CN209780209U - Novel scaffold for construction of cement closed container - Google Patents

Novel scaffold for construction of cement closed container Download PDF

Info

Publication number
CN209780209U
CN209780209U CN201920412675.5U CN201920412675U CN209780209U CN 209780209 U CN209780209 U CN 209780209U CN 201920412675 U CN201920412675 U CN 201920412675U CN 209780209 U CN209780209 U CN 209780209U
Authority
CN
China
Prior art keywords
buffer
support frame
vertical steel
plate
steel pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920412675.5U
Other languages
Chinese (zh)
Inventor
徐世浪
徐乐卿
李高敏
蔡小龙
洪建平
江旭洲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangxi Evergreen Engineering Co Ltd
Original Assignee
Jiangxi Evergreen Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangxi Evergreen Engineering Co Ltd filed Critical Jiangxi Evergreen Engineering Co Ltd
Priority to CN201920412675.5U priority Critical patent/CN209780209U/en
Application granted granted Critical
Publication of CN209780209U publication Critical patent/CN209780209U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Vibration Prevention Devices (AREA)

Abstract

The utility model discloses a novel scaffold for construction of a cement closed container, which belongs to the field of scaffolds and comprises a first support frame, a second support frame, a connecting plate, a connecting disc, a buffer assembly and a protective net; the first support frame comprises a first vertical steel pipe and a first fixing plate; the second support frame comprises a second vertical steel pipe and a second fixing plate; the buffer assembly comprises a first shaft sleeve, a first buffer column, a first buffer spring, a second shaft sleeve, a second buffer column, a second buffer spring and a buffer plate. The utility model discloses a novel scaffold for construction of cement closed container, through setting up first support frame and second support frame, realize fast assembly and demolition, the setting of connection disc, the quick and firm butt joint of connecting plate two; in addition, the buffer assembly avoids rapid descending under the self gravity of the heavy object, unnecessary damage to a human body is avoided, safety risks are reduced, construction safety is protected, and construction efficiency is improved.

Description

Novel scaffold for construction of cement closed container
Technical Field
The utility model relates to a scaffold frame field especially relates to a novel scaffold frame is used in construction of cement closed container.
Background
the scaffold frame is in order to guarantee that each work progress goes on smoothly and the work platform of setting up, and the current be used for building stove maintenance cement production airtight container protection scaffold frame, when the above outside has heavier heavy object to fall, falls at maintenance in-process unexpected material and crust promptly, may cause personnel to lead to the fact to pound the wound, consequently has great safety risk, and constructor's safety can not be ensured, then also can influence construction and maintenance efficiency again. Therefore, effective solutions to solve the above problems need to be proposed.
SUMMERY OF THE UTILITY MODEL
in order to overcome the defects of the prior art, the technical problem to be solved by the utility model is to provide a novel scaffold for the construction of a cement closed container, the first support frame and the second support frame can realize quick assembly and disassembly, the connecting disc is arranged, thereby realizing the good butt joint between the first support frame and the second support frame by the connecting plate, when a person overhauls the furnace building person and once a heavy object or other sundries falling objects outside the furnace building person, the impact force of the heavy object can be weakened through the arranged buffer component, and the buffer component realizes the absorption of the external impact force capability, thereby realizing the buffer function, avoiding the rapid fall under the self gravity of the heavy object, when unnecessary damage to the human body is overlarge, the buffer assembly and the protective net can be supported and connected, so that the safety risk is reduced, and the construction safety is protected.
To achieve the purpose, the utility model adopts the following technical proposal:
The utility model provides a novel scaffold for construction of cement closed container, which comprises a first support frame, a second support frame arranged at equal intervals with the first support frame, four connecting plates which are transversely fixed and used for connecting the first support frame and the second support frame, eight connecting discs fixedly arranged on the first support frame and the second support frame, a buffer assembly positioned above the first support frame and the second support frame, and a protective net bound below the buffer assembly;
The first support frame comprises two first vertical steel pipes which are vertically arranged and two first fixing plates which are fixed between the first vertical steel pipes through bolts;
The second support frame comprises two second vertical steel pipes which are vertically arranged and two second fixing plates which are fixed between the second vertical steel pipes through bolts;
The buffer assembly comprises a first shaft sleeve fixedly sleeved on the first vertical steel pipe through a bolt, a first buffer column positioned in the first vertical steel pipe, a first buffer spring sleeved on the first vertical steel pipe, a second shaft sleeve fixedly sleeved on the second vertical steel pipe through a bolt, a second buffer column positioned in the second vertical steel pipe, a second buffer spring sleeved on the second vertical steel pipe, and a buffer plate fixedly arranged at the tops of the first buffer column and the second buffer column;
One end of the first buffer spring is abutted against the bottom end of the buffer plate, and the other end of the first buffer spring is abutted against the upper end face of the first annular flange of the first shaft sleeve;
One end of the second buffer spring is abutted against the bottom end of the buffer plate, and the other end of the second buffer spring is abutted against the upper end face of the second annular flange of the second shaft sleeve.
optionally, the connecting disc is fixed on the first fixing plate and the second fixing plate; the connecting plate is connected between the first fixing plate and the second fixing plate through the connecting disc; the two end parts of the connecting plate are provided with positioning holes connected with the connecting disc, and the connecting disc is provided with a circular connecting hole; the connecting plate is fixed on the connecting disc through a connecting bolt.
Optionally, two parallel supporting flat plates are fixed on the connecting plate at the upper end through bolts.
Optionally, the top end face of the buffer plate is provided with two inclined faces symmetrically arranged along the vertical central axis direction of the buffer plate.
Optionally, the outer diameter of the first buffer column is 0.6-0.8 times of the inner diameter of the first vertical steel pipe;
the outer diameter of the second buffer column is 0.6-0.8 times of the inner diameter of the second vertical steel pipe.
The utility model has the advantages that:
the utility model provides a pair of novel scaffold frame is used in cement closed container construction, through setting up first support frame and second support frame, can realize fast assembly and demolish, connect the setting of disc, thereby realized the good butt joint between connecting plate with first support frame and the second support frame, when meetting the personnel when repairing building the stove personnel, in case there is the outside heavy object or other debris droppings to fall, then the impact force with the heavy object can weaken through the buffering subassembly that sets up, the absorption to outside impulsive force ability is realized to the buffering subassembly, thereby the effect of buffering has been realized, the self gravity of having avoided at the heavy object descends rapidly, can cushion subassembly and protection network to hold when causing unnecessary damage heavy object too big to the human body, thereby the safety risk has been reduced, construction safety has been protected.
drawings
fig. 1 is a schematic structural view of a novel scaffold for construction of a cement closed container according to an embodiment of the present invention;
fig. 2 is a schematic perspective view of a novel scaffold for construction of a cement sealed container according to an embodiment of the present invention;
FIG. 3 is an enlarged schematic structural view of the point A according to the embodiment of the present invention;
In the figure:
1. A first support frame; 2. a second support frame; 3. a connecting plate; 4. connecting the disks; 5. a buffer assembly; 6. a protective net; 7. a connecting bolt; 8. supporting the flat plate; 11. a first vertical steel pipe; 12. a first fixing plate; 21. a second vertical steel pipe; 22. a second fixing plate; 51. a first bushing; 52. a first buffer column; 53. a first buffer spring; 54. a second shaft sleeve; 55. a second buffer column; 56. a second buffer spring; 57. a buffer plate; 511. a first annular flange; 541. a second annular flange.
Detailed Description
The technical solution of the present invention is further explained by the following embodiments with reference to the accompanying drawings.
as shown in fig. 1-3, a novel scaffold for cement closed container construction includes a first support frame 1, a second support frame 2 disposed at equal intervals with the first support frame 1, four connecting plates 3 transversely fixed and used for connecting the first support frame 1 and the second support frame 2, eight connecting discs 4 fixed on the first support frame 1 and the second support frame 2, a buffer assembly 5 located above the first support frame 1 and the second support frame 2, and a protective net 6 bound below the buffer assembly 5; the first support frame 1 comprises two first vertical steel pipes 11 which are vertically arranged and two first fixing plates 12 which are fixed between the first vertical steel pipes 11 through bolts; the second support frame 2 comprises two second vertical steel pipes 21 which are vertically arranged and two second fixing plates 22 which are fixed between the second vertical steel pipes 21 through bolts; the buffer component 5 comprises a first shaft sleeve 51 fixedly sleeved on the first vertical steel pipe 11 through a bolt, a first buffer column 52 positioned inside the first vertical steel pipe 11, a first buffer spring 53 sleeved on the first vertical steel pipe 11, a second shaft sleeve 54 fixedly sleeved on the second vertical steel pipe 21 through a bolt, a second buffer column 55 positioned inside the second vertical steel pipe 21, a second buffer spring 56 sleeved on the second vertical steel pipe 21, and a buffer plate 57 fixedly arranged at the tops of the first buffer column 52 and the second buffer column 55; one end of the first buffer spring 53 abuts against the bottom end of the buffer plate 57, and the other end of the first buffer spring 53 abuts against the upper end surface of the first annular flange 511 of the first boss 51; one end of the second damper spring 56 abuts against the bottom end of the damper plate 57, and the other end of the second damper spring 56 abuts against the upper end surface of the second annular flange 541 of the second boss 54.
In order to realize the fixed connection of the first support frame 1 and the second support frame 2 through the connecting plate 3, the other two connecting discs 4 are arranged, wherein the other two connecting discs 4 are welded on the second vertical steel tube 21, the specific one is arranged on the middle position of the second vertical steel tube 21, and the other one is arranged on the middle position of the second vertical steel tube 21, so that the good butt joint of the connecting plate 3 between the first support frame 1 and the second support frame 2 is realized, therefore, through connecting disc 4, connecting plate 3, a simple to operate has been constituteed with second support frame 2 to first support frame 1, the scaffold frame of I-shaped is similar to that structural strength is reliable, however, this embodiment is through setting up buffering subassembly 5 and protection network 6 above first support frame 1 and second support frame 2, when meetting the personnel and being in the maintenance of building the stove personnel, in case there is the outside heavy object or other debris droppings to fall, then can weaken the impact force of heavy object through the buffering subassembly 5 that sets up, buffering subassembly 5 realizes the absorption to outside impulsive force ability, thereby the effect of buffering has been realized, avoided descending rapidly under the self gravity of heavy object, cause unnecessary damage to the human body. More specifically, the buffer assembly 5 includes a first shaft sleeve 51 fixedly sleeved on the first vertical steel pipe 11 through a bolt, a first buffer column 52 located inside the first vertical steel pipe 11, a first buffer spring 53 sleeved on the first vertical steel pipe 11, a second shaft sleeve 54 fixedly sleeved on the second vertical steel pipe 21 through a bolt, a second buffer column 55 located inside the second vertical steel pipe 21, a second buffer spring 56 sleeved on the second vertical steel pipe 21, and a buffer plate 57 fixedly arranged on the tops of the first buffer column 52 and the second buffer column 55; one end of the first buffer spring 53 abuts against the bottom end of the buffer plate 57, and the other end of the first buffer spring 53 abuts against the upper end surface of the first annular flange 511 of the first boss 51; one end of the second buffer spring 56 is abutted to the bottom end of the buffer plate 57, the other end of the second buffer spring 56 is abutted to the upper end face of the second annular flange 541 of the second shaft sleeve 54, when a falling object falls onto the buffer plate 57, impact force is generated on the buffer plate 57, meanwhile, the first buffer column 52 and the second buffer column 55 move downwards, and meanwhile, the falling object is pressed downwards and is accompanied by downward compression deformation generated on the first buffer spring 53 and the second buffer spring 56, thereby the impact force of the outside on the buffer plate 57 is absorbed by the compression of the first buffer spring 53 and the second buffer spring 56, when the heavy object is too large, the buffer assembly 5 and the protective net 6 can be supported, so that the safety risk is reduced, and the construction safety is protected.
alternatively, the connecting disc 4 is fixed on the first fixing plate 12 and the second fixing plate 22; the connecting plate 3 is connected between the first fixing plate 12 and the second fixing plate 22 through the connecting disc 4; the two end parts of the connecting plate 3 are provided with positioning holes connected with the connecting disc 4, and the connecting disc 4 is provided with a circular connecting hole; the connecting plate 3 is fixed on the connecting disc 4 through the connecting bolt 7, the connecting disc 4 is fixedly connected in a welding mode, the connecting disc 4 plays a role of an intermediate connecting piece, and the connecting mode is reliable.
Optionally, two parallel supporting flat plates 8 are fixed on the connecting plate 3 at the upper end through bolts, the supporting flat plates 8 are used for supporting personnel, and anti-skid stripes (not shown in the drawing) can be arranged on the upper end faces of the supporting flat plates 8 to improve the anti-skid performance of standing personnel.
optionally, the top end face of the buffer plate 57 is provided with two inclined planes 571 symmetrically arranged in the vertical central axis direction of the buffer plate 57, when the scaffold is manually used for maintenance, unexpected materials at the top and crusts in the maintenance process can fall into the lower part of the periphery of the scaffold along the inclined planes 571, so that the safety of constructors is protected.
Optionally, the outer diameter of the first buffer column 52 is 0.6-0.8 times the inner diameter of the first vertical steel pipe 11; the outer diameter of the second buffer column 55 is 0.6-0.8 times of the inner diameter of the second vertical steel pipe 21, wherein the buffer plate 57 is fixed at the bottom ends of the first buffer column 52 and the second buffer column 55, so that on one hand, the installation and positioning of the buffer plate 57 are realized, and on the other hand, the guide function of the first buffer spring 53 and the second buffer spring 56 in the stress process is provided.
While the invention has been described with reference to a preferred embodiment, it will be understood by those skilled in the art that various changes may be made and equivalents may be substituted for elements thereof without departing from the spirit and scope of the invention. The present invention is not to be limited by the specific embodiments disclosed herein, and other embodiments that fall within the scope of the claims of the present application are intended to be within the scope of the present invention.

Claims (5)

1. The utility model provides a novel scaffold frame is used in construction of cement closed container which characterized in that:
The device comprises a first support frame (1), a second support frame (2) which is arranged at equal height and interval with the first support frame (1), four connecting plates (3) which are transversely and fixedly arranged and are used for connecting the first support frame (1) and the second support frame (2), eight connecting discs (4) which are fixedly arranged on the first support frame (1) and the second support frame (2), a buffer assembly (5) which is positioned above the first support frame (1) and the second support frame (2), and a protective net (6) which is bound below the buffer assembly (5);
the first support frame (1) comprises two first vertical steel pipes (11) which are vertically arranged and two first fixing plates (12) which are fixed between the first vertical steel pipes (11) through bolts;
The second support frame (2) comprises two second vertical steel pipes (21) which are vertically arranged and two second fixing plates (22) which are fixed between the second vertical steel pipes (21) through bolts;
The buffer assembly (5) comprises a first shaft sleeve (51) fixedly sleeved on the first vertical steel pipe (11) through a bolt, a first buffer column (52) positioned in the first vertical steel pipe (11), a first buffer spring (53) sleeved on the first vertical steel pipe (11), a second shaft sleeve (54) fixedly sleeved on the second vertical steel pipe (21) through a bolt, a second buffer column (55) positioned in the second vertical steel pipe (21), a second buffer spring (56) sleeved on the second vertical steel pipe (21), and a buffer plate (57) fixedly arranged at the tops of the first buffer column (52) and the second buffer column (55);
One end of the first buffer spring (53) abuts against the bottom end of the buffer plate (57), and the other end of the first buffer spring (53) abuts against the upper end face of the first annular flange (511) of the first sleeve (51);
one end of the second buffer spring (56) abuts against the bottom end of the buffer plate (57), and the other end of the second buffer spring (56) abuts against the upper end face of the second annular flange (541) of the second bushing (54).
2. the novel scaffold for cement closed container construction as claimed in claim 1, wherein:
the connecting disc (4) is fixed on the first fixing plate (12) and the second fixing plate (22); the connecting plate (3) is connected between the first fixing plate (12) and the second fixing plate (22) through the connecting disc (4); positioning holes connected with the connecting disc (4) are formed in the two end portions of the connecting plate (3), and circular connecting holes are formed in the connecting disc (4); the connecting plate (3) is fixed on the connecting disc (4) through a connecting bolt (7).
3. the novel scaffold for cement closed container construction as claimed in claim 1, wherein:
the connecting plate (3) at the upper end is fixed with two parallel supporting flat plates (8) through bolts.
4. the novel scaffold for cement closed container construction as claimed in claim 1, wherein:
The top end face of the buffer plate (57) is provided with two inclined faces (571) symmetrically arranged along the vertical central axis direction of the buffer plate (57).
5. The novel scaffold for cement closed container construction as claimed in claim 1, wherein:
the outer diameter of the first buffer column (52) is 0.6-0.8 times of the inner diameter of the first vertical steel pipe (11);
The outer diameter of the second buffer column (55) is 0.6-0.8 times of the inner diameter of the second vertical steel pipe (21).
CN201920412675.5U 2019-03-27 2019-03-27 Novel scaffold for construction of cement closed container Active CN209780209U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920412675.5U CN209780209U (en) 2019-03-27 2019-03-27 Novel scaffold for construction of cement closed container

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920412675.5U CN209780209U (en) 2019-03-27 2019-03-27 Novel scaffold for construction of cement closed container

Publications (1)

Publication Number Publication Date
CN209780209U true CN209780209U (en) 2019-12-13

Family

ID=68800217

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920412675.5U Active CN209780209U (en) 2019-03-27 2019-03-27 Novel scaffold for construction of cement closed container

Country Status (1)

Country Link
CN (1) CN209780209U (en)

Similar Documents

Publication Publication Date Title
CN211597159U (en) Shock-proof and shock-absorbing structure
CN211058363U (en) Anti-falling safety device for building construction
CN104746864A (en) Operating platform system used for high-rise building robot
CN209780209U (en) Novel scaffold for construction of cement closed container
CN209815484U (en) Hoist device is used in building engineering construction
CN107601257A (en) Large scale arc special hoisting bar and its application method
CN108568621A (en) A kind of magnetic absorption metal welding fire welding device
CN206536146U (en) A kind of magnetic absorption metal welds fire welding device
CN203973093U (en) A kind of assembly type welding slag connects dish
CN206172871U (en) Movable jack -up machines
CN208249618U (en) A kind of reinforced steel structure spandrel girder with damping effect
CN211899735U (en) Temporary support seat for adjusting balance degree of prefabricated bay window
CN213330171U (en) Protection shed roof structure of crashproof
CN213297086U (en) Buffer device for accidental falling of construction hanging basket
CN210798255U (en) Anti-falling device for wall-attached lifting scaffold
CN204826594U (en) High altitude is work platform system for construction robot
CN209210183U (en) Fixed system
CN211037894U (en) Novel scaffold for constructional engineering
CN207739607U (en) A kind of elevator well crosshead
CN201649670U (en) Main truss high altitude assembling and fine adjusting device with large-span prestress chord-opening grid structure
CN206971757U (en) Wall plate member switching mechanism
CN212715319U (en) Novel antidetonation steel construction
CN211010378U (en) First-layer pump pipe shock absorber
CN210737905U (en) Novel building crossbeam structure of girder steel
JPH11124285A (en) Balancing weight supporting jig for elevator