CN209837258U - Civil engineering road drainage device - Google Patents

Civil engineering road drainage device Download PDF

Info

Publication number
CN209837258U
CN209837258U CN201920448318.4U CN201920448318U CN209837258U CN 209837258 U CN209837258 U CN 209837258U CN 201920448318 U CN201920448318 U CN 201920448318U CN 209837258 U CN209837258 U CN 209837258U
Authority
CN
China
Prior art keywords
water
funnel
bin
water tank
switch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920448318.4U
Other languages
Chinese (zh)
Inventor
朱街禄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangxi University of Technology
Original Assignee
Jiangxi University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangxi University of Technology filed Critical Jiangxi University of Technology
Priority to CN201920448318.4U priority Critical patent/CN209837258U/en
Application granted granted Critical
Publication of CN209837258U publication Critical patent/CN209837258U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Filtration Of Liquid (AREA)

Abstract

The utility model discloses a civil engineering road drainage device, including the device storehouse, one side at device storehouse top is provided with the funnel, and the funnel runs through to the inside in device storehouse, the bottom of funnel is provided with the ponding storehouse, and one side of ponding storehouse bottom is provided with the bracing piece, the opposite side of ponding storehouse bottom is provided with the water pump, and the mouth that draws water of water pump is provided with and runs through to the inside drinking-water pipeline in ponding storehouse, one side of water pump is provided with the water tank. The utility model discloses a funnel and the inside first filter screen and the second filter screen of funnel that set up can collect mud or hair etc to regularly pull up the funnel, thereby clear up the inside mud of funnel, avoid mud to block up the sewage import, the entering ponding storehouse that all the other sewage can be smooth simultaneously, then convey the water tank in through the water pump, thereby the sewage recovery's that reaches effect.

Description

Civil engineering road drainage device
Technical Field
The utility model relates to a road drainage technical field specifically is a civil engineering road drainage device.
Background
Civil engineering refers to the general term of science and technology for building various engineering facilities, and refers to both the applied materials and equipment and the technical activities of surveying, designing, constructing, maintaining, repairing, etc. and the objects of engineering construction, i.e. various engineering facilities which are built on the ground or underground, on the land or in water and directly or indirectly serve human life, production, military and scientific research, such as houses, roads, railways, pipelines, tunnels, bridges, canals, dams, harbors, power stations, airports, ocean platforms, water supply and drainage, protection engineering, etc.
Can all set up drainage system on the civil engineering road and get rid of surface ponding for rainy day road driving becomes safer, but general drainage system leads ground through the drain pipe with the ponding of road usually, but because the ponding of road generally all has a large amount of silt and rubbish, can often take place to block up because of these silt and rubbish in the drainage process of drain pipe, lead to drainage work normally to go on, and current drainage device discharged water can only flow into the ground as ordinary muddy water mostly, the resource of utilization that can not be fine.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a: in order to solve the problem, a civil engineering road drainage device is provided.
In order to achieve the above object, the utility model provides a following technical scheme: a civil engineering road drainage device comprises a device bin, wherein a funnel is arranged on one side of the top of the device bin and penetrates into the device bin, a first filtering bin and a second filtering bin are arranged in the funnel, a first filtering screen is arranged on the outer side of the first filtering bin, a second filtering screen is arranged on the outer side of the second filtering bin, a water accumulating bin is arranged at the bottom of the funnel, a supporting column is arranged on one side of the bottom of the water accumulating bin, a water pump is arranged on the other side of the bottom of the water accumulating bin, a water pumping pipeline penetrating into the water accumulating bin is arranged at the water pumping end of the water pump, a water tank is arranged on one side of the water pump, a water outlet pipeline penetrating into the water tank is arranged at the water outlet end of the water pump, a first floating ball switch and a second floating ball switch are arranged on two sides of the top of the water tank, and both the first floating ball switch and the, the top of the inside of switch box is provided with linked switch, and one side of linked switch is provided with the connecting rod, the inside of switch box is provided with the spout, and the inside of spout is provided with the steel ball, the steel ball contacts with the connecting rod, the top of water tank one side is provided with the feed inlet, and the intermediate position department of water tank one side is provided with the delivery port.
Preferably, a first valve is arranged at the top of the water outlet pipeline, and a second valve is arranged at the top of the water outlet.
Preferably, a safety door is arranged at the bottom end of one side of the water tank.
Preferably, the top of the device bin is provided with a through hole, the top of the through hole is provided with a cover plate, one side of the inside of the device bin is provided with an escalator, and the escalator is located under the through hole and matched with the cover plate.
Preferably, the middle position department at funnel top is provided with the handle, and the top of funnel is provided with multiunit through-hole, the multiunit through-hole is evenly distributed.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model discloses a funnel and the inside first filter screen and the second filter screen of funnel that set up, can collect mud or hair etc., and regularly pull up the funnel, thereby clear up the inside mud of funnel, avoid mud to block up the sewage import, simultaneously all the other sewage can be smooth get into the sump, then convey the water tank in through the water pump, thereby the sewage recovery's that reaches effect, and materials such as the active carbon that can add in the water tank, can purify sewage, the effect of sewage reuse has been reached, the resource has been practiced thrift, the setting of float switch simultaneously, can effectual control water advance and go out, the loaded down with trivial details of manual operation has been avoided, the manpower has been saved.
Additional aspects and advantages of the invention will be set forth in part in the description which follows and, in part, will be obvious from the description, or may be learned by practice of the invention.
Drawings
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic structural view of the float switch of the present invention;
fig. 3 is a top view of the funnel of the present invention;
FIG. 4 is an enlarged view of the present invention A;
fig. 5 is an enlarged view of the present invention B.
Description of the main symbols:
device bin 1 First float switch 15
Funnel with adjustable funnel diameter 2 Second float switch 16
The first filtering bin 3 Water outlet 17
The second filter bin 4 Second valve 18
Handle bar 5 Feed inlet 19
First filter screen 6 Safety door 20
Second filter screen 7 Cover plate 21
Water accumulation bin 8 Staircase 22
Support column 9 Switch box 23
Water pump 10 Linked switch 24
Water pumping pipeline 11 Sliding chute 25
Water outlet pipeline 12 Steel ball 26
First valve 13 Connecting rod 27
Water tank 14 Through hole 28
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The water pump (model: GD40-30), the dredge pump (model: NL150-16) and the float switch (model: EM221) mentioned in the utility model can be obtained by market or private ordering.
Referring to fig. 1-5, a civil engineering road drainage device comprises a device cabin 1, a funnel 2 is arranged on one side of the top of the device cabin 1, the funnel 2 penetrates into the device cabin 1, a water accumulation cabin 8 is arranged at the bottom of the funnel 2, a support column 9 is arranged on one side of the bottom of the water accumulation cabin 8, a water pump 10 is arranged on the other side of the bottom of the water accumulation cabin 8, a water pumping pipeline 11 penetrating into the water accumulation cabin 8 is arranged at the water pumping end of the water pump 10, a water tank 14 is arranged on one side of the water pump 10, a water outlet pipeline 12 penetrating into the water tank 14 is arranged at the water outlet end of the water pump 10, a first float switch 15 and a second float switch 16 are arranged on two sides of the top of the water tank 14, the first float switch 15 and the second float switch 16 both comprise a switch box 23, a linkage switch 24 is arranged at the top end of the switch box 23, the inside of switch box 23 is provided with spout 25, and the inside of spout 25 is provided with steel ball 26, and steel ball 26 contacts with connecting rod 27, and the top of water tank 14 one side is provided with feed inlet 19, and the intermediate position department of water tank 14 one side is provided with delivery port 17.
Further, the inside of funnel 2 is provided with first filter storehouse 3 and second filter storehouse 4, and the outside of first filter storehouse 3 is provided with first filter screen 6, and the outside of second filter storehouse 4 is provided with second filter screen 7.
The utility model discloses a funnel 2 that sets up and the inside first filter screen 6 and the second filter screen 7 of funnel 2 can collect mud or hair etc to regularly pull up funnel 2, thereby clear up the inside mud of funnel 2, avoid mud to block up the sewage import, the entering ponding storehouse 8 that all the other sewage can be smooth simultaneously, then convey water tank 14 in through water pump 10, thereby the effect of the sewage recovery who reaches.
Referring again to fig. 1, the top of the outlet pipe 12 is provided with a first valve 13, and the top of the outlet 17 is provided with a second valve 18.
The civil engineering road drainage device can be matched with the first float switch 15 and the second float switch 16 through the arranged first valve 13 and the second valve 18, so that the water in the water tank 14 can be effectively controlled.
Please refer to fig. 1 to 3, the bottom end of one side of the water tank 14 is provided with a safety door 20, the top of the device chamber 1 is provided with a through hole, the top of the through hole is provided with a cover plate 21, one side of the inside of the device chamber 1 is provided with a staircase 22, and the staircase 22 is located right below the through hole and is matched with the cover plate 21.
After the civil engineering road drainage device is used for a long time through the arranged water tank 14, the escalator 22 can be used for entering the device bin 1, the safety door 20 on one side of the water tank 14 is opened, and sediments in the water tank 14 are cleaned.
Please refer to fig. 1, 3 and 4, the middle position of the top of the funnel 2 is provided with a handle 5, and the top of the funnel 2 is provided with a plurality of groups of through holes 28, the plurality of groups of through holes 28 are distributed uniformly.
The working principle is as follows: firstly, sewage flows into a funnel 2 from a civil engineering road and is accompanied with a plurality of paper scraps, hair and the like, at the moment, the paper scraps, the hair and the like fall into the funnel 2 and pass through a first filtering bin 3 and a second filtering bin 4, a first filtering screen 6 on the first filtering bin 3 filters sludge for the first time, a second filtering screen 7 on the second filtering bin 4 filters the sludge for the second time, the sludge water after the secondary filtering enters a water accumulating bin 8, a water pump 10 is turned on at the moment, the water pump 10 transmits the sludge water to the inside of a water tank 14, the sludge water and the sludge in the water tank 14 start to rise, at the moment, filtering substances such as activated carbon and the like can be thrown into the inside of the water tank 14 through a feeding hole 19, the activated carbon starts to filter and purify the sludge water, along with the rise of the water level in the water tank 14, a first float switch 15 and a second float switch 16 start to rise, when the first float switch 15 rises to a, switch box 23 begins to be floated by buoyancy, steel ball 26 inside switch box 23 begins the rebound simultaneously, connecting rod 27 upwards lifts because of reset spring's reason, and drive gang switch 24 and touch the touch element, be the on-state this moment and first valve 13 closes, second float switch 16 opens second valve 18 with same principle simultaneously, then the usable pipe of staff collects the water after purifying in delivery port 17 department, after long-time the use, can open apron 21, utilize staircase 22 to get into the inside in device storehouse 1, get into the inside back in device storehouse 1, the staff can open emergency exit 20 of water tank 14 one side, clear up the inside precipitate in water tank 14, then utilize handle 5 to pull funnel 2 to ground, and clear up the inside mud wastepaper of funnel 2.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (5)

1. The civil engineering road drainage device comprises a device bin (1) and is characterized in that a funnel (2) is arranged on one side of the top of the device bin (1), the funnel (2) penetrates into the device bin (1), a first filtering bin (3) and a second filtering bin (4) are arranged inside the funnel (2), a first filtering screen (6) is arranged on the outer side of the first filtering bin (3), a second filtering screen (7) is arranged on the outer side of the second filtering bin (4), a water accumulating bin (8) is arranged at the bottom of the funnel (2), a supporting column (9) is arranged on one side of the bottom of the water accumulating bin (8), a water pump (10) is installed on the other side of the bottom of the water accumulating bin (8), a water pumping pipeline (11) penetrating into the water accumulating bin (8) is arranged at the water pumping end of the water pump (10), and a water tank (14) is arranged on one side of the water pump (10), and the water outlet end of the water pump (10) is provided with a water outlet pipeline (12) penetrating into the water tank (14), two sides of the top of the water tank (14) are provided with a first floating ball switch (15) and a second floating ball switch (16), the first floating ball switch (15) and the second floating ball switch (16) comprise switch boxes (23), the top end of the inside of each switch box (23) is provided with a linkage switch (24), one side of each linkage switch (24) is provided with a connecting rod (27), the inside of each switch box (23) is provided with a sliding groove (25), the inside of each sliding groove (25) is provided with a steel ball (26), each steel ball (26) is in contact with the corresponding connecting rod (27), the top end of one side of the water tank (14) is provided with a feed inlet (19), and the middle position of one side of the water tank (14) is.
2. A civil engineering road drainage arrangement according to claim 1, characterised in that the top of the outlet conduit (12) is provided with a first valve (13) and the top of the outlet (17) is provided with a second valve (18).
3. A civil engineering road drainage arrangement as claimed in claim 1, characterised in that the bottom end of one side of the water tank (14) is provided with a safety gate (20).
4. A civil engineering road drainage arrangement according to claim 1, characterized in that the top of the device cabin (1) is provided with a through hole and the top of the through hole is provided with a cover plate (21), one side of the inside of the device cabin (1) is provided with a staircase (22), and the staircase (22) is located right below the through hole and cooperates with the cover plate (21).
5. A civil engineering road drainage arrangement as claimed in claim 1, wherein the funnel (2) is provided with a handle (5) at a central location at the top thereof, and the funnel (2) is provided at the top thereof with a plurality of sets of through holes (28), the plurality of sets of through holes (28) being evenly distributed.
CN201920448318.4U 2019-04-03 2019-04-03 Civil engineering road drainage device Expired - Fee Related CN209837258U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920448318.4U CN209837258U (en) 2019-04-03 2019-04-03 Civil engineering road drainage device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920448318.4U CN209837258U (en) 2019-04-03 2019-04-03 Civil engineering road drainage device

Publications (1)

Publication Number Publication Date
CN209837258U true CN209837258U (en) 2019-12-24

Family

ID=68910119

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920448318.4U Expired - Fee Related CN209837258U (en) 2019-04-03 2019-04-03 Civil engineering road drainage device

Country Status (1)

Country Link
CN (1) CN209837258U (en)

Similar Documents

Publication Publication Date Title
CN105507410B (en) Sewage vacuum collection processing system implementing
CN102531282B (en) Device and method for quality-based rainwater collection, treatment and utilization
CN211200624U (en) Urban park rainwater collection, purification and recycling system
CN110104877A (en) A kind of artificial ecology wet land system handling cesspool sewage
CN108797756A (en) Rain penetration purifies savings system in a kind of landscape planting
JP6621653B2 (en) Storage and purification system
KR100699326B1 (en) Rainwater processing unit and method
CN209837258U (en) Civil engineering road drainage device
CN107354949A (en) Cyclic utilization system for the Metro station excavation water resource close to high slope
CN203989972U (en) Integrated grit chamber for treating rainwater
CN110180255A (en) A kind of wastewater recycling system
CN115726430A (en) Building site rainwater waste water recovery system
CN214401406U (en) Centralized drainage structure for bridge
CN111305362B (en) Structure of seepage layer under park road based on initial rainwater closure purification
CN210238633U (en) Rainwater recycling system
CN205012453U (en) Inlet for stom water that water ash content leaves cuts dirty device
CN210419496U (en) Pollution prevention and control system for mine waste land
CN210459373U (en) Rainwater collecting and treating system
CN113605490A (en) Riverbed type underground water taking structure
KR101532191B1 (en) Filter backwash function blocks system for nonpoint pollution and construction method
CN210002198U (en) construction site water collection comprehensive utilization system
CN109292988B (en) Anti-blocking emptying constructed subsurface constructed wetland and operation method thereof
CN216855945U (en) Gardens are with drainage device convenient to trash
CN111663626A (en) Water pipe system of sponge city
CN113136762A (en) Road rainwater recycling system for sponge city construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191224

Termination date: 20210403

CF01 Termination of patent right due to non-payment of annual fee