CN209837226U - Vertical seepage drainage device of tailing dam - Google Patents

Vertical seepage drainage device of tailing dam Download PDF

Info

Publication number
CN209837226U
CN209837226U CN201822146865.5U CN201822146865U CN209837226U CN 209837226 U CN209837226 U CN 209837226U CN 201822146865 U CN201822146865 U CN 201822146865U CN 209837226 U CN209837226 U CN 209837226U
Authority
CN
China
Prior art keywords
dam
pipe
drainage
arrange
vertical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201822146865.5U
Other languages
Chinese (zh)
Inventor
王丹丹
马斌
高榕
卫田霖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xijing University
Original Assignee
Xijing University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xijing University filed Critical Xijing University
Priority to CN201822146865.5U priority Critical patent/CN209837226U/en
Application granted granted Critical
Publication of CN209837226U publication Critical patent/CN209837226U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

A vertical seepage drainage device of a tailing dam comprises a stacking dam, a seepage drainage main pipe is buried in the stacking dam, the seepage drainage main pipe inclines downwards, one end of the seepage drainage main pipe is connected with a water inlet of a water collecting pipe arranged on the stacking dam through a first connecting pipe, the middle part of the seepage drainage main pipe is respectively connected with a plurality of vertical upward seepage drainage branch pipes through a plurality of second connecting pipes, the seepage drainage branch pipes are vertically arranged at a dry stand of the stacking dam, a layer of non-woven geotextile is wrapped outside the seepage drainage branch pipes, and a first plugging body is arranged at the other end of the seepage drainage main pipe; the utility model has the advantages of arrange the reinforcing of oozing ability, the increase is arranged and is oozed the effect and can not blockked up, cost economy, construction convenience can improve the factor of safety who piles up the dam.

Description

Vertical seepage drainage device of tailing dam
Technical Field
The utility model relates to a technical field that the tailing storehouse was arranged and is oozed, concretely relates to vertical row of tailing dam oozes device.
Background
The safety factor of the accumulation of the initial dam and the later sub-dam of the tailing pond is one of the most important links for ensuring the safety of the tailing pond, and in recent accidents of the tailing pond, the tailing pond breaks due to poor water seepage effect of the tailing dam, so that villagers living in the downstream bear huge artificial debris flow disasters, and the life and property safety of the villagers is seriously harmed. In order to solve the problem that the tailing dam is untimely in water seepage and enhance the stability of the tailing dam, a novel water seepage device is arranged on a sub-dam of the initial dam, and the important link for ensuring the later safe operation of a tailing pond is achieved. The common tailing dam drainage in China is a horizontal drainage method, a drainage pipe is buried at the bottom of each stacking dam, water seeped out from the stacking dam is guided into a water collecting channel by using a filter pipe and the drainage pipe, the water collecting channel is guided to main channels on two sides of a dam body by using an open channel, and finally the water flows into a water return pipeline for secondary utilization. The blockage of the drainage pipe and the loss of drainage capacity often occur in the drainage process of the accumulation dam; the drainage is not uniform and the drainage effect is not good; the drainage and seepage pipe device is unreasonable, which causes insufficient drainage and seepage capability and directly affects the operation safety of the accumulation dam.
Disclosure of Invention
In order to overcome above-mentioned prior art's shortcoming, the utility model discloses an aim at provides a vertical row of tailing is piled up dam and is oozed device can make row's infiltration ability reinforcing, increases row and oozes the effect, improves the factor of safety of piling up the dam.
In order to achieve the above purpose, the utility model discloses the technical scheme who takes does:
the utility model provides a dam is piled up to tailing vertical row oozes device, including piling up dam 4, pile up and bury row in the dam 4 and ooze the person in charge 1 underground, arrange and ooze the person in charge 1 downward sloping, arrange and ooze the one end of being responsible for 1 and connect the water inlet of piling up the collector pipe 2 of placing on the dam 4 through first connecting pipe 3, arrange and ooze the middle part of being responsible for 1 and connect a plurality of vertical ascending row through a plurality of second connecting pipes 5 respectively and ooze branch pipe 6, arrange and ooze branch pipe 6 and arrange in the dry stand department of piling up dam 4 perpendicularly, arrange and ooze the outside parcel one deck nonwoven geotechnological cloth 6-1 of branch pipe 6, arrange and ooze the.
Furthermore, the top of the drainage and seepage branch pipe 6 is exposed out of the water surface, and the drainage and seepage branch pipe 6 is flush with the sub-dam height of the accumulation dam 4.
Furthermore, the top of the seepage drainage branch pipe 6 is respectively provided with a second plugging body 7.
Furthermore, the seepage drainage branch pipe 6 adopts a slotted hole seepage drainage pipe with the straight length of 50 mm-100 mm.
Furthermore, the main drainage pipe 1 is a steel pipe with the diameter of 100 mm-200 mm.
Furthermore, the water collecting pipe 2 adopts a PVC drain pipe with the diameter of 100 mm-200 mm.
Further, the first blocking body 8 and the second blocking body 7 are blocked by adopting non-woven geotextile and a white steel net.
Compared with the prior art, the utility model has the advantages of it is following:
1. the drainage and seepage branch pipes 6 are additionally arranged at the middle tail part of the drainage and seepage main pipe 1, so that the seepage area is enlarged, the drainage speed is accelerated, the drainage and seepage effect is more remarkable, the dry spreading length is powerfully ensured, and the safety factor of a tailing dam is improved.
2. Arrange drainage and seepage branch pipe 6 perpendicular in the dry stand department of tailing dam, drainage and seepage branch pipe 6's top surface of water that exposes, drainage and seepage branch pipe 6 and the high parallel and level of sub-dam of piling up dam 4 have replaced the horizontal drainage and seepage method in the past, the horizontal drainage and seepage method will be according to discharging the height and constantly adjusting plastics blind pipe height, can consume more manpower and materials, and the vertical drainage and seepage method can one step put in place, the later stage need not consume the manpower and adjust, and the infiltration rate is fast, and the effect is good, has more reduced labour's input.
Drawings
Fig. 1 is a cross-sectional view of the present invention.
Fig. 2 is a schematic view of the structure of the seepage drainage branch pipe of the present invention.
Detailed Description
The present invention will be further explained with reference to the accompanying drawings.
Referring to fig. 1, a dam is piled up to tailing vertical row oozes device, including piling up dam 4, pile up and bury row in the dam 4 and ooze the person in charge 1 underground, arrange and ooze the person in charge 1 downward sloping, arrange and ooze the one end of being responsible for 1 and connect the water inlet of piling up the collector pipe 2 of placing on the dam 4 through first connecting pipe 3, arrange and ooze the middle part of being responsible for 1 and connect a plurality of vertical ascending row's of respectively and ooze branch pipe 6 through a plurality of second connecting pipes 5, arrange and ooze branch pipe 6 and arrange in the dry stand department of piling up dam 4 perpendicularly, refer to fig. 2 and show, arrange and ooze the outside parcel one deck nonwoven geotechnological cloth 6-1 of branch pipe 6. Furthermore, the top of the drainage and seepage branch pipe 6 is exposed out of the water surface, and the drainage and seepage branch pipe 6 is flush with the sub-dam height of the accumulation dam 4. The top of the seepage drainage branch pipe 6 is respectively provided with a second plugging body 7. The seepage drainage branch pipe 6 adopts a slotted hole seepage drainage pipe with the straight length of 50 mm-100 mm. The main drainage pipe 1 is a steel pipe with the diameter of 100 mm-200 mm. The water collecting pipe 2 adopts a PVC drain pipe with the diameter of 100 mm-200 mm.
The utility model discloses a theory of operation does: when a selected ore factory discharges tailing waste residues containing a large amount of water into a tailing pond, the slurry is subjected to primary filtration through the non-woven geotextile 6-1 on the drainage and seepage branch pipe 6, secondary filtration is performed through the slotted hole drainage and seepage branch pipe 6, and finally the slurry flows into the drainage and seepage main pipe 1 through the pipe, at the moment, the drainage and seepage main pipe can also filter the water in the dam, finally the water is discharged into the water collecting pipe 2, and the water is collected into a water return system by the water collecting pipe 2 to recycle water resources.

Claims (7)

1. The utility model provides a vertical row of tailing dam oozes device, a serial communication port, including piling up dam (4), it is responsible for (1) to bury row's infiltration underground in dam (4), arrange and infiltrate and be responsible for (1) downward sloping, arrange and infiltrate the one end of being responsible for (1) and connect the water inlet of the collector pipe (2) of piling up on dam (4) through first connecting pipe (3), arrange and infiltrate the middle part of being responsible for (1) and connect a plurality of vertical ascending row's infiltration branch pipes (6) respectively through a plurality of second connecting pipes (5), arrange and infiltrate branch pipe (6) and arrange in the dry stand department of dam (4) perpendicularly, arrange and infiltrate branch pipe (6) outside parcel one deck non-woven geotechnological cloth (6-1), the other end of arranging and infiltrating main pipe (1) is provided with first shutoff body (8).
2. A vertical drainage device of a tailing dam according to claim 1, characterized in that the top of the drainage branch pipe (6) is exposed to the water surface, and the drainage branch pipe (6) is flush with the height of the sub-dam of the accumulation dam (4).
3. A vertical drainage device of a tailing dam according to claim 1, characterized in that the top of the drainage branch pipe (6) is provided with a second plugging body (7) respectively.
4. The vertical drainage device of a tailing dam according to claim 1, characterized in that the drainage branch pipe (6) is a slotted drainage pipe with a straight length of 50 mm-100 mm.
5. The vertical drainage device of a tailing dam according to claim 1, characterized in that the main drainage pipe (1) is a steel pipe with a diameter of 100-200 mm.
6. The vertical drainage device of tailing dam of claim 1 characterized in that the collector pipe (2) is PVC drainpipe with diameter of 100 mm-200 mm.
7. A vertical drainage arrangement of a tailing dam according to claim 1, characterized in that the first block body (8) and the second block body (7) are blocked with non-woven geotextile and white steel mesh.
CN201822146865.5U 2018-12-20 2018-12-20 Vertical seepage drainage device of tailing dam Expired - Fee Related CN209837226U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822146865.5U CN209837226U (en) 2018-12-20 2018-12-20 Vertical seepage drainage device of tailing dam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822146865.5U CN209837226U (en) 2018-12-20 2018-12-20 Vertical seepage drainage device of tailing dam

Publications (1)

Publication Number Publication Date
CN209837226U true CN209837226U (en) 2019-12-24

Family

ID=68900232

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822146865.5U Expired - Fee Related CN209837226U (en) 2018-12-20 2018-12-20 Vertical seepage drainage device of tailing dam

Country Status (1)

Country Link
CN (1) CN209837226U (en)

Similar Documents

Publication Publication Date Title
CN204780819U (en) Reverse pre -buried french drain row system of oozing of tailing dam
CN110984346B (en) Sponge city rainwater reposition of redundant personnel discharging equipment
CN207193697U (en) A kind of road of mating formation of fast filtering draining
CN210194738U (en) Pressure groundwater recharging system for building roof rainwater
CN110952508B (en) Prevention and control method for mountain torrents and debris flow disasters
CN210827513U (en) Self-adaptation side slope drainage seepage prevention structure
CN202416168U (en) Viaduct rainwater collection system
CN209837226U (en) Vertical seepage drainage device of tailing dam
CN210797432U (en) Water conservancy river course bank protection
CN109440761B (en) Multidimensional gas injection anti-clogging integrated comprehensive drainage system for dredging mud storage yard
CN209194665U (en) Cell storm sewer exhaust system
CN201962780U (en) Water drain pipe type blind drain
CN212270579U (en) Water permeable component for water storage and supply of sponge city
CN211171841U (en) Water conservancy rapid trough
CN109098153B (en) Tailing pond sediment body surface flood discharge slot
CN207121782U (en) A kind of silt section road drainage system
CN209144964U (en) A kind of efficient rainwater isolation collection device
CN112832192A (en) Multifunctional longitudinal drainage structure for comprehensive treatment of middle slope in small watershed
CN206752233U (en) A kind of permeable pavement ground
CN201686997U (en) Drainage device
CN205822328U (en) A kind of making use of rain and flood device
CN204875703U (en) A cross adfluxion sediment weir for hydraulic and hydroelectric engineering
CN219773127U (en) Clear water drainage and diversion irrigation system for abandoned mine
CN208733773U (en) A kind of diversion trench of massif
CN214363913U (en) Roadbed protection drainage structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191224

CF01 Termination of patent right due to non-payment of annual fee