CN209815485U - Building engineering lifting device - Google Patents

Building engineering lifting device Download PDF

Info

Publication number
CN209815485U
CN209815485U CN201920633358.6U CN201920633358U CN209815485U CN 209815485 U CN209815485 U CN 209815485U CN 201920633358 U CN201920633358 U CN 201920633358U CN 209815485 U CN209815485 U CN 209815485U
Authority
CN
China
Prior art keywords
protection casing
connector
bottom plate
lifting device
welding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920633358.6U
Other languages
Chinese (zh)
Inventor
陈植坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201920633358.6U priority Critical patent/CN209815485U/en
Application granted granted Critical
Publication of CN209815485U publication Critical patent/CN209815485U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a building engineering lifting device, comprising a base plate, the bottom plate top is provided with the protection casing, protection casing top left and right sides symmetrical welding has the link, the protection casing top is provided with rings, the welding has the string rope between link and the rings, protection casing lateral wall bottom welding has connector B, the connector B outside is provided with connector A, connector A welds in the inboard middle part of couple, connector A and connector B middle part run through there is the pivot. The utility model discloses a setting of protection casing, when using this device allocation and transportation building material's in-process, the protection casing links together with the bottom plate, and the protection casing can effectually avoid the building material on the bottom plate to drop from the bottom plate, has avoided dangerous emergence, has reduced the danger of building material handling.

Description

Building engineering lifting device
Technical Field
The utility model relates to a building material hoist and mount technical field specifically is a building engineering lifting device.
Background
The tower crane can lift and move heavy objects exceeding manpower, so that the operation is convenient, the moving efficiency is high, and the application in building engineering is wide; the existing tower crane has certain disadvantages when in use.
At present, the existing tower crane has some defects, such as; the existing tower crane can not accurately lift and convey building materials to a required position in the actual use process, workers are required to convey one end distance, no protective measures are provided in the lifting process of the building materials, the materials easily drop in the air, and life threats are caused to ground constructors.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a building engineering lifting device has solved the problem that proposes in the background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a building engineering lifting device, includes the bottom plate, the bottom plate top is provided with the protection casing, protection casing top left and right sides symmetrical welding has the link, the protection casing top is provided with rings, the welding has the string rope between link and the rings, protection casing lateral wall bottom welding has connector B, the connector B outside is provided with connector A, connector A welds in the inboard middle part of couple, connector A and connector B middle part run through there is the pivot.
As an optimized embodiment of the present invention, the protective cover has a handle welded to the side wall, and the handle is specifically a plurality of groups.
As an optimized embodiment of the utility model, the clamping groove has been seted up on the bottom plate lateral wall, the draw-in groove inner chamber is gone into to couple bottom card.
As an optimized embodiment of the utility model, the welding has the spring between couple top and the protection casing lateral wall.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model relates to a building engineering lifting device, through the setting of protection casing, when using this device to transfer building material's in-process, the protection casing links together with the bottom plate, and the protection casing can effectually avoid the building material on the bottom plate to drop from the bottom plate, has avoided dangerous emergence, has reduced the danger of building material handling.
2. The utility model relates to a building engineering lifting device, through the setting of handle, when using near this device handling building material reachs required position, constructor just can directly pull the protection casing through the handle, carries out appropriate regulation to the position of protection casing, and the constructor of being convenient for carries building material handling to accurate position, distance that can effectual reduction constructor transport building material.
3. The utility model relates to a building engineering lifting device, through the setting of couple and draw-in groove, the couple card is gone into the draw-in groove inner chamber when putting the protection casing at the bottom plate top for the bottom plate is connected to together with the protection casing, when needs part protection casing and bottom plate, constructor bulldozes the couple top with the foot, makes the couple use the pivot to rotate as the centre of a circle, then takes out in the draw-in groove bottom follow the couple, then hangs up the protection casing again, just can make protection casing and bottom plate separation, the staff of being convenient for separates protection casing and bottom plate.
4. The utility model relates to a building engineering lifting device, through the setting of spring, when putting the protection casing at the bottom plate top, the couple uses the pivot to rotate to couple bottom card income draw-in groove inner chamber as the centre of a circle under the effect of spring force, and then makes protection casing and bottom plate be connected to together.
Drawings
Other features, objects and advantages of the invention will become more apparent upon reading of the detailed description of non-limiting embodiments with reference to the following drawings:
fig. 1 is a front view of the hoisting equipment for construction engineering of the present invention;
fig. 2 is a right side view of the hoisting device for construction engineering of the present invention;
fig. 3 is a top view cross-section connection diagram of a connector a and a connector B of the hoisting equipment for construction engineering of the present invention; .
In the figure: the device comprises a bottom plate 1, a clamping groove 2, a hook 3, a protective cover 4, a handle 5, a hanging ring 6, a hanging rope 7, a hanging ring 8, a rotating shaft 9, a connector A10, a connector B11 and a spring 12.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
Referring to fig. 1-3, the present invention provides a technical solution: the utility model provides a building engineering lifting device, includes bottom plate 1, 1 top of bottom plate is provided with protection casing 4, the symmetrical welding of 4 top left and right sides of protection casing has link 6, protection casing 4 top is provided with rings 8, the welding has string rope 7 between link 6 and the rings 8, the welding of 4 lateral wall bottoms of protection casing has connector B11, the connector B11 outside is provided with connector A10, connector A10 welds in 3 inboard middle parts of couple, connector A10 and connector B11 middle part run through there is pivot 9.
In this embodiment (please refer to fig. 1, 2, and 3), by the arrangement of the protective cover 4, when the device is used to transfer the building materials, the protective cover 4 is connected with the bottom plate 1, and the protective cover 4 can effectively prevent the building materials on the bottom plate 1 from falling off from the bottom plate 1, thereby avoiding the occurrence of danger and reducing the danger of hoisting the building materials.
The side wall of the protective cover 4 is welded with a handle 5, and the handles 5 are specifically multiple groups.
In this embodiment (please refer to fig. 1 and 2), through the arrangement of the handle 5, when the building material is lifted by the lifting device to reach the position near the required position, the constructor can directly pull the protective cover 4 through the handle 5 to properly adjust the position of the protective cover 4, so that the constructor can conveniently lift the building material to the accurate position, and the distance for the constructor to carry the building material can be effectively reduced.
The side wall of the bottom plate 1 is provided with a clamping groove 2, and the bottom of the hook 3 is clamped into the inner cavity of the clamping groove 2.
In this embodiment (please refer to fig. 1 and 2), through the arrangement of the hook 3 and the slot 2, when the protection cover 4 is placed on the top of the bottom plate 1, the hook 3 is clamped into the inner cavity of the slot 2, so that the bottom plate 1 and the protection cover 4 are connected together, when the protection cover 4 and the bottom plate 1 need to be separated, a constructor pushes and presses the top of the hook 3 by feet, so that the hook 3 rotates by taking the rotating shaft 9 as the center of a circle, then the bottom of the hook 3 is taken out from the slot 2, and then the protection cover 4 is lifted, so that the protection cover 4 can be separated from the bottom plate 1, and the constructor can separate the.
Wherein, a spring 12 is welded between the top of the hook 3 and the side wall of the protective cover 4.
In this embodiment (please refer to fig. 1 and 2), by the arrangement of the spring 12, when the protection cover 4 is placed on the top of the bottom plate 1, the hook 3 rotates around the rotating shaft 9 as a center of a circle under the action of the spring 12, until the bottom of the hook 3 is clamped into the inner cavity of the clamping groove 2, so that the protection cover 4 is connected with the bottom plate 1.
It should be noted that the utility model relates to a building engineering lifting device, including, the part is the general standard component or the part that technical staff in this field knows, its structure and principle all are this technical staff can learn through the technical manual or through conventional experimental method, in operation, hang rings 8 on the couple of tower crane, when needing to carry material, stack the material on bottom plate 1, then control tower crane and put protection casing 4 at bottom plate 1 top hook 3 card go into draw-in groove 2 inner chamber, make bottom plate 1 and protection casing 4 be connected together, then control tower crane and hang protection casing 4 to the position that needs the material, then constructor uses the foot bulldozes the couple 3 top, make couple 3 rotate with pivot 9 as the centre of a circle, then couple 3 bottom takes out from draw-in groove 2, then control tower crane again and hang protection casing 4, the constructor can then directly remove the material from the floor 1.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above, it will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, but that the invention may be embodied in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (4)

1. The utility model provides a building engineering lifting device, includes bottom plate (1), its characterized in that: bottom plate (1) top is provided with protection casing (4), protection casing (4) top left and right sides symmetrical welding has link (6), protection casing (4) top is provided with rings (8), the welding has between link (6) and rings (8) hangs rope (7), protection casing (4) lateral wall bottom welding has connector B (11), the connector B (11) outside is provided with connector A (10), connector A (10) weld in couple (3) inboard middle part, connector A (10) and connector B (11) middle part run through there is pivot (9).
2. A construction lifting device according to claim 1, characterised in that: the welding has handle (5) on protection casing (4) lateral wall, handle (5) specifically are the multiunit.
3. A construction lifting device according to claim 1, characterised in that: the clamping groove (2) is formed in the side wall of the bottom plate (1), and the inner cavity of the clamping groove (2) is clamped into the bottom of the hook (3).
4. A construction lifting device according to claim 1, characterised in that: a spring (12) is welded between the top of the hook (3) and the side wall of the protective cover (4).
CN201920633358.6U 2019-05-06 2019-05-06 Building engineering lifting device Expired - Fee Related CN209815485U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920633358.6U CN209815485U (en) 2019-05-06 2019-05-06 Building engineering lifting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920633358.6U CN209815485U (en) 2019-05-06 2019-05-06 Building engineering lifting device

Publications (1)

Publication Number Publication Date
CN209815485U true CN209815485U (en) 2019-12-20

Family

ID=68882546

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920633358.6U Expired - Fee Related CN209815485U (en) 2019-05-06 2019-05-06 Building engineering lifting device

Country Status (1)

Country Link
CN (1) CN209815485U (en)

Similar Documents

Publication Publication Date Title
CN104485144A (en) Shielding device for transferring radioactive waste bins of nuclear power plants
CN209009974U (en) A kind of self-balancing hanger
CN202011696U (en) Multipurpose dedicated lifting appliance
CN209815485U (en) Building engineering lifting device
CN208037893U (en) A kind of chemical equipment overhaul on-site hoisting device
CN204778345U (en) Vertical round steel -casting anchor clamps
CN215666631U (en) Lifting device for hub of wind generating set
CN206244350U (en) A kind of oil drum sling
CN207330139U (en) A kind of symmetrical plate holder device with eccentric wheel
CN207433834U (en) A kind of automatically controlled ball bead type separator
CN208292512U (en) Fixture for hollow combined insulator class product
CN208022649U (en) Lifting conveyer for heavy mechanical equipment
CN207313050U (en) A kind of frock for aiding in installation shackle
CN205616437U (en) Device of a hoist and mount graphite heat preservation section of thick bamboo
CN107739008A (en) A kind of frock for aiding in installation shackle
CN204938737U (en) A kind of mobile portable hanging apparatus
CN214527622U (en) Steel hoisting tool for building
CN205061360U (en) Fixed cone lifting device
CN211110616U (en) Ton bag lifting device
CN205170163U (en) Automatic stirring device
CN204980869U (en) Hoist compensating beam
CN205346618U (en) Instrument is transported to annular flange
CN220537300U (en) Vertical ingot casting lifting tool
CN208585962U (en) Fashioned iron lifting device and hanging device including it
CN210635603U (en) Building materials hoist and mount net for building site

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191220

Termination date: 20200506