CN209799422U - Pay-off for civil construction - Google Patents

Pay-off for civil construction Download PDF

Info

Publication number
CN209799422U
CN209799422U CN201920331247.XU CN201920331247U CN209799422U CN 209799422 U CN209799422 U CN 209799422U CN 201920331247 U CN201920331247 U CN 201920331247U CN 209799422 U CN209799422 U CN 209799422U
Authority
CN
China
Prior art keywords
wall
main box
pay
box
cotton rope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920331247.XU
Other languages
Chinese (zh)
Inventor
司斌
赵亚莉
张�杰
董海长
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou Business College
Original Assignee
Zhengzhou Business College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Business College filed Critical Zhengzhou Business College
Priority to CN201920331247.XU priority Critical patent/CN209799422U/en
Application granted granted Critical
Publication of CN209799422U publication Critical patent/CN209799422U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Emergency Lowering Means (AREA)

Abstract

The utility model discloses a pay-off for civil construction, including main box, one side outer wall fixed mounting of main box has lubricated case, the inside of main box is provided with the micromotor, the output shaft fixedly connected with axis of rotation of micromotor, the one end that the micromotor was kept away from in the axis of rotation rotates and connects on the positive inner wall of main box, the fixed rolling disc that has cup jointed of outer wall of axis of rotation, be provided with the cotton rope on the outer wall of rolling disc, the top outer wall of main box is opened there is the guiding hole, the inside of main box is provided with locking mechanism. The utility model discloses can make the quick receipts of the cotton rope of giving out, reduce the time that the staff received the line, improve staff's work efficiency, can make to receive and release the cotton rope surface and oil, reduce the frictional force between cotton rope and the pay-off shell or other objects, improve the life of cotton rope, the staff's of being convenient for control the pay-off line and receive the speed of line rope, improved the holistic practicality of pay-off.

Description

Pay-off for civil construction
Technical Field
The utility model relates to a civil construction technical field especially relates to a pay-off for civil construction.
Background
Civil construction is a general term for scientific technology for building various engineering facilities. It refers to the applied materials, equipment and the technical activities of surveying, designing, constructing, maintaining and the like; also refers to the objects of engineering construction, namely, various engineering facilities which are built on the ground or underground, on land or in water and directly or indirectly serve human life, production, military affairs and scientific research, and a pay-off device is needed in civil engineering construction.
Civil construction unwrapping wire equipment among the prior art can not make the cotton rope of releasing quick withdraw, and the staff of being not convenient for control and use pay-off lead to staff's work efficiency low, can not be fine carry out surface lubrication to the cotton rope, speed when can not control the cotton rope and receive the cotton rope, whole practicality is relatively poor.
Therefore, there is a need to design a pay-off device for civil engineering to solve the above problems.
disclosure of Invention
The utility model aims at solving the shortcoming that exists among the prior art, and the pay-off for civil construction who provides.
In order to achieve the above purpose, the utility model adopts the following technical scheme: a pay-off device for civil construction comprises a main box, wherein a lubricating box is fixedly installed on the outer wall of one side of the main box, a small motor is arranged inside the main box, an output shaft of the small motor is fixedly connected with a rotating shaft, one end, far away from the small motor, of the rotating shaft is rotatably connected onto the inner wall of the front face of the main box, a rotating disc is fixedly sleeved on the outer wall of the rotating shaft, a cotton rope is arranged on the outer wall of the rotating disc, a guide hole is formed in the outer wall of the top of the main box, a locking mechanism is arranged inside the main box and comprises a locking rod and a fixing column, the locking rod is inserted into the guide hole, the outer wall of the locking rod is sleeved with a guide column, the outer wall of the top of the guide column is welded onto the inner wall of the top of the main box, an upper locking block is fixedly installed on the outer wall of the, the outer wall of the top of the fixed column is fixedly connected with a lower locking block, the outer wall of the bottom of the upper locking block and the outer wall of the top of the lower locking block are both provided with guide grooves, the outer wall of the bottom of the upper locking block and the outer wall of the top of the lower locking block are both provided with two fixed grooves, and compression springs are fixedly mounted inside the two fixed grooves.
Further, the welding of one side outer wall of lubricated case has a fixed section of thick bamboo, one side outer wall of lubricated case is provided with the laser head, and the laser head is located the top of a fixed section of thick bamboo.
Furthermore, an oil filling hole is formed in the outer wall of the top of the lubricating box, a cavity is formed in the lubricating box, and sponge with lubricating oil is filled in the cavity.
Furthermore, the top of one side of the main box is rotatably connected with a box cover through a hinge, and a convex block is fixedly arranged on the outer wall of the top of the box cover.
Furthermore, the cord sequentially penetrates through the locking mechanism, the main box, the sponge, the lubricating box and the fixing cylinder from left to right, and one end, far away from the rotating disc, of the cord is fixedly connected with a traction ring.
Furthermore, a switch is arranged on the outer wall of one side of the main box and is connected to the small motor through an electric wire.
The utility model has the advantages that:
1. Through the small motor that sets up, can make the cotton rope of releasing quick withdraw, the staff's of being convenient for control and use pay-off have reduced the time that the staff received the line, have improved staff's work efficiency.
2. Through the sponge that sets up, the sponge that has lubricating oil can make the cotton rope of releasing and the cotton rope surface oil of retrieving, has reduced the frictional force between cotton rope and the pay-off shell or other objects, has improved the life of cotton rope.
3. Through the locking mechanism who sets up, the staff of being convenient for controls the speed of unwrapping wire and receipts cotton rope, and the length of fixed cotton rope can prevent that the cotton rope in the pay-off from emitting when necessary, and when receiving the line, control locking mechanism can make the cotton rope of rolling disc wind tightly, has improved the holistic practicality of pay-off.
Drawings
Fig. 1 is a schematic sectional structure view of a pay-off device for civil construction according to the present invention;
Fig. 2 is a schematic view of the overall structure of a pay-off device for civil construction according to the present invention;
fig. 3 is a schematic view of a three-dimensional structure of a locking mechanism of a pay-off device for civil construction provided by the utility model;
Fig. 4 is the utility model provides a pay-off for civil construction's locking mechanical system planar structure sketch map.
In the figure: the device comprises a main box 1, a lubricating box 2, a switch 3, a locking rod 4, a fixed cylinder 5, an oil injection hole 6, a laser head 7, a thread rope 8, a traction ring 9, a small motor 10, a rotating disc 11, a rotating shaft 12, a guide hole 13, a guide post 14, an upper locking block 15, a fixed post 16, a lower locking block 17, a guide groove 18, a fixed groove 19, a compression spring 20, sponge 21, a box cover 22, a convex block 23 and a locking mechanism 24.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1 to 4, a pay-off device for civil construction includes a main box 1, a lubrication box 2 is fixedly installed on an outer wall of one side of the main box 1, a small motor 10 is installed inside the main box 1, an output shaft of the small motor 10 is fixedly connected with a rotation shaft 12, one end of the rotation shaft 12, which is far away from the small motor 10, is rotatably connected to an inner wall of the front side of the main box 1, a rotation disc 11 is fixedly connected to an outer wall of the rotation shaft 12, a cord 8 is installed on an outer wall of the rotation disc 11, a guide hole 13 is opened on an outer wall of the top of the main box 1, a locking mechanism 24 is installed inside the main box 1, so that a worker can control the speed of the pay-off cord 8 and the speed of the take-up cord 8, the length of the cord 8 can be fixed if necessary, the cord 8 in the pay-off device is prevented from being paid out, and the cord, locking mechanism 24 includes lock pole 4 and fixed column 16, and lock pole 4 pegs graft in the inside of guiding hole 13, guide post 14 has been cup jointed to lock pole 4's outer wall, and the top outer wall welding of guide post 14 is on main box 1's top inner wall, lock pole 4's bottom outer wall fixed mounting has locking piece 15, fixed column 16 welds on main box 1's bottom inner wall, locking piece 17 under fixed column 4's the top outer wall fixedly connected with, guide slot 18 has all been opened to the bottom outer wall of locking piece 15 and the top outer wall of locking piece 17 down, two fixed slots 19 have all been opened to the bottom outer wall of locking piece 15 and the top outer wall of locking piece 17 down, the inside fixed mounting of two fixed slots 19 has compression spring 20.
further, the outer wall welding of one side of lubricated case 2 has a fixed section of thick bamboo 5, and one side outer wall of lubricated case 2 is provided with laser head 7, can open laser head 7 according to different needs, can observe whether cotton rope 8 is on a straight line through laser head 7, has improved the practicality of integrated device, and laser head 7 is located the top of fixed section of thick bamboo 5, and the cotton rope 8 that prevents to emit shelters from laser head 7.
Further, the oil filler point 6 is opened to the top outer wall of lubrication box 2, and the inside of lubrication box 2 is provided with the cavity, and the inside sponge 21 that has lubricating oil that fills of cavity, the sponge 21 that has lubricating oil can make the cotton rope 8 of releasing and the cotton rope 8 surface oil of withdrawing, has reduced the frictional force between cotton rope 8 and the pay-off shell or other objects, has improved the life of cotton rope 8.
Further, one side top of main box 1 is connected with lid 22 through hinge rotation, can place and install little motor 10 through opening lid 22 to its inside, and the maintenance in the later stage of being convenient for, the top outer wall fixed mounting of lid 22 has lug 23, and the staff of being convenient for opens lid 22.
Further, the cotton rope 8 sequentially passes through the locking mechanism 24, the main box 1, the sponge 21, the lubricating box 2 and the fixing cylinder 5 from left to right, the traction ring 9 is fixedly connected to one end, far away from the rotating disc 11, of the cotton rope 8, the worker can conveniently pull the cotton rope 8, and the practicability and the flexibility of the whole device are improved.
Further, the outer wall of one side of the main box 1 is provided with a switch 3, a button switch 3 is adopted, the use by workers is convenient, the switch 3 is connected to the small motor 10 through an electric wire, the switch 3 can control the on and off of the small motor 10, and the flexibility is high.
The working principle is as follows: when the device is used, a worker pulls the traction ring 9 at one end of the cord 8, the cord 8 in the main box 1 is pulled out, the locking rod 4 on the locking mechanism 24 is slowly extruded, the speed of paying off can be controlled, the locking rod 4 slides downwards in the guide groove hole 13 and the guide column 14 while the locking rod 4 is pressed downwards, the locking rod 4 pushes the upper locking block 15 to move downwards, the guide groove 18 on the upper locking block 15 can extrude the cord 8 to contact the guide groove 18 on the lower locking block 17, the locking rod 4 is pressed under control with different forces, the resistance of paying off and paying off of the cord 8 is different, when the required length is paid off, the cord 8 can be locked through the locking rod 4, the cord 8 in the main box 1 is prevented from being paid off, the laser head 7 can be opened according to different requirements, whether the cord 8 is on a straight line can be observed through the laser head 7, the practicability of the whole device is improved, when the cord is taken up, open switch 3, start small motor 10, small motor 10 drives rolling disc 11 and rotates, consequently, drive the winding of cotton rope 8 on rolling disc 11, withdraw cotton rope 8, the receipts line efficiency of staff has been improved, simultaneously when receiving line or unwrapping wire cotton rope 8 all is through the sponge 21 that has lubricating oil, cotton rope 8 can lubricate its surface through sponge 21, reduce the frictional force between cotton rope 8 and other article, the life of cotton rope 8 has been improved, when needing to add lubricating oil to sponge 8, can carry out the oiling to sponge 8 through oil filler point 6, be convenient for staff's use.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The pay-off device for the civil construction comprises a main box (1) and is characterized in that a lubricating box (2) is fixedly mounted on the outer wall of one side of the main box (1), a small motor (10) is arranged inside the main box (1), an output shaft of the small motor (10) is fixedly connected with a rotating shaft (12), one end, far away from the small motor (10), of the rotating shaft (12) is rotatably connected onto the inner wall of the front face of the main box (1), a rotating disc (11) is fixedly sleeved on the outer wall of the rotating shaft (12), a thread rope (8) is arranged on the outer wall of the rotating disc (11), a guide hole (13) is formed in the outer wall of the top of the main box (1), a locking mechanism (24) is arranged inside the main box (1), the locking mechanism (24) comprises a locking rod (4) and a fixing column (16), and the locking rod (4) is inserted into the guide hole (13), the outer wall of lock pole (4) has cup jointed guide post (14), and the top outer wall welding of guide post (14) is on the top inner wall of main box (1), the bottom outer wall fixed mounting of lock pole (4) has last locking piece (15), fixed column (16) welding is on the bottom inner wall of main box (1), locking piece (17) down is connected with to the top outer wall fixed connection of fixed column (4), the bottom outer wall of going up locking piece (15) and the top outer wall of lower locking piece (17) all open guide slot (18), the bottom outer wall of going up locking piece (15) and the top outer wall of lower locking piece (17) all open two fixed slots (19), two the inside fixed mounting of fixed slot (19) has compression spring (20).
2. The pay-off device for the civil construction according to claim 1, characterized in that, the outer wall of one side of the lubricating box (2) is welded with a fixed cylinder (5), the outer wall of one side of the lubricating box (2) is provided with a laser head (7), and the laser head (7) is positioned above the fixed cylinder (5).
3. The pay-off device for civil construction according to claim 1, characterized in that the top outer wall of the lubricating box (2) is provided with an oil filling hole (6), the inside of the lubricating box (2) is provided with a cavity, and the cavity is filled with a sponge (21) with lubricating oil.
4. The pay-off device for civil construction according to claim 1, characterized in that the top of one side of the main box (1) is rotatably connected with a box cover (22) through a hinge, and the outer wall of the top of the box cover (22) is fixedly provided with a convex block (23).
5. The pay-off device for civil construction as claimed in claim 1, characterized in that the string (8) passes through the locking mechanism (24), the main box (1), the sponge (21), the lubricating case (2) and the fixed cylinder (5) from left to right in sequence, and a traction ring (9) is fixedly connected to one end of the string (8) far away from the rotating disc (11).
6. The building construction pay-off device according to claim 1, wherein a switch (3) is provided on an outer wall of one side of the main box (1), and the switch (3) is connected to the small motor (10) through an electric wire.
CN201920331247.XU 2019-03-15 2019-03-15 Pay-off for civil construction Expired - Fee Related CN209799422U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920331247.XU CN209799422U (en) 2019-03-15 2019-03-15 Pay-off for civil construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920331247.XU CN209799422U (en) 2019-03-15 2019-03-15 Pay-off for civil construction

Publications (1)

Publication Number Publication Date
CN209799422U true CN209799422U (en) 2019-12-17

Family

ID=68824822

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920331247.XU Expired - Fee Related CN209799422U (en) 2019-03-15 2019-03-15 Pay-off for civil construction

Country Status (1)

Country Link
CN (1) CN209799422U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113882698A (en) * 2021-11-16 2022-01-04 临沂职业学院 Construction pay-off device for constructional engineering
CN118164332A (en) * 2024-05-16 2024-06-11 辽宁创程建筑科技有限公司 Pay-off for building engineering

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113882698A (en) * 2021-11-16 2022-01-04 临沂职业学院 Construction pay-off device for constructional engineering
CN118164332A (en) * 2024-05-16 2024-06-11 辽宁创程建筑科技有限公司 Pay-off for building engineering

Similar Documents

Publication Publication Date Title
CN209799422U (en) Pay-off for civil construction
CN209853465U (en) Pay-off is used in power transmission line construction
CN112124118B (en) Charging pile for charging new energy automobile and use method thereof
CN111120227A (en) Energy storage device and photovoltaic system
CN217915377U (en) Withdrawing manipulator for fully-mechanized coal mining hydraulic support
CN208690854U (en) Charge punck-down block
CN216566628U (en) Foundation pit support deformation monitoring device
CN110884966A (en) Automatic take-up of new forms of energy charging stake
CN213897063U (en) Improved inclination measuring probe for solving problem of clamping groove
CN211568331U (en) Unmanned aerial vehicle for land survey
CN210608314U (en) Intraductal threading of building electrical engineering is threaded and is put
CN110344641B (en) Road construction pole is buried underground and is used tree device
CN211081077U (en) Pay-off for building engineering
CN217110739U (en) Mechanical part of roof displacement monitor
CN218327722U (en) Roadway mine lamp convenient to replace
CN112600124B (en) Overhead line erecting machine and using method thereof
CN111335940A (en) Winch moving device for transporting underground excavation roadway of coal mine
CN213679307U (en) Cable winding device for coal mine electromechanical installation
CN211503925U (en) Soil thickness measuring device for soil surveying and mapping
CN216764139U (en) Main tail rope winding device for mine maintenance
CN215974363U (en) Cable winding device for coal mine electromechanical installation
CN118329521B (en) Deep sampling device for ecological restoration soil investigation
CN217080342U (en) Mining roof stock drilling trompil device
CN212477787U (en) Anti-pulling mechanical connecting device for foundation pile
CN219164301U (en) Gravity well energy storage device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191217

Termination date: 20210315