CN209808238U - Steel construction factory building - Google Patents

Steel construction factory building Download PDF

Info

Publication number
CN209808238U
CN209808238U CN201822049361.1U CN201822049361U CN209808238U CN 209808238 U CN209808238 U CN 209808238U CN 201822049361 U CN201822049361 U CN 201822049361U CN 209808238 U CN209808238 U CN 209808238U
Authority
CN
China
Prior art keywords
apron
roof
factory building
worm
room body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201822049361.1U
Other languages
Chinese (zh)
Inventor
贺敬轩
段乔华
佘立宇
韩路路
贾洪丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Steel Structure Co Ltd
Original Assignee
Railway Engineering Equipment Group Tunnel Equipment Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Railway Engineering Equipment Group Tunnel Equipment Manufacturing Co Ltd filed Critical Railway Engineering Equipment Group Tunnel Equipment Manufacturing Co Ltd
Priority to CN201822049361.1U priority Critical patent/CN209808238U/en
Application granted granted Critical
Publication of CN209808238U publication Critical patent/CN209808238U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The utility model relates to a steel construction application especially relates to a steel construction factory building, and its technical characteristic main points are: including the room body, install the roof on the room body, all be equipped with the stand on four angles of the room body, be connected with first crossbeam between two adjacent stands, be connected with the second crossbeam between two other stands, be equipped with first support column and second support column between first crossbeam and the second crossbeam, be connected with the installation roof beam between first support column and the second support column, be equipped with the apron on the roof, apron one end and installation roof beam fixed connection, the other end of apron is connected on the room body, be equipped with the brush cover on the apron, be equipped with at least one threaded connection lead screw on the brush cover on the roof, fixed mounting has the mounting bracket on the apron, the lead screw rotates and installs on the mounting bracket, the coaxial fixed mounting of lead screw tip has the worm wheel, rotate on the apron and install the worm with worm wheel meshing, room body internal face is equipped with the driving motor. The utility model discloses have the effect of being convenient for clean.

Description

Steel construction factory building
Technical Field
The utility model relates to a steel construction application especially relates to a steel construction factory building.
Background
The steel structure factory building mainly means that main bearing components are made of steel. Including steel post, girder steel, steel construction basis, steel roof truss, steel roof, the wall of steel construction also can adopt the brick wall to maintain. As the steel yield of China is increased, steel structure plants are mostly adopted, and particularly, the steel structure plants can be divided into light steel structure plants and heavy steel structure plants. Industrial and civil building facilities built from steel are called steel structures, and steel structure plants are characterized by: 1. the steel structure building has light weight, high strength and large span; 2. the construction period of the steel structure building is short, and the investment cost is correspondingly reduced; 3. the steel structure building has high fire resistance and strong corrosion resistance; 4. the steel structure building is convenient to move and is free of pollution during recycling.
The steel construction factory building is in long-term use, and the roof can accumulate accumulations such as some dusts and leaves, has the accumulations to persist behind the steel construction factory building roof, after experiencing rainy day, because these accumulations persist, water evaporation rate is slow in the accumulations, can cause the long-term ponding in roof, produces certain corrosive action to steel construction factory building roof, makes steel construction roof life reduce, still can bring some phenomena that influence steel construction factory building normal use such as leaking.
When a steel structure factory building roof is overhauled or cleaned at present, workers are required to climb up the roof and then operate on the roof, the existing steel structure factory building comprises the roof and a rectangular house body, four corners of the house body are vertically provided with stand columns, a support column is vertically arranged in the middle of each stand column, roof mounting beams are connected to the mounting beams, the cover plates are obliquely arranged, and the two mounting beams are located between the oppositely arranged support columns and are fixedly connected with the support columns; because the roof is higher apart from the height on ground, and the roof top surface is the various steel sheet constitution that has the inclination, so when operating personnel when cleaning on the roof, just be equivalent to an aerial working, the factor of safety is just lower, slowly cleans on the roof moreover, not only needs a large amount of operating personnel and work efficiency is very low.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a steel construction factory building, have the clear effect of being convenient for to above-mentioned prior art not enough.
The above utility model discloses an above-mentioned utility model purpose can realize through following technical scheme:
a steel structure factory building comprises a building body, wherein a roof is installed on the building body, stand columns are arranged on four corners of the building body, a first cross beam is connected between two adjacent stand columns, a second cross beam is connected between the other two stand columns, a first support column is vertically arranged in the middle of the first cross beam, a second support column is vertically arranged in the middle of the second cross beam, an installation beam is connected between the first support column and the second support column, a cover plate is arranged on the roof, one end of the cover plate is fixedly connected with the installation beam, the other end of the cover plate is connected onto the building body, a brush sleeve is arranged on the cover plate, installation sections are arranged at two ends of the brush sleeve, at least one lead screw in threaded connection with the installation sections is arranged on the roof, a mounting frame is fixedly installed on the cover plate, the lead screw is rotatably installed on the mounting frame, and a worm wheel is, the cover plate is rotatably provided with a worm meshed with the worm wheel, and the inner wall surface of the house body is provided with a driving motor connected with the worm.
Through adopting above-mentioned technical scheme, when needs are cleaned just structure factory building roof, the staff starts driving motor, it rotates to control the worm through driving motor, thereby it rotates to drive the worm wheel, also rotate thereupon with worm wheel fixed connection's lead screw, therefore, the rotation of lead screw can be controlled through the worm, because the characteristics of worm wheel and worm can the auto-lock on specific thread pitch, the worm can make the brush cover stop unable removal on the lead screw when not using, the function that can regulate and control brush cover position at will has been played, the lead screw rotates and to drive the brush cover and roll on the apron, roll on the apron through the brush cover, with the apron clean up, have the effect of being convenient for clean just structure factory building roof.
Preferably, a guide rod is connected to the other mounting section of the brush sleeve in a sliding manner.
Through adopting above-mentioned technical scheme, if there is not the guide bar here, the brush cover can rotate along with the lead screw rotation, carries on spacingly through setting up the guide bar to the brush cover, makes the lead screw brush cover can not rotate along with the lead screw when the pivoted, and the brush cover can move along installation roof beam length direction on the lead screw.
Preferably, the mounting section and the brush sleeve are fixed through bolts.
Through adopting above-mentioned technical scheme, the brush holder can be dismantled, because the brush holder carries out the clearance number of times and can remain foul on the surface after having much, can lead to the clearance after unclean, consequently the brush holder need design into can dismantle, and the staff can change the brush holder after every use a period, has the effect of being convenient for change the brush holder.
Preferably, be connected through the bearing between worm and the apron, the bearing is worn to establish the apron and is linked to each other with the apron, the worm is worn to establish the bearing and is stretched into in the room body.
Through adopting above-mentioned technical scheme, the apron is worn to establish by the worm, if do not have the bearing to act in the middle of, the worm is because will rotate, so with the laminating degree of apron not high, the worm can leak with apron department when meetting rainy day, therefore the bearing can prevent here from leaking.
Preferably, the lower end of the upright post is arranged in an inverted pyramid shape.
By adopting the technical scheme, the upright post is more convenient for workers to insert the upright post into the ground, so that the installation is more convenient.
Preferably, a layer of bristles is adhered to the surface of the brush sleeve.
Through adopting above-mentioned technical scheme, the brush hair possesses better clean effect, and is higher to the clear efficiency of apron.
Preferably, a rain shield is fixedly installed in the middle of the roof.
Through adopting above-mentioned technical scheme, be corroded rust by the rainwater easily after mechanical system such as rainy day lead screw and worm gear drenches with rain, consequently the flashing has the effect that prevents structures such as lead screw and worm gear and drench with rain and corrode.
To sum up, the utility model discloses a beneficial technological effect does:
1. the brush sleeve can directly clean the cover plate, and workers can clean the steel structure factory building by operating the driving motor below the brush sleeve, so that the roof of the steel structure factory building can be conveniently cleaned;
2. the worm is connected with the cover plate through the bearing, on one hand, the bearing enables the worm to rotate more smoothly at the cover plate due to small friction force, on the other hand, the bearing is tightly attached, the seamless attaching degree is achieved, and water leakage at the connecting position is also prevented.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of the installation beam of the present invention;
FIG. 3 is an enlarged schematic view of section A of FIG. 1;
FIG. 4 is an enlarged schematic view of section B of FIG. 1;
fig. 5 is a schematic view of the installation of the flashing of the present invention.
Reference numerals: 1. a house body; 2. a roof; 3. a column; 4. a first cross member; 5. a second cross member; 6. a first support column; 7. a second support column; 8. mounting a beam; 9. a cover plate; 10. a brush sleeve; 11. an installation section; 12. a screw rod; 13. a mounting frame; 14. a worm gear; 15. a worm; 16. a drive motor; 17. a guide bar; 18. a bolt; 19. a flashing; 20. a bearing; 21. and (3) brush hairs.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
As shown in figure 1, a steel construction factory building, including the room body 1, install roof 2 on the room body 1, the room body 1 is the rectangle, all vertically is equipped with stand 3 on four angles of the room body 1, and the upper end of stand 3 is connected in roof 2.
As shown in fig. 2, the lower extreme of stand 3 is the inverted pyramid and is used for being connected with ground, be connected with first crossbeam 4 between two adjacent stands 3, be connected with second crossbeam 5 between two other stands 3, vertically be equipped with first support column 6 in the middle of the first crossbeam 4, vertically be equipped with second support column 7 in the middle of the second crossbeam 5, be connected with installation roof beam 8 between first support column 6 and the second support column 7, the level of installation roof beam 8 is higher than the room body 1, through welded fastening between first support column 6 and second support column 7 and the installation roof beam 8.
As shown in fig. 1, a cover plate 9 is arranged at a gap formed by the mounting beam 8 and the house body 1 on the roof 2, the number of the cover plates 9 is two, the two cover plates are respectively positioned at two sides of the mounting beam 8, one end of the cover plate 9 is fixedly connected with the mounting beam 8, and the other end of the cover plate 9 is connected to the house body 1.
As shown in fig. 1 and 4, a brush sleeve 10 is arranged on a cover plate 9, a layer of brush bristles 21 is adhered to the surface of the brush sleeve 10, the brush sleeve 10 is arranged to be perpendicular to the length direction of an installation beam 8 and is tightly attached to the cover plate 9, installation sections 11 are arranged at two ends of the brush sleeve 10, the installation sections 11 and the brush sleeve 10 are fixed through bolts 18, at least one screw rod 12 in threaded connection with the installation sections 11 is arranged on a roof 2, the screw rod 12 is arranged along the length direction of the installation beam 8, an installation frame 13 is fixedly arranged on the cover plate 9, the installation frame 13 is distributed at four corners of the cover plate 9, the number of the installation frames 13 on each cover plate 9 is set to be 4, and the number of.
Another installation section 11 on the brush cover 10 is connected with a guide rod 17 in a sliding mode, the guide rod 17 is fixedly installed on another group of installation frames 13, 1 guide rod 17 is arranged on each cover plate 9, the guide rod 17 is arranged along the length direction of the installation beam 8, and therefore the lead screw 12 rotates to drive the brush cover 10 to move along the length direction of the installation beam 8, and the purpose of cleaning the cover plates 9 is achieved.
As shown in fig. 2 and 3, a worm wheel 14 is coaxially fixed at an end of the screw rod 12, a worm 15 meshed with the worm wheel 14 is rotatably installed on the cover plate 9, the worm 15 is connected with the cover plate 9 through a bearing 20, the bearing 20 penetrates through the cover plate 9 and is connected with the cover plate 9, the worm 15 penetrates through the bearing 20 and extends into the house body 1, and a driving motor 16 connected with the worm 15 is arranged on an inner wall surface of the house body 1.
As shown in fig. 5, a flashing 19 is fixedly mounted in the middle of the roof 2 along the length of the guide bar 17.
The specific implementation method of the embodiment is as follows:
when steel structure factory building roof 2 needs to be cleared up, open driving motor 16 switch, driving motor 16 control worm 15 rotates, worm 15 rotates and drives worm wheel 14 and rotates, because worm wheel 14 and lead screw 12 fixed connection, lead screw 12 rotates along with worm wheel 14, brush cover 10 threaded connection is on lead screw 12, brush cover 10 other end sliding connection has guide bar 17, lead screw 12 rotates from this, brush cover 10 can remove along the length direction of lead screw 12, brush hair 21 on brush cover 10 clears up omnidirectional clearance to apron 9.
When the brush cover 10 is used for a long time, the brush hairs 21 of the brush cover 10 become dirty, and it is necessary for a worker to replace the brush cover 10 by climbing a ladder to the roof 2.
The embodiment of this specific implementation mode is the preferred embodiment of the present invention, not limit according to this the utility model discloses a protection scope, so: all equivalent changes made according to the structure, shape and principle of the utility model are covered within the protection scope of the utility model.

Claims (7)

1. The utility model provides a steel construction factory building, includes the room body (1), install roof (2) on the room body (1), all be equipped with stand (3) on four angles of the room body (1), be connected with first crossbeam (4) between two adjacent stand (3), be connected with second crossbeam (5) between two other stand (3), vertically in the middle of first crossbeam (4) be equipped with first support column (6), vertically in the middle of second crossbeam (5) be equipped with second support column (7), be connected with between first support column (6) and second support column (7) installation roof beam (8), be equipped with apron (9) on roof (2), apron (9) one end and installation roof beam (8) fixed connection, the other end of apron (9) is connected on the room body (1), its characterized in that: be equipped with brush cover (10) on apron (9), brush cover (10) both ends are equipped with erection section (11), be equipped with lead screw (12) of at least one threaded connection on erection section (11) on roof (2), fixed mounting has mounting bracket (13) on apron (9), lead screw (12) are rotated and are installed on mounting bracket (13), the coaxial fixed mounting of lead screw (12) tip has worm wheel (14), rotate on apron (9) and install worm (15) with worm wheel (14) meshing, the room body (1) internal face is equipped with driving motor (16) continuous with worm (15).
2. The steel structure factory building of claim 1, wherein: and the other mounting section (11) of the brush sleeve (10) is connected with a guide rod (17) in a sliding way.
3. The steel structure factory building of claim 1, wherein: the mounting section (11) and the brush sleeve (10) are fixed through a bolt (18).
4. The steel structure factory building of claim 1, wherein: the worm (15) is connected with the cover plate (9) through the bearing (20), the bearing (20) is connected with the cover plate (9) in a penetrating mode, and the worm (15) is connected with the cover plate (9) in a penetrating mode through the bearing (20) and stretches into the house body (1).
5. The steel structure factory building of claim 1, wherein: the lower end of the upright post (3) is arranged in an inverted pyramid shape.
6. The steel structure factory building of claim 1, wherein: a layer of brush hair (21) is adhered to the surface of the brush sleeve (10).
7. The steel structure factory building of claim 1, wherein: a rain shielding plate (19) is fixedly arranged in the middle of the roof (2).
CN201822049361.1U 2018-12-07 2018-12-07 Steel construction factory building Active CN209808238U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822049361.1U CN209808238U (en) 2018-12-07 2018-12-07 Steel construction factory building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822049361.1U CN209808238U (en) 2018-12-07 2018-12-07 Steel construction factory building

Publications (1)

Publication Number Publication Date
CN209808238U true CN209808238U (en) 2019-12-20

Family

ID=68869274

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822049361.1U Active CN209808238U (en) 2018-12-07 2018-12-07 Steel construction factory building

Country Status (1)

Country Link
CN (1) CN209808238U (en)

Similar Documents

Publication Publication Date Title
CN209808238U (en) Steel construction factory building
CN216239867U (en) Building construction safety device
CN209808237U (en) Steel construction factory building convenient to it is clean
DE202009006754U1 (en) Variable device for cleaning and snow removal of solar modules
CN111648473B (en) High-strength steel structure
CN110952794A (en) Water-saving cleaning system for building glass curtain wall
CN211621968U (en) Light-transmitting type movable canopy
CN216109429U (en) Rain shield for building
CN212689411U (en) Triangular lighting smoke-discharging skylight
CN113356357B (en) Steel structure connecting piece
CN211499716U (en) Automatic climb a guide rail group frame for frame
CN103821394B (en) There is sand blasting room and the construction method thereof of movable roof
EP3626905B1 (en) Glass roof cleaning system
CN112813835A (en) Spraying maintenance system and method for overhead cast-in-place box girder
JP3414711B2 (en) Balcony with solar panels
CN216517254U (en) Civil engineering rail guard
CN214259212U (en) Modularization steel construction factory building
CN221523812U (en) Overhanging structure for building design
CN218027280U (en) Direction guiding device for underground crossing
JP2004003186A (en) Building structure with track guide disposed therein
CN215987886U (en) Remote building construction safety management device
CN210798007U (en) Double-layer curtain wall system with maintenance platform
CN220365418U (en) Environment-friendly noise reduction mechanism for building construction management
CN216520453U (en) Hydraulic engineering water level monitoring devices's installing support
CN219247931U (en) Management equipment for municipal works, landscape

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 211529 Duanzhuang 500, Changshan Community, Jinniuhu Street, Liuhe District, Nanjing City, Jiangsu Province

Patentee after: China Railway Steel Structure Co.,Ltd.

Address before: 211529 Duanzhuang 500, Changshan Community, Jinniuhu Street, Liuhe District, Nanjing City, Jiangsu Province

Patentee before: CHINA RAILWAY ENGINEERING EQUIPMENT GROUP STEEL STRUCTURE Co.,Ltd.