CN209853572U - Boiler installation overhead hoist - Google Patents

Boiler installation overhead hoist Download PDF

Info

Publication number
CN209853572U
CN209853572U CN201920251430.9U CN201920251430U CN209853572U CN 209853572 U CN209853572 U CN 209853572U CN 201920251430 U CN201920251430 U CN 201920251430U CN 209853572 U CN209853572 U CN 209853572U
Authority
CN
China
Prior art keywords
seat
guide rail
moving seat
equipment platform
matched
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920251430.9U
Other languages
Chinese (zh)
Inventor
游东明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Mingle Boiler Equipment Installation Co Ltd
Original Assignee
Wuhan Mingle Boiler Equipment Installation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Mingle Boiler Equipment Installation Co Ltd filed Critical Wuhan Mingle Boiler Equipment Installation Co Ltd
Priority to CN201920251430.9U priority Critical patent/CN209853572U/en
Application granted granted Critical
Publication of CN209853572U publication Critical patent/CN209853572U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a boiler installation hoisting device, including removing seat and stand, remove the seat and set up on the guide rail to set up the auxiliary wheel on the removal seat of guide rail both sides, the stand sets up on removing the seat, and the top of stand sets up the back timber, the utility model discloses a remove the seat and cooperate with the guide rail, can guarantee the stability of handling in-process equipment is whole effectively, and move through gyro wheel and guide rail cooperation, carry out the auxiliary stay by the auxiliary wheel simultaneously, improve stability; adopt side lever and equipment platform combination, support, through lift seat and lead screw cooperation, support the side lever, cooperate with the slide rail by supporting sliding sleeve simultaneously, further improve the stability of side lever to further consolidate side lever and equipment platform through a supporting beam, improve the stability of equipment platform, and by lead screw and lift seat cooperation, realize the lift adjustment of equipment platform, in order to satisfy the handling of co-altitude, it is more convenient, and the security is higher.

Description

Boiler installation overhead hoist
Technical Field
The utility model relates to a boiler equipment technical field specifically is a boiler installation overhead hoist.
Background
Because the size of boiler is great, adopt crane or tower crane to carry out the handling installation to the installation of boiler usually, and adopt the crane to carry out the handling, the security is lower to stability in the handling process is extremely poor, and the centering nature of fixed point installation is poor simultaneously, seriously reduces the installation effectiveness of boiler.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a boiler installation overhead hoist to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme:
a boiler mounting and hoisting device comprises a moving seat, a stand column, an equipment platform and a supporting sliding sleeve, wherein the moving seat is arranged on a guide rail, the moving seat is matched with the guide rail, auxiliary wheels are arranged on the moving seat on two sides of the guide rail and matched with the bottom edge of the guide rail, a roller is arranged in the moving seat, the roller is matched with the upper top surface of the guide rail, a first servo motor is arranged on the outer side of the moving seat, the shaft end of the first servo motor is matched and connected with the roller, the stand column is arranged on the moving seat, the top end of the stand column is provided with a top beam, the stand column, the moving seat and the top beam are connected through bolts, a lead screw is arranged in the stand column, a second servo motor is arranged on the moving seat, synchronous chain wheels are arranged on the shaft ends of the stand column and the second servo motor, the synchronous chain wheels are meshed, side rods are arranged at four corners of the, the lifting seat is matched with the screw rod, the lifting seat is connected with the side rods through bolts, a supporting beam is arranged on two sides of the equipment platform, the supporting beam is connected with the equipment platform and the side rods through bolts, the supporting sliding sleeve is arranged at the top end and the bottom end of the side rods, the supporting sliding sleeve is connected with the side rods through bolts, sliding rails are arranged on two sides of the stand column, and the sliding rails are matched with the supporting sliding sleeves.
As a further aspect of the present invention: and a shell is arranged on the outer side of the second servo motor and is connected with the movable seat through a bolt.
As a further aspect of the present invention: the equipment platform is provided with lifting hooks, and the lifting hooks are arranged at the front end and the rear end of the side rods in pairs.
As a further aspect of the present invention: the four upright columns correspond to four corners of the equipment table and are connected with the movable seat and the top beam in a matching mode.
As a further aspect of the present invention: the supporting sliding sleeves are eight in number and are arranged at two ends of the side rods in pairs, and the four corners of the side rods and four corners of the equipment platform are connected through bolts.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model has simple structure, adopts the matching of the movable seat and the guide rail, can effectively ensure the stability of the whole equipment in the lifting process, moves through the matching of the roller and the guide rail, and is supported by the auxiliary wheel to improve the stability; the top beam is matched with the upright column to form a gantry structure hanger which is supported by the movable seat, so that the structure is more stable; adopt side lever and equipment platform combination, support, through lift seat and lead screw cooperation, support the side lever, cooperate with the slide rail by supporting sliding sleeve simultaneously, further improve the stability of side lever, and further consolidate side lever and equipment platform through a supporting beam, improve the stability of equipment platform, guarantee the stability of boiler installation, and cooperate with the lift seat by the lead screw, realize the lift adjustment of equipment platform, in order to satisfy the handling of co-altitude, it is more convenient, improve the installation effectiveness of boiler, and the security is higher.
Drawings
FIG. 1 is a schematic structural diagram of a boiler mounting and hoisting device in a front view.
FIG. 2 is a schematic side view of the boiler mounting trolley.
In the figure: the device comprises a guide rail 1, a moving seat 2, an auxiliary wheel 3, a first servo motor 4, a machine shell 5, a vertical column 6, a screw rod 7, a side rod 8, a lifting seat 9, an outer slide rail 10, a top beam 11, an equipment table 12, a supporting slide sleeve 13, a supporting beam 14, a second servo motor 15, a synchronous chain wheel 16, a roller 17 and a lifting hook 18.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-2, in an embodiment of the present invention, a boiler installation lifting device includes a moving base 2, a column 6, an equipment table 12 and a supporting sliding sleeve 13, the moving base 2 is disposed on a guide rail 1, the moving base 2 is matched with the guide rail 1, auxiliary wheels 3 are disposed on the moving base 2 at two sides of the guide rail 1, the auxiliary wheels 3 are matched with a bottom edge of the guide rail 1, a roller 17 is disposed in the moving base 2, the roller 17 is matched with an upper top surface of the guide rail 1, a first servo motor 4 is disposed at an outer side of the moving base 2, and a shaft end of the first servo motor 4 is matched and connected with the roller 17, so that the moving base 2 is matched with the guide rail 1 to effectively ensure stability of the whole equipment during lifting, and is moved by matching the roller 17 with the guide rail 1, and is supported by the auxiliary wheels 3 to improve stability, the column 6 is disposed on the moving base 2, the top end of the upright post 6 is provided with a top beam 11, the upright post 6 is connected with the movable base 2 and the top beam 11 through bolts, a lead screw 7 is arranged in the upright post 6, the movable base 2 is provided with a second servo motor 15, the shaft ends of the upright post 6 and the second servo motor 15 are provided with synchronous chain wheels 16, the synchronous chain wheels 16 are meshed, so that a gantry structure is formed by matching the top beam 11 with the upright post 6 and is supported by the movable base 2, the structure is more stable, the four corners of the equipment table 12 are provided with side rods 8, the side rods 8 are provided with lifting seats 9, the lifting seats 9 are matched with the lead screw 7, the lifting seats 9 are connected with the side rods 8 through bolts, the two sides of the equipment table 12 are provided with supporting beams 14, the supporting beams 14 are respectively connected with the equipment table 12 and the side rods 8 through bolts, so that the side rods 8 are further reinforced with the equipment table, stability of improve equipment platform 12 is simultaneously by lead screw 7 and the cooperation of seat 9 that goes up and down, realizes the lift adjustment of equipment platform 12 to satisfy the handling of co-altitude not, it is more convenient, support sliding sleeve 13 sets up on 8 tops of side lever and bottom, and support sliding sleeve 13 passes through bolted connection with side lever 8, and set up slide rail 10 in the both sides of stand 6, slide rail 10 and the cooperation of support sliding sleeve 13, so through support sliding sleeve 13 and the cooperation of slide rail 10, further improve the steady that 8 lifts of side lever, thereby guarantee the stability of equipment operation.
The outer side of the second servo motor 15 is provided with a casing 5, and the casing 5 is connected with the movable base 2 through bolts.
Hooks 18 are provided on the equipment table 12, and the hooks 18 are provided in pairs at the front and rear ends of the side bars 8.
The number of the upright columns 6 is four, the four upright columns correspond to four corners of the equipment table 12, and the four upright columns are connected with the movable base 2 and the top beam 11 in a matching mode.
The number of the supporting sliding sleeves 13 is eight. The side bars 8 are provided in pairs at both ends thereof, and the side bars 8 are bolted to four corners of the equipment table 12.
The utility model discloses a theory of operation is: during the use, drive gyro wheel 17 through first servo motor 4 and rotate, can drive and remove seat 2 along 1 lateral slippage of guide rail to carry out the auxiliary stay through auxiliary wheel 3, stability is higher, simultaneously according to boiler installation and handling requirement, drive synchronous sprocket 16 by second servo motor 15 and rotate, drive lead screw 7 through chain drive and rotate, through lift seat 9 and lead screw 7 cooperation, drive equipment platform 12 goes up and down, can adjust corresponding height, lift by lifting hook 18 to the boiler in addition, it is more stable.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments or portions thereof without departing from the spirit and scope of the invention.

Claims (5)

1. A boiler mounting and hoisting device comprises a moving seat, a stand column, an equipment table and a supporting sliding sleeve, and is characterized in that the moving seat is arranged on a guide rail, the moving seat is matched with the guide rail, auxiliary wheels are arranged on the moving seat at two sides of the guide rail, the auxiliary wheels are matched with the bottom edge of the guide rail, meanwhile, rollers are arranged in the moving seat, the rollers are matched with the upper top surface of the guide rail, in addition, a first servo motor is arranged at the outer side of the moving seat, the shaft end of the first servo motor is matched and connected with the rollers, the stand column is arranged on the moving seat, the top end of the stand column is provided with a top beam, the stand column is connected with the moving seat and the top beam through bolts, a lead screw is arranged in the stand column, a second servo motor is arranged on the moving seat, simultaneously, synchronous chain wheels are arranged at the shaft ends of the stand column and the second servo motor, the synchronous chain wheels are meshed, the lifting seat is matched with the screw rod, the lifting seat is connected with the side rods through bolts, a supporting beam is arranged on two sides of the equipment platform, the supporting beam is connected with the equipment platform and the side rods through bolts, the supporting sliding sleeve is arranged at the top end and the bottom end of the side rods, the supporting sliding sleeve is connected with the side rods through bolts, sliding rails are arranged on two sides of the stand column, and the sliding rails are matched with the supporting sliding sleeves.
2. The boiler mounting and hoisting device of claim 1, wherein a casing is arranged outside the second servo motor, and the casing is connected with the movable base through bolts.
3. The boiler installation hoist according to claim 1, characterized in that the equipment platform is provided with lifting hooks, and the lifting hooks are provided in pairs at the front and rear ends of the side bars.
4. The boiler mounting and hoisting device of claim 1 or 3, wherein the number of the upright columns is four, the four upright columns correspond to four corners of the equipment platform and are connected with the movable seat and the top beam in a matching manner.
5. The boiler mounting and hoisting device of claim 1 or 3, wherein the number of the support sliding sleeves is eight, the support sliding sleeves are arranged at two ends of the side rods in pairs, and the side rods are connected with four corners of the equipment platform through bolts.
CN201920251430.9U 2019-02-28 2019-02-28 Boiler installation overhead hoist Expired - Fee Related CN209853572U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920251430.9U CN209853572U (en) 2019-02-28 2019-02-28 Boiler installation overhead hoist

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920251430.9U CN209853572U (en) 2019-02-28 2019-02-28 Boiler installation overhead hoist

Publications (1)

Publication Number Publication Date
CN209853572U true CN209853572U (en) 2019-12-27

Family

ID=68932292

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920251430.9U Expired - Fee Related CN209853572U (en) 2019-02-28 2019-02-28 Boiler installation overhead hoist

Country Status (1)

Country Link
CN (1) CN209853572U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112110329A (en) * 2020-08-27 2020-12-22 江苏省建筑工程集团有限公司 Large-scale component hoist device of high stationarity
CN113003404A (en) * 2021-03-09 2021-06-22 机械工业第九设计研究院有限公司 Intelligent lifting appliance for forklift charging room

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112110329A (en) * 2020-08-27 2020-12-22 江苏省建筑工程集团有限公司 Large-scale component hoist device of high stationarity
CN113003404A (en) * 2021-03-09 2021-06-22 机械工业第九设计研究院有限公司 Intelligent lifting appliance for forklift charging room
CN113003404B (en) * 2021-03-09 2022-12-02 机械工业第九设计研究院股份有限公司 Intelligent lifting appliance for forklift charging room

Similar Documents

Publication Publication Date Title
CN209853572U (en) Boiler installation overhead hoist
CN216737394U (en) Generator guide bush hoisting accessory
CN214360123U (en) Small-size lift is used in engineering construction
CN214613641U (en) Hanging basket type bridge drainage pipe construction trolley
CN214561837U (en) Tunnel is turning device for section of jurisdiction
CN211393590U (en) Lifting equipment for maintaining mechanical equipment
CN213840339U (en) Lifting rotating platform
CN211971567U (en) Hoist device for logistics storage
CN210767825U (en) Turnover formwork construction system
CN111115461B (en) Reinforcing steel bar and mould transportation and automatic assembling equipment
CN214530227U (en) Supporting equipment for bridge engineering construction
CN220093073U (en) Transfer table for lathe machining
CN211594917U (en) Small-size hoisting and transporting equipment for production workshop
CN205076241U (en) Glass all revolving racks of casing
CN213011769U (en) Moving device of crane counterweight
CN216377318U (en) A a gallows hoist and mount conveyer for EPC engineering
CN219971182U (en) Overweight long-type work piece stacker of variable width
CN215924312U (en) Material lifting device of tunnel equipment installation trolley
CN214525025U (en) Lubricating oil barrel storage rack
CN219153695U (en) Bottle blowing machine with lifting device
CN217921251U (en) Column type synchronous motion lifting mechanism
CN218861493U (en) Main wheel bracket of tail water gate
CN218595938U (en) End beam of bridge crane
CN216730381U (en) Crane girder spin welding device
CN217895020U (en) Novel winch-driven lifting tower

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191227

Termination date: 20210228