CN209816856U - Auxiliary stand is used in precast pile construction - Google Patents
Auxiliary stand is used in precast pile construction Download PDFInfo
- Publication number
- CN209816856U CN209816856U CN201920141931.1U CN201920141931U CN209816856U CN 209816856 U CN209816856 U CN 209816856U CN 201920141931 U CN201920141931 U CN 201920141931U CN 209816856 U CN209816856 U CN 209816856U
- Authority
- CN
- China
- Prior art keywords
- arc
- precast pile
- shaped limiting
- limiting piece
- piece
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model relates to an auxiliary stand is used in precast pile construction, characterized by: every the spacing piece of arc is kept away from on the one side of inserted key and is rotated and be connected with the gyro wheel, the axis of rotation of gyro wheel is perpendicular with telescopic axis. The utility model discloses have the frictional force that reduces between fastener and the precast pile for the precast pile is squeezed into the effect in the stake hole more easily.
Description
Technical Field
The utility model belongs to the technical field of the precast pile construction technique and specifically relates to an auxiliary stand is used in precast pile construction.
Background
At present, chinese patent document with publication number CN206887957U discloses a precast pile construction auxiliary support, which is arranged above a precast hole and used for supporting and positioning a precast pile, and comprises a base and a sleeve arranged on the base, wherein the top end of the base is welded with the bottom of the sleeve into a whole, the sleeve is arranged in a hollow way, a through hole which is communicated with the sleeve is arranged at the center of the base, a plurality of fasteners which are used for fixing and positioning the precast pile are arranged on the inner side wall of the sleeve, and the fasteners are circumferentially and annularly arranged along the inner side wall of the sleeve.
When inserting the precast pile in the sleeve, the fastener is outwards stretched out along recess and jack under the effect of the outside extrusion power of precast pile, and the elastic component is compressed, and the spacing piece of arc is contradicted with the precast pile, realizes fixed and location to the precast pile.
But because spacing piece of arc and precast pile tightly butt, there is great frictional force between spacing piece of arc and the precast pile, therefore the fastener also can produce certain influence in driving into the stake hole to the precast pile.
SUMMERY OF THE UTILITY MODEL
The utility model provides a not enough to prior art exists, the utility model provides an auxiliary stand is used in precast pile construction, its advantage lies in reducing the frictional force between fastener and the precast pile for the precast pile is squeezed into to the stake hole more easily.
The technical purpose of the utility model is realized through following technical scheme: the utility model provides an auxiliary stand is used in precast pile construction, every the spacing piece of arc is kept away from on the one side of inserting the key and is rotated and be connected with the gyro wheel, the rotation axis of gyro wheel is perpendicular with telescopic axis.
Through adopting above-mentioned technical scheme, after the precast pile inserted to the sleeve, the surface contact of gyro wheel and precast pile to sliding friction between with precast pile and the spacing piece of arc originally changes into rolling friction between gyro wheel and the precast pile, and then makes the precast pile still can be relaxed under the centre gripping direction of the spacing piece of arc to be squeezed into to the stake hole in.
The utility model discloses further set up to: three pairs of idler wheels are rotatably connected on each arc limiting sheet, wherein one pair is arranged in the middle of each arc limiting sheet, one pair is respectively arranged at two ends of each arc limiting sheet, and the idler wheels at the two ends of each arc limiting sheet incline to the circle center position of each arc limiting sheet.
Through adopting above-mentioned technical scheme, three pairs of gyro wheels on every spacing piece homoenergetic enough with the surface contact of precast pile, consequently make that precast pile can be good by the gyro wheel centre gripping location.
The utility model discloses further set up to: the upper end of the arc-shaped limiting piece is obliquely connected with an arc-shaped guide piece.
Through adopting above-mentioned technical scheme, the arc guide vane can lead to inserting the precast pile in the sleeve for among the precast pile can be accurate the centre gripping of entering into the gyro wheel. In addition, after the precast pile enters into in the sleeve and the contact of arc guide vane, the precast pile can be automatic push the inserted key into the jack, and need not artifical pulling inserted key make the precast pile can get into among the centre gripping of gyro wheel.
The utility model discloses further set up to: the fasteners are provided in sets at the upper and lower ends of the sleeve, respectively.
Through adopting above-mentioned technical scheme, upper and lower two sets of fasteners can be more accurate, stable carry out guiding orientation to the precast pile.
The utility model discloses further set up to: the arc-shaped limiting piece is connected with an insertion rod, one end, far away from the arc-shaped limiting piece, of the insertion rod is connected with a magnet block, and an insertion groove for inserting the insertion rod is formed in the insertion key.
Through adopting above-mentioned technical scheme, after long-term use, probably there is great frictional force between inserted key and the jack, at this moment when arc guide plate and precast pile contact the inserted key can not the retraction jack in, and the spacing piece of gyro wheel and arc receives the pressure of precast pile can deform or damage. At the moment, the insertion rod can be conveniently pulled out from the insertion groove to replace a new roller and the arc-shaped limiting sheet.
The utility model discloses further set up to: the section of the insertion rod along the length direction is square, and the section of the insertion groove along the length direction is also square.
Through adopting above-mentioned technical scheme, the inserted bar can not be in the insertion groove circumferential direction rotation for spacing piece of arc and gyro wheel can be accurate be connected with the inserted key, and then carry out guiding orientation to the precast pile.
To sum up, the utility model discloses following beneficial effect has:
1. after the precast pile is inserted into the sleeve, the roller is contacted with the surface of the precast pile, so that the sliding friction between the precast pile and the arc-shaped limiting sheet is converted into the rolling friction between the roller and the precast pile, and the precast pile can be easily driven into the pile hole under the clamping and guiding of the arc-shaped limiting sheet;
2. the arc-shaped guide piece can guide the precast pile inserted into the sleeve, so that the precast pile can accurately enter the clamping of the roller. In addition, after the precast pile enters the sleeve and contacts the arc-shaped guide sheet, the precast pile can automatically jack the inserting key into the inserting hole, and the precast pile can enter the clamping of the roller without manually pulling the inserting key;
3. after long-term use, there may be great frictional force between inserted key and the jack, and the inserted key can not retract into the jack when arc guide plate and precast pile contact this moment, and gyro wheel and the spacing piece of arc receive the pressure of precast pile can deform or damage. At the moment, the insertion rod can be conveniently pulled out from the insertion groove to replace a new roller and the arc-shaped limiting sheet.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
fig. 2 is a schematic view of the fastener structure of the present invention.
Reference numerals: 1. an arc-shaped limiting sheet; 2. inserting a key; 3. a roller; 4. a sleeve; 5. a connecting rod; 6. a guide piece; 7. a fastener; 8. an insertion rod; 9. a magnet block; 10. inserting the groove; 11. a groove 12 and a limit ring; 13. an elastic member.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
As shown in fig. 1, for the utility model discloses an auxiliary stand is used in precast pile construction, rotate in the one side that inserted key 2 was kept away from to spacing piece 1 of every arc and be connected with gyro wheel 3, the axis of rotation of gyro wheel 3 is perpendicular with sleeve 4's axis.
As shown in fig. 1 and 2, each arc-shaped limiting piece 1 is rotatably connected with three pairs of rollers 3, a connecting rod 5 is fixed on each arc-shaped limiting piece 1, and the rollers 3 are rotatably connected with the connecting rods 5. Wherein, the middle part of the arc-shaped limiting sheet 1 is provided with a pair of idler wheels 3, two ends of the arc-shaped limiting sheet 1 are respectively provided with a pair of idler wheels 3, and the idler wheels 3 at the two ends of the arc-shaped limiting sheet 1 incline to the circle center position of the arc-shaped limiting sheet 1.
After the precast pile is inserted into the sleeve 4, the three pairs of idler wheels 3 of the arc-shaped spacing pieces 1 mulberry are in surface contact with the precast pile, so that the sliding friction between the original precast pile and the arc-shaped spacing pieces 1 is converted into the rolling friction between the idler wheels 3 and the precast pile, and the precast pile can be driven into the pile hole easily under the clamping guidance of the arc-shaped spacing pieces 1.
The upper end slope of arc spacing piece 1 is connected with curved guide vane 6, and arc guide vane 6 can lead to inserting the precast pile in sleeve 4 for among the precast pile can be accurate the centre gripping of entering into gyro wheel 3. In addition, after the precast pile enters into sleeve 4 and contacts with arc guide vane 6, the precast pile can be automatic push in the jack with inserted key 2, and need not artifical pulling inserted key 2 and make the precast pile can be automatic get into among the centre gripping of gyro wheel 3.
Further, the components for clamping and positioning the precast pile, such as the fasteners 7, are provided in a set at each of the upper and lower ends of the sleeve 4. The upper and lower two groups of fasteners 7 can guide and position the precast pile more accurately and stably.
The arc-shaped limiting piece 1 is connected with an insertion rod 8, the cross section of the insertion rod 8 in the length direction is square, one end, far away from the arc-shaped limiting piece 1, of the insertion rod 8 is connected with a magnet block 9, an insertion groove 10 for inserting the insertion rod 8 is formed in the insertion key 2, and the cross section of the insertion groove 10 in the length direction is also square. When the insertion rod 8 is inserted into the insertion groove 10 on the iron insertion key 2, the insertion rod 8 is inserted and connected together through the adsorption of the magnet block 9, so that the insertion key 2 is detachably connected with the arc-shaped spacing piece 1 and the roller 3 thereon. The insertion rod 8 cannot rotate in the insertion groove 10 in the circumferential direction, so that the arc-shaped limiting sheet 1 and the roller 3 can be accurately connected with the insertion key 2, and the precast pile can be guided and positioned.
After long-term use, a large friction force may exist between the insertion key 2 and the insertion hole, at this time, the insertion key 2 cannot be retracted into the insertion hole when the arc-shaped guide piece 6 contacts with the precast pile, and the roller 3 and the arc-shaped limiting piece 1 are deformed or damaged by the pressure of the precast pile. At this time, the insertion rod 8 can be conveniently pulled out from the insertion groove 10 to replace the roller 3 and the arc-shaped limiting sheet 1.
Since the arc-shaped spacing piece 1 is connected to the inserting key 2 by the magnetic connection of the inserting rod 8 and the inserting key 2, when the elastic piece 13 is abutted against the arc-shaped spacing piece 1, the elastic piece 13 can push the inserting rod 8 out of the inserting groove 10. Therefore, a limiting ring 12 fixed coaxially with the inserting key 2 is arranged at one end of the inserting key 2 provided with the inserting groove 10, the elastic piece 13 is sleeved on the inserting key 2, one end of the elastic piece abuts against the limiting ring 12, the other end of the elastic piece abuts against the inner wall of the groove 11, and the preformed pile is clamped by driving the inserting key 2 through the elastic piece 13.
The embodiment of this specific implementation mode is the preferred embodiment of the present invention, not limit according to this the utility model discloses a protection scope, so: all equivalent changes made according to the structure, shape and principle of the utility model are covered within the protection scope of the utility model.
Claims (4)
1. The utility model provides an auxiliary stand is used in precast pile construction which characterized by: one surface, far away from the inserting key (2), of each arc-shaped limiting piece (1) is rotatably connected with a roller (3), and the rotating axis of the roller (3) is perpendicular to the axis of the sleeve (4); the upper end of the arc-shaped limiting piece (1) is obliquely connected with an arc-shaped guide piece (6); the arc-shaped limiting piece (1) is connected with an inserting rod (8), one end, far away from the arc-shaped limiting piece (1), of the inserting rod (8) is connected with a magnet block (9), and an inserting groove (10) for inserting the inserting rod (8) is formed in the inserting key (2).
2. The auxiliary support for precast pile construction as recited in claim 1, wherein: three pairs of idler wheels (3) are rotatably connected on each arc-shaped limiting piece (1), wherein one pair is arranged in the middle of each arc-shaped limiting piece (1), two pairs are respectively arranged at two ends of each arc-shaped limiting piece (1), and the idler wheels (3) at the two ends of each arc-shaped limiting piece (1) incline to the circle center position of each arc-shaped limiting piece (1).
3. The auxiliary support for precast pile construction as recited in claim 1, wherein: the fasteners (7) are respectively provided with a group at the upper end and the lower end of the sleeve (4).
4. The auxiliary support for precast pile construction as recited in claim 1, wherein: the section of the insertion rod (8) along the length direction is square, and the section of the insertion groove (10) along the length direction is also square.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920141931.1U CN209816856U (en) | 2019-01-26 | 2019-01-26 | Auxiliary stand is used in precast pile construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920141931.1U CN209816856U (en) | 2019-01-26 | 2019-01-26 | Auxiliary stand is used in precast pile construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209816856U true CN209816856U (en) | 2019-12-20 |
Family
ID=68872058
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920141931.1U Active CN209816856U (en) | 2019-01-26 | 2019-01-26 | Auxiliary stand is used in precast pile construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209816856U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112982426A (en) * | 2021-02-07 | 2021-06-18 | 中铁广州工程局集团深圳工程有限公司 | Construction method of underground assembly type station precast pile |
-
2019
- 2019-01-26 CN CN201920141931.1U patent/CN209816856U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112982426A (en) * | 2021-02-07 | 2021-06-18 | 中铁广州工程局集团深圳工程有限公司 | Construction method of underground assembly type station precast pile |
CN112982426B (en) * | 2021-02-07 | 2022-09-16 | 中铁广州工程局集团深圳工程有限公司 | Construction method of underground assembly type station precast pile |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209816856U (en) | Auxiliary stand is used in precast pile construction | |
CN211727857U (en) | DC argon arc welding machine | |
CN210766923U (en) | Socket joint formula sounding pipe for ultrasonic testing | |
CN215090849U (en) | Pipeline drilling equipment convenient to location | |
CN108894482A (en) | A kind of novel construction scaffold | |
CN218619348U (en) | Convenient unwinding support device who removes | |
CN111623814A (en) | Foundation crack measuring device for building construction | |
CN217315227U (en) | Portable coil pipe straightener | |
CN220504982U (en) | Probe fisher | |
CN214192101U (en) | Device capable of releasing bendable pipeline | |
CN212170133U (en) | Portable clamping structure on bearing detection device | |
CN214211799U (en) | Spiral pipe outer diameter adjusting device | |
CN216747342U (en) | Auxiliary device for cable detection | |
CN221782006U (en) | Clamping assembly and seamless steel tube compression-resistant detection device | |
CN214797011U (en) | Mutual inductor steel bracket convenient to stable stay | |
CN218010902U (en) | Concatenation formula PVC plastic yoga ball unable adjustment base | |
CN220324074U (en) | Signboard convenient to it is fixed | |
CN219471007U (en) | Retaining wall that durability is good | |
CN211414889U (en) | Process equipment for aligning middle hole and hole of oil pipe | |
CN220111122U (en) | Test tube rack for food detection | |
CN117775343B (en) | Be applied to measurement unmanned aerial vehicle that building site deep basal pit detected | |
CN220595616U (en) | Support for steel transportation and support | |
CN212908710U (en) | Positioning structure of movable low-voltage cabinet body | |
CN220869451U (en) | Extension device of mining pushing rod | |
CN211269012U (en) | External pull rod of suitcase |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |