includes: a first section 311 and a second section 312, wherein the first section 311 is a shaft with a fixed length. The second section 312 is a threaded shaft, and the second section 312 is connected with the support plate 4 through threads. As shown in fig. 3, the axial diameter of the first section 311 is greater than the axial diameter of the second section 312, and a positioning surface 313 is disposed at the connection between the first section 311 and the second section 312.
The first support rod 31, the second support rod 32 and the third support rod 33 have the same structure, and the first support rod 31, the second support rod 32 and the third support rod 33 are arranged in a triangular shape.
The lifting hook of the di sand shot blasting machine is frequently replaced, the main reason is that the positioning bolt of the supporting rod of the lifting hook is not flexible, so that the two ends are not balanced, the supporting rod and the chain wheel are abraded with higher speed, and the lifting hook is not stable in rotation. Therefore, the supporting rod 3 is transformed to be divided into a first section 311 and a second section 312, and the first section 311 is set to be of a fixed length, so that the complicated measuring and positioning process before the use is avoided. The second section 312 is provided as a threaded section for securing the support rod. By providing a difference in diameter between the first section 311 and the second section 312, the locating surface 313 is used for both direct locating and substantially avoids instability of bolted connections at both ends. However, threaded connections and bolted connections at the remaining end still have problems. Originally, only two bracing pieces, when one runs the position, another can't restrict, can receive its tired accelerated wear on the contrary. The event sets up three spinal branch vaulting poles, puts simultaneously and is triangle-shaped, compares in original structure firstly triangle-shaped itself and has stablized more and avoided shaking and has caused wearing and tearing, secondly can restrict the compensation each other between the three spinal branch vaulting poles, thereby reduces and runs the position volume and alleviate wearing and tearing. Specifically, the three support rods are fixed on the fixing plate 2 by welding.
The fixing plate 2 includes: first fixed column 21, second fixed column 22, third fixed column 23. The first fixing column 21, the second fixing column 22 and the third fixing column 23 are arranged in a triangular structure. The first fixing column 21, the second fixing column 22 and the third fixing column 23 are all cylinders, and a cylindrical groove is formed in the center of each cylinder. The first support rod 31, the second support rod 32 and the third support rod 33 are respectively installed in the first fixing column 21, the second fixing column 22 and the third fixing column 23.
The fixing plate 2 is arranged to further improve the stability of the support, and the first fixing column 21, the second fixing column 22 and the third fixing column 23 are arranged in a triangular shape to improve the placing reliability and are matched with the three support rods. The fixing plate 2 is provided to further restrict the positional relationship between the three support rods. The three fixing columns are respectively matched with the three supporting rods, so that the connection stability and rigidity of the supporting rods are further improved, the three supporting rods are limited from moving relative to the hanging plate, and the verticality of the three supporting rods relative to the hanging plate is guaranteed. Specifically, the fixing plate 2 is fixed to the hanger plate 1 by welding.
Lifting hook stabilizing support device still includes: a support plate 4. The supporting plate 4 is connected with the first supporting rod 31, the second supporting rod 32 and the third supporting rod 33 through threads. The bottom of the supporting plate 4 is provided with a first stabilizing plate 41, and the top is provided with a second stabilizing plate 42. The supporting plate 4, the first stabilizing plate 41 and the second stabilizing plate 42 are provided with screw holes at the centers thereof, which are communicated with each other.
The supporting plate 4 is used for fixing three supporting rods, and the first stabilizing plate 41 and the second stabilizing plate 42 are used for further improving the rigidity and the supporting stability of the supporting plate 4. The centrally located bolt hole is intended to be connected to a hanger bar 12 mounted on the hanger plate 1 for subsequent operation of the hook system.
Fig. 5 is a partial view B of fig. 1, as shown in fig. 5. A first nut 5 is connected to the second section 312, and the second section 312 is fixed in the support plate 4 by the first nut 5. The second nut 51 is arranged on the top of the first nut 5, and the second nut 51 is connected with the second section 312. The first nut 5 plays a role in fixing the support rod, and the second nut 51 is repeatedly fixed, so that the self-locking effect is achieved, and the stability of fixing is enhanced.
In use, the positioning surface 312 contacts the bottom surface of the supporting plate 4 to determine the positioning, and the supporting plate 4 is engaged with the first supporting rod 31, the second supporting rod 32, and the third supporting rod 33. The first nut 5 and the second nut 51 are tightened in this order.
It will be apparent to those skilled in the art that various changes and modifications may be made without departing from the spirit and scope of the invention. Thus, if such modifications and variations of the present invention fall within the scope of the claims and their equivalents, the present invention is also intended to include such modifications and variations.

Claims (5)

1. A shot blasting machine lifting hook stabilizing and supporting device comprises: hanger plate (1), backup pad (4), its characterized in that still includes: a fixing plate (2) and a support structure (3); the fixed plate (2) is arranged on the hanging plate (1); the supporting structure (3) is arranged on the fixing plate (2);
the support structure (3) comprises: a first support rod (31), a second support rod (32) and a third support rod (33); the first support bar (31) comprises: a first section (311), a second section (312), the first section (311) being a fixed length shaft; the second section (312) is a threaded shaft, and the second section (312) is in threaded connection with the support plate (4); the shaft diameter of the first section (311) is larger than that of the second section (312), and a positioning surface (313) is arranged at the joint of the first section (311) and the second section (312);
the first supporting rod (31) is the same in structure as the second supporting rod (32) and the third supporting rod (33), and the first supporting rod (31) is placed in a triangular mode between the second supporting rod (32) and the third supporting rod (33).
2. The shot-blasting machine lifting hook stable supporting device as claimed in claim 1, wherein the fixing plate (2) comprises: a first fixed column (21), a second fixed column (22) and a third fixed column (23); the first fixing column (21), the second fixing column (22) and the third fixing column (23) are arranged in a triangular structure.
3. The stable supporting device of the shot blasting machine lifting hook is characterized in that the first fixing column (21), the second fixing column (22) and the third fixing column (23) are all cylinders, and a cylinder groove is formed in the center of the cylinders; the first supporting rod (31), the second supporting rod (32) and the third supporting rod (33) are respectively installed in the first fixing column (21), the second fixing column (22) and the third fixing column (23).
4. The shot blasting machine lifting hook stable supporting device is characterized in that the supporting plate (4) is in threaded connection with the first supporting rod (31), the second supporting rod (32) and the third supporting rod (33); the bottom of the supporting plate (4) is provided with a first stabilizing plate (41), and the top of the supporting plate is provided with a second stabilizing plate (42).
5. The shot blasting machine lifting hook stable supporting device as claimed in claim 1, wherein a first nut (5) is connected to the second section (312), and the first nut (5) fixes the second section (312) in the supporting plate (4); and a second nut (51) is arranged at the top of the first nut (5), and the second nut (51) is connected with a second section (312).
CN201920535423.1U 2019-04-17 2019-04-17 Shot-blasting machine lifting hook stabilizing support device Expired - Fee Related CN209868340U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920535423.1U CN209868340U (en) 2019-04-17 2019-04-17 Shot-blasting machine lifting hook stabilizing support device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920535423.1U CN209868340U (en) 2019-04-17 2019-04-17 Shot-blasting machine lifting hook stabilizing support device

Publications (1)

Publication Number Publication Date
CN209868340U true CN209868340U (en) 2019-12-31

Family

ID=68961064

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920535423.1U Expired - Fee Related CN209868340U (en) 2019-04-17 2019-04-17 Shot-blasting machine lifting hook stabilizing support device

Country Status (1)

Country Link
CN (1) CN209868340U (en)

Similar Documents

Publication Publication Date Title
CN209430463U (en) A kind of water pump mounting bracket
CN209868340U (en) Shot-blasting machine lifting hook stabilizing support device
CN203517190U (en) Bolt sleeve assembly
CN203726278U (en) Supporting device for grinding stepped shafts in centerless grinding machines
CN211077421U (en) Auxiliary conveying equipment is used in dispersant production
CN210744635U (en) Support structure for fixing cable
CN207292179U (en) A kind of crawler of excavator support roller being easily installed
CN109129353A (en) A kind of construction processes mounting rack that stability can be improved
CN214024506U (en) Numerical control machine tool base adjusting device
CN210026909U (en) Truckle mounting structure capable of reducing screw fixation
CN207105186U (en) A kind of concrete vibrator and its workbench
CN102923555B (en) Tail rope hanging device and multi-rope friction wheel type vertical shaft hoisting system
CN219263400U (en) Pipeline support and hanger with spring buffer structure
CN219158400U (en) Fixed column hoop of concrete pouring template and template reinforcing device
CN213712285U (en) Horizontal adjustable guide pipeline hanger
CN208221392U (en) A kind of stable type support of bearing
CN221523334U (en) Hanging basket protection structure for continuous beam construction
CN209095354U (en) A kind of shot-blasting machine hanger mechanism for small diameter long rod workpieces
CN208595366U (en) Support device and compressor
CN218522243U (en) Template clamping structure
CN207777948U (en) A kind of mechanical processing economic benefits and social benefits holder
CN203652856U (en) Steel band tray discharging stand
CN211992496U (en) Shot blasting suspension bracket
CN212801646U (en) Self-propelled bottom plate side form device
CN215213887U (en) Fixing device for water pump ferry value measuring equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191231

CF01 Termination of patent right due to non-payment of annual fee