CN209797265U - Clamp device for hoisting steel rail - Google Patents
Clamp device for hoisting steel rail Download PDFInfo
- Publication number
- CN209797265U CN209797265U CN201920122591.8U CN201920122591U CN209797265U CN 209797265 U CN209797265 U CN 209797265U CN 201920122591 U CN201920122591 U CN 201920122591U CN 209797265 U CN209797265 U CN 209797265U
- Authority
- CN
- China
- Prior art keywords
- hook plate
- rail
- spring
- hanging beam
- limiting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
The utility model relates to a hoist and mount rail clamp device belongs to railway system rail hoist and mount special lifting device equipment technical field. The technical scheme is as follows: the upper end of the hanging beam (1) is provided with a hoisting hole (4), the lower end of the hanging beam (1) and the fixed hook plate (2-2) are fixed into an integral structure, the lower end of the hanging beam (1) is rotatably connected with the movable hook plate (2-1) through a shaft pin (3), the movable hook plate (2-1) and the fixed hook plate (2-2) form a clamp matched with a steel rail, the movable hook plate (2-1) is provided with a limiting hole (9), the hanging beam (1) is provided with a limiting pin (5) matched with the limiting hole (9), the limiting pin (5) is provided with a spring (6), and two ends of the spring (6) are respectively provided with a spring clamping plate (7). The utility model has the advantages that: the hoisting operation of completion rail that can convenient and fast avoids the rail unhook, reduces and bumps or injures staff's danger by a crashing object, can reduce the damage of rail moreover.
Description
Technical Field
The utility model relates to a hoist and mount rail clamp device belongs to railway system rail hoist and mount special lifting device equipment technical field.
Background
In the process of hoisting and laying the steel rail, steel wire ropes are usually adopted for binding and hoisting operation during hoisting, but when the steel rail is laid, the steel wire ropes are difficult to take out after the steel rail is in place due to the fact that a beam is in contact with the ground or a ground foundation, and construction operation efficiency is affected. The scissor-type lifting appliance is used, the hook head can be freely opened and closed, but when the steel rail is lifted, the hook head is easily unhooked, the progress of construction operation is influenced, the steel rail is damaged, and certain potential safety hazards can be generated.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a hoist and mount rail clamping device, the hoist and mount operation of completion rail that can convenient and fast avoids the rail unhook, reduces and impairs or injures staff's danger by a crashing object, solves the problem that exists among the background art.
The technical scheme of the utility model is that:
The utility model provides a hoist and mount rail clamping device, contain the hanging beam, the activity hook plate, fixed hook plate, the pivot, the hole for hoist, the spacer pin, a spring, spring cardboard and spacing hole, the upper end of hanging beam is equipped with the hole for hoist, the lower extreme of hanging beam is fixed into an organic whole structure with fixed hook plate, the lower extreme of hanging beam passes through the pivot and rotates with the activity hook plate to be connected, activity hook plate and fixed hook plate mutual disposition constitute with rail matched with clamp, be equipped with spacing hole on the activity hook plate, be equipped with the spacer pin with spacing hole matched with on the hanging beam, be equipped with the spring on the spacer pin, the both ends of spring are equipped with the spring cardboard respectively.
The limiting pin is fixed on the hanging beam through spring clamping plates at two ends of the spring.
And the spring clamping plate is provided with a limiting pin sliding groove matched with the limiting pin.
The limiting pin is inserted into the limiting hole of the movable hook plate.
Adopt the utility model discloses, extract the spacer pin from spacing hole, lift up the activity hook plate, put the rail undervolume with fixed hook plate, put down the activity hook plate, the spacer pin is in the spacing downthehole of spring action downwardly inserting the activity hook plate, prevents that the activity hook plate from lifting up, and fixed hook plate folds up the rail because of self gravity with the activity hook plate, then can lift by crane the rail.
The utility model has the advantages that: the hoisting operation of completion rail that can convenient and fast avoids the rail unhook, reduces and bumps or injures staff's danger by a crashing object, can reduce the damage of rail moreover.
Drawings
FIG. 1 is a front view of the present invention;
Fig. 2 is a left side view of the present invention;
FIG. 3 is a schematic diagram of a movable hook plate structure;
FIG. 4 is a schematic view of the connection of the hanging beam and the fixed hook plate;
FIG. 5 is a first schematic view illustrating a usage status of the present invention;
FIG. 6 is a schematic view of the second embodiment of the present invention;
In the figure: 1. a hanging beam; 2-1, a movable hook plate; 2-2, fixing a hook plate; 3. a shaft pin; 4. hoisting holes; 5. a spacing pin; 6. a spring; 7. a spring catch plate; 8. a limit pin chute; 9. and a limiting hole.
Detailed Description
The invention will be further explained by way of example with reference to the accompanying drawings.
Referring to the attached figure 1 ~ 4, the clamp device for hoisting the steel rail comprises a hoisting beam 1, a movable hook plate 2-1, a fixed hook plate 2-2, a shaft pin 3, a hoisting hole 4, a limiting pin 5, a spring 6, a spring clamping plate 7 and a limiting hole 9, wherein the hoisting hole 4 is arranged at the upper end of the hoisting beam 1, the lower end of the hoisting beam 1 and the fixed hook plate 2-2 are fixed into an integral structure, the lower end of the hoisting beam 1 is rotatably connected with the movable hook plate 2-1 through the shaft pin 3, the movable hook plate 2-1 and the fixed hook plate 2-2 are oppositely arranged to form a clamp matched with the steel rail, the limiting hole 9 is arranged on the movable hook plate 2-1, the limiting pin 5 matched with the limiting hole 9 is arranged on the hoisting beam 1, the spring 6 is arranged on the limiting pin 5, and the spring clamping plate 7 is respectively arranged.
The specific embodiment is as follows:
In this embodiment, referring to fig. 1-4, the spring catch plate 7 is provided with a stop pin sliding slot 8 matching with the stop pin 5, the stop pin 5 is fixed on the stop pin sliding slot 8 of the hanging beam 1 through the spring catch plates 7 at both ends of the spring 6, and the lower end of the stop pin 5 can be inserted into the stop hole 9 of the movable hook plate 2-1.
The steel rail hoisting process comprises the following steps:
referring to the attached drawings 5 and 6, the limiting pin 5 is pulled out of the limiting hole 9 of the movable hook plate 2-1, the movable hook plate 2-1 is lifted, the fixed hook plate 2-2 is placed below the steel rail, the movable hook plate 2-1 is put down, the limiting pin 5 is downwards inserted into the limiting hole 9 of the movable hook plate 2-1 under the action of the spring 6 to prevent the movable hook plate 2-1 from being lifted, the fixed hook plate 2-2 and the movable hook plate 2-1 are folded to wrap the steel rail due to self gravity, and then the steel rail can be lifted. When the steel rail is lifted, the steel rail generates friction force and shearing force with the fixed hook plate 2-2 and the movable hook plate 2-1 due to gravity, and the limiting pin 5 is inserted into the limiting hole 9 of the movable hook plate 2-1, so that the movable hook plate 2-1 is prevented from opening, and the phenomenon of unhooking of the steel rail is avoided.
Claims (4)
1. the utility model provides a hoist and mount rail clamp device which characterized in that: comprises a hanging beam (1), a movable hook plate (2-1), a fixed hook plate (2-2), a shaft pin (3), a hoisting hole (4), a limiting pin (5), a spring (6), a spring clamping plate (7) and a limiting hole (9), the upper end of the hanging beam (1) is provided with a hoisting hole (4), the lower end of the hanging beam (1) and the fixed hook plate (2-2) are fixed into an integral structure, the lower end of the hanging beam (1) is rotatably connected with the movable hook plate (2-1) through a shaft pin (3), the movable hook plate (2-1) and the fixed hook plate (2-2) are arranged oppositely to form a clamp matched with a steel rail, the movable hook plate (2-1) is provided with a limiting hole (9), the hanging beam (1) is provided with a limiting pin (5) matched with the limiting hole (9), the limiting pin (5) is provided with a spring (6), and two ends of the spring (6) are respectively provided with a spring clamping plate (7).
2. the device for hoisting steel rail clamp according to claim 1, characterized in that: the limiting pin (5) is fixed on the hanging beam (1) through spring clamping plates (7) at two ends of the spring (6).
3. the device for hoisting steel rail clamp according to claim 2, characterized in that: and the spring clamping plate (7) is provided with a limiting pin sliding groove (8) matched with the limiting pin (5).
4. A lifting rail clamp apparatus as claimed in claim 1 or claim 2, wherein: the limiting pin (5) is inserted into the limiting hole (9) of the movable hook plate (2-1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920122591.8U CN209797265U (en) | 2019-01-24 | 2019-01-24 | Clamp device for hoisting steel rail |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920122591.8U CN209797265U (en) | 2019-01-24 | 2019-01-24 | Clamp device for hoisting steel rail |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209797265U true CN209797265U (en) | 2019-12-17 |
Family
ID=68820711
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920122591.8U Active CN209797265U (en) | 2019-01-24 | 2019-01-24 | Clamp device for hoisting steel rail |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209797265U (en) |
-
2019
- 2019-01-24 CN CN201920122591.8U patent/CN209797265U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205346625U (en) | High altitude hoist and mount automatic unhooking device | |
CN110182683A (en) | A kind of prefabricated member hanging device | |
CN103863972B (en) | Forklift truck lifting equipment holding tool and hanging method thereof | |
CN201288023Y (en) | Portable lifting device of electric power apparatus | |
CN209797265U (en) | Clamp device for hoisting steel rail | |
CN208561580U (en) | A kind of electric power well lid opening and closing vehicle | |
CN208440155U (en) | It is a kind of for boring the hanging apparatus of fluted disc | |
CN202988556U (en) | Special lifting appliance for angle-steel type frame body | |
CN206917390U (en) | Vertical device is hung in tower section segmentation | |
CN203865930U (en) | Cable cover plate lifting device | |
CN210340124U (en) | Scroll handling equipment of convenient centre gripping | |
CN204022267U (en) | Steel trestle tool special for hoisting | |
CN208700413U (en) | A kind of anti-dropout crampon | |
CN208249695U (en) | A kind of graphite electrode turnover lifting appliance | |
CN108545591A (en) | A kind of steel structure column Hoisting Security detacher | |
CN107445064B (en) | Balance pulley and pulley block of crane for hoisting molten metal | |
CN206635823U (en) | Weight for engineering foundation pile strain detecting lifts percussion mechanism | |
CN206135297U (en) | Earth connection lifting mechanism is maked somebody a mere figurehead to fluid pressure type | |
CN201560046U (en) | Tool for hoisting electric pole | |
CN216190643U (en) | Device for hanging hoist at high place conveniently | |
CN201099877Y (en) | Crawler type slipping loading apparatus locking apparatus | |
CN205892490U (en) | A special lifting device for concrete pipe pile hoist and mount | |
CN221216860U (en) | Hoist device convenient to use | |
CN221652124U (en) | Unmanned aerial vehicle hanging wire coaster | |
CN221396898U (en) | Hook body unhooking type static load balancing weight lifting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20210603 Address after: 067002 Chenggang No.1 office building, Shuangluan District, Chengde City, Hebei Province Patentee after: Chengde Chenggang Logistics Co.,Ltd. Address before: 067102 A block 520, Luanhe town finance square, Shuangluan District, Chengde, Hebei Patentee before: CHENGDE BRANCH COMPANY, HBIS Co.,Ltd. |