CN209816898U - Civil engineering pile foundation construction structures - Google Patents

Civil engineering pile foundation construction structures Download PDF

Info

Publication number
CN209816898U
CN209816898U CN201920511638.XU CN201920511638U CN209816898U CN 209816898 U CN209816898 U CN 209816898U CN 201920511638 U CN201920511638 U CN 201920511638U CN 209816898 U CN209816898 U CN 209816898U
Authority
CN
China
Prior art keywords
pile
cushion cap
foundation construction
vertical
pile foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920511638.XU
Other languages
Chinese (zh)
Inventor
曹希庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Cao Xiqing
Original Assignee
Cao Xiqing
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Cao Xiqing filed Critical Cao Xiqing
Priority to CN201920511638.XU priority Critical patent/CN209816898U/en
Application granted granted Critical
Publication of CN209816898U publication Critical patent/CN209816898U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Foundations (AREA)

Abstract

The utility model discloses a civil engineering pile foundation construction structures, including the frame post, the bottom of frame post is fixed with the cushion cap, and the inside groove has been seted up to the bottom of cushion cap, and the bottom of cushion cap is fixed with perpendicular stake. The utility model discloses a table wall of batter pile is helical structure, during the use, frictional force between increase batter pile and the soil that can be fine, make the difficult emergence of pile foundation construction structure rock, be convenient for strengthen the stability of base construction structure, and the batter pile of the side of erecting the pile is equilateral triangle structural distribution, adopt the triangle structure, bearing capacity and the structural stability of improvement structure that can be fine, be convenient for bear great horizontal thrust, reduce the structure moment of flexure, be convenient for reduce lateral displacement, the while stake of erecting passes through link and inside groove and cushion cap formation threaded connection, when transporting pile foundation construction structure, twist and move the stake of erecting, make the link of erecting the pile twist out from the inside groove of cushion cap bottom, can be fine dismantle cushion cap and stake of erecting, the separation rear is convenient for transport.

Description

Civil engineering pile foundation construction structures
Technical Field
The utility model relates to a civil engineering technical field specifically is a civil engineering pile foundation construction structures.
Background
The pile foundation construction indicates to building foundation work progress, and the pile foundation comprises stake and pile cap, and the construction method of pile foundation divide into two major types exhibition of precast pile and bored concrete pile, and the pile foundation has all obtained extensive application in different trades, the utility model particularly relates to a civil engineering pile foundation construction structure.
However, the prior art has the following defects:
1. the existing pile foundation construction structure is easy to incline when bearing larger horizontal load, and the stability of an upper layer structure is influenced;
2. the existing pile foundation construction structure is mostly of an integrated structure, occupies a space easily and is inconvenient to carry.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
The utility model provides a not enough to prior art, the utility model provides a civil engineering pile foundation construction structures has solved current pile foundation construction structures, takes place the slope easily when bearing great horizontal load, influences superstructure's stability, and structure as an organic whole is mostly moreover, occupation space easily, the problem of the transport of not being convenient for.
(II) technical scheme
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a civil engineering pile foundation construction structures, includes the frame post, and the bottom of frame post is fixed with the cushion cap, and the inside groove has been seted up to the bottom of cushion cap, and the bottom of cushion cap is fixed with perpendicular stake, and the link has been installed at the top of perpendicular stake, and the side of keeping away from the perpendicular stake one end of link is fixed with the batter pile, and perpendicular stake and batter pile are installed and are inserted into the inside of soil.
Preferably, the vertical piles and the inclined piles jointly form a foundation pile structure, and the vertical piles are uniformly distributed at the bottom of the bearing platform.
Preferably, the surface wall of the connecting end and the inner wall of the inner groove are both in a threaded structure, and the vertical piles are in threaded connection with the bearing platform through the connecting end and the inner groove.
Preferably, the surface wall of the inclined pile is of a spiral structure, and both the inclined pile and the vertical pile are driven cast-in-place piles.
Preferably, every three inclined piles form a group, and the three inclined piles are distributed on the side surface of the vertical pile in an equilateral triangle structure.
(III) advantageous effects
The utility model provides a civil engineering pile foundation construction structures possesses following beneficial effect:
(1) the utility model discloses a table wall of batter pile is helical structure, during the use, frictional force between increase batter pile that can be fine and the soil for pile foundation construction structure is difficult for taking place to rock, is convenient for strengthen pile foundation construction structure's stability.
(2) The utility model discloses the batter pile of the side of erecting the stake is equilateral triangle structural distribution, adopts the triangle structure, and the bearing capacity and the structural stability of improvement structure that can be fine are convenient for bear great horizontal thrust, reduce the structure moment of flexure, are convenient for reduce the lateral displacement.
(3) The utility model discloses a vertical pile passes through link and inside groove and cushion cap formation threaded connection, during the use, aligns the inside groove of cushion cap bottom with the link of vertical pile, then twists and moves vertical pile for inside the fixed inside groove that advances of link at vertical pile top, fixed vertical pile, when transportation pile foundation construction structure, twist and move vertical pile, make vertical pile's link twist out from the inside groove of cushion cap bottom, can be fine dismantle cushion cap and vertical pile, the separation rear is convenient to transport.
Drawings
Fig. 1 is a front view of the present invention;
FIG. 2 is an enlarged view of the structure A of FIG. 1 according to the present invention;
fig. 3 is a top view structural diagram of the bottom of the platform of the present invention.
The reference numbers in the figures are: 1. a frame column; 2. a bearing platform; 3. an inner tank; 4. erecting piles; 5. a connecting end; 6. oblique piles; 7. and (3) soil.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
As shown in fig. 1-3, the utility model provides a technical solution: a civil engineering pile foundation construction structure comprises a frame column 1, a bearing platform 2, an inner groove 3, vertical piles 4, connecting ends 5, inclined piles 6 and soil 7, wherein the bottom of the frame column 1 is fixed with the bearing platform 2, the inner groove 3 is formed in the bottom of the bearing platform 2, the bottom of the bearing platform 2 is fixed with the vertical piles 4, the vertical piles 4 and the inclined piles 6 jointly form a foundation pile structure, the vertical piles 4 are uniformly distributed at the bottom of the bearing platform 2, the bearing capacity and the structural stability of the structure are improved, the structure has strong bending resistance and shearing strength, the connecting ends 5 are arranged at the tops of the vertical piles 4, the surface walls of the connecting ends 5 and the inner walls of the inner grooves 3 are both of a threaded structure, the vertical piles 4 are in threaded connection with the bearing platform 2 through the connecting ends 5 and the inner grooves 3, when the pile foundation construction structure is transported, the vertical piles 4 are twisted, so that the connecting ends 5 of the vertical piles 4 are twisted out from the inner grooves 3 at the bottom of the bearing platform, convenient transportation in separation rear, the side of keeping away from 4 one ends of the vertical pile of link 5 is fixed with batter pile 6, the table wall of batter pile 6 is helical structure, batter pile 6 and vertical pile 4 are immersed tube bored concrete pile, every three of batter pile 6 is a set of, three batter pile 6 is equilateral triangle structural distribution in the side of vertical pile 4, the table wall of batter pile 6 is helical structure, during the use, frictional force between increase batter pile 6 that can be fine and soil 7, make the difficult emergence of pile foundation construction structure rock, be convenient for strengthen base construction structure's stability, and the batter pile 6 of the side of vertical pile 4 is equilateral triangle structural distribution, adopt the triangular structure, can be fine bearing capacity and the structural stability of improvement structure, vertical pile 4 and batter pile 6 ann insert into the inside of soil 7.
The working principle is as follows: before using this civil engineering pile foundation construction structures, at first need carry out the simple understanding structurally to whole civil engineering pile foundation construction structures, during the use, aim at the inside groove 3 of 2 bottoms of cushion cap with the link 5 of vertical pile 4, then twist vertical pile 4, make the link 5 at vertical pile 4 top fix inside 3 inside grooves, fix vertical pile 4, it can directly sink into soil 7 with vertical pile 4 and batter pile 6 on the pile foundation construction structures inside, when transporting pile foundation construction structures, twist vertical pile 4, make the link 5 of vertical pile 4 twist out from inside groove 3 of 2 bottoms of cushion cap, can dismantle the separation with cushion cap 2 and vertical pile 4 and transport again.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. The utility model provides a civil engineering pile foundation construction structures, includes frame post (1), its characterized in that: the bottom of frame post (1) is fixed with cushion cap (2), and inside groove (3) have been seted up to the bottom of cushion cap (2), and the bottom of cushion cap (2) is fixed with vertical pile (4), and link (5) have been installed at the top of vertical pile (4), and the side of keeping away from vertical pile (4) one end of link (5) is fixed with batter pile (6), and vertical pile (4) and batter pile (6) are installed and are inserted into the inside of soil (7).
2. A civil engineering pile foundation construction structure as claimed in claim 1, wherein: the vertical piles (4) and the inclined piles (6) jointly form a foundation pile structure, and the vertical piles (4) are uniformly distributed at the bottom of the bearing platform (2).
3. A civil engineering pile foundation construction structure as claimed in claim 1, wherein: the surface wall of the connecting end (5) and the inner wall of the inner groove (3) are both in a threaded structure, and the vertical pile (4) is in threaded connection with the bearing platform (2) through the connecting end (5) and the inner groove (3).
4. A civil engineering pile foundation construction structure as claimed in claim 1, wherein: the surface wall of the inclined pile (6) is of a spiral structure, and both the inclined pile (6) and the vertical pile (4) are immersed tube cast-in-place piles.
5. A civil engineering pile foundation construction structure as claimed in claim 1, wherein: every three inclined piles (6) form a group, and the three inclined piles (6) are distributed on the side surface of the vertical pile (4) in an equilateral triangle structure.
CN201920511638.XU 2019-04-16 2019-04-16 Civil engineering pile foundation construction structures Expired - Fee Related CN209816898U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920511638.XU CN209816898U (en) 2019-04-16 2019-04-16 Civil engineering pile foundation construction structures

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920511638.XU CN209816898U (en) 2019-04-16 2019-04-16 Civil engineering pile foundation construction structures

Publications (1)

Publication Number Publication Date
CN209816898U true CN209816898U (en) 2019-12-20

Family

ID=68879935

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920511638.XU Expired - Fee Related CN209816898U (en) 2019-04-16 2019-04-16 Civil engineering pile foundation construction structures

Country Status (1)

Country Link
CN (1) CN209816898U (en)

Similar Documents

Publication Publication Date Title
CN204370431U (en) A kind of occlusion long-short pile space enclosing structure
CN111910660A (en) Ultrahigh slope supporting structure and construction method thereof
DE1484498A1 (en) Submersible submersible frame for underwater operations
CN209816898U (en) Civil engineering pile foundation construction structures
CN210104765U (en) High and large retaining structure of soft geological side slope
CN112095632A (en) Pile-arch combined retaining structure and construction method thereof
CN213979037U (en) Assembled type steel reinforced concrete arch plate retaining wall
CN211948542U (en) Anti-skid weight-balancing retaining wall assembly and retaining wall system
CN209620075U (en) Highway soft soil ground support disk pile connection structure
CN110004969B (en) Tower crane foundation structure
CN212175363U (en) Frame-type anti-skidding structure with road system
CN210975386U (en) Karst development area high-speed railway tunnel lays structure
CN106567400A (en) Pile foundation structure suitable for soft soil layer
CN110080314B (en) Method for reducing side friction resistance of pile foundation
CN205576933U (en) Net stake supporting construction
CN201598646U (en) Digging type rod tower base
CN207130736U (en) Formwork support for assisting reverse construction
CN215105458U (en) High cantilever pile foundation joist
CN210797584U (en) Foundation pit supporting and support replacing structure
CN101696576B (en) Reinforced concrete frame abutment shallow pile plate foundation under two-driveway beam type cross connecting beam
CN217710801U (en) Be applied to basement bottom plate structure on heavy grade rock stratum
CN221194294U (en) Interior wall template bearing structure
CN219908542U (en) Bridge structure for high-steep slope road
CN218912307U (en) Temporary material storage platform for slope protection construction
CN211256936U (en) High-rise building underground karst foundation prevents subsiding reinforced structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191220

Termination date: 20210416