CN209799116U - Semi-hidden frame and hidden frame glass curtain wall without glass auxiliary frame in dry construction - Google Patents
Semi-hidden frame and hidden frame glass curtain wall without glass auxiliary frame in dry construction Download PDFInfo
- Publication number
- CN209799116U CN209799116U CN201920481624.8U CN201920481624U CN209799116U CN 209799116 U CN209799116 U CN 209799116U CN 201920481624 U CN201920481624 U CN 201920481624U CN 209799116 U CN209799116 U CN 209799116U
- Authority
- CN
- China
- Prior art keywords
- glass
- curtain wall
- hidden frame
- frame
- curtain
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000011521 glass Substances 0.000 title claims abstract description 85
- 238000010276 construction Methods 0.000 title claims abstract description 15
- 229910000838 Al alloy Inorganic materials 0.000 claims abstract description 24
- 239000003292 glue Substances 0.000 claims abstract description 17
- 238000002788 crimping Methods 0.000 claims abstract description 6
- 239000012634 fragment Substances 0.000 claims abstract description 4
- 238000010030 laminating Methods 0.000 claims abstract description 4
- 230000011218 segmentation Effects 0.000 claims abstract description 4
- 238000003825 pressing Methods 0.000 claims description 8
- 239000002390 adhesive tape Substances 0.000 claims description 6
- 239000010935 stainless steel Substances 0.000 claims description 4
- 229910001220 stainless steel Inorganic materials 0.000 claims description 4
- 238000009434 installation Methods 0.000 abstract description 10
- 238000000034 method Methods 0.000 abstract description 9
- 230000000694 effects Effects 0.000 abstract description 6
- 238000003908 quality control method Methods 0.000 abstract description 4
- 239000000853 adhesive Substances 0.000 description 6
- 230000001070 adhesive effect Effects 0.000 description 6
- 238000010586 diagram Methods 0.000 description 3
- 229920002943 EPDM rubber Polymers 0.000 description 2
- 229920001875 Ebonite Polymers 0.000 description 2
- 239000006260 foam Substances 0.000 description 2
- 238000002347 injection Methods 0.000 description 2
- 239000007924 injection Substances 0.000 description 2
- 229920001296 polysiloxane Polymers 0.000 description 2
- 239000000565 sealant Substances 0.000 description 2
- 230000000007 visual effect Effects 0.000 description 2
- 230000005540 biological transmission Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 238000007711 solidification Methods 0.000 description 1
- 230000008023 solidification Effects 0.000 description 1
Landscapes
- Load-Bearing And Curtain Walls (AREA)
Abstract
Be applied to half hidden frame, hidden frame glass curtain wall of vice frame of dry construction glass of building curtain wall field, glue inboard segmentation embedding glass at curtain cavity glass panels's the built-in U type groove of laminating structure, adopt the aluminum alloy briquetting of taking the landing leg with the built-in U type groove crimping of glass on the curtain fossil fragments to half hidden frame, hidden frame glass curtain wall dry construction and indoor no effect of vice frame have been realized. The curtain wall has the characteristics of safety, reliability, short construction period, simple process, complete and attractive indoor effect, cost saving, simplicity and convenience in processing and installation, simplicity and easiness in quality control and the like, and has a good popularization prospect in the field of building curtain walls.
Description
Technical Field
The utility model relates to a dry construction does not have half latent frame, latent frame glass curtain wall of vice frame of glass is applied to building curtain field glass curtain wall's design and installation.
Background
Traditional half hidden frame, hidden frame glass curtain wall, curtain cavity glass panels need send earlier to the curtain processing factory after glass processing factory processing is accomplished, beats with the vice frame of glass and glues with the silicone structure and glue the bonding, waits to send again after the structure glues the solidification toward the building site installation, and curtain manufacturing procedure is more complicated, and the cycle is longer, and the cost is higher, and the gluey injecting glue flow of curtain processing factory's structure often adopts manual completion, and the injecting glue quality is difficult for guaranteeing. In addition, the glass auxiliary frame and the stand column or the cross beam are flush and densely assembled, the side face of the glass auxiliary frame is visible indoors, so that the indoor side gap is too much, the visual effect is incomplete, the appearance is attractive, and in actual installation, the situation that the glass auxiliary frame and the stand column or the cross beam are uneven objectively exists due to the processing and installation deviation, so that the indoor visual effect is poorer.
Disclosure of Invention
In order to overcome the not enough of background art, the utility model provides a dry construction does not have half hidden frame, hidden frame glass curtain wall of vice frame of glass, in the built-in U type groove of the inboard segmentation embedding glass of the structure glue that closes of curtain cavity glass panels, the aluminum alloy briquetting that adopts the landing leg is with the built-in U type groove crimping of glass on the curtain fossil fragments to half hidden frame, hidden frame glass curtain wall dry construction and indoor no effect of vice frame have been realized. The curtain wall has the characteristics of safety, reliability, short construction period, simple process, complete and attractive indoor effect, cost saving, simplicity and convenience in processing and installation, simplicity and easiness in quality control and the like.
The utility model discloses the technical scheme who adopts is, a dry construction does not have half latent frame, latent frame glass curtain wall of vice frame of glass, characterized by: the built-in U-shaped groove of glass has been inlayed in the inboard segmentation at the piece structure that closes of curtain cavity glass panel and has been glued, and pi shape aluminum alloy briquetting passes through stainless steel bolt group with built-in U-shaped groove crimping of glass on the curtain fossil fragments, and stand crossbeam outside both ends have the adhesive tape notch, penetrates the adhesive tape in the groove when the curtain is installed, and the inner wall crimping of cavity glass panel is on the adhesive tape. When cavity glass produced at the glass processing factory, glass built-in U type groove was not embedded when solidifying after the gluey injecting glue of laminating structure, and its thickness slightly is lighter than the cavity layer thickness of cavity glass panel, avoided U type groove and glass to take place direct contact. When the curtain wall is installed, two supporting legs of the Pi-shaped aluminum alloy pressing block are supported at the bolt notch of the stand column cross beam for positioning, and the left wing and the right wing of the Pi-shaped aluminum alloy pressing block are pressed on the inner wall of the glass built-in U-shaped groove.
Technical characteristics
The technical characteristics of the curtain wall are explained as follows:
1. Safe and reliable: the inner side of the hollow glass laminated structure glue is embedded into a glass built-in U-shaped groove in a segmented mode, the aluminum alloy pressing block directly transmits the load of the glass panel to a keel of the curtain wall, the force transmission path of the structure is reduced, and the curtain wall is safer and more reliable.
2. The construction period is short: the inner side of the hollow glass laminated structural adhesive is embedded into the built-in U-shaped groove of the glass in a segmented manner, and the auxiliary frame does not need to be bonded by the structural adhesive on the outer side of the glass panel, so that the processes of secondary transportation, loading and unloading and secondary adhesive applying of the glass panel are saved, and the construction period is greatly shortened.
3. The process is simple: compared with the traditional curtain wall process, the curtain wall simplifies the glue frame process of injecting glue again between the glass panel and the auxiliary frame of the curtain wall processing plant, and has simple process and good manufacturability.
4. The quality control is simple and easy: the curtain wall processing and mounting process is simple, the operation is convenient and fast, and the processing and mounting deviation can be digested to a certain degree, so that the quality control is simpler and more feasible.
5. The indoor effect is complete pleasing to the eye: the built-in U-shaped groove of glass is embedded into the inner side of the hollow glass laminating structural adhesive in a segmented mode, the outer side of the glass panel is free of a glass auxiliary frame, the phenomenon of gaps and wrong platforms between the glass auxiliary frame and the keel cannot occur indoors, and the indoor effect is more complete and attractive.
6. the cost is saved: compared with the traditional curtain wall additionally injected with the auxiliary frame, the curtain wall removes the glue frame process of injecting glue again between the glass panel and the glass auxiliary frame, saves the cost of silicone structural glue and the material of the glass auxiliary frame for secondary glue injection, saves the labor, machinery and measure cost for secondary transportation, loading and unloading and secondary glue injection, and greatly reduces the cost.
Drawings
The invention will be further explained with reference to the following description of the embodiments of the drawings.
Fig. 1 is an installation diagram of a U-shaped groove built in hollow glass of a curtain wall.
FIG. 2 is a longitudinal section node diagram of the curtain wall with hidden frame in transverse direction.
Fig. 3 is an exploded view of the installation of the curtain wall with the hidden frame in the transverse direction.
Fig. 4 is a cross section node diagram when the curtain wall is vertically a hidden frame.
Fig. 5 is an exploded view of the installation of the curtain wall with a hidden frame in the vertical direction.
In the figure, 1, an aluminum alloy upright column, 2, an aluminum alloy cross beam, 3, a curtain wall hollow glass panel, 4, an ethylene propylene diene monomer rubber strip, 5, a stainless steel bolt group, 6, an aluminum alloy pressing block with supporting legs, 7, an aluminum alloy glass supporting strip, 8, a hard rubber cushion block, 9, a glass built-in U-shaped groove, 10, a foam rod and 11, weather-resistant sealant are arranged.
Detailed Description
In fig. 1, when the curtain wall hollow glass panel 3 is processed in a factory, a glass built-in U-shaped groove 9 is embedded into the inner side of the laminated structure adhesive of the curtain wall glass panel 3 in a subsection manner in advance before the hollow glass laminated structure adhesive is not cured. In the figures 2, 3, 4 and 5, during field installation, the aluminum alloy upright post 1 and the aluminum alloy cross beam 2 are assembled to form a curtain wall keel system, the ethylene propylene diene monomer rubber strip 4 penetrates into notches at two sides of the front ends of the aluminum alloy upright post 1 and the aluminum alloy cross beam 2, then the aluminum alloy pressing block 6 with the supporting legs is connected to the aluminum alloy upright post 1 and the aluminum alloy cross beam 2 through the stainless steel bolt group 5, and the left and right wings of the aluminum alloy pressing block 6 with the supporting legs are pressed on the inner wall of the glass built-in U-shaped groove 9 of the glass panel 3 of the curtain wall, so that reliable connection is formed. Before the curtain wall hollow glass panel 3 is installed, the aluminum alloy glass supporting strip 7 is hung on the nut groove of the aluminum alloy beam 2, and the upper end of the aluminum alloy glass supporting strip 7 is padded with a hard rubber cushion block 8 for supporting the weight of glass. Finally, a foam rod 10 is plugged into the joint of the glass panel 3, and weather-resistant sealant 11 is applied for sealing.
Claims (3)
1. The utility model provides a dry construction does not have half hidden frame, hidden frame glass curtain wall of glass subframe, characterized by: the built-in U-shaped groove of glass has been inlayed in the inboard segmentation at the piece structure that closes of curtain cavity glass panel and has been glued, and pi shape aluminum alloy briquetting passes through stainless steel bolt group with built-in U-shaped groove crimping of glass on the curtain fossil fragments, and stand crossbeam outside both ends have the adhesive tape notch, penetrates the adhesive tape in the groove when the curtain is installed, and the inner wall crimping of cavity glass panel is on the adhesive tape.
2. The dry construction glass curtain wall without the semi-hidden frame and the hidden frame of the glass subframe of claim 1 is characterized in that: when cavity glass produced at the glass processing factory, glass built-in U type groove was not embedded when solidifying after the gluey injecting glue of laminating structure, and its thickness slightly is lighter than the cavity layer thickness of cavity glass panel, avoided U type groove and glass to take place direct contact.
3. The dry construction glass curtain wall without the semi-hidden frame and the hidden frame of the glass subframe of claim 1 is characterized in that: when the curtain wall is installed, two supporting legs of the Pi-shaped aluminum alloy pressing block are supported at the bolt notch of the stand column cross beam for positioning, and the left wing and the right wing of the Pi-shaped aluminum alloy pressing block are pressed on the inner wall of the glass built-in U-shaped groove.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920481624.8U CN209799116U (en) | 2019-04-08 | 2019-04-08 | Semi-hidden frame and hidden frame glass curtain wall without glass auxiliary frame in dry construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920481624.8U CN209799116U (en) | 2019-04-08 | 2019-04-08 | Semi-hidden frame and hidden frame glass curtain wall without glass auxiliary frame in dry construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209799116U true CN209799116U (en) | 2019-12-17 |
Family
ID=68829217
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920481624.8U Expired - Fee Related CN209799116U (en) | 2019-04-08 | 2019-04-08 | Semi-hidden frame and hidden frame glass curtain wall without glass auxiliary frame in dry construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209799116U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114991366A (en) * | 2022-06-08 | 2022-09-02 | 湖北中建三局建筑工程技术有限责任公司 | Plug-in type briquetting is chosen latent frame glass curtain wall system of no subframe of piece |
-
2019
- 2019-04-08 CN CN201920481624.8U patent/CN209799116U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114991366A (en) * | 2022-06-08 | 2022-09-02 | 湖北中建三局建筑工程技术有限责任公司 | Plug-in type briquetting is chosen latent frame glass curtain wall system of no subframe of piece |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN212506882U (en) | Horizontal joint for prefabricated sandwich heat-insulation external wall | |
CN209799116U (en) | Semi-hidden frame and hidden frame glass curtain wall without glass auxiliary frame in dry construction | |
CN208346986U (en) | A kind of assembled steel tube-bamboo slab rubber combination node of column and beam | |
CN208760623U (en) | A kind of fixed structure of novel sleeping carriage sleeping berth | |
CN201874129U (en) | Exposed frame unit curtain wall system | |
CN213329604U (en) | High-strength energy-saving hidden frame curtain wall | |
CN113356402A (en) | Waterproof heat-preservation energy-saving building outer wall | |
CN108331217B (en) | Composite unit type curtain wall system | |
CN207291133U (en) | A kind of composite material cellular sandwich harden structure | |
CN204983288U (en) | Peripheral structure of curtain wall glass | |
CN201857731U (en) | Anchor device for heat-insulation decorative composite plate | |
CN110644657A (en) | Transverse long-span unit type curtain wall system | |
CN219586950U (en) | Combined section bar for heat insulation board | |
CN110499853B (en) | High-rise building glass curtain wall | |
CN211597284U (en) | Aluminum-plastic panel unit curtain wall mounting structure | |
CN219773232U (en) | High-strength integrated external wall insulation board | |
CN213869531U (en) | Four sides one shot forming's composite door | |
CN204850908U (en) | Compound door and window of aluminum -wood | |
CN211312986U (en) | Glass metal curtain wall combination | |
CN218758051U (en) | Plugging node structure between wall column and glass window | |
CN216948978U (en) | Glass curtain wall system with outward-projecting longitudinal decorative lines | |
CN204876177U (en) | Prefabricated wall body of high -speed joint | |
CN220555945U (en) | Door and window heat insulation strip | |
CN204299036U (en) | With the materials for wall of bionical honeycomb | |
CN217353080U (en) | Hidden frame reinforced glass curtain wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20191217 |