CN209798821U - pipe rack bearing structure based on city utility tunnel - Google Patents

pipe rack bearing structure based on city utility tunnel Download PDF

Info

Publication number
CN209798821U
CN209798821U CN201920237874.7U CN201920237874U CN209798821U CN 209798821 U CN209798821 U CN 209798821U CN 201920237874 U CN201920237874 U CN 201920237874U CN 209798821 U CN209798821 U CN 209798821U
Authority
CN
China
Prior art keywords
plate
erection
erection plate
mounting plate
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920237874.7U
Other languages
Chinese (zh)
Inventor
张宇锋
黄小龙
王崇俭
成伟
沈彬彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NANJING SANSHIYIDU MECHANICAL AND ELECTRICAL EQUIPMENT Co Ltd
Original Assignee
NANJING SANSHIYIDU MECHANICAL AND ELECTRICAL EQUIPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANJING SANSHIYIDU MECHANICAL AND ELECTRICAL EQUIPMENT Co Ltd filed Critical NANJING SANSHIYIDU MECHANICAL AND ELECTRICAL EQUIPMENT Co Ltd
Priority to CN201920237874.7U priority Critical patent/CN209798821U/en
Application granted granted Critical
Publication of CN209798821U publication Critical patent/CN209798821U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a piping lane bearing structure based on city utility tunnel to the problem that current inconvenience was laid, the following scheme is put forward now, and it includes first mounting plate, second mounting plate, third mounting plate, its characterized in that, first mounting plate, second mounting plate, the mutual parallel arrangement of third mounting plate three, the back at first mounting plate, second mounting plate, third mounting plate three both ends is equipped with the mounting panel of vertical setting, two the locating plate that the equidistance set up is all welded in the front of mounting panel, and first mounting plate, second mounting plate, third mounting plate all fix the top at the locating plate, the utility model discloses, can conveniently hold the needle operation, can adjust the length of holding the needle device according to the demand simultaneously, and be convenient for change and sew up the needle body, make it better satisfy the user demand, accord with the user demand.

Description

Pipe rack bearing structure based on city utility tunnel
Technical Field
The utility model relates to a bearing structure field especially relates to a piping lane bearing structure based on city utility tunnel.
Background
The underground comprehensive pipe gallery is one of the important forms of urban underground space development at present, but the conventional method for constructing the urban underground comprehensive pipe gallery structure is a wood template, an aluminum mould, a plastic mould or a combined steel mould, and the common method consists of the templates and an inner support system. Every one cabin of being under construction needs a large amount of templates to prop up and establishes, and labor operation personnel assemble, and template repeated assembly time when adjacent section piping lane structure is under construction is longer, and the efficiency of construction is slower, for this reason we have proposed a piping lane bearing structure based on city utility tunnel.
SUMMERY OF THE UTILITY MODEL
The utility model provides a pair of pipe gallery bearing structure based on city utility tunnel has solved the inconvenient problem of laying.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
The utility model provides a piping lane bearing structure based on city utility tunnel, includes first mounting panel, second mounting panel, third mounting panel, its characterized in that, first mounting panel, second mounting panel, the mutual parallel arrangement of third mounting panel three, the back at first mounting panel, second mounting panel, third mounting panel three both ends is equipped with the mounting panel of vertical setting, two the locating plate that the equidistance set up is all welded in the front of mounting panel, and first mounting panel, second mounting panel, third mounting panel all fix the top at the locating plate, the top of first mounting panel, second mounting panel, third mounting panel all is fixed with first cardboard, second cardboard, and first cardboard is located the outside of second cardboard, and two one side that the mounting panel is close to each other all welds the fixed plate that the symmetry set up, and one side that two the mounting panel was kept away from each other is fixed with the fixed block that the symmetry set up respectively, The connecting block, two equal threaded connection in one side that the fixed block kept away from each other has the gim peg, two the fixed orifices has all been seted up on the connecting block, and the inner wall threaded connection of gim peg and fixed orifices.
Preferably, the top four corners of the first erection plate, the second erection plate and the third erection plate are all provided with vertically arranged threaded holes, the inner wall of each threaded hole is in threaded connection with a bolt, and the bolts are fixed on the positioning plates.
Preferably, first cardboard is the arc structure, the connecting plate has all been welded at the both ends of first cardboard, and equal threaded connection has the fastening to tie on the connecting plate, and fastening bolt threaded connection is at the top of first erector board, and the second cardboard is the same with the structure of first cardboard, and the size and specification is different.
Preferably, the first erection plate, the second erection plate and the third erection plate have the same size and specification, the fixing plate is positioned on the back of the first erection plate, and the operation fixing plate is provided with a mounting hole.
The utility model discloses in, erect board, third through installing first frame and erect board, second and erect board, mounting panel, locating plate, first cardboard, second cardboard, fixed block, gim peg, connecting block, screw hole, fastening bolt, fixed plate, under the combined action of each part, be convenient for lay each and erect the board, convenient concatenation simultaneously, the convenience is fixed the pipeline, can effectively improve the pipeline and lay efficiency, and can play better supporting role, accord with the actual demand.
Drawings
Fig. 1 is a schematic structural diagram of the connection of the present invention.
Fig. 2 is a schematic top view of the first frame plate of the present invention.
Fig. 3 is a schematic structural diagram of the first clamping plate of the present invention.
Reference numbers in the figures: 1 first mounting plate, 2 second mounting plates, 3 third mounting plates, 4 mounting plates, 5 locating plates, 6 first clamping plates, 7 second clamping plates, 8 fixing blocks, 9 fixing bolts, 10 connecting blocks, 11 threaded holes, 12 fastening bolts and 13 fixing plates.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-3, a pipe gallery supporting structure based on an urban underground comprehensive pipe gallery comprises a first erection plate 1, a second erection plate 2 and a third erection plate 3, wherein the first erection plate 1, the second erection plate 2 and the third erection plate 3 are arranged in parallel, the back surfaces of the two ends of the first erection plate 1, the second erection plate 2 and the third erection plate 3 are provided with vertically arranged mounting plates 4, the front surfaces of the two mounting plates 4 are welded with positioning plates 5 arranged at equal intervals, the first erection plate 1, the second erection plate 2 and the third erection plate 3 are fixed at the top of the positioning plates 5, the top parts of the first erection plate 1, the second erection plate 2 and the third erection plate 3 are respectively fixed with a first clamping plate 6 and a second clamping plate 7, the first clamping plate 6 is positioned at the outer side of the second clamping plate 7, the side parts, close to each other, of the two mounting plates 4 are welded with symmetrically arranged fixing plates 13, one side that two mounting panels 4 kept away from each other is fixed with fixed block 8, the connecting block 10 that the symmetry set up respectively, and the equal threaded connection in one side that two fixed blocks 8 kept away from each other has gim peg 9, has all seted up the fixed orifices on two connecting blocks 10, and the inner wall threaded connection of gim peg 9 and fixed orifices.
First erects board 1, second erects board 2, the screw hole 11 of vertical setting is all seted up in the top four corners of third erector board 3, the inner wall threaded connection of screw hole 11 has the bolt, and the bolt fastening is on locating plate 5, first cardboard 6 is the arc structure, the connecting plate has all been welded at the both ends of first cardboard 6, equal threaded connection has fastening bolt 12 on the connecting plate, and fastening bolt 12 threaded connection is at the top of first erector board 1, and second cardboard 7 is the same with the structure of first cardboard 6, big or small specification is different, first erector board 1, second erector board 2, the big or small specification homogeneous phase of 3 three of third erector board, fixed plate 13 is located the back of first erector board 1, the mounting hole has been seted up on the operation fixed plate 13.
The working principle of the structure is as follows: when laying, firstly, only one mounting plate 4 is vertically arranged on a wall body, then a fixing plate 13 is fixed on the wall body by using a mounting bolt, then one end of a first erection plate 1 can be fixed on a positioning plate 5 by a bolt, then the other end of the first erection plate 1 is fixed on the positioning plate 5 of another mounting plate 4, then the mounting plate 4 is fixed on the wall body, then the installation plates are sequentially erected, two different mounting plates 4 can be fixed by a fixing block 8 and a connecting block 10, the stability of the whole frame body is further enhanced, then a second clamping plate 7 and a third clamping plate 8 are arranged on the positioning plate 5 in a layered way, and the pipeline body can be directly erected on the erection plate and fixed by the clamping plates matched with the pipeline body, the operation is simple, the carrying and the assembling are convenient, and the actual laying requirements are met, under the common action of all the parts, can conveniently hold the needle operation, can adjust the length of holding the needle device according to the demand simultaneously, and be convenient for change and sew up the needle body, make it better satisfy the user demand, accord with the user demand.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (4)

1. A pipe gallery supporting structure based on an urban underground comprehensive pipe gallery comprises a first erection plate (1), a second erection plate (2) and a third erection plate (3), and is characterized in that the first erection plate (1), the second erection plate (2) and the third erection plate (3) are arranged in parallel, the back surfaces of the two ends of the first erection plate (1), the second erection plate (2) and the third erection plate (3) are provided with vertically arranged mounting plates (4), the front surfaces of the two mounting plates (4) are welded with positioning plates (5) arranged at equal intervals, the first erection plate (1), the second erection plate (2) and the third erection plate (3) are fixed at the top of the positioning plates (5), the top portions of the first erection plate (1), the second erection plate (2) and the third erection plate (3) are respectively fixed with a first clamping plate (6) and a second clamping plate (7), and first cardboard (6) are located the outside of second cardboard (7), two fixed plate (13) that the symmetry set up, two are all welded to one side that mounting panel (4) are close to each other one side that mounting panel (4) were kept away from each other is fixed with fixed block (8), connecting block (10) that the symmetry set up respectively, two the equal threaded connection in one side that fixed block (8) were kept away from each other has gim peg (9), two the fixed orifices has all been seted up on connecting block (10), and the inner wall threaded connection of gim peg (9) and fixed orifices.
2. The pipe gallery supporting structure based on the urban underground comprehensive pipe gallery according to claim 1, wherein vertically arranged threaded holes (11) are formed in four corners of the top of the first erection plate (1), the top of the second erection plate (2) and the top of the third erection plate (3), and bolts are connected to the inner wall of the threaded holes (11) in a threaded mode and fixed on the positioning plate (5).
3. The pipe gallery supporting structure based on the urban underground comprehensive pipe gallery according to claim 1, wherein the first clamping plate (6) is of an arc-shaped structure, connecting plates are welded to two ends of the first clamping plate (6), fastening bolts (12) are screwed on the connecting plates, the fastening bolts (12) are screwed on the tops of the first erection plates (1), and the second clamping plate (7) is identical to the first clamping plate (6) in structure and different in size and specification.
4. The pipe gallery supporting structure based on the urban underground comprehensive pipe gallery according to claim 1, wherein the first erection plate (1), the second erection plate (2) and the third erection plate (3) are identical in size and specification, the fixing plate (13) is located on the back of the first erection plate (1), and mounting holes are formed in the operation fixing plate (13).
CN201920237874.7U 2019-02-26 2019-02-26 pipe rack bearing structure based on city utility tunnel Active CN209798821U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920237874.7U CN209798821U (en) 2019-02-26 2019-02-26 pipe rack bearing structure based on city utility tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920237874.7U CN209798821U (en) 2019-02-26 2019-02-26 pipe rack bearing structure based on city utility tunnel

Publications (1)

Publication Number Publication Date
CN209798821U true CN209798821U (en) 2019-12-17

Family

ID=68822812

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920237874.7U Active CN209798821U (en) 2019-02-26 2019-02-26 pipe rack bearing structure based on city utility tunnel

Country Status (1)

Country Link
CN (1) CN209798821U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111809661A (en) * 2020-07-20 2020-10-23 福建荣冠环境建设集团有限公司 Pipe rack bearing structure based on city utility tunnel

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111809661A (en) * 2020-07-20 2020-10-23 福建荣冠环境建设集团有限公司 Pipe rack bearing structure based on city utility tunnel
CN111809661B (en) * 2020-07-20 2021-12-17 福建荣冠环境建设集团有限公司 Pipe rack bearing structure based on city utility tunnel

Similar Documents

Publication Publication Date Title
CN203430059U (en) Temporary fixing device used for installing large-span steel structure roof primary truss
CN112796514A (en) Masonry corner constructional column template shaping and reinforcing device and construction method
CN213773847U (en) Cross-shaped steel pipe concrete column and steel beam connecting node structure
CN209798821U (en) pipe rack bearing structure based on city utility tunnel
CN205171994U (en) A stencil assembly for clear water concrete construction
CN211501206U (en) Display unit splicing support for splicing large screen
CN203271096U (en) Operating platform
CN204080843U (en) Movable plank house foundation structure
CN216109594U (en) Construction engineering place construction is with scaffold frame of encorbelmenting of dismouting operation of being convenient for
CN210423968U (en) Assembled support and hanger and building using same
CN210857276U (en) Piping lane chamfer template braced system
CN210798292U (en) Combined beam bottom dismantling head and beam bottom supporting system
CN203213595U (en) Cast-in-place concrete fence plate supporting die structure
CN201937500U (en) Photovoltaic component bracket
CN201850762U (en) Beam bottom supporting frame for crossbeam formwork support
CN219033730U (en) Assembled building steel structure roof truss
CN213836775U (en) Special structure foundation reinforcement structure
CN218643222U (en) Safe construction platform at top of cylindrical mold
CN218933828U (en) Wood shear wall structure system
CN212336740U (en) Fastening fastener group of formwork system
CN215252352U (en) Prefabricated web steel bar binding rack
CN218668075U (en) Curtain wall construction convenient to dismouting
CN210636442U (en) Integrally-assembled double-row steel pile foundation pit supporting structure
CN219710388U (en) Subway platform frame beam prefabricated structure
CN215291401U (en) Aluminum mould board securing device is built in room

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant