CN209784359U - Construction project information management device - Google Patents

Construction project information management device Download PDF

Info

Publication number
CN209784359U
CN209784359U CN201920490869.7U CN201920490869U CN209784359U CN 209784359 U CN209784359 U CN 209784359U CN 201920490869 U CN201920490869 U CN 201920490869U CN 209784359 U CN209784359 U CN 209784359U
Authority
CN
China
Prior art keywords
information management
management device
device body
fixedly connected
construction project
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920490869.7U
Other languages
Chinese (zh)
Inventor
王卫华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201920490869.7U priority Critical patent/CN209784359U/en
Application granted granted Critical
Publication of CN209784359U publication Critical patent/CN209784359U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a construction project information management device, relate to construction technical field, this construction project information management device, including information management device body, one side upper end fixedly connected with push rod of information management device body, one side lower extreme swing joint of information management device body has hand wheel, the lower surface four corners department of information management device body all has the gyro wheel through connecting piece swing joint, hand wheel is close to the one end of one side middle part fixed connection pivot of information management device body, the other end fixedly connected with connecting axle of pivot, the inner wall swing joint of rotary joint and information management device body is passed through to the one end of connecting axle, the equal fixedly connected with initiative helical gear in both ends of connecting axle, one side meshing of initiative helical gear is connected with driven helical gear. This construction project information management device, the personnel of conveniently managing remove the information management device body to detecting position, have reduced the intensity of labour who manages personnel, have improved work efficiency.

Description

Construction project information management device
Technical Field
the utility model relates to a construction technical field specifically is a construction project information management device.
Background
The construction project is a project in which construction is a carrier, and is a disposable construction task as a managed object. The method takes a building or a structure as a target product, needs to pay a certain fee, is completed within a certain time according to a certain program, and meets the relevant quality requirements. The construction project is also called as engineering construction project, and specifically refers to the sum of all engineering projects constructed on one or more sites according to the overall design requirement of a construction unit, and the constructed engineering projects have complete systems and can independently form production capacity or use value.
The construction of the building is a long-term project, which relates to knowledge in many aspects, and in the construction process, usually a prisoner can detect the compressive strength of the concrete by adopting a rebound method, a core drilling method, an ultrasonic rebound synthesis method, a post-anchoring method, a pressure reduction method and the like, so that the construction quality control and management are facilitated.
The utility model discloses a highway construction project information management device who discloses in chinese utility model patent application laid-open specification CN 206362639U, though, this information management device simple structure reduces the destruction to the concrete structure, adopts the multiple spot to detect, improves and detects the precision, conveniently manages personnel's operation, improves whole efficiency of supervising, however, this information management device is not convenient for remove, and inconvenient supervision personnel move this information management device to detecting the position and detect.
at present, the existing information management device is inconvenient to use and is not beneficial to popularization and use.
SUMMERY OF THE UTILITY MODEL
technical problem to be solved
Not enough to prior art, the utility model provides a construction project information management device has solved current information management device and has removed inconvenient problem.
(II) technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes:
A construction project information management device comprises an information management device body, wherein the upper end of one side of the information management device body is fixedly connected with a push rod, and the lower end of one side of the information management device body is movably connected with a hand-operated wheel;
the four corners of the lower surface of the information management device body are respectively and movably connected with a roller through connecting pieces, and rubber fixing blocks are arranged at the four corners of the lower surface of the information management device body and are positioned on the outer sides of the rollers;
The middle part of one side of the hand-operated wheel, which is close to the information management device body, is fixedly connected with one end of a rotating shaft, the other end of the rotating shaft penetrates into the information management device body, and the other end of the rotating shaft is fixedly connected with a connecting shaft;
one end of the connecting shaft is movably connected with the inner wall of the information management device body through a rotary joint, driving bevel gears are fixedly connected to two ends of the connecting shaft, and a driven bevel gear is meshed with one side of each driving bevel gear.
Optionally, a screw is arranged in the middle of the driven helical gear, and a sliding rod is fixedly connected to the bottom end of the screw.
Optionally, the middle part of the driven bevel gear is provided with threads, and the driven bevel gear is in threaded connection with the screw rod.
optionally, the two ends of the sliding rod are provided with positioning rods, and the two ends of the lower surface of the sliding rod are fixedly connected with supporting rods.
Optionally, both ends of the positioning rod penetrate through the sliding rod and are fixedly connected with the inner wall of the information management device body, and the positioning rod is connected with the sliding rod in a sliding mode.
Optionally, the bottom end of the supporting rod penetrates through the outside of the information management device body, and the bottom end of the supporting rod is fixedly connected with the rubber fixing block.
(III) advantageous effects
The utility model provides a construction project information management device possesses following beneficial effect:
(1) This construction project information management device through being provided with push rod and gyro wheel, can remove the information management device body, has increased the flexibility of information management device body, and convenient prisoner removes the information management device body to the detection position and detects, has reduced prisoner's intensity of labour, has improved work efficiency.
(2) this construction project information management device uses through the cooperation of hand round, pivot, connecting axle, initiative helical gear, driven helical gear, screw rod, slide bar, locating lever and bracing piece, can go up and down to the rubber fixed block, and the convenience is fixed the information management device body, easy operation, and it is convenient to use.
Drawings
FIG. 1 is a schematic view of the present invention;
Fig. 2 is a top view of the present invention;
FIG. 3 is a schematic bottom plan view of the information management device body structure of the present invention;
Fig. 4 is a schematic view of a partial side view section of the information management device body structure of the present invention.
In the figure: 1. an information management apparatus body; 2. a push rod; 3. a hand-operated wheel; 4. a roller; 5. a rubber fixing block; 6. a rotating shaft; 7. a connecting shaft; 8. a driving bevel gear; 9. a driven helical gear; 10. a screw; 11. a slide bar; 12. positioning a rod; 13. a support rod.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
in the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", "axial", "radial", "circumferential", and the like, indicate the orientation or positional relationship indicated based on the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
in the present invention, unless otherwise expressly stated or limited, the terms "disposed," "mounted," "connected," and "fixed" are to be construed broadly, e.g., as meaning either a fixed connection or a removable connection; may be a mechanical connection; may be directly connected or indirectly connected through an intermediate. The specific meaning of the above terms in the present invention can be understood according to specific situations by those skilled in the art.
Referring to fig. 1-4, the present invention provides a technical solution:
A construction project information management device comprises an information management device body 1, wherein the upper end of one side of the information management device body 1 is fixedly connected with a push rod 2, and the lower end of one side of the information management device body 1 is movably connected with a hand-operated wheel 3;
The four corners of the lower surface of the information management device body 1 are movably connected with the idler wheels 4 through the connecting pieces, the information management device body 1 can be moved, the flexibility of the information management device body 1 is improved, a supervisor can conveniently move the information management device body 1 to a detection position for detection, the labor intensity of the supervisor is reduced, the working efficiency is improved, the four corners of the lower surface of the information management device body 1 are provided with the rubber fixing blocks 5, and the rubber fixing blocks 5 are located on the outer sides of the idler wheels 4;
The middle part of one side of the hand-operated wheel 3, which is close to the information management device body 1, is fixedly connected with one end of a rotating shaft 6, the other end of the rotating shaft 6 penetrates into the information management device body 1, and the other end of the rotating shaft 6 is fixedly connected with a connecting shaft 7;
One end of the connecting shaft 7 is movably connected with the inner wall of the information management device body 1 through a rotary joint, two ends of the connecting shaft 7 are fixedly connected with driving bevel gears 8, and one side of each driving bevel gear 8 is connected with a driven bevel gear 9 in an engaged mode.
as an optional technical solution of the utility model:
The middle part of the driven bevel gear 9 is provided with a screw rod 10, and the bottom end of the screw rod 10 is fixedly connected with a sliding rod 11, so that the structure is reasonable.
as an optional technical solution of the utility model:
The middle part of the driven bevel gear 9 is provided with threads, and the driven bevel gear 9 is in threaded connection with the screw 10, so that the transmission is convenient.
As an optional technical solution of the utility model:
Positioning rods 12 are arranged at two ends of the sliding rod 11, and supporting rods 13 are fixedly connected to two ends of the lower surface of the sliding rod 11.
As an optional technical solution of the utility model:
Both ends of the positioning rod 12 penetrate the slide rod 11 and are fixedly connected to the inner wall of the information management device body 1, and the positioning rod 12 is slidably connected to the slide rod 11 and can limit the position where the slide rod 11 moves.
As an optional technical solution of the utility model:
The bottom of bracing piece 13 runs through to the outside of information management device body 1, and the bottom and the 5 fixed connection of rubber fixed block of bracing piece 13 conveniently fix information management device body 1.
in summary, this construction project information management device, move information management device body 1 to the detection position through push rod 2, rotate hand wheel 3, hand wheel 3 drives connecting axle 7 through pivot 6 and rotates, connecting axle 7 drives driven helical gear 9 through initiative helical gear 8 and rotates, driven helical gear 9 drives slide bar 11 through screw 10 and moves down, and meanwhile, slide bar 11 slides on locating lever 12, slide bar 11 drives rubber fixed block 5 through bracing piece 13 and moves down, makes rubber fixed block 5 closely laminate with ground, thereby fix information management device body 1, then alright begin to carry out the quality testing.
It should be further explained that the information management device body 1 and its attached structure in the present invention are the technologies disclosed in the patent application publication specification CN 206362639U of the present utility model, and are not the improvement point of the present invention.
it is noted that in the present disclosure, unless otherwise explicitly specified or limited, a first feature "on" or "under" a second feature may be directly contacting the first and second features or indirectly contacting the first and second features through an intermediate. Also, a first feature "on," "over," and "above" a second feature may be directly or diagonally above the second feature, or may simply indicate that the first feature is at a higher level than the second feature. A first feature being "under," "below," and "beneath" a second feature may be directly under or obliquely under the first feature, or may simply mean that the first feature is at a lesser elevation than the second feature.
the above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. a construction project information management device includes an information management device body (1), and is characterized in that: the upper end of one side of the information management device body (1) is fixedly connected with a push rod (2), and the lower end of one side of the information management device body (1) is movably connected with a hand-operated wheel (3);
the four corners of the lower surface of the information management device body (1) are respectively and movably connected with a roller (4) through connecting pieces, the four corners of the lower surface of the information management device body (1) are respectively provided with a rubber fixing block (5), and the rubber fixing blocks (5) are positioned on the outer side of the rollers (4);
The middle of one side, close to the information management device body (1), of the hand-operated wheel (3) is fixedly connected with one end of a rotating shaft (6), the other end of the rotating shaft (6) penetrates into the information management device body (1), and the other end of the rotating shaft (6) is fixedly connected with a connecting shaft (7);
One end of the connecting shaft (7) is movably connected with the inner wall of the information management device body (1) through a rotary joint, driving bevel gears (8) are fixedly connected to the two ends of the connecting shaft (7), and driven bevel gears (9) are meshed and connected to one sides of the driving bevel gears (8).
2. the construction project information management apparatus according to claim 1, wherein:
the middle part of the driven bevel gear (9) is provided with a screw rod (10), and the bottom end of the screw rod (10) is fixedly connected with a sliding rod (11).
3. The construction project information management apparatus according to claim 1, wherein:
The middle part of the driven bevel gear (9) is provided with threads, and the driven bevel gear (9) is in threaded connection with the screw (10).
4. the construction project information management apparatus according to claim 2, wherein:
positioning rods (12) are arranged at two ends of the sliding rod (11), and supporting rods (13) are fixedly connected to two ends of the lower surface of the sliding rod (11).
5. the construction project information management apparatus according to claim 4, wherein:
the two ends of the positioning rod (12) penetrate through the sliding rod (11) and are fixedly connected with the inner wall of the information management device body (1), and the positioning rod (12) is connected with the sliding rod (11) in a sliding mode.
6. The construction project information management apparatus according to claim 4, wherein:
The bottom of bracing piece (13) runs through to the outside of information management device body (1), the bottom and the rubber fixed block (5) fixed connection of bracing piece (13).
CN201920490869.7U 2019-04-12 2019-04-12 Construction project information management device Expired - Fee Related CN209784359U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920490869.7U CN209784359U (en) 2019-04-12 2019-04-12 Construction project information management device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920490869.7U CN209784359U (en) 2019-04-12 2019-04-12 Construction project information management device

Publications (1)

Publication Number Publication Date
CN209784359U true CN209784359U (en) 2019-12-13

Family

ID=68802120

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920490869.7U Expired - Fee Related CN209784359U (en) 2019-04-12 2019-04-12 Construction project information management device

Country Status (1)

Country Link
CN (1) CN209784359U (en)

Similar Documents

Publication Publication Date Title
CN209784359U (en) Construction project information management device
CN214952793U (en) Strength detection resiliometer for concrete production
CN210123279U (en) Highway is stake hole aperture detection device for engineering construction
CN215413525U (en) Soil thickness measuring device for soil surveying and mapping
CN209439695U (en) A kind of round tube welding platform
CN213653229U (en) Bridge sliding device with guiding function and capable of being heightened
CN212963120U (en) Mobile detection equipment for water conservancy construction
CN209277578U (en) A kind of highway engineering deep pit monitor protective device
CN110293419B (en) Numerical control machine tool convenient for material changing work
CN218329863U (en) Roller compacted soil layer thickness detection device
CN208179452U (en) Workbench is used in a kind of processing of Hardware fitting
CN110987508A (en) Sampling test equipment is used in production of chemical rubber adhesion promoter
CN211425388U (en) High-precision verticality precision measuring device
CN219930643U (en) Three-wheeled road roller rolls wheel surface cleaning device
CN213274933U (en) Conveniently get road of material and detect with boring core machine
CN215114299U (en) Adjustable measuring tool for forklift gantry roller track measurement
CN215178753U (en) Soil sample collecting device for paddy field cultivation
CN112430821B (en) Reinforcing bar surface cleaning device for concrete construction
CN217738705U (en) Concrete sampling equipment
CN215750040U (en) Concrete drilling coring device
CN216205817U (en) A size measurement device for steel bar truss floor carrier plate piping construction
CN216283782U (en) Novel geotechnical engineering is with reconnaissance groundwater level measuring device that precision is high
CN219954936U (en) Building environment sampling detection device
CN115041515B (en) Automatic control device for pollution site treatment
CN214297075U (en) Urban garden planning measuring device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191213

Termination date: 20200412